HomeMy WebLinkAboutNC0003468_CAP Part 1 DEQ Cover Letter_20151112DUKE
ENERGY,
NVVembur 12. 2U15
mr. uunald R. van der VaarT, Secretary
North Carolina Department ut Environmental wuality
1 601 Flail SCI vlue Canter
Raleigh, NoRh Carolina 27699-16U1
506ject: cURREc t Iv AC 11014 PLAN PART 1
Duke Energy Dan River Steam Station Asti Basin
Eden; RocRinynam Geunty. NUFfn Uarvlina
NPDES Permit No. NCuOu34b8
Dear Mr. van der Vaart
Rarry R. Sideris
Senior vice -President
E;iv1rGnM3Mta1, 1`6altfi & Sarety
5Zo South Clturclt Street:
hail U535a EC;3AP
Charlotte, I9ortH l:umbria 282u2
/u4 -38Z-430
In acccrdanue with Duke Energy's October 9, 2015 letter (Sideris to Reeder) and I9CuEU's
October 13; 2015 electronic mail response (Reeder to Sideris, et al.), DuRe Eneryy nereby
sal5mits the CuIruutive AC;tiun Plan (CRP) Part 1 for the Dan River Steam Station Ash Basin. As
indicated below, Duke Energy is also providing the CAP Part 1 tc additicnal M ;DEQ Central
Ottice personnel, the NCDEu Winstun-Salem Rey cnal Off ca, and the Coal Ash Management
C;ummissiun.
It you Have wi, iments and/ur yuesi gins, please direct them to me at 704-382-4303 or Ed
Sullivan, Manager of Waste & Groundwater Pruyrams, at 98u -3i3-3719:
(SI/I�II;CrCIy,
l � W
Rarry K. Sideris
SCniur Vice -President
Environmental. Realm & Satety
Enclosure Corrective Action Plan Part 1, Dan River Steam 5tatiUn Asn Basin
cc: Stanley (Jay) Zimmerman; Director, Division ut water Resuumes, c;antral Off lue
I9CDEu Winston-Salem Reyivnal Vffice
Coal Ash Management Commission