Loading...
HomeMy WebLinkAboutNC0003468_CAP Part 1 DEQ Cover Letter_20151112DUKE ENERGY, NVVembur 12. 2U15 mr. uunald R. van der VaarT, Secretary North Carolina Department ut Environmental wuality 1 601 Flail SCI vlue Canter Raleigh, NoRh Carolina 27699-16U1 506ject: cURREc t Iv AC 11014 PLAN PART 1 Duke Energy Dan River Steam Station Asti Basin Eden; RocRinynam Geunty. NUFfn Uarvlina NPDES Permit No. NCuOu34b8 Dear Mr. van der Vaart Rarry R. Sideris Senior vice -President E;iv1rGnM3Mta1, 1`6altfi & Sarety 5Zo South Clturclt Street: hail U535a EC;3AP Charlotte, I9ortH l:umbria 282u2 /u4 -38Z-430 In acccrdanue with Duke Energy's October 9, 2015 letter (Sideris to Reeder) and I9CuEU's October 13; 2015 electronic mail response (Reeder to Sideris, et al.), DuRe Eneryy nereby sal5mits the CuIruutive AC;tiun Plan (CRP) Part 1 for the Dan River Steam Station Ash Basin. As indicated below, Duke Energy is also providing the CAP Part 1 tc additicnal M ;DEQ Central Ottice personnel, the NCDEu Winstun-Salem Rey cnal Off ca, and the Coal Ash Management C;ummissiun. It you Have wi, iments and/ur yuesi gins, please direct them to me at 704-382-4303 or Ed Sullivan, Manager of Waste & Groundwater Pruyrams, at 98u -3i3-3719: (SI/I�II;CrCIy, l � W Rarry K. Sideris SCniur Vice -President Environmental. Realm & Satety Enclosure Corrective Action Plan Part 1, Dan River Steam 5tatiUn Asn Basin cc: Stanley (Jay) Zimmerman; Director, Division ut water Resuumes, c;antral Off lue I9CDEu Winston-Salem Reyivnal Vffice Coal Ash Management Commission