Loading...
HomeMy WebLinkAboutNC0001422_Sutton CSA Report FIGURES b_20150805# # # # ") ") ") ") ")") ") ") ") U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 P R J -I -1 4 0 FORMER ASHDISPOSAL AREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLING PONDCOOLING POND FIGURE ES-1SITE CONCEPTUAL MODEL - PLAN VIEWL.V. SUTTON ENERGY COMPLEX ± WATER SUPPLY WELLS1 WATER SUPPLY WELL IN INVENTORY (APPROXIMATE) WOOTEN PRODUCTION WELL (APPROXIMATE) #CFPUA PRODUCTION WELL LOCATION (APPROXIMATE) EDR REPORTED WELL LOCATION (APPROXIMATE) INVISTA PRODUCTION WELL (APPROXIMATE) ")DUKE ENERGY PROGRESSS PRODUCTION WELL (APPROXIMATE) P:\D uke Energy Progress.1026\00 GIS BASE DATA\Sutton\Map_Docs\Draft_CSA_v07152015\Sutton - Figure ES-1 - Executive Summary Figure.mxd L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com GRAPHIC SCALE 500 0 500 1,000 1,500 2,000 (IN FEET) PROJECT MANAGER: J. MAHAN DRAWN BY: J. MEADOWS DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: K. WEBB NOTES:1 FROM DRINKING WATER WELL AND RECEPTOR STUDY (NOVEMBER 2014). 2 BORON EXHIBITS THE GREATEST THREE-DIMENSIONAL EXTENT OFMIGRATION FROM THE L.V. SUTTON ENERGY COMPLEX ASH BASIN. THE NORTHCAROLINA 2L (NC2L) FOR BORON IS 700 μg/L. 3 APRIL 17, 2014 AERIAL ORTHOPHOTOGRAPHY OBTAINED FROM WSP. 4 2012 AERIAL ORTHOPHOTOGRAPHY OBTAINED FROM THE NC CENTER FORGEOGRAPHIC INFORMATION AND ANALYSIS. (http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINED FROM THE NC CENTER FORGEOGRAPHIC INFORMATION AND ANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATEPLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). AREA OF CONCENTRATIONS IN GROUNDWATER ABOVE NC2L 2 GROUNDWATER FLOW DIRECTION (SHALLOW AQUIFER) ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY HAL F-MILE OFFSET FROM COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY LEGEND P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\DE SUTTON FIG 1-1 (SITE LOCATION MAP).dwg PROJECT MANAGER: LAYOUT: DRAWN BY: KATHY WEBB DATE:J. CHASTAIN FIG 1 (USGS SITE LOCATION) 2014-12-15 CONTOUR INTERVAL: MAP DATE: 10ft 2013 APPROXIMATE ROUTE OF THE NEW WILLMINGTON BYPASS (I-140) 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA PHONE 864-421-9999 www.synterracorp.com FIGURE 1-1 SITE LOCATION MAP L.V. SUTTON ENERGY COMPLEX 801 SUTTON STEAM PLANT RD WILMINGTON, NORTH CAROLINA LELAND AND CASTLE HAYNE NC QUADRANGLES RALEIGH WILMINGTON GREENVILLE GREENSBORO 3000 GRAPHIC SCALE 1500 IN FEET 15000 U S H I G H W A Y 4 2 1 PROPERTY BOUNDARY 500' COMPLIANCE BOUNDARY WASTE BOUNDARY L.V. SUTTON ENERGY COMPLEX NEW HANOVER COUNTY SOURCE: USGS TOPOGRAPHIC MAP OBTAINED FROM THE USGS STORE AT http://store.usgs.gov/b2c_usgs/b2c/start/%%%28xcm=r3standardpitrex_prd%%%29/.do L.V. SUTTON ENERGY COMPLEX 0 H 2 H 2 G P E - S W 2 P E - S W 4 P E - S W 3 P E - S W 5 P E - S W 6 A P E - S W 6 B P E - S W 6 D P E - S W 6 E w w w . s y n t e r r a c o r p . c o m 1 4 8 R i v e r S t r e e t , S u i t e 2 2 0 G r e e n v i l l e , S o u t h C a r o l i n a 2 9 6 0 1 8 6 4 - 4 2 1 - 9 9 9 9 5 / 2 2 / 2 0 1 5 5 / 2 2 / 2 0 1 5 P . W A L D R E P C . N E W E L L P R O J E C T M A N A G E R : L A Y O U T N A M E : D R A W N B Y : C H E C K E D B Y : K A T H Y W E B B D A T E : D A T E : F I G U R E 1 - 2 S I T E L A Y O U T M A P 8/2/2015 1:38 PM P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\SUTTON-CSA-FIGURES.dwg F I G U R E 1 - 2 1 2 0 0 G R A P H I C S C A L E ( I N F E E T ) 0 6 0 0 3 0 0 6 0 0 L . V . S U T T O N E N E R G Y C O M P L E X 8 0 1 S U T T O N S T E A M P L A N T R D W I L M I N G T O N , N O R T H C A R O L I N A N C W I L D L I F E L A K E A C C E S S S U T T O N L A K E R D CAP E F E A R R I V E R S U T T O N L A K E R D COOLING POND WATER LEVEL = 9.60 ftPROVIDED BY DUKE ENERGY 06-02-2014 M E T R O C I R C L E E Z Z E L L T R U C K I N G L C H H O L D I N G S S . T . W O O T E N C O R P O R A T I O N N C H I G H W A Y 4 2 1 T R A N S C O M C T B E V E L R D R O Y M A C D R N E W H A N O V E R C O U N T Y S A U N D E R S & S A U N D E R S , L L C R O Y M A C B U S I N E S S P A R K R O Y M A C P A R T N E R S H I P A B S O L U T E P R O P E R T I E S H U R R I C A N E P R O P E R T I E S M A O L A M I L K & I C E C R E A M C O . S O U R C E S : 1 . 2 0 1 4 A E R I A L P H O T O G R A P H W A S O B T A I N E D F R O M W S P F L O W N O N A P R I L 1 7 , 2 0 1 4 2 . 2 0 1 3 A E R I A L P H O T O G R A P H W A S O B T A I N E D F R O M T H E N R C S G E O S P A T I A L D A T A G A T E W A Y A T h t t p : / / d a t a g a t e w a y . n r c s . u s d a . g o v / 3 . D R A W I N G H A S B E E N S E T W I T H A P R O J E C T I O N O F N O R T H C A R O L I N A S T A T E P L A N E C O O R D I N A T E S Y S T E M F I P S 3 2 0 0 ( N A D 8 3 ) . 4 . P A R C E L D A T A W A S O B T A I N E D F R O M T H E N O R T H C A R O L I N A S T A T E L I B R A R I E S A T h t t p : / / w w w . l i b . n c s u . e d u / g i s / c o u n t i e s . h t m l F O R N E W H A N O V E R C O U N T Y . 5 . 2 f t C O N T O U R I N T E R V A L S F R O M N C D O T L I D A R D A T E D 2 0 0 7 h t t p s : / / c o n n e c t . n c d o t . g o v / r e s o u r c e s / g i s / p a g e s / c o n t - e l e v _ v 2 . a s p x 6 . W E L L L O C A T I O N S A N D M E A S U R I N G P O I N T S W E R E B A S E D O N A S U R V E Y B Y J A M E S L . H A I N E S & A S S O C I A T E S F O R I S H , I N C . D A T E D D E C E M B E R 2 3 , 2 0 0 8 . I S H D R A W I N G I S T I T L E D " P O T E N T I A L L O C A T I O N S F O R P R O P O S E D G E O P R O B E A N D W E L L I N S T A L L A T I O N S " , D A T E D F E B R U A R Y 2 5 , 2 0 0 9 W I T H A C A D F I L E N A M E F i g u r e 2 2 . d w g 7 . N E W W E L L L O C A T I O N S A N D M E A S U R I N G P O I N T S W E R E B A S E D O N A T A B L E B Y P A R A M O U N T E E N G I N E E R I N G , W I L M I N G T O N N C D A T E D 2 0 1 2 - 0 3 - 0 5 S U P P L I E D B Y P R O G R E S S E N E R G Y . H O R I Z O N T A L D A T U M I S N A D 8 3 ( N S R S 2 0 0 7 ) A N D T H E V E R T I C A L D A T U M I S N G V D 2 9 . 8 . T H E P R O P E R T Y B O U N D A R Y F O R T H E L . V . S U T T O N S T E A M E L E C T R I C P L A N T W A S B A S E D O N A C O M P O S I T E M A P P R E P A R E D B Y D A V I S - M A R T I N - P O W E L L & A S S O C . , I N C . T H E D R A W I N G S A R E D A T E D J U N E , 1 9 9 5 W I T H R E V I S I O N N O T E F O R M A R C H 4 , 2 0 0 4 . F I L E N A M E I S L - D - 9 0 2 2 - 7 . D W G . H O R I Z O N T A L D A T U M I S N A D 8 3 A N D T H E V E R T I C A L D A T U M I S N G V 2 9 . 9 . T H E L O C A T I O N O F T H E F O R M E R A S H D I S P O S A L A R E A S W A S B A S E D O N A F I G U R E 2 - 2 P R E P A R E D B Y B L A S L A N D , B O U C K & L E E , I N C . T H E F I G U R E I S T I T L E D " H O R I Z O N T A L E X T E N T O F T H E A S H W I T H I N T H E F O R M E R D I S P O S A L A R E A " . 1 0 . M O N I T O R I N G W E L L S / P I E Z O M E T E R S / S O I L B O R I N G S C O M P L E T E D A T P A R T O F P R E V I O U S A S S E S S M E N T A C T I V I T I E S . L O C A T I O N S A R E A P P R O X I M A T E . N O T E : 1 . C O N T O U R L I N E S A R E U S E D F O R R E P R E S E N T A T I V E P U R P O S E S O N L Y A N D A R E N O T T O B E U S E D F O R D E S I G N O R C O N S T R U C T I O N P U R P O S E S . D U K E E N E R G Y P R O G R E S S P R O D U C T I O N W E L L ( A P P R O X I M A T E ) P E - S W 2 N H C - S W 4 C F P U A P R O D U C T I O N W E L L ( A P P R O X I M A T E ) 0 H 2 I N V I S T A R E P O R T E D P R O D U C T I O N W E L L L O C A T I O N D U K E E N E R G Y P R O G R E S S P R O D U C T I O N W E L L ( S U R V E Y E D ) P E - S W 2 M W - 3 2 C A S H / S O I L B O R I N G ( A B ) A N D M O N I T O R I N G W E L L ( A B M W ) L O C A T I O N ( S U R V E Y E D ) O L D A S H B A S I N A R E A N E W A S H B A S I N A R E A F O R M E R A S H D I S P O S A L A R E A C A N A L C A N A L A S T C O N C R E T E P A D R A I L R O A D S O L A R F A R M COOLINGPOND COOLINGPOND S U T T O N S T E A M P L A N T R D T R A N S C O M C T R O Y M A C D R F R E D R I C K S O N R D C A N A L A C C E S S R O A D N H C - S W 4 N H C - S W 3 N H C - S W 2 ( N O T I N U S E ) IN T E R S T A T E 1 4 0 ( U S H I G H W A Y 1 7 ) F R E D R I C K S O N R D A P P R O X I M A T E R O U T E O F T H E N E W W I L M I N G T O N B Y P A S S ( I - 1 4 0 ) N C H I G H W A Y 4 2 1 N C H I G H W A Y 4 2 1 N C H I G H W A Y 4 2 1 R A I L R O A D R A I L R O A D R A I L R O A D R A I L R O A D N H C - S W 1 ( A B A N D O N E D ) I N V I S T A C F P U A M W - 4 B M W - 5 C M W - 3 3 C M W - 3 2 C M W - 2 7 B M W - 2 7 C M W - 3 1 B M W - 3 1 C M W - 2 4 C M W - 2 4 B M W - 2 3 C M W - 2 3 B M W - 2 2 C M W - 2 2 B M W - 1 9 M W - 2 1 C M W - 2 8 B M W - 2 8 C M W - 7 C M W - 1 1 M W - 1 2 S W - 3 S M W - 5 B M W - 5 A M W - 9 M W - 8 P Z - 1 P Z - A P Z - B P Z - 7 P Z - 9 P Z - 1 2 P Z - 1 0 D P Z - 1 0 S P Z - 1 1 M W - 1 0 P Z - 1 4 P Z - 1 6 M W - 1 3 P Z - 1 8 P Z - 1 5 P Z - 1 7 P Z - 1 9 P Z - 2 1 M W - 3 4 C P Z - 2 A P Z - 2 B P Z - 1 P Z - 1 B P Z - 3 B M W - 3 6 C P Z - 3 A C P T - 4 P Z - 4 B P Z - 4 A P Z - 5 A S P T - 6 P Z - 6 A C P T - 7 A P Z - I N T C P T - 5 S P T - 3 A S P T - 8 S C P T - 5 A S P T - 6 S P T - 2 P Z - 2 3 P Z - 2 2 P Z - 2 4 P Z - 2 6 S P T - 4 M W - 6 B M W - 6 A M W - 6 C P Z - 2 0 M W - 4 M W - 4 A P Z - 1 1 D G P - 5 B - 1 H A - 1 - 2 H A - 1 - 1 G P - 3 G P - 6 G P - 2 S P T - 7 S P T - 4 C P T - 3 C P T - 2 B - 1 H A - 2 - 1 H A - 2 - 2 S P T - 1 B - 3 H A - 3 - 1 H A - 3 - 2 G P - 1 P Z - 1 9 7 1 S P T - 3 C P T - 8 S C P T - 1 G P - 4 M W - 1 8 M W - 1 7 P Z - 3 0 M W - 1 4 M W - 1 3 M W - 1 3 D M W - 1 6 M W - 1 6 D M W - 3 A M W - 3 B M W - 2 A M W - 2 B M W - 2 C S B - 2 M W - 7 B M W - 7 A M W - 1 5 M W - 1 5 D M W - 2 0 M W - 2 0 D A S H L A N D F I L L L E A C H A T E M O N I T O R I N G L O C A T I O N ( A P P R O X I M A T E ) P - 2 E X I S T I N G M O N I T O R I N G W E L L S / P I E Z O M E T E R S / S O I L B O R I N G S ( S U R V E Y E D ) M W - 5 B L E G E N D B A C K G R O U N D M O N I T O R I N G W E L L ( S U R V E Y E D ) C O M P L I A N C E M O N I T O R I N G W E L L ( S U R V E Y E D ) M W - 1 2 M W - 4 B P R O P O S E D G E O L O G I C C R O S S S E C T I O N M O N I T O R I N G W E L L ( S U R V E Y E D ) M O N I T O R I N G W E L L L O C A T I O N ( S U R V E Y E D ) B I - A N N U A L W A T E R L E V E L P I E Z O M E T E R N P D E S O U T F A L L 0 0 3 N P D E S O U T F A L L S W - 2 W A T E R Q U A L I T Y A N D S E D I M E N T L O C A T I O N P Z - 1 2 SW-8A P Z - 9 A N P D E S O U T F A L L S W - 0 0 4 SW-CFP S W - 1 C SW-6A N P D E S O U T F A L L S W - 0 0 2 N P D E S O U T F A L L S W - 0 0 1 S W - C F 0 0 1 C O O L I N G P O N D S W - 6 A S W - C F U P C A P E F E A R R I V E R I N S E T A U P S T R E A M S A M P L E L O C A T I O N O N T H E C A P E F E A R R I V E R 1 2 0 0 G R A P H I C S C A L E ( I N F E E T ) 0 6 0 0 3 0 0 6 0 0 SEE INSET A (THIS FIGURE) FORUPSTREAM SAMPLE LOCATIONON THE CAPE FEAR RIVER S W - 0 0 4 M W - 2 8 T M I N E B O U N D A R Y C U B - 1 C O N F I N I N G U N I T A S S E S S M E N T B O R I N G C U B - 1 C U B - 2 C U B - 3 C U B - 4 M W - 2 3 E C U B - 5 C U B - 6 C U B - 7 C U B - 8 S E E I N S E T B ( T H I S F I G U R E ) F O R M O R E C U B S A M P L E L O C A T I O N S . INSET BCUB SAMPLE LOCATIONS1200GRAPHIC SCALE(IN FEET)0600300600 CUB-10 CUB-9CUB-11 CUB-12 CUB-8 P Z - 3 A P Z - 3 B M W - 3 4 B M W - 3 5 C M W - 3 5 B M W - 3 6 B P Z - 1 B P Z - 1 A P Z - 4 A P Z - 4 B 5 0 0 f t C O M P L I A N C E B O U N D A R Y D U K E E N E R G Y P R O G R E S S S U T T O N P L A N T W A S T E B O U N D A R Y F L O W D I R E C T I O N ( D A S H E D W H E R E L O C A T I O N A P P R O X I M A T E ) C O N T O U R M A J O R C O N T O U R M I N O R 1 2 0 1 / 2 M I L E O F F S E T F R O M C O M P L I A N C E B O U N D A R Y P Z - 6 S P Z - 6 D 1 5 0 0 f t O F F S E T F O R U N D E R G R O U N D U T I L I T Y I N F O R M A T I O N 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com PROJECT MANAGER: LAYOUT: DRAWN BY: P. WALDREP DATE:JOHN CHASTAIN FIG 2-1 1949 AERIAL 08/02/2015 08/04/2015 1:19 PM P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\DE SUTTON HISTORIC AERIALS.dwg FIGURE 2-1 1949 AERIAL PHOTOGRAPH L.V. SUTTON ENERGY COMPLEX WILMINGTON, NORTH CAROLINA GRAPHIC SCALE 500 IN FEET 0 500 1000 SOURCE: APRIL 19, 1949 AERIAL PHOTOGRAPH DOWNLOADED FROM THE NEW HANOVER CO GIS WEBSITE AT ftp://ftp.nhcgov.com/Outbound/Gisdata/orthos/ FUTURE COOLING POND SUTTON PLANT BOUNDARY F U T U R E U S H I G H W A Y 4 2 1 CAPE F E A R R I V E R CAT F I S H C R E E K 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com PROJECT MANAGER: LAYOUT: DRAWN BY: P. WALDREP DATE:JOHN CHASTAIN FIG 2-2 1981 AERIAL 07/27/2015 08/04/2015 1:20 PM P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\DE SUTTON HISTORIC AERIALS.dwg FIGURE 2-2 1981 AERIAL PHOTOGRAPH L.V. SUTTON ENERGY COMPLEX WILMINGTON, NORTH CAROLINA GRAPHIC SCALE 500 IN FEET 0 500 1000 SOURCE: FEBRUARY 5, 1981 AERIAL PHOTOGRAPH DOWNLOADED FROM THE NEW HANOVER CO GIS WEBSITE AT ftp://ftp.nhcgov.com/Outbound/Gisdata/orthos/ COOLING POND SUTTON PLANT BOUNDARY U S H I G H W A Y 4 2 1 CAPE F E A R R I V E R P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\DE SUTTON FIG 2-3 HISTORICAL USGS TOPO.dwg PROJECT MANAGER: LAYOUT: DRAWN BY: P. WALDREP DATE:JOHN CHASTAIN FIG 2-3 HISTORICAL USGS TOPO 07/30/2015 4000 GRAPHIC SCALE 2000 IN FEET 20000CONTOUR INTERVAL: MAP DATES: 10ft &20ft 1944 THRU 1954 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA PHONE 864-421-9999 www.synterracorp.com SOURCE: USGS TOPOGRAPHIC MAP OBTAINED FROM THE NRCS GEOSPATIAL DATA GATEWAY AT http://datagateway.nrcs.usda.gov/ FIGURE 2-3 HISTORICAL USGS TOPOGRAPHIC MAP DUKE ENERGY PROGRESS L. V. SUTTON ENERGY COMPLEX 801 SUTTON STEAM PLANT RD WILMINGTON, NORTH CAROLINA RALEIGH WILMINGTON GREENVILLE GREENSBORO SUTTON POWER PLANT NEW HANOVER COUNTY F U T U R E U S H I G H W A Y 4 2 1 FUTURE COOLING POND SUTTON PLANT BOUNDARY Fi g u r e 3 - 1 : C o a l a s h T C L P l e a c h a t e c o n c e n t r a t i o n r an g e s c o m p a r e d t o r e g u l a t o r y l i m i t s . ( S o u r c e : E P R I 2 0 1 0 ) Fi g u r e 3 - 2 : K n o w n s a m p l e o f a s h f o r c o m p a r i s o n . ( S ou r c e : D u k e E n e r g y 2 0 1 4 ) Ra n g e ( 1 0 th p e r c e n t i l e – 9 0 th p e r c e n t i l e ) i n b u l k c o m p o s i t i o n o f f l y a s h , b o t t o m a s h , r o c k , a n d s o i l . ( S o u r c e : E P R I 2 0 0 9 a ) Fi g u r e 3 - 3 : E l e m e n t a l c o m p o s i t i o n f o r b o t t o m a s h , fl y a s h , s h a l e , a n d v o l c a n i c a s h . ( S o u r c e : E P R I 2 0 0 9a ) Fi g u r e 3 - 4 : T r a c e e l e m e n t c o n c e n t r a t i o n r a n g e s i n fl y a s h c o m p a r e d t o E P A r e s i d e n t i a l s o i l s c r e e n i n g le v e l s . ( S o u r c e : E P R I 2 0 0 9 b ) Tr a c e e l e m e n t c o n c e n t r a t i o n r a n g e s i n b o t t o m a s h c o mp a r e d t o E P A r e s i d e n t i a l s o i l s c r e e n i n g l e v e l s . ( S ou r c e : E P R I 2 0 0 9 b ) Elevation S t a t i o n -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 600+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+0016+0017+0018+0019+0020+0021+0022+0023+0024+0025+0026+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 60+00 61+00 62+00 63+00 64+00 65+00 66+00 67+00 68+00 69+00 70+00 71+00 72+00 73+00 74+00 75+00 76+00 77+00 78+00 79+00 80+00 3 . 7 x 1 0 - 2 3 . 0 x 1 0 - 2 N T N T NT 4 . 3 x 1 0 - 2 2 . 6 x 1 0 - 2 Elevation - 1 1 0 - 1 0 0 - 9 0 - 8 0 - 7 0 - 6 0 - 5 0 - 4 0 - 3 0 - 2 0 - 1 0 0 1 0 2 0 3 0 4 0 5 0 6 0 80+0081+0082+0083+0084+0085+0086+0087+0088+0089+0090+0091+0092+0093+0094+0095+0096+0097+0098+0099+00100+00101+00 102+00 103+00 104+00 105+00 106+00 107+00 108+00 109+00 110+00 111+00 112+00 113+00 114+00 115+00 116+00 117+00 118+00 119+00 120+00 121+00 122+00 123+00 124+00 125+00 126+00 127+00 128+00 129+00 130+00 131+00 132+00 133+00 134+00 135+00 136+00 137+00 138+00 139+00 140+00 141+00 142+00 143+00 144+00 145+00 146+00 146+50 6.7 x 10-42.8 x 10-2 4 . 4 x 1 0 - 2 1.1 x 10-4 7 . 2 x 1 0 - 4 3 . 8 x 1 0 - 2 6 . 2 x 1 0 - 2 1 . 2 x 1 0 - 5 2 . 6 x 1 0 - 2 5 / 2 2 / 2 0 1 5 5 / 2 2 / 2 0 1 5 P . W A L D R E P C . N E W E L L P R O J E C T M A N A G E R : L A Y O U T N A M E : D R A W N B Y : C H E C K E D B Y : K A T H Y W E B B D A T E : D A T E : F I G U R E 6 - 1 G E O L O G I C C R O S S S E C T I O N A - A ' F I G U R E 6 - 1 w w w . s y n t e r r a c o r p . c o m 1 4 8 R i v e r S t r e e t , S u i t e 2 2 0 G r e e n v i l l e , S o u t h C a r o l i n a 2 9 6 0 1 8 6 4 - 4 2 1 - 9 9 9 9 L . V . S U T T O N E N E R G Y C O M P L E X 8 0 1 S U T T O N S T E A M P L A N T R D W I L M I N G T O N , N O R T H C A R O L I N A S O U R C E S : 1 . D R A W I N G H A S B E E N S E T W I T H A P R O J E C T I O N O F N O R T H C A R O L I N A S T A T E P L A N E C O O R D I N A T E S Y S T E M F I P S 3 2 0 0 ( N A D 8 3 ) . 2 . 2 f t C O N T O U R I N T E R V A L S F R O M N C D O T L I D A R D A T E D 2 0 0 7 h t t p s : / / c o n n e c t . n c d o t . g o v / r e s o u r c e s / g i s / p a g e s / c o n t - e l e v _ v 2 . a s p x 3 . S E L E C T T O P O G R A P H I C A D J U S T M E N T S B A S E D O N S I T E S U R V E Y A N D C O M P A R I S O N T O A E R I A L P H O T O G R A P H . N O T E : 1 . C O N T O U R L I N E S A R E U S E D F O R R E P R E S E N T A T I V E P U R P O S E S O N L Y A N D A R E N O T T O B E U S E D F O R D E S I G N O R C O N S T R U C T I O N P U R P O S E S . 2 . C R O S S S E C T I O N L O C A T I O N S A R E S H O W N O N F I G U R E 1 - 2 . L E G E N D S U R F I C I A L S A N D ( W E L L S O R T E D - S I L T Y S A N D - M E D I U M T O F I N E G R A I N E D S A N D ) S U R F I C I A L S A N D ( P O O R L Y S O R T E D - M E D I U M T O C O A R S E G R A I N E D S A N D ) C O A L A S H C O A R S E S A N D W I T H F I N E G R A V E L S A N D ( P E E D E E ) C L A Y R I C H F A C I E S S A M P L E D E S C R I P T I O N S m e t a l s T O T A L M E T A L S T O C T O T A L O R G A N I C C A R B O N I P G R A I N S I Z E , M O I S T U R E C O N T E X T I I N D E X S O I L S A M P L E ( M O I S T U R E , S P E C I F I C G R A V I T Y , G R A I N S I Z E ) S P L P S Y N T H E T I C P R E C I P I T A T I O N L E A C H I N G P R O C E D U R E K d S O R P T I O N C O E F F I C I E N T S H F O H Y D R O U S F E R R I C O X I D E S m i n M I N E R A L O G Y B Y X - R A Y D I F F R A C T I O N A N D W H O L E R O C K C H E M I S T R Y 3 0 0 0 3 0 0 6 0 0 G R A P H I C S C A L E I N F E E T 3 0 0 3 0 6 0 I N F E E T H O R I Z O N T A L : 1 " = 3 0 0 ' V E R T I C A L : 1 " = 3 0 ' S E C T I O N A - A ' F A C I N G E A S T S E C T I O N A - A ' F A C I N G E A S T MATCH LINE MATCH LINE (MSL) (MSL) MW-5C MW-27C CANAL CANAL A S H B A S I N MW-36C GP-01 AW- 0 8 0-2': m e t a l s , T O C , S P L P , I 8'-10 ' : m e t a l s , T O C , S P L P , I 40'-4 2 ' : m e t a l s , T O C , S P L P , I AB-020-8': Kd3'-5': metals,TOC6'-8': SPLP,min10'-12': metals,TOC,SPLP,Kd,I,min49.5'-52': I53'-55': SPLP,I,min,metals53'-60': Kd A W - 0 9 2 ' - 4 ' : m e t a l s , T O C , S P L P , I 1 0 ' - 1 2 ' : H F O 1 4 ' - 1 6 ' : m e t a l s , T O C , S P L P 2 3 ' - 2 5 ' : I 4 3 ' - 4 5 ' : m e t a l s , T O C , S P L P 4 7 ' - 5 0 ' : H F O 5 5 ' - 5 7 ' : H F O C O A L A S H C O A L A S H COALASHCOAL ASHSURFICIAL S U R F I C I A L S U R F I C I A L SURFICIAL P E E D E E P E E D E E M W - 3 7 0 - 2 ' : m e t a l s , T O C , S P L P 4 ' - 6 ' : m e t a l s , T O C , S P L P 4 3 ' - 4 5 ' : m e t a l s , T O C , S P L P 4 5 ' - 4 7 ' : I P:\DUKE ENERGY PROGRESS.1026\108. SUTTON ASH BASIN GW ASSESSMENT PLAN\1.11 CSA REPORTING\FIGURES\SUTTON-CSA-FIGURES.DWG08/02/2015 1:41 PM C O A L A S H C L A Y L I N E R ( 1 2 " ) R O A D W A T E R L E V E L ( J U N E 2 0 1 5 ) N O T T E S T E D N T F I L L M A T E R I A L S C A L E : A S S H O W N B O R I N G S Y M B O L S W E L L S C R E E N W I T H H Y D R A U L I C C O N D U C T I V I T Y I N C E N T I M E T E R S P E R S E C O N D ( S O U R C E : S Y N T E R R A ) U N D I S T U R B E D S O I L S A M P L E W I T H V E R T I C A L H Y D R A U L I C C O N D U C T I V I T Y ( S O U R C E : B L E ) S O I L S A M P L E ( G R A B ) K V a l u e 4 . 4 x 1 0 - 4 A B M W - 0 1 3 ' - 5 ' : I , m e t a l s 3 8 ' - 4 8 ' : K d 4 3 ' - 4 5 ' : I , m i n 7 8 ' - 8 6 ' : m e t a l s 8 2 ' - 8 4 ' : m e t a l s 8 3 ' - 8 8 ' : K d 8 4 ' - 8 6 ' : I , m i n 8 8 ' - 9 0 ' : I 9 6 ' - 9 8 ' : m e t a l s Elevation Elevation S t a t i o n -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 - 1 0 0 - 9 0 - 8 0 - 7 0 - 6 0 - 5 0 - 4 0 - 3 0 - 2 0 - 1 0 0 1 0 2 0 3 0 4 0 5 0 6 0 0+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 54+00 54+50 N T N T 1 . 7 x 1 0 - 5 1 . 5 x 1 0 - 7 8 . 2 x 1 0 - 3 6 . 7 x 1 0 - 4 4 . 2 x 1 0 - 2 4 . 7 x 1 0 - 2 Elevation Elevation S t a t i o n -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 - 1 4 0 - 1 3 0 - 1 2 0 - 1 1 0 - 1 0 0 - 9 0 - 8 0 - 7 0 - 6 0 - 5 0 - 4 0 - 3 0 - 2 0 - 1 0 0 1 0 2 0 3 0 4 0 5 0 6 0 0+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 53+50 3 . 7 x 1 0 - 5 9 . 0 x 1 0 - 5 1 . 9 x 1 0 - 7 5 . 7 x 1 0 - 2 3 . 6 x 1 0 - 2 N T N T 4 . 7 x 1 0 - 2 4 . 5 x 1 0 - 2 5 / 2 2 / 2 0 1 5 5 / 2 2 / 2 0 1 5 P . W A L D R E P C . N E W E L L P R O J E C T M A N A G E R : L A Y O U T N A M E : D R A W N B Y : C H E C K E D B Y : K A T H Y W E B B D A T E : D A T E : F I G U R E 6 - 2 G E O L O G I C C R O S S S E C T I O N S B - B ' A N D C - C ' F I G U R E 6 - 2 w w w . s y n t e r r a c o r p . c o m 1 4 8 R i v e r S t r e e t , S u i t e 2 2 0 G r e e n v i l l e , S o u t h C a r o l i n a 2 9 6 0 1 8 6 4 - 4 2 1 - 9 9 9 9 L . V . S U T T O N E N E R G Y C O M P L E X 8 0 1 S U T T O N S T E A M P L A N T R D W I L M I N G T O N , N O R T H C A R O L I N A 3 0 0 0 3 0 0 6 0 0 G R A P H I C S C A L E I N F E E T 3 0 0 3 0 6 0 I N F E E T H O R I Z O N T A L : 1 " = 3 0 0 ' V E R T I C A L : 1 " = 3 0 ' S E C T I O N C - C ' F A C I N G N O R T H (MSL) (MSL) MW-24C PZ-INT S E C T I O N B - B ' F A C I N G N O R T H (MSL) (MSL)COOLING POND GP-03 P E E D E E COAL ASH S U R F I C I A L M W - 2 3 E 8 ' - 1 0 ' : H F O 4 3 ' - 4 5 ' : H F O 6 0 ' - 6 2 ' : H F O 1 4 5 ' - 1 4 7 ' : K d , I A W - 0 4 0 - 2 ' : m e t a l s , T O C 9 ' - 1 0 ' : m e t a l s , T O C 4 7 ' - 4 8 ' : m e t a l s , T O C S M W - 0 1 0 - 2 ' : m e t a l s , T O C 8 ' - 1 0 ' : m e t a l s , T O C 1 2 ' - 1 5 ' : H F O 4 0 ' - 4 4 ' : H F O 4 2 ' - 4 4 ' : m e t a l s , T O C 4 5 ' - 4 8 ' : H F O COAL ASH S U R F I C I A L S U R F I C I A L P E E D E E ABMW-0 1 3'-5': I, m e t a l s 38'-48': K d 43'-45': I, m i n 78'-86': m e t a l s 82'-84': m e t a l s 83'-88': K d 84'-86': I, m i n 88'-90': I96'-98': m e t a l s A W - 0 7 0 - 2 ' : m e t a l s , T O C 8 ' - 1 0 ' : m e t a l s , T O C 1 5 ' - 1 7 ' : m e t a l s , T O C 4 6 ' - 4 7 ' : m e t a l s , T O C 4 7 ' - 4 9 ' : I 9 7 ' - 9 9 ' : I S M W - 0 5 0 - 2 ' : m e t a l s , T O C 6 ' - 8 ' : m e t a l s , T O C 4 1 ' - 4 3 ' : m e t a l s , T O C , I P:\DUKE ENERGY PROGRESS.1026\108. SUTTON ASH BASIN GW ASSESSMENT PLAN\1.11 CSA REPORTING\FIGURES\SUTTON-CSA-FIGURES.DWG08/02/2015 1:42 PM S O U R C E S : 1 . D R A W I N G H A S B E E N S E T W I T H A P R O J E C T I O N O F N O R T H C A R O L I N A S T A T E P L A N E C O O R D I N A T E S Y S T E M F I P S 3 2 0 0 ( N A D 8 3 ) . 2 . 2 f t C O N T O U R I N T E R V A L S F R O M N C D O T L I D A R D A T E D 2 0 0 7 h t t p s : / / c o n n e c t . n c d o t . g o v / r e s o u r c e s / g i s / p a g e s / c o n t - e l e v _ v 2 . a s p x 3 . S E L E C T T O P O G R A P H I C A D J U S T M E N T S B A S E D O N S I T E S U R V E Y A N D C O M P A R I S O N T O A E R I A L P H O T O G R A P H . N O T E : 1 . C O N T O U R L I N E S A R E U S E D F O R R E P R E S E N T A T I V E P U R P O S E S O N L Y A N D A R E N O T T O B E U S E D F O R D E S I G N O R C O N S T R U C T I O N P U R P O S E S . 2 . C R O S S S E C T I O N L O C A T I O N S A R E S H O W N O N F I G U R E 1 - 2 . W A T E R L E V E L ( J U N E 2 0 1 5 ) L E G E N D S U R F I C I A L S A N D ( W E L L S O R T E D - S I L T Y S A N D - M E D I U M T O F I N E G R A I N E D S A N D ) S U R F I C I A L S A N D ( P O O R L Y S O R T E D - M E D I U M T O C O A R S E G R A I N E D S A N D ) C O A L A S H C O A R S E S A N D W I T H F I N E G R A V E L S A N D ( P E E D E E ) C L A Y R I C H F A C I E S N O T T E S T E D N T CLAY LINER (12") F I L L M A T E R I A L S C A L E : A S S H O W N S A M P L E D E S C R I P T I O N S m e t a l s T O T A L M E T A L S T O C T O T A L O R G A N I C C A R B O N I P G R A I N S I Z E , M O I S T U R E C O N T E X T I I N D E X S O I L S A M P L E ( M O I S T U R E , S P E C I F I C G R A V I T Y , G R A I N S I Z E ) S P L P S Y N T H E T I C P R E C I P I T A T I O N L E A C H I N G P R O C E D U R E K d S O R P T I O N C O E F F I C I E N T S H F O H Y D R O U S F E R R I C O X I D E S m i n M I N E R A L O G Y B Y X - R A Y D I F F R A C T I O N A N D W H O L E R O C K C H E M I S T R Y B O R I N G S Y M B O L S W E L L S C R E E N W I T H H Y D R A U L I C C O N D U C T I V I T Y I N C E N T I M E T E R S P E R S E C O N D ( S O U R C E : S Y N T E R R A ) U N D I S T U R B E D S O I L S A M P L E W I T H V E R T I C A L H Y D R A U L I C C O N D U C T I V I T Y ( S O U R C E : B L E ) S O I L S A M P L E ( G R A B ) K V a l u e 4 . 4 x 1 0 - 4 Elevation S t a t i o n -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 600+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+0016+0017+0018+0019+0020+0021+0022+0023+0024+0025+0026+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 60+00 61+00 62+00 63+00 64+00 65+00 66+00 67+00 68+00 69+00 70+00 71+00 72+00 73+00 74+00 75+00 76+00 77+00 78+00 79+00 80+00 3 . 7 x 1 0 - 2 3 . 0 x 1 0 - 2 N T N T NT 4 . 3 x 1 0 - 2 2 . 6 x 1 0 - 2 5 / 2 2 / 2 0 1 5 5 / 2 2 / 2 0 1 5 P . W A L D R E P C . N E W E L L P R O J E C T M A N A G E R : L A Y O U T N A M E : D R A W N B Y : C H E C K E D B Y : K A T H Y W E B B D A T E : D A T E : F I G U R E 6 - 3 w w w . s y n t e r r a c o r p . c o m 1 4 8 R i v e r S t r e e t , S u i t e 2 2 0 G r e e n v i l l e , S o u t h C a r o l i n a 2 9 6 0 1 8 6 4 - 4 2 1 - 9 9 9 9 L . V . S U T T O N E N E R G Y C O M P L E X 8 0 1 S U T T O N S T E A M P L A N T R D W I L M I N G T O N , N O R T H C A R O L I N A 3 0 0 0 3 0 0 6 0 0 G R A P H I C S C A L E I N F E E T 3 0 0 3 0 6 0 I N F E E T H O R I Z O N T A L : 1 " = 3 0 0 ' V E R T I C A L : 1 " = 3 0 ' S E C T I O N A - A ' F A C I N G E A S T MATCH LINE - SEE FIGURE 6-2 (MSL)MW-5C MW-27C MW-36C AW- 0 8 0-2': m e t a l s , T O C , S P L P , H C 8'-10 ' : m e t a l s , T O C , S P L P , H C 40'-4 2 ' : m e t a l s , T O C , S P L P , H C C O A L A S H C O A L A S H S U R F I C I A L SURFICIAL P E E D E E F I G U R E 6 - 3 G E O L O G I C C R O S S S E C T I O N A - A ' N O R T H E N D W I T H P H O T O G R A P H S COARSE S A N D / F I N E G R A V E L L A Y E R TYPICAL O F L O W E R S U R F I C I A L Z O N E F L Y A S H I N U P P E R 1 0 ' TYPICAL SANDS OF LOWER SURFICIAL ZONE S U R F I C I A L / P E E D E E C O N T A C T C O N T A C T B E T W E E N F L Y A S H A N D S U R F I C I A L S A N D T Y P I C A L F I N E S A N D / S I L T O F T H E U P P E R P E E D E E F O R M A T I O N P:\DUKE ENERGY PROGRESS.1026\108. SUTTON ASH BASIN GW ASSESSMENT PLAN\1.11 CSA REPORTING\FIGURES\SUTTON-CSA-FIGURES.DWG08/02/2015 1:44 PM S O U R C E S : 1 . D R A W I N G H A S B E E N S E T W I T H A P R O J E C T I O N O F N O R T H C A R O L I N A S T A T E P L A N E C O O R D I N A T E S Y S T E M F I P S 3 2 0 0 ( N A D 8 3 ) . 2 . 2 f t C O N T O U R I N T E R V A L S F R O M N C D O T L I D A R D A T E D 2 0 0 7 h t t p s : / / c o n n e c t . n c d o t . g o v / r e s o u r c e s / g i s / p a g e s / c o n t - e l e v _ v 2 . a s p x 3 . S E L E C T T O P O G R A P H I C A D J U S T M E N T S B A S E D O N S I T E S U R V E Y A N D C O M P A R I S O N T O A E R I A L P H O T O G R A P H . N O T E : 1 . C O N T O U R L I N E S A R E U S E D F O R R E P R E S E N T A T I V E P U R P O S E S O N L Y A N D A R E N O T T O B E U S E D F O R D E S I G N O R C O N S T R U C T I O N P U R P O S E S . 2 . C R O S S S E C T I O N L O C A T I O N S A R E S H O W N O N F I G U R E 1 - 2 . A S H B A S I N C O A L A S H C L A Y L I N E R ( 1 2 " ) R O A D W A T E R L E V E L ( J U N E 2 0 1 5 ) L E G E N D S U R F I C I A L S A N D ( W E L L S O R T E D - S I L T Y S A N D - M E D I U M T O F I N E G R A I N E D S A N D ) S U R F I C I A L S A N D ( P O O R L Y S O R T E D - M E D I U M T O C O A R S E G R A I N E D S A N D ) C O A L A S H C O A R S E S A N D W I T H F I N E G R A V E L S A N D ( P E E D E E ) C L A Y R I C H F A C I E S N O T T E S T E D N T F I L L M A T E R I A L S C A L E : A S S H O W N S A M P L E D E S C R I P T I O N S m e t a l s T O T A L M E T A L S T O C T O T A L O R G A N I C C A R B O N I P G R A I N S I Z E , M O I S T U R E C O N T E X T I I N D E X S O I L S A M P L E ( M O I S T U R E , S P E C I F I C G R A V I T Y , G R A I N S I Z E ) S P L P S Y N T H E T I C P R E C I P I T A T I O N L E A C H I N G P R O C E D U R E K d S O R P T I O N C O E F F I C I E N T S H F O H Y D R O U S F E R R I C O X I D E S m i n M I N E R A L O G Y B Y X - R A Y D I F F R A C T I O N A N D W H O L E R O C K C H E M I S T R Y B O R I N G S Y M B O L S W E L L S C R E E N W I T H H Y D R A U L I C C O N D U C T I V I T Y I N C E N T I M E T E R S P E R S E C O N D ( S O U R C E : S Y N T E R R A ) U N D I S T U R B E D S O I L S A M P L E W I T H V E R T I C A L H Y D R A U L I C C O N D U C T I V I T Y ( S O U R C E : B L E ) S O I L S A M P L E ( G R A B ) K V a l u e 4 . 4 x 1 0 - 4 A B M W - 0 1 3 ' - 5 ' : I , m e t a l s 3 8 ' - 4 8 ' : K d 4 3 ' - 4 5 ' : I , m i n 7 8 ' - 8 6 ' : m e t a l s 8 2 ' - 8 4 ' : m e t a l s 8 3 ' - 8 8 ' : K d 8 4 ' - 8 6 ' : I , m i n 8 8 ' - 9 0 ' : I 9 6 ' - 9 8 ' : m e t a l s Elevation - 1 1 0 - 1 0 0 - 9 0 - 8 0 - 7 0 - 6 0 - 5 0 - 4 0 - 3 0 - 2 0 - 1 0 0 1 0 2 0 3 0 4 0 5 0 6 0 80+0081+0082+0083+0084+0085+0086+0087+0088+0089+0090+0091+0092+0093+0094+0095+0096+0097+0098+0099+00100+00101+00 102+00 103+00 104+00 105+00 106+00 107+00 108+00 109+00 110+00 111+00 112+00 113+00 114+00 115+00 116+00 117+00 118+00 119+00 120+00 121+00 122+00 123+00 124+00 125+00 126+00 127+00 128+00 129+00 130+00 131+00 132+00 133+00 134+00 135+00 136+00 137+00 138+00 139+00 140+00 141+00 142+00 143+00 144+00 145+00 146+00 146+50 6.7 x 10-42.8 x 10-2 4 . 4 x 1 0 - 2 1.1 x 10-4 7 . 2 x 1 0 - 4 3 . 8 x 1 0 - 2 6 . 2 x 1 0 - 2 1 . 2 x 1 0 - 5 2 . 6 x 1 0 - 2 5 / 2 2 / 2 0 1 5 5 / 2 2 / 2 0 1 5 P . W A L D R E P C . N E W E L L P R O J E C T M A N A G E R : L A Y O U T N A M E : D R A W N B Y : C H E C K E D B Y : K A T H Y W E B B D A T E : D A T E : F I G U R E 6 - 4 G E O L O G I C C R O S S S E C T I O N A - A ' S O U T H E N D W I T H P H O T O G R A P H S F I G U R E 6 - 4 w w w . s y n t e r r a c o r p . c o m 1 4 8 R i v e r S t r e e t , S u i t e 2 2 0 G r e e n v i l l e , S o u t h C a r o l i n a 2 9 6 0 1 8 6 4 - 4 2 1 - 9 9 9 9 L . V . S U T T O N E N E R G Y C O M P L E X 8 0 1 S U T T O N S T E A M P L A N T R D W I L M I N G T O N , N O R T H C A R O L I N A 3 0 0 0 3 0 0 6 0 0 G R A P H I C S C A L E I N F E E T 3 0 0 3 0 6 0 I N F E E T H O R I Z O N T A L : 1 " = 3 0 0 ' V E R T I C A L : 1 " = 3 0 ' S E C T I O N A - A ' F A C I N G E A S T MATCH LINE - SEE FIGURE 6-1 (MSL) CANAL CANAL GP-01AB-020-8': Kd3'-5': metals,TOC6'-8': SPLP,min10'-12': metals,TOC,SPLP,Kd,I,min49.5'-52': I53'-55': SPLP,I,min, metals53'-60': Kd A W - 0 9 2 ' - 4 ' : m e t a l s , T O C , S P L P , I 1 0 ' - 1 2 ' : H F O 1 4 ' - 1 6 ' : m e t a l s , T O C , S P L P 2 3 ' - 2 5 ' : I 4 3 ' - 4 5 ' : m e t a l s , T O C , S P L P 4 7 ' - 5 0 ' : H F O 5 5 ' - 5 7 ' : H F O COALASHCOAL ASHSURFICIAL S U R F I C I A L P E E D E E M W - 3 7 0 - 2 ' : m e t a l s , T O C , S P L P 4 ' - 6 ' : m e t a l s , T O C , S P L P 4 3 ' - 4 5 ' : m e t a l s , T O C , S P L P 4 5 ' - 4 7 ' : I P:\DUKE ENERGY PROGRESS.1026\108. SUTTON ASH BASIN GW ASSESSMENT PLAN\1.11 CSA REPORTING\FIGURES\SUTTON-CSA-FIGURES.DWG08/02/2015 1:45 PM TYPICAL FLYASH IN THE FADATYPICAL UPPER SURFICIAL SANDSFINE S A N D / S I L T U N D E R L Y I N G SURFI C I A L A Q U I F E R I N T H E F A D A S O U R C E S : 1 . D R A W I N G H A S B E E N S E T W I T H A P R O J E C T I O N O F N O R T H C A R O L I N A S T A T E P L A N E C O O R D I N A T E S Y S T E M F I P S 3 2 0 0 ( N A D 8 3 ) . 2 . 2 f t C O N T O U R I N T E R V A L S F R O M N C D O T L I D A R D A T E D 2 0 0 7 h t t p s : / / c o n n e c t . n c d o t . g o v / r e s o u r c e s / g i s / p a g e s / c o n t - e l e v _ v 2 . a s p x 3 . S E L E C T T O P O G R A P H I C A D J U S T M E N T S B A S E D O N S I T E S U R V E Y A N D C O M P A R I S O N T O A E R I A L P H O T O G R A P H . N O T E : 1 . C O N T O U R L I N E S A R E U S E D F O R R E P R E S E N T A T I V E P U R P O S E S O N L Y A N D A R E N O T T O B E U S E D F O R D E S I G N O R C O N S T R U C T I O N P U R P O S E S . 2 . C R O S S S E C T I O N L O C A T I O N S A R E S H O W N O N F I G U R E 1 - 2 . W A T E R L E V E L ( J U N E 2 0 1 5 ) L E G E N D S U R F I C I A L S A N D ( W E L L S O R T E D - S I L T Y S A N D - M E D I U M T O F I N E G R A I N E D S A N D ) S U R F I C I A L S A N D ( P O O R L Y S O R T E D - M E D I U M T O C O A R S E G R A I N E D S A N D ) C O A L A S H C O A R S E S A N D W I T H F I N E G R A V E L S A N D ( P E E D E E ) C L A Y R I C H F A C I E S N O T T E S T E D N T F I L L M A T E R I A L S C A L E : A S S H O W N S A M P L E D E S C R I P T I O N S m e t a l s T O T A L M E T A L S T O C T O T A L O R G A N I C C A R B O N I P G R A I N S I Z E , M O I S T U R E C O N T E X T I I N D E X S O I L S A M P L E ( M O I S T U R E , S P E C I F I C G R A V I T Y , G R A I N S I Z E ) S P L P S Y N T H E T I C P R E C I P I T A T I O N L E A C H I N G P R O C E D U R E K d S O R P T I O N C O E F F I C I E N T S H F O H Y D R O U S F E R R I C O X I D E S m i n M I N E R A L O G Y B Y X - R A Y D I F F R A C T I O N A N D W H O L E R O C K C H E M I S T R Y B O R I N G S Y M B O L S W E L L S C R E E N W I T H H Y D R A U L I C C O N D U C T I V I T Y I N C E N T I M E T E R S P E R S E C O N D ( S O U R C E : S Y N T E R R A ) U N D I S T U R B E D S O I L S A M P L E W I T H V E R T I C A L H Y D R A U L I C C O N D U C T I V I T Y ( S O U R C E : B L E ) S O I L S A M P L E ( G R A B ) K V a l u e 4 . 4 x 1 0 - 4 Elevation Elevation S t a t i o n -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 - 1 0 0 - 9 0 - 8 0 - 7 0 - 6 0 - 5 0 - 4 0 - 3 0 - 2 0 - 1 0 0 1 0 2 0 3 0 4 0 5 0 6 0 0+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 54+00 54+50 N T N T 1 . 7 x 1 0 - 5 1 . 5 x 1 0 - 7 8 . 2 x 1 0 - 3 6 . 7 x 1 0 - 4 4 . 2 x 1 0 - 2 4 . 7 x 1 0 - 2 5 / 2 2 / 2 0 1 5 5 / 2 2 / 2 0 1 5 P . W A L D R E P C . N E W E L L P R O J E C T M A N A G E R : L A Y O U T N A M E : D R A W N B Y : C H E C K E D B Y : K A T H Y W E B B D A T E : D A T E : F I G U R E 6 - 5 w w w . s y n t e r r a c o r p . c o m 1 4 8 R i v e r S t r e e t , S u i t e 2 2 0 G r e e n v i l l e , S o u t h C a r o l i n a 2 9 6 0 1 8 6 4 - 4 2 1 - 9 9 9 9 L . V . S U T T O N E N E R G Y C O M P L E X 8 0 1 S U T T O N S T E A M P L A N T R D W I L M I N G T O N , N O R T H C A R O L I N A 3 0 0 0 3 0 0 6 0 0 G R A P H I C S C A L E I N F E E T 3 0 0 3 0 6 0 I N F E E T H O R I Z O N T A L : 1 " = 3 0 0 ' V E R T I C A L : 1 " = 3 0 ' S E C T I O N C - C ' F A C I N G N O R T H (MSL) (MSL) MW-24C PZ-INT P E E D E E COAL ASH S U R F I C I A L A W - 0 7 0 - 2 ' : m e t a l s , T O C 8 ' - 1 0 ' : m e t a l s , T O C 1 5 ' - 1 7 ' : m e t a l s , T O C 4 6 ' - 4 7 ' : m e t a l s , T O C 4 7 ' - 4 9 ' : I 9 7 ' - 9 9 ' : I S M W - 0 5 0 - 2 ' : m e t a l s , T O C 6 ' - 8 ' : m e t a l s , T O C 4 1 ' - 4 3 ' : m e t a l s , T O C , I F I G U R E 6 - 5 G E O L O G I C C R O S S S E C T I O N C - C ' W I T H P H O T O G R A P H S TYPICAL U P P E R S U R F I C I A L S A N D S T Y P I C A L U P P E R S U R F I C I A L A Q U I F E R S A N D S TYPICAL MID-LOWER SURFICIAL SANDSWITH COURSE SAND LAYERSFINE SAND / SILT OF THE PEE DEE FORMATION C O A R S E S A N D / F I N E G R A V E L L A Y E R A T T H E B A S E O F T H E S U R F I C I A L A Q U I F E R S H A R P C O N T A C T B E T W E E N T H E P E E D E E F O R M A T I O N ( L E F T ) A N D T H E S U R F I C I A L S A N D S ( R I G H T ) P:\DUKE ENERGY PROGRESS.1026\108. SUTTON ASH BASIN GW ASSESSMENT PLAN\1.11 CSA REPORTING\FIGURES\SUTTON-CSA-FIGURES.DWG08/02/2015 1:47 PM S O U R C E S : 1 . D R A W I N G H A S B E E N S E T W I T H A P R O J E C T I O N O F N O R T H C A R O L I N A S T A T E P L A N E C O O R D I N A T E S Y S T E M F I P S 3 2 0 0 ( N A D 8 3 ) . 2 . 2 f t C O N T O U R I N T E R V A L S F R O M N C D O T L I D A R D A T E D 2 0 0 7 h t t p s : / / c o n n e c t . n c d o t . g o v / r e s o u r c e s / g i s / p a g e s / c o n t - e l e v _ v 2 . a s p x 3 . S E L E C T T O P O G R A P H I C A D J U S T M E N T S B A S E D O N S I T E S U R V E Y A N D C O M P A R I S O N T O A E R I A L P H O T O G R A P H . N O T E : 1 . C O N T O U R L I N E S A R E U S E D F O R R E P R E S E N T A T I V E P U R P O S E S O N L Y A N D A R E N O T T O B E U S E D F O R D E S I G N O R C O N S T R U C T I O N P U R P O S E S . 2 . C R O S S S E C T I O N L O C A T I O N S A R E S H O W N O N F I G U R E 1 - 2 . W A T E R L E V E L ( J U N E 2 0 1 5 ) L E G E N D S U R F I C I A L S A N D ( W E L L S O R T E D - S I L T Y S A N D - M E D I U M T O F I N E G R A I N E D S A N D ) S U R F I C I A L S A N D ( P O O R L Y S O R T E D - M E D I U M T O C O A R S E G R A I N E D S A N D ) C O A L A S H C O A R S E S A N D W I T H F I N E G R A V E L S A N D ( P E E D E E ) C L A Y R I C H F A C I E S N O T T E S T E D N T CLAY LINER (12") F I L L M A T E R I A L S C A L E : A S S H O W N S A M P L E D E S C R I P T I O N S m e t a l s T O T A L M E T A L S T O C T O T A L O R G A N I C C A R B O N I P G R A I N S I Z E , M O I S T U R E C O N T E X T I I N D E X S O I L S A M P L E ( M O I S T U R E , S P E C I F I C G R A V I T Y , G R A I N S I Z E ) S P L P S Y N T H E T I C P R E C I P I T A T I O N L E A C H I N G P R O C E D U R E K d S O R P T I O N C O E F F I C I E N T S H F O H Y D R O U S F E R R I C O X I D E S m i n M I N E R A L O G Y B Y X - R A Y D I F F R A C T I O N A N D W H O L E R O C K C H E M I S T R Y B O R I N G S Y M B O L S W E L L S C R E E N W I T H H Y D R A U L I C C O N D U C T I V I T Y I N C E N T I M E T E R S P E R S E C O N D ( S O U R C E : S Y N T E R R A ) U N D I S T U R B E D S O I L S A M P L E W I T H V E R T I C A L H Y D R A U L I C C O N D U C T I V I T Y ( S O U R C E : B L E ) S O I L S A M P L E ( G R A B ) K V a l u e 4 . 4 x 1 0 - 4 EDR 11 EDR 5 EDR 3 C A N A L 8/2/2015 8/2/2015P. WALDREP J. CHASTAIN PROJECT MANAGER: LAYOUT NAME: DRAWN BY: CHECKED BY: KATHY WEBB DATE: DATE: FIGURE 6-6 POTENTIOMETRIC SURFACE UPPER SURFICIAL AQUIFER JUNE 1, 20158/ 4 / 2 0 1 5 1 : 2 6 P M P: \ D u k e E n e r g y P r o g r e s s . 1 0 2 6 \ 1 0 8 . S u t t o n A s h B a s i n G W A s s e s s m e n t P l a n \ 1 . 1 1 C S A R e p o r t i n g \ F I G U R E S \ D E S U T T O N W A T E R L E V E L B A S E M A P 2 0 1 5 - 0 8 - 0 2 . d w g FIG 6-6 UPPER SURFICIAL AQUIFER 1200 GRAPHIC SCALE (IN FEET) 0 600300600 www.synterracorp.com 148 River Street, Suite 220 Greenville, South Carolina 29601 864-421-9999 L.V. SUTTON ENERGY COMPLEX 801 SUTTON STEAM PLANT RD WILMINGTON, NORTH CAROLINA SOURCES: 1.2014 AERIAL PHOTOGRAPH WAS OBTAINED FROM WSP FLOWN ON APRIL 17, 2014 2.MAY 23, 2014 AERIAL PHOTOGRAPH WAS OBTAINED FROM THE NRCS GEOSPATIAL DATA GATEWAY AT http://datagateway.nrcs.usda.gov/ 3.DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 HORIZONTAL DATUM (NAD 83) AND VERTICAL DATUM (NGVD88). 4.PARCEL DATA WAS OBTAINED FROM THE NORTH CAROLINA STATE LIBRARIES AT http://www.lib.ncsu.edu/gis/counties.html FOR NEW HANOVER COUNTY. 5.NEW WELL LOCATIONS SURVEYED BY McKIM & CREED. HORIZONTAL DATUM IS NAD83 AND THE VERTICAL DATUM IS NGVD88. 6.WELL LOCATIONS AND MEASURING POINTS WERE BASED ON A SURVEY BY JAMES L. HAINES & ASSOCIATES FOR ISH, INC. DATED DECEMBER 23, 2008. ISH DRAWING IS TITLED "POTENTIAL LOCATIONS FOR PROPOSED GEOPROBE AND WELL INSTALLATIONS", DATED FEBRUARY 25, 2009 WITH A CAD FILE NAME Figure 22.dwg 7. WELL LOCATIONS AND MEASURING POINTS WERE BASED ON A TABLE BY PARAMOUNTE ENGINEERING, WILMINGTON NC DATED 2012-03-05 SUPPLIED BY PROGRESS ENERGY. HORIZONTAL DATUM IS NAD83(NSRS2007) AND THE VERTICAL DATUM IS NGVD29. 8.THE PROPERTY BOUNDARY FOR THE L.V. SUTTON STEAM ELECTRIC PLANT WAS BASED ON A COMPOSITE MAP PREPARED BY DAVIS-MARTIN-POWELL & ASSOC., INC. THE DRAWINGS ARE DATED JUNE, 1995 WITH REVISION NOTE FOR MARCH 4, 2004. FILE NAME IS L-D-9022-7.DWG. HORIZONTAL DATUM IS NAD83 AND THE VERTICAL DATUM IS NGV 29. 9.THE LOCATION OF THE FORMER ASH DISPOSAL AREAS WAS BASED ON A FIGURE 2-2 PREPARED BY BLASLAND, BOUCK & LEE, INC. THE FIGURE IS TITLED "HORIZONTAL EXTENT OF THE ASH WITHIN THE FORMER DISPOSAL AREA". 10.MONITORING WELLS/PIEZOMETERS/SOIL BORINGS COMPLETED AS PART OF PREVIOUS ASSESSMENT ACTIVITIES. LOCATIONS ARE APPROXIMATE. LEGEND AMW-15S 71.18 BACKGROUND COMPLIANCE WELL WATER LEVEL IN FEET (msl.) BGMW-10 73.01 CMW-6R 69.12 DOWNGRADIENT COMPLIANCE WELL WATER LVEL ELEVATION IN FEET (msl.) ASSESSMENT WELL WELL WATER LEVEL ELEVATION IN FEET (msl.) DMW-1 66.84 MONITORING WELL WATER LVEL ELEVATION IN FEET (msl.) WATER LEVEL CONTOUR IN FEET (msl.) INFERRED WATER LEVEL CONTOUR (msl.) 500 ft COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS WASTE BOUNDARY SMW-06C SMW-06DSMW-06B 9.96 SMW-05CSMW-05B 10.28 SMW-01B 10.02 SMW-01C SMW-02B 10.03 SMW-02C SMW-03B 9.61 SMW-03C SMW-04B 10.70 SMW-04C PZ-INT GWPZ-3BGWPZ-3A GWPZ-2A GWPZ-2B MW-23C MW-23B 10.88 MW-22CMW-22B 10.43 GWPZ-4A GWPZ-4BABMW-01S ABMW-01D ABMW-02D ABMW-02S 7.42 MW-14 9.20 MW-16 8.45 MW-16D MW-15 7.27 MW-15D MW-20DMW-20 3.73 AW-09B 8.61AW-09D AW-09C MW-7C MW-7B 9.13 MW-7A 9.08 MW-19MW-21C MW-18 MW-28C MW-28B 9.66 MW-28T LA-PZ-5 MW-33C MW-32C MW-34B MW-35B MW-35C MW-34C MW-36C MW-36B MW-27B 9.99 PZ-10S 10.72 PZ-10D LA-PZ-1 AW-08B 9.70 MW-11 PZ-6S 10.30 MW-9 LA-PZ-2 LA-PZ-4 LA-PZ-3 MW-24C MW-24B 11.03 MW-12 AW-02CAW-02B 10.85 AW-02D AW-03B 11.02AW-03C AW-01C AW-01B 10.67 MW-8 MW-5A 9.36 MW-5B 9.36 MW-5C MW-37C MW-37B 8.03 AW-05D AW-05B 10.18 AW-05E AW-05C AW-04B 10.75 AW-04C MW-4 11.28 MW-4A 11.31 MW-4B MW-31B 11.03 MW-31C AW-07D 4 5 6 PE-SW2 PE-SW6E PE-SW6C (ABANDONED)PE-SW6B PE-SW6APE-SW5 PE-SW4 PE-SW3 CA N A L C A N A L NC WILDLIFE LAKE ACCESS S U T T O N L A K E R D COOLING POND N C H I G H W A Y 4 2 1 N C H I G H W A Y 4 2 1 R A I L R O A D R A I L R O A D SUTT O N L A K E R D SUTTON STEAM P L A N T R D ROYMAC D R F R E D R I C K S O N R D METR O C I R C L E F R E D R I C K S O N R D APPROXIMATE ROUTE OF THE NEW WILLMINGTON BYPASS (I-140) N C H I G H W A Y 4 2 1 R A I L R O A D R A I L R O A D NHC-SW1 (ABANDONED) OLD ASH POND AREA NEW ASH POND AREA - LINED FORMER ASH DISPOSAL AREA CAPE FEAR RIVER CA P E F E A R R I V E R WOOTEN PRODUCTION WELL (APPROXIMATE) PE-SW2 DUKE ENERGY PROGRESS PRODUCTION WELL (APPROXIMATE) NHC-SW4 CFPUA PRODUCTION WELL (APPROXIMATE) PARCEL LINE (APPROXIMATE) 6 EDR 3 EDR REPORTED WELL LOCATION (APPROXIMATE) INVISTA 3 INVISTA 6 INVISTA 5 INVISTA 4 INVISTA 3 INVISTA 2 INVISTA 1 INVISTA PRODUCTION WELL (APPROXIMATE) PRODUCTION WELLS PREVIOUSLY REPORTED OR OBSERVED PRODUCTION WELLS SHOWN. SOME WELLS MAY NO LONGER EXIST OR BE OPERATIONAL. ALL PRIVATE WATER SUPPLY WELLS ARE NOT SHOWN ON THIS DRAWING. S. T. WOOTEN CORPORATION S. T. WOOTEN CORPORATION MINE BOUNDARY IN T E R S T A T E 1 4 0 ( U S H I G H W A Y 1 7 ) PE-SW6D COOLING POND WATER LEVEL = 9.7 ft PROVIDED BY DUKE ENERGY 06-01-2015 NPDES OUTFALL SW-004 NPDES OUTFALL SW-002 NPDES OUTFALL SW-001 NHC-SW (NOT IN USE) NHC-SW4 NHC-SW3 SOLAR FARM GWPZ-1B 10.20 GWPZ-1A 10.29 MW-27C AW-08C MW-10 PZ-6D MW-23E AW-06B 11.06 AW-06D AW-06E 1 1 . 0 1 1 . 0 1 0 . 5 10 . 5 10 . 0 10.5 10.0 9.5 9.5 9.5 9.0 9.0 9.5 6 . 0 10.0 9. 0 12.0 5 . 0 7 . 0 8 . 0 9.5 9.0 11 . 0 11.0 5.0 6.0 8.0 9.0 6.0 4.0 8.0NOTE: WATER LEVEL CONTOURS IN THE FORMER ASH DISPOSAL AREA MAY BE AFFECTED BY DISCREPANCIES IN WELL ELEVATION SURVEY DATA. 7.0 EDR 11 EDR 5 EDR 3 C A N A L 8/2/2015 8/2/2015P. WALDREP J. CHASTAIN PROJECT MANAGER: LAYOUT NAME: DRAWN BY: CHECKED BY: KATHY WEBB DATE: DATE: FIGURE 6-7 POTENTIOMETRIC SURFACE LOWER SURFICIAL AQUIFER JUNE 1, 20158/ 4 / 2 0 1 5 1 : 3 0 P M P: \ D u k e E n e r g y P r o g r e s s . 1 0 2 6 \ 1 0 8 . S u t t o n A s h B a s i n G W A s s e s s m e n t P l a n \ 1 . 1 1 C S A R e p o r t i n g \ F I G U R E S \ D E S U T T O N W A T E R L E V E L B A S E M A P 2 0 1 5 - 0 8 - 0 2 . d w g FIG 6-7 LOWER SURFICIAL AQUIFER 1200 GRAPHIC SCALE (IN FEET) 0 600300600 www.synterracorp.com 148 River Street, Suite 220 Greenville, South Carolina 29601 864-421-9999 L.V. SUTTON ENERGY COMPLEX 801 SUTTON STEAM PLANT RD WILMINGTON, NORTH CAROLINA LEGEND AMW-15S 71.18 BACKGROUND COMPLIANCE WELL WATER LEVEL IN FEET (msl.) BGMW-10 73.01 CMW-6R 69.12 DOWNGRADIENT COMPLIANCE WELL WATER LVEL ELEVATION IN FEET (msl.) ASSESSMENT WELL WELL WATER LEVEL ELEVATION IN FEET (msl.) DMW-1 66.84 MONITORING WELL WATER LVEL ELEVATION IN FEET (msl.) WATER LEVEL CONTOUR IN FEET (msl.) INFERRED WATER LEVEL CONTOUR (msl.) 500 ft COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS WASTE BOUNDARY SMW-06C 9.92 SMW-06DSMW-06B SMW-05C 10.48SMW-05B SMW-01B SMW-01C 10.10 SMW-02B SMW-02C 10.01 SMW-03B SMW-03C 9.63 SMW-04B SMW-04C 10.69 PZ-INT GWPZ-3BGWPZ-3A GWPZ-2A GWPZ-2B MW-23C 10.89 MW-23B MW-22C 10.39MW-22B GWPZ-4A GWPZ-4BABMW-01S 11.16 ABMW-01D ABMW-02D 7.39 ABMW-02S MW-14 MW-16 MW-16D 8.39 MW-15 MW-15D 7.21 MW-20D 4.11 MW-20 AW-09BAW-09D AW-09C 8.63 MW-7C 9.04 MW-7B MW-7A MW-19 9.78MW-21C 9.79 MW-18 MW-28C 9.66 MW-28BMW-28T LA-PZ-5 MW-33C 10.02 MW-32C 10.32 MW-34B MW-35B MW-35C MW-34C MW-36C MW-36B MW-27B PZ-10S PZ-10D LA-PZ-1 AW-08B MW-11 11.86 PZ-6S MW-9 10.74 LA-PZ-2 LA-PZ-4 LA-PZ-3 MW-24C 11.02 MW-24B MW-12 10.96 AW-02C 10.87 AW-02B AW-02D AW-03B AW-03C 10.97 AW-01C 10.70 AW-01B MW-8 9.87 MW-5A MW-5B MW-5C 9.32 MW-37C 8.62 MW-37B AW-05D AW-05B AW-05E AW-05C 10.17 AW-04B AW-04C 10.67 MW-4MW-4A MW-4B 8.31 MW-31B MW-31C 11.03 AW-07D CA N A L C A N A L NHC-SW4 NHC-SW3 NHC-SW (NOT IN USE) INVISTA 1 INVISTA 2 INVISTA 3 INVISTA 4 INVISTA 5 INVISTA 6 PE-SW2 PE-SW4 PE-SW3 PE-SW5 PE-SW6A PE-SW6B PE-SW6C (ABANDONED) PE-SW6E 10 . 5 10 9.5 9.0 9.0 9.5 10. 0 10. 5 11 . 0 10.5 10. 0 9.5 9.5 11. 0 4 5 6 8.5 NC WILDLIFE LAKE ACCESS S U T T O N L A K E R D COOLING POND N C H I G H W A Y 4 2 1 N C H I G H W A Y 4 2 1 R A I L R O A D R A I L R O A D SUTT O N L A K E R D SUTTON STEAM P L A N T R D ROYMAC D R F R E D R I C K S O N R D METR O C I R C L E F R E D R I C K S O N R D APPROXIMATE ROUTE OF THE NEW WILLMINGTON BYPASS (I-140) N C H I G H W A Y 4 2 1 R A I L R O A D R A I L R O A D NHC-SW1 (ABANDONED) OLD ASH POND AREA NEW ASH POND AREA - LINED FORMER ASH DISPOSAL AREA CAPE FEAR RIVER CA P E F E A R R I V E R WOOTEN PRODUCTION WELL (APPROXIMATE) PE-SW2 DUKE ENERGY PROGRESS PRODUCTION WELL (APPROXIMATE) NHC-SW4 CFPUA PRODUCTION WELL (APPROXIMATE) PARCEL LINE (APPROXIMATE) 6 EDR 3 EDR REPORTED WELL LOCATION (APPROXIMATE) INVISTA 3 INVISTA PRODUCTION WELL (APPROXIMATE) S. T. WOOTEN CORPORATION S. T. WOOTEN CORPORATION MINE BOUNDARY IN T E R S T A T E 1 4 0 ( U S H I G H W A Y 1 7 ) PE-SW6D COOLING POND WATER LEVEL = 9.7 ft PROVIDED BY DUKE ENERGY 06-01-2015 NPDES OUTFALL SW-004 NPDES OUTFALL SW-002 NPDES OUTFALL SW-001 SOLAR FARM GWPZ-1B GWPZ-1A MW-27C 9.97 AW-08C 9.77 MW-10 9.95 PZ-6D MW-23E AW-06B AW-06D AW-06E 6.0 4.0 7.0 NOTE: WATER LEVEL CONTOURS IN THE FORMER ASH DISPOSAL AREA MAY BE AFFECTED BY DISCREPANCIES IN SURVEY DATA. 8.0 5.0 SOURCES: 1.2014 AERIAL PHOTOGRAPH WAS OBTAINED FROM WSP FLOWN ON APRIL 17, 2014 2.MAY 23, 2014 AERIAL PHOTOGRAPH WAS OBTAINED FROM THE NRCS GEOSPATIAL DATA GATEWAY AT http://datagateway.nrcs.usda.gov/ 3.DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 HORIZONTAL DATUM (NAD 83) AND VERTICAL DATUM (NGVD88). 4.PARCEL DATA WAS OBTAINED FROM THE NORTH CAROLINA STATE LIBRARIES AT http://www.lib.ncsu.edu/gis/counties.html FOR NEW HANOVER COUNTY. 5.NEW WELL LOCATIONS SURVEYED BY McKIM & CREED. HORIZONTAL DATUM IS NAD83 AND THE VERTICAL DATUM IS NGVD88. 6.WELL LOCATIONS AND MEASURING POINTS WERE BASED ON A SURVEY BY JAMES L. HAINES & ASSOCIATES FOR ISH, INC. DATED DECEMBER 23, 2008. ISH DRAWING IS TITLED "POTENTIAL LOCATIONS FOR PROPOSED GEOPROBE AND WELL INSTALLATIONS", DATED FEBRUARY 25, 2009 WITH A CAD FILE NAME Figure 22.dwg 7. WELL LOCATIONS AND MEASURING POINTS WERE BASED ON A TABLE BY PARAMOUNTE ENGINEERING, WILMINGTON NC DATED 2012-03-05 SUPPLIED BY PROGRESS ENERGY. HORIZONTAL DATUM IS NAD83(NSRS2007) AND THE VERTICAL DATUM IS NGVD29. 8.THE PROPERTY BOUNDARY FOR THE L.V. SUTTON STEAM ELECTRIC PLANT WAS BASED ON A COMPOSITE MAP PREPARED BY DAVIS-MARTIN-POWELL & ASSOC., INC. THE DRAWINGS ARE DATED JUNE, 1995 WITH REVISION NOTE FOR MARCH 4, 2004. FILE NAME IS L-D-9022-7.DWG. HORIZONTAL DATUM IS NAD83 AND THE VERTICAL DATUM IS NGV 29. 9.THE LOCATION OF THE FORMER ASH DISPOSAL AREAS WAS BASED ON A FIGURE 2-2 PREPARED BY BLASLAND, BOUCK & LEE, INC. THE FIGURE IS TITLED "HORIZONTAL EXTENT OF THE ASH WITHIN THE FORMER DISPOSAL AREA". 10.MONITORING WELLS/PIEZOMETERS/SOIL BORINGS COMPLETED AS PART OF PREVIOUS ASSESSMENT ACTIVITIES. LOCATIONS ARE APPROXIMATE. EDR 11 EDR 5 EDR 3 C A N A L 8/2/2015 8/2/2015P. WALDREP J. CHASTAIN PROJECT MANAGER: LAYOUT NAME: DRAWN BY: CHECKED BY: KATHY WEBB DATE: DATE: FIGURE 6-8 POTENTIOMETRIC SURFACE PEE DEE AQUIFER JUNE 1, 20158/ 4 / 2 0 1 5 1 : 3 4 P M P: \ D u k e E n e r g y P r o g r e s s . 1 0 2 6 \ 1 0 8 . S u t t o n A s h B a s i n G W A s s e s s m e n t P l a n \ 1 . 1 1 C S A R e p o r t i n g \ F I G U R E S \ D E S U T T O N W A T E R L E V E L B A S E M A P 2 0 1 5 - 0 8 - 0 2 . d w g FIG 6-8 PEE DEE AQUIFER 1200 GRAPHIC SCALE (IN FEET) 0 600300600 www.synterracorp.com 148 River Street, Suite 220 Greenville, South Carolina 29601 864-421-9999 L.V. SUTTON ENERGY COMPLEX 801 SUTTON STEAM PLANT RD WILMINGTON, NORTH CAROLINA LEGEND BACKGROUND COMPLIANCE WELL WATER LEVEL IN FEET (msl.) DOWNGRADIENT COMPLIANCE WELL WATER LVEL ELEVATION IN FEET (msl.) ASSESSMENT WELL WELL WATER LEVEL ELEVATION IN FEET (msl.) MONITORING WELL WATER LVEL ELEVATION IN FEET (msl.) WATER LEVEL CONTOUR IN FEET (msl.) INFERRED WATER LEVEL CONTOUR (msl.) 500 ft COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS WASTE BOUNDARY SMW-06C SMW-06D 10.17 SMW-06B SMW-05CSMW-05B SMW-01B SMW-01C SMW-02B SMW-02C SMW-03B SMW-03C SMW-04B SMW-04C PZ-INT GWPZ-3BGWPZ-3A GWPZ-2A GWPZ-2B MW-23C MW-23B MW-22CMW-22B GWPZ-4B GWPZ-4BABMW-01S ABMW-01D 10.55 ABMW-02D ABMW-02S MW-14 MW-16 MW-16D MW-15 MW-15D MW-20DMW-20 AW-09BAW-09D 8.55 AW-09C MW-7C MW-7B MW-7A MW-19MW-21C MW-18 MW-28C MW-28B MW-28T 9.66 LA-PZ-5 MW-33C MW-32C MW-34B MW-35B MW-35C MW-34C MW-36C MW-36B MW-27B PZ-10S PZ-10D 10.55 LA-PZ-1 AW-08B MW-11 PZ-6S MW-9 LA-PZ-2 LA-PZ-4 LA-PZ-3 MW-24C MW-24B MW-12 AW-02C AW-02B AW-02D 10.85 AW-03B AW-03C AW-01C AW-01B MW-8 MW-5A MW-5B MW-5C MW-37CMW-37B AW-05D 10.20 AW-05B AW-05E 10.09 AW-05C AW-04B AW-04C MW-4MW-4A MW-4B MW-31B MW-31C AW-07D 11.02 4 5 6 PE-SW2 PE-SW6E PE-SW6C (ABANDONED)PE-SW6B PE-SW6APE-SW5 PE-SW4 PE-SW3 CA N A L C A N A L NC WILDLIFE LAKE ACCESS S U T T O N L A K E R D COOLING POND N C H I G H W A Y 4 2 1 N C H I G H W A Y 4 2 1 R A I L R O A D R A I L R O A D SUTT O N L A K E R D SUTTON STEAM P L A N T R D ROYMAC D R F R E D R I C K S O N R D METR O C I R C L E F R E D R I C K S O N R D APPROXIMATE ROUTE OF THE NEW WILLMINGTON BYPASS (I-140) N C H I G H W A Y 4 2 1 R A I L R O A D R A I L R O A D NHC-SW1 (ABANDONED) OLD ASH POND AREA NEW ASH POND AREA - LINED FORMER ASH DISPOSAL AREA CAPE FEAR RIVER CA P E F E A R R I V E R WOOTEN PRODUCTION WELL (APPROXIMATE) PE-SW2 DUKE ENERGY PROGRESS PRODUCTION WELL (APPROXIMATE) NHC-SW4 CFPUA PRODUCTION WELL (APPROXIMATE) PARCEL LINE (APPROXIMATE) 6 EDR 3 EDR REPORTED WELL LOCATION (APPROXIMATE) INVISTA 3 INVISTA 6 INVISTA 5 INVISTA 4 INVISTA 3 INVISTA 2 INVISTA 1 INVISTA PRODUCTION WELL (APPROXIMATE) PRODUCTION WELLS PREVIOUSLY REPORTED OR OBSERVED PRODUCTION WELLS SHOWN. SOME WELLS MAY NO LONGER EXIST OR BE OPERATIONAL. ALL PRIVATE WATER WELL SUPPLY WELLS ARE NOT SHOWN ON THIS DRAWING. S. T. WOOTEN CORPORATION S. T. WOOTEN CORPORATION MINE BOUNDARY IN T E R S T A T E 1 4 0 ( U S H I G H W A Y 1 7 ) PE-SW6D COOLING POND WATER LEVEL = 9.7 ft PROVIDED BY DUKE ENERGY 06-01-2015 NPDES OUTFALL SW-004 NPDES OUTFALL SW-002 NPDES OUTFALL SW-001 NHC-SW (NOT IN USE) NHC-SW4 NHC-SW3 SOLAR FARM MW-27C AW-08C MW-10 PZ-6D 10.62 MW-23E 10.41 SMW-06D 10.17 MW-4B MW-23B PZ-10D 10.55 AW-06B AW-06D 10.99 AW-06E 10.82 1 0 . 5 1 1 . 0 10 . 5 10 . 5 10 . 0 9 . 0 9 . 5 10 . 0 10 . 0 GWPZ-1B GWPZ-1A SOURCES: 1.2014 AERIAL PHOTOGRAPH WAS OBTAINED FROM WSP FLOWN ON APRIL 17, 2014 2.MAY 23, 2014 AERIAL PHOTOGRAPH WAS OBTAINED FROM THE NRCS GEOSPATIAL DATA GATEWAY AT http://datagateway.nrcs.usda.gov/ 3.DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 HORIZONTAL DATUM (NAD 83) AND VERTICAL DATUM (NGVD88). 4.PARCEL DATA WAS OBTAINED FROM THE NORTH CAROLINA STATE LIBRARIES AT http://www.lib.ncsu.edu/gis/counties.html FOR NEW HANOVER COUNTY. 5.NEW WELL LOCATIONS SURVEYED BY McKIM & CREED. HORIZONTAL DATUM IS NAD83 AND THE VERTICAL DATUM IS NGVD88. 6.WELL LOCATIONS AND MEASURING POINTS WERE BASED ON A SURVEY BY JAMES L. HAINES & ASSOCIATES FOR ISH, INC. DATED DECEMBER 23, 2008. ISH DRAWING IS TITLED "POTENTIAL LOCATIONS FOR PROPOSED GEOPROBE AND WELL INSTALLATIONS", DATED FEBRUARY 25, 2009 WITH A CAD FILE NAME Figure 22.dwg 7. WELL LOCATIONS AND MEASURING POINTS WERE BASED ON A TABLE BY PARAMOUNTE ENGINEERING, WILMINGTON NC DATED 2012-03-05 SUPPLIED BY PROGRESS ENERGY. HORIZONTAL DATUM IS NAD83(NSRS2007) AND THE VERTICAL DATUM IS NGVD29. 8.THE PROPERTY BOUNDARY FOR THE L.V. SUTTON STEAM ELECTRIC PLANT WAS BASED ON A COMPOSITE MAP PREPARED BY DAVIS-MARTIN-POWELL & ASSOC., INC. THE DRAWINGS ARE DATED JUNE, 1995 WITH REVISION NOTE FOR MARCH 4, 2004. FILE NAME IS L-D-9022-7.DWG. HORIZONTAL DATUM IS NAD83 AND THE VERTICAL DATUM IS NGV 29. 9.THE LOCATION OF THE FORMER ASH DISPOSAL AREAS WAS BASED ON A FIGURE 2-2 PREPARED BY BLASLAND, BOUCK & LEE, INC. THE FIGURE IS TITLED "HORIZONTAL EXTENT OF THE ASH WITHIN THE FORMER DISPOSAL AREA". 10.MONITORING WELLS/PIEZOMETERS/SOIL BORINGS COMPLETED AS PART OF PREVIOUS ASSESSMENT ACTIVITIES. LOCATIONS ARE APPROXIMATE. 0 8 / 0 4 / 2 0 1 5 1 : 3 7 P M P : \ D u k e E n e r g y P r o g r e s s . 1 0 2 6 \ 1 0 8 . S u t t o n A s h B a s i n G W A s s e s s m e n t P l a n \ 1 . 1 1 C S A R e p o r t i n g \ F I G U R E S \ D E S U T T O N F I G U R E 6 - 9 X - S E C T I O N S I T E C O N C E P T U A L M O D E L . d w g 1 4 8 R I V E R S T R E E T , S U I T E 2 2 0 G R E E N V I L L E , S O U T H C A R O L I N A 2 9 6 0 1 P H O N E 8 6 4 - 4 2 1 - 9 9 9 9 w w w . s y n t e r r a c o r p . c o m P R O J E C T M A N A G E R : L A Y O U T : D R A W N B Y : P . W A L D R E P D A T E : J O H N C H A S T A I N F I G 6 - 9 X - S E C T I O N C O N C E P T U A L M O D E L 0 7 / 3 0 / 2 0 1 5 1 9 7 1 A S H B A S I N ( S O U R C E ) A S H COOLI N G P O N D L A K E S U T T O N R D S A N D H I L L S W I T H P O S S I B L E R E C H A R G E Z O N E S PROPERTY LINE A S H P O R E W A T E R S A N D Q U A R R Y P O N D PEE DEE A Q U I F E R CAPE FEAR RIVER MANMADE BERM FORTHE COOLING POND L E G E N D I N F E R R E D O R M E A S U R E D A P P R O X I M A T E W A T E R T A B L E N O T E : D A S H E D G R O U N D W A T E R F L O W D I R E C T I O N A R R O W S I N D I C A T E I N F E R R E D F R O M T O P O G R A P H Y SEA WATER FRESH WATER W S W O O T E N P R O P E R T Y D U K E E N E R G Y P R O G R E S S S U T T O N E N E R G Y C O M P L E X P R O D U C T I O N W E L L S P E E D E E A Q U I F E R S E A W A T E R F R E S H W A T E R PEE DEE A Q U I F E R P E E D E E A Q U I F E R F I G U R E 6 - 9 C R O S S - S E C T I O N - C O N C E P T U A L S I T E M O D E L L . V . S U T T O N E N E R G Y C O M P L E X W I L M I N G T O N , N O R T H C A R O L I N A N O T T O S C A L E A R E A O F C O N C E N T R A T I O N S I N G R O U N D W A T E R A B O V E N C 2 L S T A N D A R D Elevation S t a t i o n -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 600+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+0016+0017+0018+0019+0020+0021+0022+0023+0024+0025+0026+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 60+00 61+00 62+00 63+00 64+00 65+00 66+00 67+00 68+00 69+00 70+00 71+00 72+00 73+00 74+00 75+00 76+00 77+00 78+00 79+00 80+00 3 . 7 x 1 0 - 2 3 . 0 x 1 0 - 2 N T N T NT 4 . 3 x 1 0 - 2 2 . 6 x 1 0 - 2 Elevation - 1 1 0 - 1 0 0 - 9 0 - 8 0 - 7 0 - 6 0 - 5 0 - 4 0 - 3 0 - 2 0 - 1 0 0 1 0 2 0 3 0 4 0 5 0 6 0 80+0081+0082+0083+0084+0085+0086+0087+0088+0089+0090+0091+0092+0093+0094+0095+0096+0097+0098+0099+00100+00101+00 102+00 103+00 104+00 105+00 106+00 107+00 108+00 109+00 110+00 111+00 112+00 113+00 114+00 115+00 116+00 117+00 118+00 119+00 120+00 121+00 122+00 123+00 124+00 125+00 126+00 127+00 128+00 129+00 130+00 131+00 132+00 133+00 134+00 135+00 136+00 137+00 138+00 139+00 140+00 141+00 142+00 143+00 144+00 145+00 146+00 146+50 6.7 x 10-42.8 x 10-2 4 . 4 x 1 0 - 2 1.1 x 10-4 7 . 2 x 1 0 - 4 3 . 8 x 1 0 - 2 6 . 2 x 1 0 - 2 1 . 2 x 1 0 - 5 2 . 6 x 1 0 - 2 AW-08AW-08B: Sb<1 / As<1 / B<50 / Ba25 / Co2.53 / Fe4450 / Mn29 / Tl<0.2 / V0 . 3 3 5 AW-08C: Sb<1 / As<1 / B<50 / Ba94 / Co1.19 / Fe61 / Mn231 / Tl<0.2 / V<0 . 3 0-2': Sb<1.1 / As<1.1 / B<2.7 / Co<1.1 / Fe31.5 / Mn<0.27 / V<1.18'-10': Sb<1.2 / As<1.2 / B<3.1 / Co<1.2 / Fe85.3 / Mn0.41 / V<1.240'-42': Sb<1.1 / As<1.1 / B<2.8 / Co<1.1 / Fe392 / Mn1.5 / V1.1 M W - 2 7 B : S b < 1 / A s < 1 / B 1 9 5 / C o 1 . 6 5 / F e < 1 0 / M n 5 5 / T l < 0 . 2 / V < 0 . 3 ABMW-02ABMW-02S: Sb<1 / As53.4 / B234 / Ba1840 / Co<1 / Fe24100 / Mn7 8 4 / T l < 0 . 2 / V 1 . 2 8 ABMW-02D: Sb<1 / As170 / B600 / Ba65 / Co<1 / Fe1270 / Mn150 / T l < 0 . 2 / V < . 0 3 3'-5': Sb<4.7 / As51.4 / B21.9j / Co19.5 / Fe9860 / Mn79.5 / V7810'-12': Sb<2.8 / As<2.8 / B<14.1 / Co<2.8 / Fe211 / Mn<1.4 / V<2.8 A W - 0 9 A W - 0 9 B : S b < 1 / A s < 1 / B < 5 0 / B a 1 6 / C o < 1 / F e 2 2 5 / M n 1 8 / T l < 0 . 2 / V < 0 . 3 A W - 0 9 C : S b < 1 / A s < 1 / B 5 5 4 / B a 1 0 4 / C o 1 . 1 3 / F e 1 0 2 / M n 2 8 9 / T l < 0 . 2 / V < 0 . 3 A W - 0 9 D : B a 8 2 ' - 4 ' : S b < 1 / A s < 1 / B < 2 . 6 / C o < 1 . 3 / F e 1 1 . 9 / M n 0 . 5 4 / V < 1 1 4 ' - 1 6 ' : S b < 1 . 3 / A s < 1 . 3 / B < 3 . 2 / C o < 1 . 1 / F e 1 9 4 / M n 0 . 7 2 / V < 1 . 3 4 3 ' - 4 5 ' : S b < 1 . 3 / A s < 1 . 3 / B < 3 . 2 / C o < 1 . 3 / F e 2 5 3 / M n 3 . 1 / V < 1 . 3 M W - 3 7 M W - 3 7 B : S b < 1 / A s 3 . 0 8 / B < 5 0 / C o 2 . 5 2 / F e 9 5 8 0 / M n 2 5 4 / T l < 0 . 2 / V < 0 . 3 M W - 3 7 C : S b < 1 / A s < 1 / B < 5 0 / C o < 1 / F e 3 3 / M n 6 / T l < 0 . 2 / V 1 . 2 2 0 - 2 ' : S b < 1 . 1 / A s < 1 . 1 / B < 2 . 7 / C o < 1 . 1 / F e 5 7 . 9 / M n 0 . 7 2 / V < 1 . 1 4 ' - 6 ' : S b < 1 . 1 / A s < 1 . 1 / B < 2 . 8 / C o < 1 . 1 / F e 8 7 5 / M n 3 . 9 / V < 1 . 1 4 3 ' - 4 5 ' : S b < 1 . 2 / A s 1 . 2 / B 4 . 5 / C o < 1 . 2 / F e 1 3 0 0 / M n 6 . 3 / V 7 . 6 w w w . s y n t e r r a c o r p . c o m 1 4 8 R i v e r S t r e e t , S u i t e 2 2 0 G r e e n v i l l e , S o u t h C a r o l i n a 2 9 6 0 1 8 6 4 - 4 2 1 - 9 9 9 9 5 / 2 2 / 2 0 1 5 5 / 2 2 / 2 0 1 5 P . W A L D R E P C . N E W E L L P R O J E C T M A N A G E R : L A Y O U T N A M E : D R A W N B Y : C H E C K E D B Y : K A T H Y W E B B D A T E : D A T E : F I G U R E 8 - 1 G E O L O G I C C R O S S S E C T I O N A - A ' C O I A N A L Y T I C A L R E S U L T S F I G U R E 8 - 1 L . V . S U T T O N E N E R G Y C O M P L E X 8 0 1 S U T T O N S T E A M P L A N T R D W I L M I N G T O N , N O R T H C A R O L I N A B O R I N G S Y M B O L S W E L L S C R E E N W I T H H Y D R A U L I C C O N D U C T I V I T Y I N C E N T I M E T E R S P E R S E C O N D ( S O U R C E : S Y N T E R R A ) 3 0 0 0 3 0 0 6 0 0 G R A P H I C S C A L E I N F E E T 3 0 0 3 0 6 0 I N F E E T H O R I Z O N T A L : 1 " = 3 0 0 ' V E R T I C A L : 1 " = 3 0 ' S E C T I O N A - A ' F A C I N G E A S T S E C T I O N A - A ' F A C I N G E A S T MATCH LINE MATCH LINE (MSL) (MSL) CANAL CANAL MW-36C GP-01 C O A L A S H C O A L A S H COALASHCOAL ASHSURFICIAL S U R F I C I A L S U R F I C I A L SURFICIAL P E E D E E P E E D E E U N D I S T U R B E D S O I L S A M P L E W I T H V E R T I C A L H Y D R A U L I C C O N D U C T I V I T Y ( S O U R C E : B L E ) MW-5C: Sb<1 / As<1 / B<50 / Co1.62 / Fe<10 / Mn441 / Tl<0.2 / VNAP:\DUKE ENERGY PROGRESS.1026\108. SUTTON ASH BASIN GW ASSESSMENT PLAN\1.11 CSA REPORTING\FIGURES\SUTTON-CSA-FIGURES.DWG08/02/2015 1:49 PM S O U R C E S : 1 . D R A W I N G H A S B E E N S E T W I T H A P R O J E C T I O N O F N O R T H C A R O L I N A S T A T E P L A N E C O O R D I N A T E S Y S T E M F I P S 3 2 0 0 ( N A D 8 3 ) . 2 . 2 f t C O N T O U R I N T E R V A L S F R O M N C D O T L I D A R D A T E D 2 0 0 7 h t t p s : / / c o n n e c t . n c d o t . g o v / r e s o u r c e s / g i s / p a g e s / c o n t - e l e v _ v 2 . a s p x 3 . S E L E C T T O P O G R A P H I C A D J U S T M E N T S B A S E D O N S I T E S U R V E Y A N D C O M P A R I S O N T O A E R I A L P H O T O G R A P H . N O T E : 1 . C O N T O U R L I N E S A R E U S E D F O R R E P R E S E N T A T I V E P U R P O S E S O N L Y A N D A R E N O T T O B E U S E D F O R D E S I G N O R C O N S T R U C T I O N P U R P O S E S . 2 . C R O S S S E C T I O N L O C A T I O N S A R E S H O W N O N F I G U R E 1 - 2 . A S H B A S I N C O A L A S H C L A Y L I N E R ( 1 2 " ) R O A D W A T E R L E V E L ( J U N E 2 0 1 5 ) L E G E N D S U R F I C I A L S A N D ( W E L L S O R T E D - S I L T Y S A N D - M E D I U M T O F I N E G R A I N E D S A N D ) S U R F I C I A L S A N D ( P O O R L Y S O R T E D - M E D I U M T O C O A R S E G R A I N E D S A N D ) C O A L A S H C O A R S E S A N D W I T H F I N E G R A V E L S A N D ( P E E D E E ) C L A Y R I C H F A C I E S N O T T E S T E D N T F I L L M A T E R I A L S C A L E : A S S H O W N S O I L S A M P L E ( G R A B ) K V a l u e A W - 0 1 A W - 0 1 B : G R O U N D W A T E R A N A L Y T I C A L R E S U L T S F O R S U R F I C I A L A Q U I F E R I N M I C R O G R A M S P E R L I T E R A W - 0 1 C : G R O U N D W A T E R A N A L Y T I C A L R E S U L T S F O R P E E D E E I N M I C R O G R A M S P E R L I T E R 0 - 2 ' : S O I L T O T A L A N A L Y T I C A L R E S U L T S I N m g / k g 4 . 4 x 1 0 - 4 A B M W - 0 1 A B M W - 0 1 S : S b < 1 / A s 6 3 4 / B 3 9 4 0 / B a 5 8 5 / C o < 1 / F e 1 5 2 / M n 8 8 / T l < 0 . 2 / V 3 . 4 5 A B M W - 0 1 D : S b < 1 / A s 1 . 0 3 / B 1 6 7 / B a 1 6 / C o < 1 / F e 4 7 5 / M n 8 2 / T l < 0 . 2 / V 0 . 6 4 2 3 ' - 5 ' : S b < 3 . 4 / A s 2 2 . 1 / B 8 . 7 j / C o 6 . 7 / F e 9 5 9 0 / M n 3 5 . 2 / V 3 4 . 4 7 8 ' - 8 0 ' : S b < 2 . 8 / A s 1 6 . 8 / N 7 . 2 j / C o 2 . 5 j / F e 5 1 1 0 / M n 2 4 . 2 / V 1 5 . 7 8 2 ' - 8 4 ' : S b < 3 . 4 / A s 3 . 3 j / B 1 2 . 6 j / C o < 3 . 4 / F e 6 5 0 0 / M n 2 8 . 9 / V 7 . 9 9 6 ' - 9 8 ' : S b < 3 . 3 / A s 2 . 1 j / B 1 2 . 5 j / C o 3 . 3 / F e 6 0 5 0 / M n 3 9 . 3 / V 8 . 8 Elevation Elevation S t a t i o n -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 - 1 0 0 - 9 0 - 8 0 - 7 0 - 6 0 - 5 0 - 4 0 - 3 0 - 2 0 - 1 0 0 1 0 2 0 3 0 4 0 5 0 6 0 0+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 54+00 54+50 N T N T 1 . 7 x 1 0 - 5 1 . 5 x 1 0 - 7 8 . 2 x 1 0 - 3 6 . 7 x 1 0 - 4 4 . 2 x 1 0 - 2 4 . 7 x 1 0 - 2 Elevation Elevation S t a t i o n -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 - 1 4 0 - 1 3 0 - 1 2 0 - 1 1 0 - 1 0 0 - 9 0 - 8 0 - 7 0 - 6 0 - 5 0 - 4 0 - 3 0 - 2 0 - 1 0 0 1 0 2 0 3 0 4 0 5 0 6 0 0+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 53+50 3 . 7 x 1 0 - 5 9 . 0 x 1 0 - 5 1 . 9 x 1 0 - 7 5 . 7 x 1 0 - 2 3 . 6 x 1 0 - 2 N T N T 4 . 7 x 1 0 - 2 4 . 5 x 1 0 - 2 5 / 2 2 / 2 0 1 5 5 / 2 2 / 2 0 1 5 P . W A L D R E P C . N E W E L L P R O J E C T M A N A G E R : L A Y O U T N A M E : D R A W N B Y : C H E C K E D B Y : K A T H Y W E B B D A T E : D A T E : F I G U R E 8 - 2 w w w . s y n t e r r a c o r p . c o m 1 4 8 R i v e r S t r e e t , S u i t e 2 2 0 G r e e n v i l l e , S o u t h C a r o l i n a 2 9 6 0 1 8 6 4 - 4 2 1 - 9 9 9 9 L . V . S U T T O N E N E R G Y C O M P L E X 8 0 1 S U T T O N S T E A M P L A N T R D W I L M I N G T O N , N O R T H C A R O L I N A 3 0 0 0 3 0 0 6 0 0 G R A P H I C S C A L E I N F E E T 3 0 0 3 0 6 0 I N F E E T H O R I Z O N T A L : 1 " = 3 0 0 ' V E R T I C A L : 1 " = 3 0 ' S E C T I O N C - C ' F A C I N G N O R T H (MSL) (MSL) PZ-INT S E C T I O N B - B ' F A C I N G N O R T H (MSL) (MSL)COOLING POND GP-03 P E E D E E COAL ASH S U R F I C I A L COAL ASH S U R F I C I A L S U R F I C I A L P E E D E E M W - 2 3 B : S b < 1 / A s < 1 / B 1 4 4 / B a 3 8 / C o < 1 / F e 2 0 / M n 9 / T l < 0 . 2 / V < 0 . 3 M W - 2 3 C : S b < 1 / A s < 1 / B 2 0 5 0 / B a 3 5 / C o 5 . 1 9 / F e 8 8 / M n 3 0 9 / T l 0 . 2 1 / V 0 . 3 2 3 M W - 2 3 E : S b < 1 / A s < 1 / B 2 5 0 0 / B a < 5 / C o < 1 / F e 4 8 / M n 5 / T l < 0 . 2 / V 0 . 9 9 3 ABMW-01ABMW-01S: Sb<1 / As634 / B3940 / Ba585 / Co<1 / F e 1 5 2 / M n 8 8 / T l < 0 . 2 / V 3 . 4 5 ABMW-01D: Sb<1 / As1.03 / B167 / Ba16 / Co<1 / F e 4 7 5 / M n 8 2 / T l < 0 . 2 / V 0 . 6 4 2 3'-5': Sb<3.4 / As22.1 / B8.7j / Co6.7 / Fe9590 / Mn3 5 . 2 / V 3 4 . 4 78'-80': Sb<2.8 / As16.8 / N7.2j / Co2.5j / Fe5110 / M n 2 4 . 2 / V 1 5 . 7 82'-84': Sb<3.4 / As3.3j / B12.6j / Co<3.4 / Fe6500 / M n 2 8 . 9 / V 7 . 9 96'-98': Sb<3.3 / As2.1j / B12.5j / Co3.3 / Fe6050 / M n 3 9 . 3 / V 8 . 8 A W - 0 4 A W - 0 4 B : S b < 1 / A s < 1 / B < 5 0 / B a 1 1 / C o < 1 / F e 4 1 / M n 2 2 / T l < 0 . 2 / V < 0 . 3 A W - 0 4 C : S b < 1 / A s < 1 / B 1 4 5 0 / B a 3 9 / C o < 1 / F e 3 9 9 0 / M n 7 8 7 / T l < 0 . 2 / V 0 . 5 1 8 0 - 2 ' : S b < 1 / A s < 1 / B < 2 . 6 / C o < 1 / F e 8 1 5 / M n 1 . 4 / V 2 . 2 9 ' - 1 0 ' : S b < 1 . 1 / A s < 1 . 1 / B 2 < 2 . 8 / C o < 1 . 1 / F e 2 9 7 / M n 1 / V < 1 . 1 4 7 ' - 4 8 ' : S b < 1 . 1 / A s < 1 . 1 / B < 2 . 8 / C o < 1 . 1 / F e 1 9 5 0 / M n 1 9 . 5 / V < 1 . 1 A W - 0 7 A W - 0 7 D : S b < 1 / A s < 1 / B 8 1 5 / B a < 5 / C o < 1 / F e 2 2 0 / M n 1 4 / T l < 0 . 2 / V 0 . 9 9 2 M W - 3 1 C : S b < 1 / A s < 1 / B 1 1 8 0 / B a 5 7 / C o 1 . 1 / F e 2 6 9 0 / M n 1 7 4 0 / T l < 0 . 2 / V < 0 . 3 0 - 2 ' : S b < 1 . 1 / A s < 1 . 1 / B < 2 . 7 / C o < 1 . 1 / F e 1 3 3 0 / M n 1 . 4 / V 2 . 9 8 ' - 1 0 ' : S b < 1 . 1 / A s < 1 . 1 / B < 2 . 9 / C o < 1 . 1 / F e 7 8 2 / M n 7 . 3 / V < 1 . 1 1 5 ' - 1 7 ' : S b < 1 . 2 / A s < 1 . 2 / B < 2 . 9 / C o < 1 . 2 / F e 1 0 1 / M n 0 . 5 6 / V < 1 . 2 4 6 ' - 4 7 ' : S b < 1 . 1 / A s 4 . 5 / B 2 0 . 8 / C o < 1 . 1 / F e 1 8 0 0 0 / M n 2 0 4 / V 9 S M W - 0 1 S M W - 0 1 B : S b < 1 / A s < 1 / B 1 0 0 / B a 7 4 / C o < 1 / F e 3 0 / M n 1 4 / T l < 0 . 2 / V < 0 . 3 S M W - 0 1 C : S b < 1 / A s < 1 / B 7 7 6 / B a 3 5 / C o < 1 / F e 4 2 5 0 / M n 8 0 7 / T l < 0 . 2 / V 0 . 4 0 2 0 - 2 ' : S b < 6 . 9 / A s < 6 . 9 / B < 1 7 . 2 / C o < 6 . 9 / F e 6 0 9 / M n 2 . 1 / V < 6 . 9 8 ' - 1 0 ' : S b < 6 . 1 / A s < 6 . 1 / B < 1 5 . 3 / C o < 6 . 1 / F e 8 2 . 3 / M n < 1 . 5 / V < 6 . 1 4 2 ' - 4 4 ' : S b < 6 . 2 / A s < 6 . 2 / B < 1 5 . 4 / C o < 6 . 2 / F e 1 8 7 0 / M n 7 . 5 / V < 6 . 2 S M W - 0 5 S M W - 0 5 B : S b < 1 / A s 1 . 4 7 / B < 5 0 / B a 3 6 / C o < 1 / F e 9 9 1 0 / M n 1 3 9 / T l < 0 . 2 / V 0 . 8 1 S M W - 0 5 C : S b < 1 / A s < 1 / B 3 6 2 / B a 7 6 / C o 2 . 6 / F e 1 7 5 / M n 1 3 0 / T l < 0 . 2 / V < 0 . 3 0 - 2 ' : S b < 7 . 2 / A s < 7 . 2 / B < 1 7 . 9 / C o < 7 . 2 / F e 4 3 . 8 / M n < 1 . 8 / V < 7 . 2 6 ' - 8 ' : S b < 6 . 1 / A s < 6 . 1 / B < 1 5 . 3 / C o < 6 . 1 / F e 5 4 . 6 / M n < 1 . 5 / V < 6 . 1 4 1 ' - 4 3 ' : S b < 5 . 8 / A s < 5 . 8 / B < 1 4 . 6 / C o < 5 . 8 / F e 1 2 4 / M n 4 . 3 / V < 5 . 8 MW-24B: Sb< 1 / A s < 1 / B 4 0 9 / C o < 1 / F e < 1 0 / M n 3 5 / T l < 0 . 2 / V 0 . 5 5 5 MW-24C: Sb< 1 / A s 3 . 4 2 / B 1 0 4 0 / C o 1 8 . 6 / F e 4 1 8 0 / M n 1 1 2 0 / T l < 0 . 2 / V 0 . 5 4 3 P:\DUKE ENERGY PROGRESS.1026\108. SUTTON ASH BASIN GW ASSESSMENT PLAN\1.11 CSA REPORTING\FIGURES\SUTTON-CSA-FIGURES.DWG08/02/2015 1:50 PM S O U R C E S : 1 . D R A W I N G H A S B E E N S E T W I T H A P R O J E C T I O N O F N O R T H C A R O L I N A S T A T E P L A N E C O O R D I N A T E S Y S T E M F I P S 3 2 0 0 ( N A D 8 3 ) . 2 . 2 f t C O N T O U R I N T E R V A L S F R O M N C D O T L I D A R D A T E D 2 0 0 7 h t t p s : / / c o n n e c t . n c d o t . g o v / r e s o u r c e s / g i s / p a g e s / c o n t - e l e v _ v 2 . a s p x 3 . S E L E C T T O P O G R A P H I C A D J U S T M E N T S B A S E D O N S I T E S U R V E Y A N D C O M P A R I S O N T O A E R I A L P H O T O G R A P H . N O T E : 1 . C O N T O U R L I N E S A R E U S E D F O R R E P R E S E N T A T I V E P U R P O S E S O N L Y A N D A R E N O T T O B E U S E D F O R D E S I G N O R C O N S T R U C T I O N P U R P O S E S . 2 . C R O S S S E C T I O N L O C A T I O N S A R E S H O W N O N F I G U R E 1 - 2 . W A T E R L E V E L ( J U N E 2 0 1 5 ) F I G U R E 8 - 2 G E O L O G I C C R O S S S E C T I O N S B - B ' A N D C - C ' C O I A N A L Y T I C A L R E S U L T S L E G E N D S U R F I C I A L S A N D ( W E L L S O R T E D - S I L T Y S A N D - M E D I U M T O F I N E G R A I N E D S A N D ) S U R F I C I A L S A N D ( P O O R L Y S O R T E D - M E D I U M T O C O A R S E G R A I N E D S A N D ) C O A L A S H C O A R S E S A N D W I T H F I N E G R A V E L S A N D ( P E E D E E ) C L A Y R I C H F A C I E S N O T T E S T E D N T CLAY LINER (12") F I L L M A T E R I A L S C A L E : A S S H O W N B O R I N G S Y M B O L S W E L L S C R E E N W I T H H Y D R A U L I C C O N D U C T I V I T Y I N C E N T I M E T E R S P E R S E C O N D ( S O U R C E : S Y N T E R R A ) U N D I S T U R B E D S O I L S A M P L E W I T H V E R T I C A L H Y D R A U L I C C O N D U C T I V I T Y ( S O U R C E : B L E ) S O I L S A M P L E ( G R A B ) K V a l u e A W - 0 1 A W - 0 1 B : G R O U N D W A T E R A N A L Y T I C A L R E S U L T S F O R S U R F I C I A L A Q U I F E R I N M I C R O G R A M S P E R L I T E R A W - 0 1 C : G R O U N D W A T E R A N A L Y T I C A L R E S U L T S F O R P E E D E E I N M I C R O G R A M S P E R L I T E R 0 - 2 ' : S O I L T O T A L A N A L Y T I C A L R E S U L T S I N m g / k g 4 . 4 x 1 0 - 4 C A P E F E A R R I V E R U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND C O O L I N G P O N D COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 8-3-Site M ap with Soil Exceedances_v08012015.mxd PROJECT MANAGER: J MAHAN DRAWN BY: T KING DATE: 08/01/2015 DATE: 08/01/2015 CHECKED BY: J. MEADOWS FIGURE 8-3SITE MAP W IT H SOIL EXCEEDANCESL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com LEGEND NOTES:1 APRIL 17, 2014 AERIAL ORTHOPHOTOGRAPHY OBTAINED FROM WSP 2 2013 AERIAL ORTHOPHOTOGRAPHY OBTAINED FROM NC CENTER FOR GEOGRAPHIC INFORMATION AND ANALYSIS, AT (http://services.nconemap.gov/) 3 PARCEL BOUNDARY WAS OBTAINED FROM THE NC CENTER FOR GEOGRAPHIC INFORMATION AND ANALYSIS, AT (http://services.nconemap.gov/) 4 DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83). 5 j = INDICATES CONCENTRATION REPORTED BELOW PQL, BUT ABOVE MDL AND THEREFORE CONCENTRATION IS ESTIMATED MONITORI NG WEL L SOI L BORING ASH BASIN BOUNDARY ASH BASIN CO MPLIANCE BO UNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY Ana lytica l Parameter Reporting Units 01-Industrial Health EPA RSL 2015-06 02-Residential Health EPA RSL 2015-06 03-Protection of Groundwa ter EPA RSL 2015-06 Aluminum mg/kg 110000 7700 Arsenic mg/kg 3 0.68 0.29 Ba rium mg/kg 22000 1500 82 Beryllium mg/kg 230 16 3.2 Coba lt mg/kg 35 2.3 Copper mg/kg 4700 310 46 Iron mg/kg 82000 5500 Lead mg/kg 800 400 14 Manganese mg/kg 2600 180 Mercury mg/kg 4 0.94 0.1 Selenium mg/kg 580 39 0.26 Va na dium mg/kg 580 39 DEPTH(82-84)(96-98) Arsenic3.3 j2.1 j Iron65006050 AB-01 DEPTH(53-55)Arsenic2 j Iron5640 AB-02 DEPTH(108-110)Arsenic2.2 Iron11000 AW-06D DEPTH(46-47)Arsenic4.5 Iron18000 Manganese204 AW-07D DEPTH(101-103)Iron9000 SMW-06D Se rvice L ayer Cre dits: NC One Ma p, NCCenter for Geo graphic Info rma tio n a ndAnalysis, NC 911 Board PRJ-I-140 SR-1347 S R -1 3 8 5 SR-1430 RMP-5815 U S-421 SR-1394 SR-2836 R M P -5 8 2 1 S R -2 8 3 8 S R-2 1 6 9 U S-17 S R -2 7 7 9 S R -2 1 4 5 P R J -I -1 4 0 SR-2000 I -1 4 0 I -1 4 0 R M P -5 8 1 4 S R -1 4 3 1 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND P:\DU KE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-1-SITE LAYOUT WITH 2L EXCEEDANCES-UPPER SURFICIAL AQUIFER_V07302015.MXD LEGEND MONITORING WELL PIEZOMETER ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITEBOUNDARY 148 River S treet, Su ite 220Greenville, SC 29601864-421-9999www.syn terraco rp .com DATE: 08/01/201 5CHECKED BY: J. MEAD OWSDRAWN BY: T. KING PR OJECT MANAGER: P. WAL DREP 400 0 400 800 1,200 1,600 2,000 (IN FEET) GRAPHIC SCALE L. V. SUT TON ENE RGY COM P LE X801 SU TTON ST EA M P LA NT RDWILMINGTON, NORT H CAROL INA FIG URE 10-1SITE LAYOUT WITH 2 L EXC EEDA NCESUPPER SURFICIAL AQUIFER NOT ES:1 AP RIL 17, 2014 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM WS P 2 2013 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 3 PARCEL B OUNDA RY WA S OB TAINED FROM THE NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 4 DRAW ING HA S BE EN SE T W ITH A PROJE CTION O F NO RTH CA ROLINA S TAT E PLANE COORDINATE SYS TEM FIPS 3200 (NA D83). 5 NORTH CA RO LINA 2L INTERIM MA XIMUM A LLOWABLE CONCENTRATION DATE: 08/01/201 5 Constitue nt Abbreviati on Uppe r Limit Units Lower Li mitAntimony5Sb1µg/L ---Arseni c As 10 µg/L ---Boron B 700 µg/L ---Chlori de Cl 250 mg/L ---Chromi um Cr 10 µg/L ---Cobal t5 Co 1 µg/L ---Iron Fe 300 µg/L ---Mangane se Mn 50 µg/L ---pH pH 8.5 S.U.6.5SeleniumSe20µg/L ---Sul fate SO4 250 mg/L ---Thal lium5 Tl 0.2 µg/L ---Total Di ssol ved Solids TDS 500 mg/L ---Vanadium5 V 0.3 µg/L --- North Carol i na 2L Standards ConstituentMnpH Result845.7 421-Well 3 ConstituentMnpH Result575.3 421-Well 4 ConstituentAsBMnpHTDSV Result6343940888.976803.45 ABMW-01S ConstituentAsBaFeMnV Result53.41810241007841.28 ABMW-02S ConstituentCoFeMnpH Result1.4426801055.8 AW-01B ConstituentFeMnpH Result13202046.1 AW-02B ConstituentFepHV Result62905.80.427 AW-03B ConstituentpH Result6.16 AW-04B ConstituentpH Result4.8 AW-06B ConstituentCoFepHV Result2.5344505.10.335 AW-08B ConstituentCr(VI)pH Result0.0384.6 AW-09B ConstituentpH Result4.1 MW-07A ConstituentpH Result4.3 MW-07B ConstituentAsFeMnV Result23.63690763.88 MW-15 ConstituentpHV Result5.90.316 MW-16 ConstituentBCoFeMnpHTl Result20805.279143866.40.458 MW-19 ConstituentFeMnV Result74710739.6 MW-20 ConstituentpH Result5.71 MW-22B ConstituentCr(VI)pH Result0.0516.3 MW-23B ConstituentBCoCr(VI)FeMnV Result103017.90.098356010400.555 MW-24B ConstituentCoMnpHSe Result1.95554.727.1 MW-27B ConstituentpH Result6.3 MW-28B ConstituentFeMnpHV Result11807360.378 MW-31B ConstituentCoFeMnpH Result2.5295802544.3 MW-37B ConstituentpH Result4.6 SMW-01B ConstituentFeMnpHV Result288004136.41.42 SMW-02B ConstituentFeMnNO2+NO3pH Result131091155.5 SMW-03B ConstituentFeMnpH Result7590855.7 SMW-04B ConstituentFeMnpHV Result99101395.70.81 SMW-05B ConstituentpH Result5.66 SMW-06B Se rvice L ayer Cre dits: NC One Ma p, NCCenter for Geo graphic Info rma tio n a ndAnalysis, NC 911 Board PRJ-I-140 SR-1347 S R -1 3 8 5 SR-1430 RMP-5815 U S-421 SR-1394 SR-2836 R M P -5 8 2 1 S R -2 8 3 8 S R-2 1 6 9 U S-17 S R -2 7 7 9 S R -2 1 4 5 P R J -I -1 4 0 SR-2000 I -1 4 0 I -1 4 0 R M P -5 8 1 4 S R -1 4 3 1 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND P:\DU KE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-2-SITE LAYOUT WITH 2L EXCEEDANCES-LOWER SURFICIAL AQUIFER_V07302015.MXD LEGEND MONITORING WELL PIEZOMETER ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGESS SUTTON PLANT SITEBOUNDARY 148 River S treet, Su ite 220Greenville, SC 29601864-421-9999www.syn terraco rp .com DATE: 08/01/201 5CHECKED BY: J. MEAD OWSDRAWN BY: T. KING PR OJECT MANAGER: P. WAL DREP 400 0 400 800 1,200 1,600 2,000 (IN FEET) GRAPHIC SCALE L. V. SUT TON ENE RGY COM P LE X801 SU TTON ST EA M P LA NT RDWILMINGTON, NORT H CAROL INA FIG URE 10-2SITE LAYOUT WITH 2 L EXC EEDA NCESLOWER SURFICIAL AQUIFER NOT ES:1 AP RIL 17, 2014 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM WS P 2 2013 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 3 PARCEL B OUNDA RY WA S OB TAINED FROM THE NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 4 DRAW ING HA S BE EN SE T W ITH A PROJE CTION O F NO RTH CA ROLINA S TAT E PLANE COORDINATE SYS TEM FIPS 3200 (NA D83). 5 NORTH CA RO LINA 2L INTERIM MA XIMUM A LLOWABLE CONCENTRATION DATE: 08/01/201 5 Constitue nt Abbreviati on Uppe r Limit Units Lower Li mitAntimony5Sb1µg/L ---Arseni c As 10 µg/L ---Boron B 700 µg/L ---Chlori de Cl 250 mg/L ---Chromi um Cr 10 µg/L ---Cobal t5 Co 1 µg/L ---Iron Fe 300 µg/L ---Mangane se Mn 50 µg/L ---pH pH 8.5 S.U.6.5SeleniumSe20µg/L ---Sul fate SO4 250 mg/L ---Thal lium5 Tl 0.2 µg/L ---Total Di ssol ved Solids TDS 500 mg/L ---Vanadium5 V 0.3 µg/L --- North Carol i na 2L Standards ConstituentAsFeMn Result1701270150 ABM W-02D ConstituentFeMnpH Result4701794.8 AW-01C ConstituentFeMnpH Result7610575.9 AW-02C ConstituentBCoFeMnpHTDSV Result13706.911130018305.95100.75 AW-03C ConstituentBFeMnpHV Result145039907876.20.518 AW-04C ConstituentpH Result4.7 AW-05C ConstituentCopH Result1.194.4 AW-08C ConstituentCoCr(VI)MnpH Result1.130.0462895.1 AW-09C ConstituentFeMn Result128059 MW-04B ConstituentCoMnpH Result1.624415.5 MW-05C ConstituentMnpHTl Result36850.405 MW-07C ConstituentpH Result4.5 MW-11 ConstituentBCoFeMn Result14701.265690691 MW-12 ConstituentCoMnpH Result13.59406.4 MW-15D ConstituentCoFeMnpHV Result5.2210203115.42.09 MW-16DConstituentFeMn Result864131 MW-20D ConstituentAsBCoFeMn Result53.8212010.65110430 MW-21C ConstituentBCoMnpHTl Result25604.777326.430.398 MW-22C ConstituentBCoMnTl Result20505.193090.21 MW-23C ConstituentBCoFeMnpHV Result104018.6418011205.50.543 MW-24C ConstituentpH Result5.62 MW-28C ConstituentBFeMnpHTDS Result1180285016805.2540 MW-31C ConstituentpH Result4.97 MW-32C ConstituentpH Result4.6 MW-33C ConstituentCoFeMnpHV Result2.7395802445.71.22 MW-37C ConstituentBFeMnpHV Result77642508075.50.402 SM W-01C ConstituentCoFeMnpH Result3.3753705395.7 SM W-02C ConstituentCoFeMnpH Result9.2115105844.9 SM W-03C ConstituentFeMnV Result96601320.803 SM W-04C ConstituentCoMnpH Result2.61304.9 SM W-05C ConstituentCoFeMnpH Result3.6513202735 SM W-06C Se rvice L ayer Cre dits: NC One Ma p, NCCenter for Geo graphic Info rma tio n a ndAnalysis, NC 911 Board PRJ-I-140 SR-1347 S R -1 3 8 5 SR-1430 RMP-5815 U S-421 SR-1394 SR-2836 R M P -5 8 2 1 S R -2 8 3 8 S R-2 1 6 9 U S-17 S R -2 7 7 9 S R -2 1 4 5 P R J -I -1 4 0 SR-2000 I -1 4 0 I -1 4 0 R M P -5 8 1 4 S R -1 4 3 1 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND P:\DU KE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-3-SITE LAYOUT WITH 2L EXCEEDANCES-UPPER PEE DEE WELLS_V07302015.MXD LEGEND MONITORING WELL PIEZOMETER ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGESS SUTTON PLANT SITEBOUNDARY 148 River S treet, Su ite 220Greenville, SC 29601864-421-9999www.syn terraco rp .com DATE: 08/01/201 5CHECKED BY: J. MEAD OWSDRAWN BY: T. KING PR OJECT MANAGER: P. WAL DREP 400 0 400 800 1,200 1,600 2,000 (IN FEET) GRAPHIC SCALE L. V. SUT TON ENE RGY COM P LE X801 SU TTON ST EA M P LA NT RDWILMINGTON, NORT H CAROL INA FIG URE 10-3SITE LAYOUT WITH 2 L EXC EEDA NCESUPPER PEE DEE WELLS NOT ES:1 AP RIL 17, 2014 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM WS P 2 2013 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 3 PARCEL B OUNDA RY WA S OB TAINED FROM THE NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 4 DRAW ING HA S BE EN SE T W ITH A PROJE CTION O F NO RTH CA ROLINA S TAT E PLANE COORDINATE SYS TEM FIPS 3200 (NA D83). 5 NORTH CA RO LINA 2L INTERIM MA XIMUM A LLOWABLE CONCENTRATION DATE: 08/01/201 5 Constitue nt Abbreviati on Uppe r Limit Units Lower Li mitAntimony5Sb1µg/L ---Arseni c As 10 µg/L ---Boron B 700 µg/L ---Chlori de Cl 250 mg/L ---Chromi um Cr 10 µg/L ---Cobal t5 Co 1 µg/L ---Iron Fe 300 µg/L ---Mangane se Mn 50 µg/L ---pH pH 8.5 S.U.6.5SeleniumSe20µg/L ---Sul fate SO4 250 mg/L ---Thal lium5 Tl 0.2 µg/L ---Total Di ssol ved Solids TDS 500 mg/L ---Vanadium5 V 0.3 µg/L --- North Carol i na 2L Standards ConstituentFeMnV Result475820.642 ABM W-01D ConstituentFeMnTDS Result43859510 AW-02D ConstituentBTDS Result980720 AW-06D ConstituentBpHTDSV Result8159.975100.992 AW-07D ConstituentTDS Result630 AW-09D ConstituentFeMnV Result347530.397 PZ -10D ConstituentBCr(VI)pHTDSV Result9900.0729.86701.61 SM W-06D Service Layer Credits: NC OneMap, NCCenter for Geographic Information andAnalysis, NC 911 Board PRJ-I-140 SR-1347 S R -1 3 8 5 SR-1430 RMP-5815 U S-421 SR-1394 SR-2836 R M P -5 8 2 1 S R -2 8 3 8 S R-2169 U S-17 S R -2 7 7 9 S R -2 1 4 5 P R J -I -1 4 0 SR-2000 I -1 4 0 I -1 4 0 R M P -5 8 1 4 S R -1 4 3 1 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-4-SITE LAYOUT WITH 2L EXCEEDANCES-LOWER PEE DEE WELLS_V07302015.MXD LEGEND MONITORING WELL PIEZOMETER ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGESS SUTTON PLANT SITEBOUNDARY 148 River Street, Suite 220Greenville, SC 29601864-421-9999www.synterracorp.com DATE: 08/01/2015CHECKED BY: J. MEADOWSDRAWN BY: T. KING PROJECT MANAGER: P. WALDREP 400 0 400 800 1,200 1,600 2,000 (IN FEET) GRAPHIC SCALE L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA FIGURE 10-4SITE LAYOUT WITH 2L EXCEEDANCESLOWER PEE DEE WELLS NOTES:1 APRIL 17, 2014 AERIAL ORTHOPHOTOGRAPHY OBTAINED FROM WSP 2 2013 AERIAL ORTHOPHOTOGRAPHY OBTAINED FROM NC CENTER FOR GEOGRAPHIC INFORMATION AND ANALYSIS, AT (http://services.nconemap.gov/) 3 PARCEL BOUNDARY WAS OBTAINED FROM THE NC CENTER FOR GEOGRAPHIC INFORMATION AND ANALYSIS, AT (http://services.nconemap.gov/) 4 DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83). 5 NORTH CAROLINA 2L INTERIM MAXIMUM ALLOWABLE CONCENTRATION DATE: 08/01/2015 Constituent Abbreviation Upper Limit Units Lower LimitAntimony5Sb1µg/L ---Arsenic As 10 µg/L ---Boron B 700 µg/L ---Chloride Cl 250 mg/L ---Chromium Cr 10 µg/L ---Cobalt5 Co 1 µg/L ---Iron Fe 300 µg/L ---Manganese Mn 50 µg/L ---pH pH 8.5 S.U.6.5SeleniumSe20µg/L ---Sulfate SO4 250 mg/L ---Thallium5 Tl 0.2 µg/L ---Total Dissolved Solids TDS 500 mg/L ---Vanadium5 V 0.3 µg/L --- North Carolina 2L Standards ConstituentBClpHTDS Result19505408.71500 AW-05E ConstituentBClCrCr(VI)FeTDSV Result247049014.70.06470415001.77 AW-06E ConstituentBClCr(VI)pHTDSV Result25005000.0471015000.993 MW-23E C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 1 0 1 0 10 1 0 0 FORMER ASHDISPOSAL AREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN MW-24B< 1 (2.91) AW-08B< 1 (< 1) MW-07B< 1 (< 1) MW-23B< 1 (< 1) MW-27B< 1 (< 1) AW-01B< 1 (< 1) AW-02B< 1 (< 1) AW-05B< 1 (< 1) AW-06B< 1 (< 1) 421-Well 3< 1 (NS) 421-Well 4< 1 (NS) SMW-06B< 1 (< 1) ABMW-01S634 (654) ABMW-02S53.4 (54.6) AW-09B< 1 (< 1) SMW-02B< 1 (1.04) SMW-03B< 1 (< 1) MW-31B< 1 (< 1) AW-04B< 1 (< 1) SMW-01B< 1 (< 1) SMW-04B< 1 (< 1) SMW-05B1.47 (1.34) AW-03B< 1 (< 1) MW-1523.6 (20.5) MW-161.49 (1.59) MW-201.12 (1) MW-37B3.08 (< 1) MW-07A< 1 (< 1) MW-192.62 (NS) MW-22B< 1 (NS) MW-28B< 1 (NS) COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE NORTH CAROLINA 2L FOR ARSENIC IS 10 μg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011). P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-5JUNE 2015 ISOCONCENTRATION MAPARSENIC IN UPPER SURFICIAL W EL LSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (10)(10) 1010 DISSOLVED ARSENIC CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL ARSENIC CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 700 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN MW-24B47 (40) AW-08B25 (25) MW-07B22 (22) MW-23B40 (38) MW-27B41 (39) AW-01B< 5 (< 5) AW-02B16 (15) AW-05B25 (21) AW-06B32 (30) 421-Well 344 (NS) 421-Well 444 (NS) SMW-06B48 (43) ABMW-01S594 (585) ABMW-02S1810 (1840)AW-09B18 (16) SMW-02B61 (59) SMW-03B53 (52) MW-31B35 (36) AW-04B12 (11) SMW-01B78 (74) SMW-04B17 (16) SMW-05B36 (36) AW-03B10 (9) MW-1530 (31) MW-1620 (20) MW-2055 (59) MW-37B39 (8) MW-07A6 (6) MW-1973 (NS) MW-22B9 (NS) MW-28B28 (NS) COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE NORTH CAROLINA 2L FOR BARIUM IS 700 μg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011). P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-6JUNE 2015 ISOCONCENTRATION MAPBARIUM IN UPPER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (700)(700) 700700 DISSOLVED BARIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL BARIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 700 700 FORMER ASHDISPOSAL AREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN MW-24B409 (1080) AW-08B< 50 (< 50) MW-07B< 50 (< 50) MW-23B145 (144) MW-27B198 (193) AW-01B< 50 (< 50) AW-02B< 50 (< 50) AW-05B< 50 (< 50) AW-06B< 50 (< 50) 421-Well 373 (NS) 421-Well 454 (NS) SMW-06B60 (59) ABMW-01S3940 (3950) ABMW-02S234 (237) AW-09B< 50 (< 50) SMW-02B< 50 (< 50) SMW-03B50 (52) MW-31B< 50 (54) AW-04B< 50 (< 50) SMW-01B100 (99) SMW-04B< 50 (< 50) SMW-05B< 50 (< 50) AW-03B< 50 (< 50) MW-1554 (64) MW-1690 (98) MW-2052 (65) MW-37B< 50 (< 50) MW-07A< 50 (< 50) MW-192080 (NS) MW-22B< 50 (NS) MW-28B< 50 (NS) COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE NORTH CAROLINA 2L FOR BORON IS 700 μg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011). P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-7JUNE 2015 ISOCONCENTRATION MAPBORON IN UPPER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (700)(700) 700700 DISSOLVED BORON CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL BORON CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 1 1 1 1 FORMER ASHDISPOSAL AREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN MW-24B< 1 (14) AW-08B2.53 (2.55) MW-07B< 1 (< 1) MW-23B< 1 (< 1) MW-27B1.95 (1.79) AW-01B1.44 (1.24) AW-02B< 1 (< 1) AW-05B< 1 (< 1) AW-06B< 1 (< 1) 421-Well 3< 1 (NS) 421-Well 4< 1 (NS) SMW-06B< 1 (< 1) ABMW-01S< 1 (< 1) ABMW-02S< 1 (< 1) AW-09B< 1 (< 1) SMW-02B< 1 (< 1) SMW-03B< 1 (< 1) MW-31B< 1 (< 1) AW-04B< 1 (< 1) SMW-01B< 1 (< 1) SMW-04B< 1 (< 1) SMW-05B< 1 (< 1) AW-03B< 1 (< 1) MW-15< 1 (< 1) MW-16< 1 (< 1) MW-20< 1 (< 1) MW-37B2.52 (< 1) MW-07A< 1 (< 1) MW-195.27 (NS) MW-22B< 1 (NS) MW-28B< 1 (NS) COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) FOR COBALT IS 1 μg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-8JUNE 2015 ISOCONCENTRATION MAPCOBALT IN UPPER SURFICIAL W EL LSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (1.0)(1.0) 11 DISSOLVED COBALT CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL COBALT CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 3 0 0 300 300 3 0 0 3 0 0 3 0 0 300 300 3 0 0 0 3000 3 0 0 0 3 0 0 0 30 0 0 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN MW-24B< 10 (2830) AW-08B4450 (4160) MW-07B15 (< 10) MW-23B< 10 (< 10) MW-27B21 (< 10) AW-01B2680 (2160) AW-02B1320 (1630) AW-05B281 (33) AW-06B71 (< 10) 421-Well 337 (NS) 421-Well 471 (NS) SMW-06B22 (16) ABMW-01S152 (94) ABMW-02S24100 (24700) AW-09B225 (39) SMW-02B28800 (27900) SMW-03B1310 (1320) MW-31B1180 (649) AW-04B41 (< 10) SMW-01B30 (14) SMW-04B7590 (7470) SMW-05B9910 (11400) AW-03B6290 (6600) MW-153690 (3230) MW-16113 (95) MW-20747 (607) MW-37B9580 (22) MW-07A93 (< 10) MW-19914 (NS) MW-22B< 10 (NS) MW-28B10 (NS) COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE NORTH CAROLINA 2L FOR IRON IS 300 μg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011). P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-9JUNE 2015 ISOCONCENTRATION MAPIRON IN UPPER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (300)(300) 300300 DISSOLVED IRON CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL IRON CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 5 0 50 50 5 0 5 0 50 5 0 5 0 0 FORMER ASHDISPOSAL AREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN MW-24B35 (868) AW-08B29 (28) MW-07B9 (7) MW-23B7 (< 5) MW-27B55 (54) AW-01B105 (89) AW-02B204 (202) AW-05B26 (17) AW-06B17 (17) 421-Well 384 (NS) 421-Well 457 (NS) SMW-06B30 (30) ABMW-01S88 (88) ABMW-02S784 (812) AW-09B18 (18) SMW-02B413 (412) SMW-03B91 (92) MW-31B73 (68) AW-04B22 (23) SMW-01B14 (13) SMW-04B85 (83) SMW-05B139 (148) AW-03B13 (15) MW-1576 (79) MW-169 (10) MW-20107 (114) MW-37B254 (8) MW-07A< 5 (< 5) MW-19386 (NS) MW-22B< 5 (NS) MW-28B10 (NS) COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE NORTH CAROLINA 2L FOR MANGANESE IS 50 μg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011). P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-10JUNE 2015 ISOCONCENTRATION MAPMANGANESE IN UPPER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (50)(50) 5050 DISSOLVED MANGANESE CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL MANGANESE CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 8.5 6.5 6 .5 6 . 5 6.5 6.5 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN MW-24B6.6 AW-08B5.1 MW-07B4.3 MW-23B6.3 MW-27B4.7 AW-01B5.8 AW-02B6.1 AW-05B8.5 AW-06B4.8 421-Well3 5.7 421-Well4 5.3 SMW-06B5.66 ABMW-01S8.97 ABMW-02S7.48 AW-09B4.6 SMW-02B6.4 SMW-03B5.5 MW-31B6 AW-04B6.16 SMW-01B4.6 SMW-04B5.7 SMW-05B5.7 AW-03B5.8 MW-156.8 MW-165.9 MW-207 MW-37B4.3 MW-07A4.1 MW-196.4 MW-22B5.71 MW-28B6.3 COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE NORTH CAROLINA 2L RANGE FOR pH IS 6.5 TO 8.5S.U.. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIGURE 10-11JUNE 2015 ISOCONCENTRATION MAPpH IN UPPER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (8.5)(8.5) 8.58.5 DISSOLVED pH CONCENTRATION (S.U.)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL pH CONCENTRATION1 (S.U.)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 0.2 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN MW-24B< 0.2 (< 0.2) AW-08B< 0.2 (0.258) MW-07B< 0.2 (< 0.2) MW-23B< 0.2 (< 0.2) MW-27B< 0.2 (0.291) AW-01B< 0.2 (< 0.2) AW-02B< 0.2 (< 0.2) AW-05B< 0.2 (< 0.2) AW-06B< 0.2 (< 0.2) 421-Well 3< 0.2 (NS) 421-Well 4< 0.2 (NS) SMW-06B< 0.2 (< 0.2) ABMW-01S< 0.2 (< 0.2) ABMW-02S< 0.2 (< 0.2) AW-09B< 0.2 (0.272) SMW-02B< 0.2 (< 0.2) SMW-03B< 0.2 (< 0.2) MW-31B< 0.2 (< 0.2) AW-04B< 0.2 (< 0.2) SMW-01B< 0.2 (< 0.2) SMW-04B< 0.2 (< 0.2) SMW-05B< 0.2 (< 0.2) AW-03B< 0.2 (< 0.2) MW-15< 0.2 (< 0.2)MW-16< 0.2 (< 0.2)MW-20< 0.2 (< 0.2) MW-37B< 0.2 (< 0.2) MW-07A< 0.2 (< 0.2) MW-190.458 (NS) MW-22B< 0.2 (NS) MW-28B< 0.2 (NS) COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) THALLIUM IS 0.2 μg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-12JUNE 2015 ISOCONCENTRATION MAPTHALLIUM IN UPPER SURF ICIAL W ELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (0.2)(0.2) 0.20.2 DISSOLVED THALLIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL THALLIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 500 FORMER ASHDISPOSAL AREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN MW-24B140 AW-08B26 MW-07B< 25 MW-23B55 MW-27B110 AW-01B44 AW-02B< 25 AW-05B50 AW-06B< 25 421-Well3 66 421-Well4 45 SMW-06B83 ABMW-01S680 ABMW-02S330 AW-09B< 25 SMW-02B140 SMW-03B250 MW-31B40 AW-04B< 25 SMW-01B57 SMW-04B42 SMW-05B150 AW-03B29 MW-15250 MW-1684 MW-20220 MW-37B< 25 MW-07A< 25 MW-19380 MW-22B< 25 MW-28B40 COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE NORTH CAROLINA 2L FOR TOTAL DISSOLVEDSOLIDS IS 500 mg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-13JUNE 2015 ISOCONCENTRATION MAPTOTAL DISSO LVED SOL IDS IN UPPER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY 500500 LEGEND TOTAL DISSOLVED SOLIDS CONCENTRATION1 (mg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 0 .3 0.3 0 .3 0 .3 0 .3 0 .3 3 3 FORMER ASHDISPOSAL AREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN MW-24B0.555 (0.318) AW-08B0.335 (0.346) MW-07B< 0.3 (< 0.3) MW-23B< 0.3 (< 0.3) MW-27B< 0.3 (< 0.3) AW-01B< 0.3 (< 0.3) AW-02B< 0.3 (< 0.3) AW-05B< 0.3 (< 0.3) AW-06B< 0.3 (< 0.3) SMW-06B< 0.3 (< 0.3) ABMW-01S3.45 (2.87) ABMW-02S1.28 (1.46) AW-09B< 0.3 (< 0.3) SMW-02B1.42 (1.61) SMW-03B< 0.3 (< 0.3) MW-31B0.378 (< 0.3) AW-04B< 0.3 (< 0.3) SMW-01B< 0.3 (< 0.3) SMW-04B< 0.3 (< 0.3) SMW-05B0.81 (0.77) AW-03B0.427 (0.421) MW-153.88 (2.19) MW-160.316 (< 0.3) MW-2039.6 (26) MW-37B< 0.3 (< 0.3) MW-07A< 0.3 (< 0.3) COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) FOR VANADIUM IS 0.3 μg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-14JUNE 2015 ISOCONCENTRATION MAPVANADIUM IN UPPER SURFICIAL W ELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (0.3)(0.3) 0.30.3 DISSOLVED VANADIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL VANADIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 10 10 1 0 1 0 1 0 100 100 FORMER ASHDISPOSAL AREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN MW-12< 1 (< 1) MW-23C< 1 (< 1) MW-24C3.42 (< 1) MW-31C< 1 (< 1) MW-07C< 1 (< 1) AW-01C< 1 (< 1) AW-02C< 1 (< 1) AW-05C< 1 (< 1) MW-32C< 1 (NS) MW-33C< 1 (NS)ABMW-02D170 (167) AW-09C< 1 (< 1) SMW-02C< 1 (< 1) SMW-03C< 1 (< 1) SMW-06C2.79 (2.55) AW-04C< 1 (< 1) SMW-01C< 1 (< 1) SMW-04C2.56 (2.09) SMW-05C< 1 (< 1) AW-03C1.54 (1.54) MW-15D< 1 (< 1) MW-16D< 1 (< 1)MW-20D2.25 (1.8) AW-08C< 1 (< 1) MW-37C< 1 (2.56) MW-11< 1 (NS) MW-21C53.8 (NS) MW-22C< 1 (NS) MW-28C< 1 (NS) MW-04B< 1 (NS) MW-05C< 1 (NS) ABMW-01S634 (654) COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE NORTH CAROLINA 2L FOR ARSENIC IS 10 μg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011). P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-15JUNE 2015 ISOCONCENTRATION MAPARSENIC IN LOWER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (10)(10) 1010 DISSOLVED ARSENIC CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL ARSENIC CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 FORMER ASHDISPOSAL AREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN MW-1229 (30) MW-23C36 (35) MW-24C39 (46) MW-31C55 (57) MW-07C75 (76) AW-01C141 (136) AW-02C55 (49) AW-05C36 (32) MW-32C27 (NS) MW-33C21 (NS)ABMW-02D65 (65) AW-09C118 (104) SMW-02C37 (35) SMW-03C86 (84) SMW-06C53 (51) AW-04C37 (39) SMW-01C34 (35) SMW-04C36 (32) SMW-05C79 (76) AW-03C96 (98) MW-15D41 (42) MW-16D40 (41) MW-20D51 (49) AW-08C40 (37) MW-37C8 (39) MW-1182 (NS) MW-21C66 (NS) MW-22C95 (NS) MW-28C51 (NS) MW-04B68 (NS) MW-05C27 (NS) ABMW-01S594 (585) COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE NORTH CAROLINA 2L FOR BARIUM IS 700 μg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011). P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-16JUNE 2015 ISOCONCENTRATION MAPBARIUM IN LOWER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (700)(700) 700700 DISSOLVED BARIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL BARIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 7 0 0 7 0 0 7 0 0 2 0 0 0 1 0 0 0 1 0 0 0 FORMER ASHDISPOSAL AREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN MW-121470 (1490) MW-23C2050 (1980) MW-24C1040 (415) MW-31C1180 (1190) MW-07C560 (571) AW-01C98 (111) AW-02C< 50 (< 50) AW-05C69 (65) MW-32C115 (NS) MW-33C< 50 (NS)ABMW-02D600 (604) AW-09C554 (566) SMW-02C337 (329) SMW-03C417 (418) SMW-06C197 (199) AW-04C1450 (1440) SMW-01C776 (791) SMW-04C85 (79) SMW-05C362 (365) AW-03C1370 (1430) MW-15D560 (555) MW-16D680 (733) MW-20D305 (313) AW-08C< 50 (< 50) MW-37C< 50 (< 50) MW-11< 50 (NS) MW-21C2120 (NS) MW-22C2560 (NS) MW-28C< 50 (NS) MW-04B< 50 (NS) MW-05C< 50 (NS) ABMW-01S3940 (3950) COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE NORTH CAROLINA 2L FOR BORON IS 700 μg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011). P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-17JUNE 2015 ISOCONCENTRATION MAPBORON IN LOWER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (700)(700) 700700 DISSOLVED BORON CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL BORON CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 1 1 1 1 1 1 1FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN MW-121.26 (1.21) MW-23C5.19 (3.79) MW-24C18.6 (< 1) MW-31C< 1 (< 1) MW-07C< 1 (< 1) AW-01C< 1 (< 1) AW-02C< 1 (< 1) AW-05C< 1 (< 1) MW-32C< 1 (NS) MW-33C< 1 (NS)ABMW-02D< 1 (< 1) AW-09C1.13 (1.18) SMW-02C3.37 (2.85) SMW-03C9.21 (9.95) SMW-06C3.65 (3.69) AW-04C< 1 (< 1) SMW-01C< 1 (< 1) SMW-04C< 1 (< 1) SMW-05C2.6 (2.44)AW-03C6.91 (6.35) MW-15D13.5 (10.9) MW-16D5.22 (5.18) MW-20D< 1 (< 1) AW-08C1.19 (1.07) MW-37C< 1 (2.35) MW-11< 1 (NS) MW-21C10.6 (NS) MW-22C4.77 (NS) MW-28C< 1 (NS) MW-04B< 1 (NS) MW-05C1.62 (NS) ABMW-01S< 1 (< 1) COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) FOR COBALT IS 1 μg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-18JUNE 2015 ISOCONCENTRATION MAPCOBALT IN LOWER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (1)(1) 11 DISSOLVED COBALT CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL COBALT CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 300 3 0 0 300 3 0 0 3 0 0 300 300 300 3000 3 0 0 0 3000 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN MW-125690 (5660) MW-23C88 (31) MW-24C4180 (< 10) MW-31C2850 (2700) MW-07C166 (< 10) AW-01C470 (67) AW-02C7610 (6840) AW-05C128 (< 10) MW-32C30 (NS)MW-33C20 (NS) ABMW-02D1270 (1230) AW-09C102 (< 10) SMW-02C5370 (5310) SMW-03C1510 (1490) SMW-06C1320 (1310) AW-04C3990 (4420) SMW-01C4250 (4210) SMW-04C9660 (8860) SMW-05C175 (78) AW-03C11300 (11700) MW-15D85 (21) MW-16D1020 (517)MW-20D864 (324) AW-08C61 (61) MW-37C33 (8550) MW-1148 (NS) MW-21C5110 (NS) MW-22C141 (NS) MW-28C< 10 (NS) MW-04B1280 (NS) MW-05C< 10 (NS) ABMW-01S152 (94) COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE NORTH CAROLINA 2L FOR IRON IS 300 μg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011). P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-19JUNE 2015 ISOCONCENTRATION MAPIRON IN LOWER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (300)(300) 300300 DISSOLVED IRON CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL IRON CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 50 50 5 0 50 50 50 50 1000 500500 FORMER ASHDISPOSAL AREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN MW-12691 (677) MW-23C309 (280) MW-24C1120 (37) MW-31C1680 (1750) MW-07C368 (343) AW-01C179 (171) AW-02C57 (54) AW-05C21 (20) MW-32C30 (NS) MW-33C30 (NS)ABMW-02D150 (150) AW-09C289 (304) SMW-02C539 (539) SMW-03C584 (591) SMW-06C273 (276) AW-04C787 (797) SMW-01C807 (810) SMW-04C132 (124) SMW-05C130 (131) AW-03C1830 (1940) MW-15D940 (811) MW-16D311 (345) MW-20D131 (115) AW-08C23 (22) MW-37C6 (249) MW-1130 (NS) MW-21C430 (NS) MW-22C732 (NS) MW-28C8 (NS) MW-04B59 (NS) MW-05C441 (NS) ABMW-01S88 (88) COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE NORTH CAROLINA 2L FOR MANGANESE IS 50 μg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011). P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-20JUNE 2015 ISOCONCENTRATION MAPMANGANESE IN LOW ER SURFICIAL W ELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (50)(50) 5050 DISSOLVED MANGANESE CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL MANGANESE CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 8 .5 6 .5 6 .5 6 .5 6.5 6.5 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN MW-128.5 MW-23C6.61 MW-24C5.5 MW-31C5.2 MW-07C5 AW-01C4.8 AW-02C5.9 AW-05C4.7 MW-32C4.97 MW-33C4.6ABMW-02D8.16 AW-09C5.1 SMW-02C5.7 SMW-03C4.9 SMW-06C5 AW-04C6.2 SMW-01C5.5 SMW-04C6.6 SMW-05C4.9 AW-03C5.9 MW-15D6.4 MW-16D5.4 MW-20D7 AW-08C4.4 MW-37C5.7 MW-114.5 MW-21C6.5 MW-22C6.43 MW-28C5.62 MW-04B6.8 MW-05C5.5 ABMW-01S8.97 COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE NORTH CAROLINA 2L RANGE FOR pH IS 6.5 TO 8.5S.U.. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-21JUNE 2015 ISOCONCENTRATION MAPpH IN LOWER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (8.5)(8.5) 8.58.5 DISSOLVED pH CONCENTRATION (S.U.)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL pH CONCENTRATION1 (S.U.)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 0 .2 0.2 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN MW-12< 0.2 (< 0.2)MW-23C0.21 (< 0.2) MW-24C< 0.2 (< 0.2) MW-31C< 0.2 (< 0.2) MW-07C0.405 (< 0.2) AW-01C< 0.2 (< 0.2) AW-02C< 0.2 (< 0.2) AW-05C< 0.2 (< 0.2) MW-32C< 0.2 (NS) MW-33C< 0.2 (NS)ABMW-02D< 0.2 (< 0.2) AW-09C< 0.2 (< 0.2) SMW-02C< 0.2 (< 0.2) SMW-03C< 0.2 (< 0.2) SMW-06C< 0.2 (< 0.2) AW-04C< 0.2 (< 0.2) SMW-01C< 0.2 (< 0.2) SMW-04C< 0.2 (< 0.2) SMW-05C< 0.2 (0.26) AW-03C< 0.2 (< 0.2) MW-15D< 0.2 (< 0.2) MW-16D< 0.2 (< 0.2) MW-20D< 0.2 (< 0.2) AW-08C< 0.2 (< 0.2) MW-37C< 0.2 (< 0.2) MW-11< 0.2 (NS) MW-21C< 0.2 (NS) MW-22C0.398 (NS) MW-28C< 0.2 (NS) MW-04B< 0.2 (NS) MW-05C< 0.2 (NS) ABMW-01S< 0.2 (< 0.2) COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) THALLIUM IS 0.2 μg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-22JUNE 2015 ISOCONCENTRATION MAPTHALLIUM IN LOWER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (0.2)(0.2) 0.20.2 DISSOLVED THALLIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL THALLIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 5 0 0 FORMER ASHDISPOSAL AREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN MW-12410 MW-23C280 MW-24C500 MW-31C540 MW-07C200 AW-01C84 AW-02C38 AW-05C40 MW-32C31 MW-33C30ABMW-02D300 AW-09C190 SMW-02C130 SMW-03C190 SMW-06C110 AW-04C310 SMW-01C340 SMW-04C110 SMW-05C120 AW-03C510 MW-15D430 MW-16D350 MW-20D340 AW-08C30 MW-37C81 MW-11< 25 MW-21C420 MW-22C440 MW-28C26 MW-04B210 MW-05C69 ABMW-01S680 COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE NORTH CAROLINA 2L FOR TOTAL DISSOLVEDSOLIDS IS 500 mg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-23JUNE 2015 ISOCONCENTRATION MAPTOTAL DISSOLVED SOLIDS IN LO WER SURFICIAL W EL LSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY 500500 LEGEND TOTAL DISSOLVED SOLIDS CONCENTRATION1 (mg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 0.3 0 .3 0 .3 0 .3 0 .3 3 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN MW-12< 0.3 (< 0.3) MW-23C0.323 (< 0.3) MW-24C0.543 (0.366) MW-07C0.573 (< 0.3) AW-01C< 0.3 (< 0.3) AW-02C< 0.3 (< 0.3) AW-05C< 0.3 (< 0.3) ABMW-02D< 0.3 (0.504) AW-09C< 0.3 (< 0.3) SMW-02C< 0.3 (< 0.3) SMW-03C< 0.3 (0.424) SMW-06C< 0.3 (< 0.3) MW-31C< 0.3 (0.316) AW-04C0.518 (0.394) SMW-01C0.402 (< 0.3) SMW-04C0.803 (0.328) SMW-05C< 0.3 (< 0.3) AW-03C0.75 (0.596) MW-15D< 0.3 (< 0.3) MW-16D2.09 (0.534) MW-20D< 0.3 (< 0.3) AW-08C< 0.3 (< 0.3) MW-37C1.22 (0.795) ABMW-01S3.45 (2.87) COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) FOR VANADIUM IS 0.3 μg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-24JUNE 2015 ISOCONCENTRATION MAPVANADIUM IN LOWER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (0.3)(0.3) 0.30.3 DISSOLVED VANADIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL VANADIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN AW-02D< 1 (< 1) AW-06D1.57 (2.14) SMW-06D3.76 (3.82) AW-05D1.36 (1.32) AW-09D< 1 (< 1) AW-07D< 1 (< 1) PZ-10D< 1 (< 1) ABMW-01D1.03 (< 1) COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE NORTH CAROLINA 2L FOR ARSENIC IS 10 μg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011). P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-25JUNE 2015 ISOCONCENTRATION MAPARSENIC IN UPPER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (10)(10) 1010 DISSOLVED ARSENIC CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL ARSENIC CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN AW-02D12 (11) AW-06D16 (15) SMW-06D15 (14) AW-05D9 (8) AW-09D7 (8) AW-07D< 5 (< 5) PZ-10D55 (53) ABMW-01D17 (16) COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE NORTH CAROLINA 2L FOR BARIUM IS 700 μg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011). P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-26JUNE 2015 ISOCONCENTRATION MAPBARIUM IN UPPER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (700)(700) 700700 DISSOLVED BARIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL BARIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 700 7 0 0 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN AW-02D666 (652) AW-06D980 (934) SMW-06D990 (987) AW-05D306 (301) AW-09D581 (590) AW-07D815 (804) PZ-10D368 (363) ABMW-01D167 (176) COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE NORTH CAROLINA 2L FOR BORON IS 700 μg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011). P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-27JUNE 2015 ISOCONCENTRATION MAPBORON IN UPPER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (700)(700) 700700 DISSOLVED BORON CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL BORON CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN AW-02D< 1 (< 1) AW-06D< 1 (< 1) SMW-06D< 1 (< 1) AW-05D< 1 (< 1) AW-09D< 1 (< 1) AW-07D< 1 (< 1) PZ-10D< 1 (< 1) ABMW-01D< 1 (< 1) COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) COBALT IS 1 μg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-28JUNE 2015 ISOCONCENTRATION MAPCOBALT IN UPPER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (1)(1) 11 DISSOLVED COBALT CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL COBALT CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 3 0 0 3 0 0 3 0 0 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN AW-02D438 (174) AW-06D102 (13) SMW-06D300 (58) AW-05D298 (27) AW-09D194 (62) AW-07D220 (33) PZ-10D347 (244) ABMW-01D475 (42) COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE NORTH CAROLINA 2L FOR IRON IS 300 μg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011). P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-29JUNE 2015 ISOCONCENTRATION MAPIRON IN UPPER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (300)(300) 300300 DISSOLVED IRON CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL IRON CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 50 5 0 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN AW-02D59 (56) AW-06D18 (16) SMW-06D37 (31) AW-05D38 (37) AW-09D40 (39) AW-07D14 (13) PZ-10D53 (52) ABMW-01D82 (79) COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE NORTH CAROLINA 2L FOR MANGANESE IS 50 μg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011). P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-30JUNE 2015 ISOCONCENTRATION MAPMANGANESE IN UPPER PEE DEE W ELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (50)(50) 5050 DISSOLVED MANGANESE CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL MANGANESE CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 8.5 8.5 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN AW-02D8 AW-06D8.2 SMW-06D9.8 AW-05D8.4 AW-09D8.2 AW-07D9.97 PZ-10D7.7 ABMW-01D7.8 COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE NORTH CAROLINA 2L RANGE FOR pH IS 6.5 TO 8.5S.U.. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-31JUNE 2015 ISOCONCENTRATION MAPpH IN UPPER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (8.5)(8.5) 8.58.5 DISSOLVED pH CONCENTRATION (S.U.)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL pH CONCENTRATION1 (S.U.)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN AW-02D< 0.2 (< 0.2) AW-06D< 0.2 (< 0.2) SMW-06D< 0.2 (< 0.2) AW-05D< 0.2 (< 0.2) AW-09D< 0.2 (< 0.2) AW-07D< 0.2 (< 0.2) PZ-10D< 0.2 (< 0.2) ABMW-01D< 0.2 (< 0.2) COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) THALLIUM IS 0.2 μg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-32JUNE 2015 ISOCONCENTRATION MAPTHALIUM IN UPPER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (0.2)(0.2) 0.20.2 DISSOLVED THALIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL THALIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 500 5 0 0 5 0 0 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN AW-02D510 AW-06D720 SMW-06D670 AW-05D330 AW-09D630 AW-07D510 PZ-10D380 ABMW-01D350 COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE NORTH CAROLINA 2L FOR TOTAL DISSOLVEDSOLIDS IS 500 mg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-33JUNE 2015 ISOCONCENTRATION MAPTOTAL DISSOLVED SOLIDS IN UPPER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY 500500 LEGEND TOTAL DISSOLVED SOLIDS CONCENTRATION1 (mg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 0 .3 0.3 0 . 3 0 . 3 0.9 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN AW-02D< 0.3 (< 0.3) AW-06D< 0.3 (0.38) SMW-06D1.61 (1.19) AW-05D< 0.3 (< 0.3) AW-09D< 0.3 (< 0.3) AW-07D0.992 (0.626) PZ-10D0.397 (< 0.3) ABMW-01D0.642 (0.38) COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) FOR VANADIUM IS 0.3 μg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-34JUNE 2015 ISOCONCENTRATION MAPVANADIUM IN UPPER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (0.3)(0.3) 0.30.3 DISSOLVED VANADIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL VANADIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN AW-05E1.37 (1.24) MW-23E< 1 (< 1) AW-06E< 1 (< 1) COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE NORTH CAROLINA 2L FOR ARSENIC IS 10 μg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011). P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-35JUNE 2015 ISOCONCENTRATION MAPARSENIC IN LOWER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (10)(10) 1010 DISSOLVED ARSENIC CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL ARSENIC CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN AW-05E8 (9) MW-23E< 5 (< 5) AW-06E8 (5) COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE NORTH CAROLINA 2L FOR BARIUM IS 700 μg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011). P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-36JUNE 2015 ISOCONCENTRATION MAPBARIUM IN LO WER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (700)(700) 700700 DISSOLVED BARIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL BARIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 700 7 0 0 2000 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN AW-05E1950 (1920) MW-23E2500 (2420) AW-06E2470 (2490) COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE NORTH CAROLINA 2L FOR BORON IS 700 μg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011). P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-37JUNE 2015 ISOCONCENTRATION MAPBORON IN LOWER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (700)(700) 700700 DISSOLVED BORON CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL BORON CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN AW-05E< 1 (< 1) MW-23E< 1 (< 1) AW-06E< 1 (< 1) COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) COBALT IS 1 μg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-38JUNE 2015 ISOCONCENTRATION MAPCOBALT IN LOWER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (1)(1) 11 DISSOLVED COBALT CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL COBALT CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN AW-05E276 (66) MW-23E48 (< 10) AW-06E704 (< 10) COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE NORTH CAROLINA 2L FOR IRON IS 300 μg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011). P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-39JUNE 2015 ISOCONCENTRATION MAPIRON IN L OWER PEE DEE WELL SL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (300)(300) 300300 DISSOLVED IRON CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL IRON CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN AW-05E9 (7) MW-23E5 (< 5) AW-06E24 (16) COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE NORTH CAROLINA 2L FOR MANGANESE IS 50 μg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011). P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-40JUNE 2015 ISOCONCENTRATION MAPMANGANESE IN LOW ER PEE DEE W EL LSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (50)(50) 5050 DISSOLVED MANGANESE CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL MANGANESE CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 8 .5 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN AW-05E8.7 MW-23E10 AW-06E8.1 COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE NORTH CAROLINA 2L RANGE FOR pH IS 6.5 TO 8.5S.U.. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-41JUNE 2015 ISOCONCENTRATION MAPpH IN LOWER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (8.5)(8.5) 8.58.5 DISSOLVED pH CONCENTRATION (S.U.)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL pH CONCENTRATION1 (S.U.)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN AW-05E< 0.2 (< 0.2) MW-23E< 0.2 (< 0.2) AW-06E< 0.2 (< 0.2) COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) THALLIUM IS 0.2 μg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-42JUNE 2015 ISOCONCENTRATION MAPTHALLIUM IN LOWER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (0.2)(0.2) 0.20.2 DISSOLVED THALLIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL THALLIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 500 5 0 0 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN AW-05E1500 MW-23E1500 AW-06E1500 COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE NORTH CAROLINA 2L FOR TOTAL DISSOLVEDSOLIDS IS 500 mg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-43JUNE 2015 ISOCONCENTRATION MAPTOTAL DISSOLVED SOLIDS IN LOWER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY 500500 LEGEND TOTAL DISSOLVED SOLIDS CONCENTRATION1 (mg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) C A P E F E A R RIVER U S-421 S R-2 1 6 9 P R J -I -1 4 0 SR-1394 S R -2 7 7 9 S R -2 1 4 5 PRJ-I-140 P R J -I -1 4 0 0.3 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN AW-05E< 0.3 (< 0.3) MW-23E0.993 (1.16) AW-06E1.77 (0.711) COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND GRAPHIC SCALE 500 0 500 1,000 1,500 (IN FEET) NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT. 2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) FOR VANADIUM IS 0.3 μg/L. 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd PROJECT MANAGER: P. WALDREP DRAWN BY: T. KING DATE: 07/31/2015 DATE: 07/31/2015 CHECKED BY: J. MEADOWS FIG URE 10-44JUNE 2015 ISOCONCENTRATION MAPVANADIUM IN LOWER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY (0.3)(0.3) 0.30.3 DISSOLVED VANADIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. LEGEND TOTAL VANADIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2. ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED) NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS) Se rvice L ayer Cre dits: NC One Ma p, NCCenter for Geo graphic Info rma tio n a ndAnalysis, NC 911 Board PRJ-I-140 SR-1347 S R -1 3 8 5 SR-1430 RMP-5815 U S-421 SR-1394 SR-2836 R M P -5 8 2 1 S R -2 8 3 8 S R-2 1 6 9 U S-17 S R -2 7 7 9 S R -2 1 4 5 P R J -I -1 4 0 SR-2000 I -1 4 0 I -1 4 0 R M P -5 8 1 4 S R -1 4 3 1 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND P:\DU KE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-45-DETECTION MONITORING CONSTITUENT MAP-UPPER SURFICIAL AQUIFER_V07302015.MXD LEGEND MONITORING WELL PIEZOMETER ASH BASIN BOUNDARY ASH BASIN COMPLIANCE DUKE ENERGY PROGESS SUTTON PLANT SITEBOUNDARY 148 River S treet, Su ite 220Greenville, SC 29601864-421-9999www.syn terraco rp .com DATE: 08/01/201 5CHECKED BY: J. MEAD OWSDRAWN BY: T. KING PR OJECT MANAGER: P. WAL DREP 400 0 400 800 1,200 1,600 2,000 (IN FEET) GRAPHIC SCALE L. V. SUT TON ENE RGY COM P LE X801 SU TTON ST EA M P LA NT RDWILMINGTON, NORT H CAROL INA FIGURE 10-45CCR RULE DETECTION MONITORING CONSTITUENT MAPUPPER SURFICIAL AQUIFER NOT ES:1 CCR RULE AS INDENTIFIE D IN THE US EPA A PRIL 2015 FINAL RULING 40 CFR PA RTS 257 AND 261 2 AP RIL 17, 2014 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM WS P 3 2013 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 4 PARCEL B OUNDA RY WA S OB TAINED FROM THE NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 5 DRAW ING HA S BE EN SE T W ITH A PROJE CTION O F NO RTH CA ROLINA S TAT E PLANE COORDINATE SYS TEM FIPS 3200 (NA D83).DATE: 08/01/201 5 Consti tue nt Abbre vi ati on Uni tsBoronBµg/LCalciumCamg/LChlorideClmg/LSpecific Conductance Sp Cond µmhos/cmpHpHSUSulfateSO4mg/LTotal Di ssol ve d Sol i ds TDS mg/L ConstituentBCaClpHSO4Sp CondTDS Result7313.27.25.724137.666 421-Well 3 ConstituentBCaClpHSO4Sp CondTDS Result547.017.55.3178845 421-Well 4 ConstituentBCaClpHSO4Sp CondTDS Result3940128838.97831162680 ABM W-01S ConstituentBCaClpHSO4Sp CondTDS Result23460.8147.48<0.1635330 ABMW-02S ConstituentBCaClpHSO4Sp CondTDS Result<501.012.35.84.54244 AW-01B ConstituentBCaClpHSO4Sp CondTDS Result<501.61.36.12.924<25 AW-02B ConstituentBCaClpHSO4Sp CondTDS Result<500.6073.85.8448.829 AW-03B ConstituentBCaClpHSO4Sp CondTDS Result<504.283.96.165.443.3<25 AW-04B ConstituentBCaClpHSO4Sp CondTDS Result<506.141.68.58.78650 AW-05B ConstituentBCaClpHSO4Sp CondTDS Result<501.713.64.81438<25 AW-06B ConstituentBCaClpHSO4Sp CondTDS Result<500.5032.35.1164326 AW-08B ConstituentBCaClpHSO4Sp CondTDS Result<501.214.44.61844<25 AW-09B ConstituentBCaClpHSO4Sp CondTDS Result<500.7941.14.11428<25 MW-07A ConstituentBCaClpHSO4Sp CondTDS Result<502.2924.31739<25 MW-07BConstituentBCaClpHSO4Sp CondTDS Result5477.47.66.817408250 MW-15 ConstituentBCaClpHSO4Sp CondTDS Result905.55195.922150.584 MW-16 ConstituentBCaClpHSO4Sp CondTDS Result208061.5286.4140630380 MW-19 ConstituentBCaClpHSO4Sp CondTDS Result5249.126745385220 MW-20 ConstituentBCaClpHSO4Sp CondTDS Result<502.152.75.714.831.1<25 MW-22B ConstituentBCaClpHSO4Sp CondTDS Result14512.92.36.39.890.455 MW-23B ConstituentBCaClpHSO4Sp CondTDS Result40922.8116.628265.3140 MW-24B ConstituentBCaClpHSO4Sp CondTDS Result19813144.762196110 MW-27B ConstituentBCaClpHSO4Sp CondTDS Result<506.014.86.31068.840 MW-28B ConstituentBCaClpHSO4Sp CondTDS Result<505.613.76861.240 MW-31B ConstituentBCaClpHSO4Sp CondTDS Result<508.933.84.37.232<25 MW-37B ConstituentBCaClpHSO4Sp CondTDS Result1009.296.24.64510657 SM W-01B ConstituentBCaClpHSO4Sp CondTDS Result<5028.38.36.43.2281140 SM W-02B ConstituentBCaClpHSO4Sp CondTDS Result50416.95.538342250 SM W-03B ConstituentBCaClpHSO4Sp CondTDS Result<505.424.35.76.63042 SM W-04B ConstituentBCaClpHSO4Sp CondTDS Result<5027.35.25.749237150 SM W-05B ConstituentBCaClpHSO4Sp CondTDS Result605.365.85.664217183 SM W-06B Service Layer Credits: NC OneMap, NCCenter for Geographic Information andAnalysis, NC 911 Board PRJ-I-140 SR-1347 S R -1 3 8 5 SR-1430 RMP-5815 U S-421 SR-1394 SR-2836 R M P -5 8 2 1 S R -2 8 3 8 S R-2169 U S-17 S R -2 7 7 9 S R -2 1 4 5 P R J -I -1 4 0 SR-2000 I -1 4 0 I -1 4 0 R M P -5 8 1 4 S R -1 4 3 1 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-46-DETECTION MONITORING CONSTITUENT MAP-LOWER SURFICIAL AQUIFER_V07302015.MXD LEGEND MONITORING WELL PIEZOMETER ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGESS SUTTON PLANT SITEBOUNDARY 148 River Street, Suite 220Greenville, SC 29601864-421-9999www.synterracorp.com DATE: 08/01/2015CHECKED BY: J. MEADOWSDRAWN BY: T. KING PROJECT MANAGER: P. WALDREP 400 0 400 800 1,200 1,600 2,000 (IN FEET) GRAPHIC SCALE L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA FIGURE 10-46CCR RULE DETECTION MONITORING CONSTITUENT MAPLOWER SURFICIAL AQUIFER DATE: 08/01/2015 NOTES:1 CCR RULE AS INDENTIFIED IN THE USEPA APRIL 2015 FINAL RULING 40 CFR PARTS 257 AND 261 2 APRIL 17, 2014 AERIAL ORTHOPHOTOGRAPHY OBTAINED FROM WSP 3 2013 AERIAL ORTHOPHOTOGRAPHY OBTAINED FROM NC CENTER FOR GEOGRAPHIC INFORMATION AND ANALYSIS, AT (http://services.nconemap.gov/) 4 PARCEL BOUNDARY WAS OBTAINED FROM THE NC CENTER FOR GEOGRAPHIC INFORMATION AND ANALYSIS, AT (http://services.nconemap.gov/) 5 DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83). Constituent Abbreviation UnitsBoronBµg/LCalciumCamg/LChlorideClmg/LSpecific Conductance Sp Cond µmhos/cmpHpHSUSulfateSO4mg/LTotal Dissolved Solids TDS mg/L ConstituentBCaClpHSO4Sp CondTDS Result60034.8437.9191524.3300 ABMW-02D ConstituentBCaClpHSO4Sp CondTDS Result985.24294.8329784 AW-01C ConstituentBCaClpHSO4Sp CondTDS Result<501.964.75.936038 AW-02C ConstituentBCaClpHSO4Sp CondTDS Result137046.81605.9140874510 AW-03C ConstituentBCaClpHSO4Sp CondTDS Result145041.7496.2120525310 AW-04C ConstituentBCaClpHSO4Sp CondTDS Result696.244.7236940 AW-05C ConstituentBCaClpHSO4Sp CondTDS Result<501.946.54.4216230 AW-08C ConstituentBCaClpHSO4Sp CondTDS Result55419.8315.199314190 AW-09C ConstituentBCaClpHSO4Sp CondTDS Result<5060.1136.810385.1210 MW-04B ConstituentBCaClpHSO4Sp CondTDS Result<503.89215.51413569 MW-05C ConstituentBCaClpHSO4Sp CondTDS Result56019.638583299200 MW-07C ConstituentBCaClpHSO4Sp CondTDS Result<501.8344.51248<25 MW-11 ConstituentBCaClpHSO4Sp CondTDS Result147051.61008.5130264410 MW-12 ConstituentBCaClpHSO4Sp CondTDS Result56057.41306.485721430 MW-15D ConstituentBCaClpHSO4Sp CondTDS Result68026.81105.4120637350 MW-16D ConstituentBCaClpHSO4Sp CondTDS Result3055578766605340 MW-20D ConstituentBCaClpHSO4Sp CondTDS Result212070.3346.5140697420 MW-21C ConstituentBCaClpHSO4Sp CondTDS Result256069.9416.43160684440 MW-22C ConstituentBCaClpHSO4Sp CondTDS Result205047.5296.6169454280 MW-23C ConstituentBCaClpHSO4Sp CondTDS Result104049.91505.5150858500 MW-24C ConstituentBCaClpHSO4Sp CondTDS Result<5042.65.621055.426 MW-28C ConstituentBCaClpHSO4Sp CondTDS Result118054.81705.2160908540 MW-31C ConstituentBCaClpHSO4Sp CondTDS Result1155.24.24.97167031 MW-32C ConstituentBCaClpHSO4Sp CondTDS Result<504.014.54.61255.330 MW-33C ConstituentBCaCaClpHSO4Sp CondTDS Result<500.5178.483.55.79.812081 MW-37C ConstituentBCaClpHSO4Sp CondTDS Result77639665.5140561340 SMW-01C ConstituentBCaClpHSO4Sp CondTDS Result33719.5235.749215130 SMW-02C ConstituentBCaClpHSO4Sp CondTDS Result41724.9354.993333190 SMW-03C ConstituentBCaClpHSO4Sp CondTDS Result859.59186.616203.4110 SMW-04C ConstituentBCaClpHSO4Sp CondTDS Result36215.2334.953230120 SMW-05C ConstituentBCaClpHSO4Sp CondTDS Result19715.520540194110 SMW-06C Se rvice L ayer Cre dits: NC One Ma p, NCCenter for Geo graphic Info rma tio n a ndAnalysis, NC 911 Board PRJ-I-140 SR-1347 S R -1 3 8 5 SR-1430 RMP-5815 U S-421 SR-1394 SR-2836 R M P -5 8 2 1 S R -2 8 3 8 S R-2 1 6 9 U S-17 S R -2 7 7 9 S R -2 1 4 5 P R J -I -1 4 0 SR-2000 I -1 4 0 I -1 4 0 R M P -5 8 1 4 S R -1 4 3 1 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND P:\DU KE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-47-DETECTION MONITORING CONSTITUENT MAP-UPPER PEE DEE WELLS_V07302015.MXD LEGEND MONITORING WELL PIEZOMETER ASH BASIN BOUNDARY ASH BASIN COMPLIANCE DUKE ENERGY PROGESS SUTTON PLANT SITEBOUNDARY 148 River S treet, Su ite 220Greenville, SC 29601864-421-9999www.syn terraco rp .com DATE: 08/01/201 5CHECKED BY: J. MEAD OWSDRAWN BY: T. KING PR OJECT MANAGER: P. WAL DREP 400 0 400 800 1,200 1,600 2,000 (IN FEET) GRAPHIC SCALE L. V. SUT TON ENE RGY COM P LE X801 SU TTON ST EA M P LA NT RDWILMINGTON, NORT H CAROL INA FIGURE 10-47CCR RULE DETECTION MONITORING CONSTITUENT MAPUPPER PEE DEE WELLS DATE: 08/01/201 5 NOT ES:1 CCR RULE AS INDENTIFIE D IN THE US EPA A PRIL 2015 FINAL RULING 40 CFR PA RTS 257 AND 261 2 AP RIL 17, 2014 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM WS P 3 2013 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 4 PARCEL B OUNDA RY WA S OB TAINED FROM THE NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 5 DRAW ING HA S BE EN SE T W ITH A PROJE CTION O F NO RTH CA ROLINA S TAT E PLANE COORDINATE SYS TEM FIPS 3200 (NA D83). Consti tue nt Abbre vi ati on Uni tsBoronBµg/LCalciumCamg/LChlorideClmg/LSpecific Conductance Sp Cond µmhos/cmpHpHSUSulfateSO4mg/LTotal Di ssol ve d Sol i ds TDS mg/L ConstituentBCaClpHSO4Sp CondTDS Result16731.7537.81.6505350 ABM W-01D ConstituentBCaClpHSO4Sp CondTDS Result66613.3160835965510 AW-02D ConstituentBCaClpHSO4Sp CondTDS Result30612.9968.424612330 AW-05D ConstituentBCaClpHSO4Sp CondTDS Result9807.331908.2151208720 AW-06D ConstituentBCaClpHSO4Sp CondTDS Result81511.41209.975.7872510 AW-07D ConstituentBCaClpHSO4Sp CondTDS Result58116.72208.2531140630 AW-09D ConstituentBCaClpHSO4Sp CondTDS Result36816.11207.725727380 PZ -10D ConstituentBCaClpHSO4Sp CondTDS Result9906.791909.8261195670 SM W-06D Se rvice L ayer Cre dits: NC One Ma p, NCCenter for Geo graphic Info rma tio n a ndAnalysis, NC 911 Board PRJ-I-140 SR-1347 S R -1 3 8 5 SR-1430 RMP-5815 U S-421 SR-1394 SR-2836 R M P -5 8 2 1 S R -2 8 3 8 S R-2 1 6 9 U S-17 S R -2 7 7 9 S R -2 1 4 5 P R J -I -1 4 0 SR-2000 I -1 4 0 I -1 4 0 R M P -5 8 1 4 S R -1 4 3 1 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND P:\DU KE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-48-DETECTION MONITORING CONSTITUENT MAP-LOWER PEE DEE WELLS_V07302015.MXD LEGEND MONITORING WELL PIEZOMETER ASH BASIN BOUNDARY ASH BASIN COMPLIANCE DUKE ENERGY PROGESS SUTTON PLANT SITEBOUNDARY 148 River S treet, Su ite 220Greenville, SC 29601864-421-9999www.syn terraco rp .com DATE: 08/01/201 5CHECKED BY: J. MEAD OWSDRAWN BY: T. KING PR OJECT MANAGER: P. WAL DREP 400 0 400 800 1,200 1,600 2,000 (IN FEET) GRAPHIC SCALE L. V. SUT TON ENE RGY COM P LE X801 SU TTON ST EA M P LA NT RDWILMINGTON, NORT H CAROL INA FIGURE 10-48CCR RULE DETECTION MONITORING CONSTITUENT MAPLOWER PEE DEE W ELLS DATE: 08/01/201 5 NOT ES:1 CCR RULE AS INDENTIFIE D IN THE US EPA A PRIL 2015 FINAL RULING 40 CFR PA RTS 257 AND 261 2 AP RIL 17, 2014 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM WS P 3 2013 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 4 PARCEL B OUNDA RY WA S OB TAINED FROM THE NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 5 DRAW ING HA S BE EN SE T W ITH A PROJE CTION O F NO RTH CA ROLINA S TAT E PLANE COORDINATE SYS TEM FIPS 3200 (NA D83). Consti tue nt Abbre vi ati on Uni tsBoronBµg/LCalciumCamg/LChlorideClmg/LSpecific Conductance Sp Cond µmhos/cmpHpHSUSulfateSO4mg/LTotal Di ssol ve d Sol i ds TDS mg/L ConstituentBCaClpHSO4Sp CondTDS Result195012.65408.712027661500 AW-05E ConstituentBCaClpHSO4Sp CondTDS Result247013.84908.112026481500 AW-06E ConstituentBCaClpHSO4Sp CondTDS Result25004.965001011026271500 MW-23E Se rvice L ayer Cre dits: NC One Ma p, NCCenter for Geo graphic Info rma tio n a ndAnalysis, NC 911 Board PRJ-I-140 SR-1347 S R -1 3 8 5 SR-1430 RMP-5815 U S-421 SR-1394 SR-2836 R M P -5 8 2 1 S R -2 8 3 8 S R-2 1 6 9 U S-17 S R -2 7 7 9 S R -2 1 4 5 P R J -I -1 4 0 SR-2000 I -1 4 0 I -1 4 0 R M P -5 8 1 4 S R -1 4 3 1 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND P:\DU KE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-49-ASSESSMENT MONITORING CONSTITUENT MAP-UPPER SURFICIAL AQUIFER_V07302015.MXD LEGEND MONITORING WELL PIEZOMETER ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGESS SUTTON PLANT SITEBOUNDARY 148 River S treet, Su ite 220Greenville, SC 29601864-421-9999www.syn terraco rp .com DATE: 08/01/201 5CHECKED BY: J. MEAD OWSDRAWN BY: T. KING PR OJECT MANAGER: P. WAL DREP 400 0 400 800 1,200 1,600 2,000 (IN FEET) GRAPHIC SCALE L. V. SUT TON ENE RGY COM P LE X801 SU TTON ST EA M P LA NT RDWILMINGTON, NORT H CAROL INA FIGURE 10-49CCR RULE ASSESSMENT MONITORING CONSTITUENT MAPUPPER SURFICIAL AQUIFER NOT ES:1 AP RIL 17, 2014 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM WS P 2 2013 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 3 PARCEL B OUNDA RY WA S OB TAINED FROM THE NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 4 DRAW ING HA S BE EN SE T W ITH A PROJE CTION O F NO RTH CA ROLINA S TAT E PLANE COORDINATE SYS TEM FIPS 3200 (NA D83). DATE: 08/01/201 5 Consti tue nt A bbre vi ati on Uni tsAluminumAlµg/LAntimonySbµg/LArsenicAsµg/LBariumBaµg/LBerylliumBeµg/LCadmiumCdµg/LChromiumCrµg/LCopperCumg/LIronFeµg/LLeadPbµg/LManganeseMnµg/LMercuryHgµg/LMolybdenumMoµg/LSeleniumSeµg/LSulfateSO4mg/LSulfideSulfidemg/LThalliumTlµg/LVandadiumVµg/L ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4Tl Result182<144<1<1<5<0.00537<0.0584<1<1<1<124<0.2 421-Well 3 ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4Tl Result239<144<1<1<5<0.00571<0.0557<1<1<1<117<0.2 421-Well 4 ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV Result143634594<1<1<1<0.001152<0.0588162<1<1<183<0.1<0.23.45 ABMW-01S ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV Result6453.41810<1<1<1<0.00124100<0.057845.18<1<1<1<0.1<0.2<0.21.28 ABMW-02S ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV Result522<1<5<1<1<1<0.0012680<0.051051.37<1<1<14.5<1<0.2<0.3 AW-01B ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV Result35<116<1<1<1<0.0011320<0.052041.4<1<1<12.9<0.1<0.2<0.3 AW-02B ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV Result32<110<1<1<1<0.0016290<0.0513<1<1<1<140.439<0.20.427 AW-03B ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV Result7<112<1<1<1<0.00141<0.0522<1<1<1<15.4<0.1<0.2<0.3 AW-04B ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV Result45<125<1<1<1<0.001281<0.05268.54<1<1<18.70.173<0.2<0.3 AW-05B ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV Result890<132<1<1<1<0.00171<0.0517<1<1<1<114<0.1<0.2<0.3 AW-06B ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV Result276<125<1<11.65<0.0014450<0.0529<1<1<1<1160.527<0.20.335 AW-08B ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV Result1420<118<1<1<1<0.001225<0.0518<1<1<1<118<0.1<0.2<0.3 AW-09B ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV Result1130<16<1<1<1<0.00193<0.05<5<1<1<1<114<0.1<0.2<0.3 MW-07A ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV Result590<122<1<1<1<0.00115<0.059<1<1<1<117<0.1<0.2<0.3 MW-07B ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV Result9023.630<1<1<1<0.0013690<0.05769.6<1<1<117<0.1<0.23.88 MW-15 ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV Result1231.4920<1<1<1<0.001113<0.0593<1<1<122<0.1<0.20.316 MW-16 ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4Tl Result92.6273<1<1<5<0.005914<0.05386112<1<1<11400.458 MW-19 ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV Result391.1255<1<1<1<0.001747<0.051076.53<1<1<1450.19<0.239.6 MW-20 ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4Tl Result24<19<1<1<5<0.005<10<0.05<51.5<1<1<14.8<0.2 MW-22B ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4TlV Result14<140<1<1<5<0.005<10<0.057126<1<14.259.8<0.20.3 MW-23B ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4TlV Result7<147<1<1<5<0.005<10<0.053597<1<1<128<0.20.555 MW-24B ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4TlV Result267<141<1<1<5<0.00521<0.0555<1<1<127.162<0.20.3 MW-27B ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4Tl Result23<128<1<1<5<0.00510<0.0510<1<1<1<110<0.2 MW-28B ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV Result203<135<1<1<1<0.0011180<0.0573<1<1<1<18<0.1<0.20.378 MW-31B ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4TlV Result703.0839<1<1<5<0.0059580<0.05254<1<1<1<17.2<0.20.3 MW-37B ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV Result769<178<1<1<1<0.00130<0.0514<1<1<1<145<0.1<0.2<0.3 SMW-01B ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV Result84<161<1<12.29<0.00128800<0.054131.01<1<1<13.20.473<0.21.42 SMW-02B ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV Result25<153<1<1<1<0.0011310<0.0591<1<1<1<138<0.1<0.2<0.3 SMW-03B ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV Result86<117<1<1<1<0.0017590<0.05852.66<1<1<16.60.652<0.2<0.3 SMW-04B ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV Result421.4736<1<1<1<0.0019910<0.05139<1<1<1<1490.399<0.20.81 SMW-05B ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV Result73<148<1<1<1<0.00122<0.0530<1<1<1<142<0.1<0.2<0.3 SMW-06B Service Layer Credits: NC OneMap, NCCenter for Geographic Information andAnalysis, NC 911 Board PRJ-I-140 SR-1347 S R -1 3 8 5 SR-1430 RMP-5815 U S-421 SR-1394 SR-2836 R M P -5 8 2 1 S R -2 8 3 8 S R-2169 U S-17 S R -2 7 7 9 S R -2 1 4 5 P R J -I -1 4 0 SR-2000 I -1 4 0 I -1 4 0 R M P -5 8 1 4 S R -1 4 3 1 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-50-ASSESSMENT MONITORING CONSTITUENT MAP-LOWER SURFICIAL AQUIFER_V07302015.MXD LEGEND MONITORING WELL PIEZOMETER ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGESS SUTTON PLANT SITEBOUNDARY 148 River Street, Suite 220Greenville, SC 29601864-421-9999www.synterracorp.com DATE: 08/01/2015CHECKED BY: J. MEADOWSDRAWN BY: T. KING PROJECT MANAGER: P. WALDREP 400 0 400 800 1,200 1,600 2,000 (IN FEET) GRAPHIC SCALE L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA FIGURE 10-50CCR RULE ASSESSMENT MONITORING CONSTITUENT MAPLOWER SURFICIAL AQUIFER DATE: 08/01/2015 NOTES:1 APRIL 17, 2014 AERIAL ORTHOPHOTOGRAPHY OBTAINED FROM WSP 2 2013 AERIAL ORTHOPHOTOGRAPHY OBTAINED FROM NC CENTER FOR GEOGRAPHIC INFORMATION AND ANALYSIS, AT (http://services.nconemap.gov/) 3 PARCEL BOUNDARY WAS OBTAINED FROM THE NC CENTER FOR GEOGRAPHIC INFORMATION AND ANALYSIS, AT (http://services.nconemap.gov/) 4 DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83). Constitue nt Abbreviation UnitsAluminumAlµg/LAntimonySbµg/LArsenicAsµg/LBariumBaµg/LBerylliumBeµg/LCadmiumCdµg/LChromiumCrµg/LCopperCumg/LIronFeµg/LLeadPbµg/LManganeseMnµg/LMercuryHgµg/LMolybdenumMoµg/LSeleniumSeµg/LSulfateSO4mg/LSulfideSulfidemg/LThalliumTlµg/LVandadiumVµg/L ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV Result2317065<1<1<1<0.0011270150117<1<1<191<0.2<0.2<0.3 ABMW-02D ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV Result472<1141<1<1<1<0.001470179<1<1<12.632<0.5<0.2<0.3 AW-01C ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV Result117<155<1<1<1<0.001761057<1<1<1<132.43<0.2<0.3 AW-02C ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV Result221.5496<1<1<1<0.001113001830<1<1<1<11402.29<0.20.75 AW-03C ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV Result38<137<1<1<1<0.0013990787<1<1<1<11203.89<0.20.518 AW-04C ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV Result256<136<1<1<1<0.00112821<1<1<1<123<0.1<0.2<0.3 AW-05C ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV Result339<140<1<1<1<0.0016123<1<1<1<121<0.1<0.2<0.3 AW-08C ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV Result199<1118<1<1<1<0.001102289<1<1<1<199<0.1<0.2<0.3 AW-09C ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4Tl Result7<168<1<1<5<0.005128059<1<1<1<110<0.2 MW-04B ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4Tl Result6<127<1<1<5<0.005<10441<1<1<1<114<0.2 MW-05C ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4TlV Result154<175<1<1<5<0.005166368<1<1<1<1830.4050.573 MW-07C ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4Tl Result289<182<1<1<5<0.0054830<1<1<1<112<0.2 MW-11 ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4TlV Result22<129<1<1<5<0.005569069115.2<1<1<1130<0.20.3 MW-12 ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV Result5<141<1<1<1<0.00185940<1<1<1<185<0.1<0.2<0.3 MW-15D ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV Result106<140<1<1<1<0.0011020311<1<1<1<1120<0.1<0.22.09 MW-16D ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV Result102.2551<1<1<1<0.00186413114<1<1<166<0.1<0.2<0.3 MW-20D ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4Tl Result1353.866<1<1<5<0.0055110430191<1<1<1140<0.2 MW-21C ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4Tl Result<5<195<1<1<5<0.005141732169<1<1<11600.398 MW-22C ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4TlV Result22<136<1<1<5<0.00588309396<1<1<1690.210.323 MW-23C ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4TlV Result313.4239<1<1<5<0.00541801120<1<1<1<1150<0.20.543 MW-24C ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4Tl Result37<151<1<1<5<0.005<1086.23<1<1<110<0.2 MW-28C ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4TlV Result29<155<1<1<5<0.00528501680<1<1<1<1160<0.20.3 MW-31C ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4Tl Result171<127<1<1<5<0.0053030<1<1<1<116<0.2 MW-32C ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4Tl Result136<121<1<1<5<0.0052030<1<1<1<112<0.2 MW-33C ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4TlV Result746<18<1<1<5<0.005336<1<1<1<19.8<0.21.22 MW-37C ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV Result99<134<1<1<1<0.0014250807<1<1<1<11401.87<0.20.402 SMW-01C ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV Result142<137<1<1<1<0.0015370539<1<1<1<149<0.1<0.2<0.3 SMW-02C ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV Result163<186<1<1<1<0.0011510584<1<1<1<1930.177<0.2<0.3 SMW-03C ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV Result2602.5636<1<1<1<0.00196601322.69<1<1<1160.147<0.20.803 SMW-04C ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV Result121<179<1<1<1<0.001175130<1<1<1<153<0.1<0.2<0.3 SMW-05C ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV Result632.7953<1<1<1<0.0011320273<1<1<1<1402.95<0.2<0.3 SMW-06C Se rvice L ayer Cre dits: NC One Ma p, NCCenter for Geo graphic Info rma tio n a ndAnalysis, NC 911 Board PRJ-I-140 SR-1347 S R -1 3 8 5 SR-1430 RMP-5815 U S-421 SR-1394 SR-2836 R M P -5 8 2 1 S R -2 8 3 8 S R-2 1 6 9 U S-17 S R -2 7 7 9 S R -2 1 4 5 P R J -I -1 4 0 SR-2000 I -1 4 0 I -1 4 0 R M P -5 8 1 4 S R -1 4 3 1 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND P:\DU KE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-51-ASSESSMENT MONITORING CONSTITUENT MAP-UPPER PEE DEE WELLS_V07302015.MXD LEGEND MONITORING WELL PIEZOMETER ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGESS SUTTON PLANT SITEBOUNDARY 148 River S treet, Su ite 220Greenville, SC 29601864-421-9999www.syn terraco rp .com DATE: 08/01/201 5CHECKED BY: J. MEAD OWSDRAWN BY: T. KING PR OJECT MANAGER: P. WAL DREP 400 0 400 800 1,200 1,600 2,000 (IN FEET) GRAPHIC SCALE L. V. SUT TON ENE RGY COM P LE X801 SU TTON ST EA M P LA NT RDWILMINGTON, NORT H CAROL INA FIGURE 10-51CCR RULEASSESSMENT MONITORING CONSTITUENT MAPUPPER PEE DEE WELLS DATE: 08/01/201 5 NOT ES:1 AP RIL 17, 2014 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM WS P 2 2013 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 3 PARCEL B OUNDA RY WA S OB TAINED FROM THE NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 4 DRAW ING HA S BE EN SE T W ITH A PROJE CTION O F NO RTH CA ROLINA S TAT E PLANE COORDINATE SYS TEM FIPS 3200 (NA D83). Consti tue nt A bbre vi ati on Uni tsAluminumAlµg/LAntimonySbµg/LArsenicAsµg/LBariumBaµg/LBerylliumBeµg/LCadmiumCdµg/LChromiumCrµg/LCopperCumg/LIronFeµg/LLeadPbµg/LManganeseMnµg/LMercuryHgµg/LMolybdenumMoµg/LSeleniumSeµg/LSulfateSO4mg/LSulfideSulfidemg/LThalliumTlµg/LVandadiumVµg/L ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV Result521.0317<1<1<1<0.0014758211.2<1<1<11.62.9<0.20.642 ABM W-01D ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV Result104<112<1<1<1<0.001438593.15<1<1<135<0.1<0.2<0.3 AW-02D ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV Result1491.369<1<1<1<0.0012983850.7<1<1<124<0.2<0.2<0.3 AW-05D ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV Result431.5716<1<1<1<0.0011021818.1<1<1<115<0.1<0.2<0.3 AW-06D ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV Result136<1<5<1<1<1<0.001220148.53<1<1<15.72.09<0.20.992 AW-07D ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV Result46<17<1<1<1<0.001194408.23<1<1<153<0.5<0.2<0.3 AW-09D ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV Result91<155<1<1<1<0.001347532.38<1<1<125<0.1<0.20.397 PZ -10D ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV Result2213.7615<1<1<1<0.00130037110<1<1<1263.24<0.21.61 SMW-06D Se rvice L ayer Cre dits: NC One Ma p, NCCenter for Geo graphic Info rma tio n a ndAnalysis, NC 911 Board PRJ-I-140 SR-1347 S R -1 3 8 5 SR-1430 RMP-5815 U S-421 SR-1394 SR-2836 R M P -5 8 2 1 S R -2 8 3 8 S R-2 1 6 9 U S-17 S R -2 7 7 9 S R -2 1 4 5 P R J -I -1 4 0 SR-2000 I -1 4 0 I -1 4 0 R M P -5 8 1 4 S R -1 4 3 1 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND P:\DU KE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-52-ASSESSMENT MONITORING CONSTITUENT MAP-LOWER PEE DEE WELLS_V07302015.MXD LEGEND MONITORING WELL PIEZOMETER ASH BASIN BOUNDARY ASH BASIN COMPLIANCE DUKE ENERGY PROGESS SUTTON PLANT SITEBOUNDARY 148 River S treet, Su ite 220Greenville, SC 29601864-421-9999www.syn terraco rp .com DATE: 08/01/201 5CHECKED BY: J. MEAD OWSDRAWN BY: T. KING PR OJECT MANAGER: P. WAL DREP 400 0 400 800 1,200 1,600 2,000 (IN FEET) GRAPHIC SCALE L. V. SUT TON ENE RGY COM P LE X801 SU TTON ST EA M P LA NT RDWILMINGTON, NORT H CAROL INA FIGURE 10-52CCR RULE ASSESSMENT MONITORING CONSTITUENT MAPLOWER PEE DEE WELLS DATE: 08/01/201 5 NOTES:1 APRIL 17, 2014 AERIAL ORTHOPHOTOGRAPHY OBTAINED FROM WSP 2 2013 AERIAL ORTHOPHOTOGRAPHY OBTAINED FROM NC CENTER FOR GEOGRAPHIC INFORMATION AND ANALYSIS, AT (http://services.nconemap.gov/) 3 PARCEL BOUNDARY WAS OBTAINED FROM THE NC CENTER FOR GEOGRAPHIC INFORMATION AND ANALYSIS, AT (http://services.nconemap.gov/) 4 DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83). Consti tue nt A bbre vi ati on Uni tsAluminumAlµg/LAntimonySbµg/LArsenicAsµg/LBariumBaµg/LBerylliumBeµg/LCadmiumCdµg/LChromiumCrµg/LCopperCumg/LIronFeµg/LLeadPbµg/LManganeseMnµg/LMercuryHgµg/LMolybdenumMoµg/LSeleniumSeµg/LSulfateSO4mg/LSulfideSulfidemg/LThalliumTlµg/LVandadiumVµg/L ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV Result971.378<1<1<1<0.001276921.3<1<1<1120<0.1<0.2<0.3 AW-05E ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV Result577<18<1<114.7<0.001704246.63<1<1<1120<0.2<0.21.77 AW-06E ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV Result41<1<5<1<1<1<0.00148515.6<1<1<1110<0.1<0.20.993 MW-23E 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: J. GILMER PROJECT MANAGER: P. WALDREP LAYOUT: DATE: JUNE 2015 FIGURE 10-53 PIPER DIAGRAM – ASH PORE WATER L.V. SUTTON ENERGY COMPLEX 801 SUTTON STEAM PLANT ROAD WILMINGTON, NORTH CAROLINA 28401 P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\Stats Figures\Piper Diagrams 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: J. GILMER PROJECT MANAGER: P. WALDREP LAYOUT: DATE: JUNE 2015 FIGURE 10-54 PIPER DIAGRAM – PEE DEE L.V. SUTTON ENERGY COMPLEX 801 SUTTON STEAM PLANT ROAD WILMINGTON, NORTH CAROLINA 28401 P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\Stats Figures\Piper Diagrams 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: J. GILMER PROJECT MANAGER: P. WALDREP LAYOUT: DATE: JUNE 2015 FIGURE 10-55 PIPER DIAGRAM – SURFICIAL AQUIFER (SHALLOW) L.V. SUTTON ENERGY COMPLEX 801 SUTTON STEAM PLANT ROAD WILMINGTON, NORTH CAROLINA 28401 P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\Stats Figures\Piper Diagrams 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: J. GILMER PROJECT MANAGER: P. WALDREP LAYOUT: DATE: JUNE 2015 FIGURE 10-56 PIPER DIAGRAM – SURFICIAL AQUIFER (INTERMEDIATE) L.V. SUTTON ENERGY COMPLEX 801 SUTTON STEAM PLANT ROAD WILMINGTON, NORTH CAROLINA 28401 P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\Stats Figures\Piper Diagrams 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: J. GILMER PROJECT MANAGER: P. WALDREP LAYOUT: DATE: JUNE 2015 FIGURE 10-57 PIPER DIAGRAM – SURFICIAL AQUIFER (DEEP) L.V. SUTTON ENERGY COMPLEX 801 SUTTON STEAM PLANT ROAD WILMINGTON, NORTH CAROLINA 28401 P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\Stats Figures\Piper Diagrams 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: J. GILMER PROJECT MANAGER: P. WALDREP LAYOUT: DATE: JUNE 2015 FIGURE 10-58 PIPER DIAGRAM – SURFACE WATER L.V. SUTTON ENERGY COMPLEX 801 SUTTON STEAM PLANT ROAD WILMINGTON, NORTH CAROLINA 28401 P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\Stats Figures\Piper Diagrams 15 NCAC 02L Standard = 10 ug/L Ar s e n i c ( µ g / L ) Ba r i u m ( µ g / L ) Bo r o n ( µ g / L ) 15 NCAC 02L Standard = 700 ug/L 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: J. GILMER PROJECT MANAGER: P. WALDREP LAYOUT: DATE: JUNE 2015 P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\Stats Figures\Boxplots FIGURE 10-59 COMPLIANCE WELL BOX AND WHISKER PLOTS ARSENIC, BARIUM, BORON L.V. SUTTON ENERGY COMPLEX 801 SUTTON STEAM PLANT ROAD WILMINGTON, NORTH CAROLINA 28401 Note: 15 NCAC 02L Standard = 700 µg/L 15 NCAC 02L Standard = 300 ug/L Ir o n ( µ g / L ) 15 NCAC 02L Standard = 50 ug/L Ma n g a n e s e ( µ g / L ) 15 NCAC 02L Standard = 250 mg/L Ch l o r i d e ( m g / L ) 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: J. GILMER PROJECT MANAGER: P. WALDREP LAYOUT: DATE: JUNE 2015 P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\Stats Figures\Boxplots FIGURE 10-60 COMPLIANCE WELL BOX AND WHISKER PLOTS CHLORIDE, IRON, MANGANESE L.V. SUTTON ENERGY COMPLEX 801 SUTTON STEAM PLANT ROAD WILMINGTON, NORTH CAROLINA 28401 15 NCAC 02L Standard = 250 mg/L Su l f a t e ( m g / L ) 15 NCAC 02L Standard = 20 ug/L Se l e n i u m ( µ g / L ) Ni t r a t e ( µ g / L ) 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: J. GILMER PROJECT MANAGER: P. WALDREP LAYOUT: DATE: JUNE 2015 P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\Stats Figures\Boxplots FIGURE 10-61 COMPLIANCE WELL BOX AND WHISKER PLOTS NITRATE, SELENIUM, SULFATE L.V. SUTTON ENERGY COMPLEX 801 SUTTON STEAM PLANT ROAD WILMINGTON, NORTH CAROLINA 28401 Note: 15 NCAC 02L Standard = 10 µg/L Zi n c ( µ g / L ) 15 NCAC 02L Standard = 0.2 ug/L Th a l l i u m ( µ g / L ) 15 NCAC 02L Standard = 500 mg/L To t a l D i s s o l v e d S o l i d s ( m g / L ) 1.5e+003 2e+003 1e+003 500 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: J. GILMER PROJECT MANAGER: P. WALDREP LAYOUT: DATE: JUNE 2015 P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\Stats Figures\Boxplots FIGURE 10-62 COMPLIANCE WELL BOX AND WHISKER PLOTS TOTAL DISSOLVED SOLIDS, THALLIUM, ZINC L.V. SUTTON ENERGY COMPLEX 801 SUTTON STEAM PLANT ROAD WILMINGTON, NORTH CAROLINA 28401 Note: 15 NCAC 02L Standard = 1000 µg/L Tu r b i d i t y ( N T U ) pH ( S . U . ) Di s s o l v e d O x y g e n ( µ g / L ) 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: J. GILMER PROJECT MANAGER: P. WALDREP LAYOUT: DATE: JUNE 2015 P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\Stats Figures\Boxplots FIGURE 10-63 COMPLIANCE WELL BOX AND WHISKER PLOTS DISSOLVED OXYGEN, pH, TURBIDITY L.V. SUTTON ENERGY COMPLEX 801 SUTTON STEAM PLANT ROAD WILMINGTON, NORTH CAROLINA 28401 Elevation Elevation S t a t i o n -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 - 1 4 0 - 1 3 0 - 1 2 0 - 1 1 0 - 1 0 0 - 9 0 - 8 0 - 7 0 - 6 0 - 5 0 - 4 0 - 3 0 - 2 0 - 1 0 0 1 0 2 0 3 0 4 0 5 0 6 0 0+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 53+50 Elevation Elevation S t a t i o n -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 - 1 4 0 - 1 3 0 - 1 2 0 - 1 1 0 - 1 0 0 - 9 0 - 8 0 - 7 0 - 6 0 - 5 0 - 4 0 - 3 0 - 2 0 - 1 0 0 1 0 2 0 3 0 4 0 5 0 6 0 0+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 53+50 5 / 2 2 / 2 0 1 5 5 / 2 2 / 2 0 1 5 P . W A L D R E P C . N E W E L L P R O J E C T M A N A G E R : L A Y O U T N A M E : D R A W N B Y : C H E C K E D B Y : K A T H Y W E B B D A T E : D A T E : F I G U R E 1 1 - 1 G E O L O G I C C R O S S S E C T I O N S W I T H B O R O N & C H L O R I D E A N D A R S E N I C F I G U R E 1 1 - 1 w w w . s y n t e r r a c o r p . c o m 1 4 8 R i v e r S t r e e t , S u i t e 2 2 0 G r e e n v i l l e , S o u t h C a r o l i n a 2 9 6 0 1 8 6 4 - 4 2 1 - 9 9 9 9 L . V . S U T T O N E N E R G Y C O M P L E X 8 0 1 S U T T O N S T E A M P L A N T R D W I L M I N G T O N , N O R T H C A R O L I N A B O R I N G S Y M B O L S S O I L S A M P L E W E L L S C R E E N W I T H C O N C E N T R A T I O N O F C O I ( m i c r o g r a m s p e r l i t e r ) ( m i l i g r a m s p e r l i t e r f o r C h l o r i d e ) 3 0 0 0 3 0 0 6 0 0 G R A P H I C S C A L E I N F E E T 3 0 0 3 0 6 0 I N F E E T H O R I Z O N T A L : 1 " = 3 0 0 ' V E R T I C A L : 1 " = 3 0 ' S E C T I O N B - B ' - B O R O N & C H L O R I D E F A C I N G N O R T H (MSL) (MSL)COOLING POND GP-03COAL ASH S U R F I C I A L S U R F I C I A L P E E D E E S E C T I O N B - B ' - A R S E N I C F A C I N G N O R T H (MSL) (MSL)COOLING POND GP-03COAL ASH S U R F I C I A L S U R F I C I A L P E E D E E P:\DUKE ENERGY PROGRESS.1026\108. SUTTON ASH BASIN GW ASSESSMENT PLAN\1.11 CSA REPORTING\FIGURES\SUTTON-CSA-FIGURES.DWG08/02/2015 1:52 PM AB-01ABMW-01S: Sb<1 / As634 / B3940 / Ba585 / Cl83 / C o < 1 / F e 1 5 2 / M n 8 8 / T l < 0 . 2 / V 3 . 4 5 ABMW-01D: Sb<1 / As1.03 / B167 / Ba16 / Cl53 / C o < 1 / F e 4 7 5 / M n 8 2 / T l < 0 . 2 / V 0 . 6 4 2 3'-5': Sb<3.4 / As22.1 / B8.7j / Co6.7 / Fe9590 / Mn3 5 . 2 / V 3 4 . 4 78'-80': Sb<2.8 / As16.8 / N7.2j / Co2.5j / Fe5110 / M n 2 4 . 2 / V 1 5 . 7 82'-84': Sb<3.4 / As3.3j / B12.6j / Co<3.4 / Fe6500 / M n 2 8 . 9 / V 7 . 9 96'-98': Sb<3.3 / As2.1j / B12.5j / Co3.3 / Fe6050 / M n 3 9 . 3 / V 8 . 8 A W - 0 4 A W - 0 4 B : S b < 1 / A s < 1 / B < 5 0 / B a 1 1 / C l 3 . 9 / C o < 1 / F e 4 1 / M n 2 2 / T l < 0 . 2 / V < 0 . 3 A W - 0 4 C : S b < 1 / A s < 1 / B 1 4 5 0 / B a 3 9 / C l 4 9 / C o < 1 / F e 3 9 9 0 / M n 7 8 7 / T l < 0 . 2 / V 0 . 5 1 8 0 - 2 ' : S b < 1 / A s < 1 / B < 2 . 6 / C o < 1 / F e 8 1 5 / M n 1 . 4 / V 2 . 2 9 ' - 1 0 ' : S b < 1 . 1 / A s < 1 . 1 / B 2 < 2 . 8 / C o < 1 . 1 / F e 2 9 7 / M n 1 / V < 1 . 1 4 7 ' - 4 8 ' : S b < 1 . 1 / A s < 1 . 1 / B < 2 . 8 / C o < 1 . 1 / F e 1 9 5 0 / M n 1 9 . 5 / V < 1 . 1 S M W - 0 1 S M W - 0 1 B : S b < 1 / A s < 1 / B 1 0 0 / B a 7 4 / C l 6 . 2 / C o < 1 / F e 3 0 / M n 1 4 / T l < 0 . 2 / V < 0 . 3 S M W - 0 1 C : S b < 1 / A s < 1 / B 7 7 6 / B a 3 5 / C l 6 6 / C o < 1 / F e 4 2 5 0 / M n 8 0 7 / T l < 0 . 2 / V 0 . 4 0 2 0 - 2 ' : S b < 6 . 9 / A s < 6 . 9 / B < 1 7 . 2 / C o < 6 . 9 / F e 6 0 9 / M n 2 . 1 / V < 6 . 9 8 ' - 1 0 ' : S b < 6 . 1 / A s < 6 . 1 / B < 1 5 . 3 / C o < 6 . 1 / F e 8 2 . 3 / M n < 1 . 5 / V < 6 . 1 4 2 ' - 4 4 ' : S b < 6 . 2 / A s < 6 . 2 / B < 1 5 . 4 / C o < 6 . 2 / F e 1 8 7 0 / M n 7 . 5 / V < 6 . 2 AB-01ABMW-01S: Sb<1 / As634 / B3940 / Ba585 / Co<1 / F e 1 5 2 / M n 8 8 / T l < 0 . 2 / V 3 . 4 5 ABMW-01D: Sb<1 / As1.03 / B167 / Ba16 / Co<1 / F e 4 7 5 / M n 8 2 / T l < 0 . 2 / V 0 . 6 4 2 3'-5': Sb<3.4 / As22.1 / B8.7j / Co6.7 / Fe9590 / Mn3 5 . 2 / V 3 4 . 4 78'-80': Sb<2.8 / As16.8 / N7.2j / Co2.5j / Fe5110 / M n 2 4 . 2 / V 1 5 . 7 82'-84': Sb<3.4 / As3.3j / B12.6j / Co<3.4 / Fe6500 / M n 2 8 . 9 / V 7 . 9 96'-98': Sb<3.3 / As2.1j / B12.5j / Co3.3 / Fe6050 / M n 3 9 . 3 / V 8 . 8 A W - 0 4 A W - 0 4 B : S b < 1 / A s < 1 / B < 5 0 / B a 1 1 / C o < 1 / F e 4 1 / M n 2 2 / T l < 0 . 2 / V < 0 . 3 A W - 0 4 C : S b < 1 / A s < 1 / B 1 4 5 0 / B a 3 9 / C o < 1 / F e 3 9 9 0 / M n 7 8 7 / T l < 0 . 2 / V 0 . 5 1 8 0 - 2 ' : S b < 1 / A s < 1 / B < 2 . 6 / C o < 1 / F e 8 1 5 / M n 1 . 4 / V 2 . 2 9 ' - 1 0 ' : S b < 1 . 1 / A s < 1 . 1 / B 2 < 2 . 8 / C o < 1 . 1 / F e 2 9 7 / M n 1 / V < 1 . 1 4 7 ' - 4 8 ' : S b < 1 . 1 / A s < 1 . 1 / B < 2 . 8 / C o < 1 . 1 / F e 1 9 5 0 / M n 1 9 . 5 / V < 1 . 1 S M W - 0 1 S M W - 0 1 B : S b < 1 / A s < 1 / B 1 0 0 / B a 7 4 / C o < 1 / F e 3 0 / M n 1 4 / T l < 0 . 2 / V < 0 . 3 S M W - 0 1 C : S b < 1 / A s < 1 / B 7 7 6 / B a 3 5 / C o < 1 / F e 4 2 5 0 / M n 8 0 7 / T l < 0 . 2 / V 0 . 4 0 2 0 - 2 ' : S b < 6 . 9 / A s < 6 . 9 / B < 1 7 . 2 / C o < 6 . 9 / F e 6 0 9 / M n 2 . 1 / V < 6 . 9 8 ' - 1 0 ' : S b < 6 . 1 / A s < 6 . 1 / B < 1 5 . 3 / C o < 6 . 1 / F e 8 2 . 3 / M n < 1 . 5 / V < 6 . 1 4 2 ' - 4 4 ' : S b < 6 . 2 / A s < 6 . 2 / B < 1 5 . 4 / C o < 6 . 2 / F e 1 8 7 0 / M n 7 . 5 / V < 6 . 2 7 0 0 7 0 0 1 6 7 / 5 3 3 9 4 0 / 8 3 2 5 0 0 / 5 0 0 2 0 5 0 / 2 9 7 0 0 < 5 0 / 3 . 9 1 4 5 0 / 4 9 1 0 0 / 6 . 2 7 7 6 / 6 6 6 3 4 1 . 0 3 < 1 < 1 N D < 1 < 1 < 1 < 1 10 S O U R C E S : 1 . D R A W I N G H A S B E E N S E T W I T H A P R O J E C T I O N O F N O R T H C A R O L I N A S T A T E P L A N E C O O R D I N A T E S Y S T E M F I P S 3 2 0 0 ( N A D 8 3 ) . 2 . 2 f t C O N T O U R I N T E R V A L S F R O M N C D O T L I D A R D A T E D 2 0 0 7 h t t p s : / / c o n n e c t . n c d o t . g o v / r e s o u r c e s / g i s / p a g e s / c o n t - e l e v _ v 2 . a s p x 3 . S E L E C T T O P O G R A P H I C A D J U S T M E N T S B A S E D O N S I T E S U R V E Y A N D C O M P A R I S O N T O A E R I A L P H O T O G R A P H . N O T E : 1 . C O N T O U R L I N E S A R E U S E D F O R R E P R E S E N T A T I V E P U R P O S E S O N L Y A N D A R E N O T T O B E U S E D F O R D E S I G N O R C O N S T R U C T I O N P U R P O S E S . 2 . C R O S S S E C T I O N L O C A T I O N S A R E S H O W N O N F I G U R E 1 - 2 . M W - 2 3 B : S b < 1 / A s < 1 / B 1 3 7 / B a 3 9 / C l 2 . 5 / C o < 1 / F e 2 0 / M n 9 / T l < 0 . 2 / V < 0 . 3 M W - 2 3 C : S b < 1 / A s < 1 / B 2 0 5 0 / B a 3 5 / C l 2 9 / C o 5 . 1 9 / F e 8 8 / M n 3 0 9 / T l 0 . 2 1 / V 0 . 3 2 3 M W - 2 3 E : S b < 1 / A s < 1 / B 2 5 0 0 / B a < 5 / C o < 1 / F e 4 8 / M n 5 / T l < 0 . 2 / V 0 . 9 9 3 M W - 2 3 B : S b < 1 / A s < 1 / B 1 4 4 / B a 3 8 / C o < 1 / F e 2 0 / M n 9 / T l < 0 . 2 / V < 0 . 3 M W - 2 3 C : S b < 1 / A s < 1 / B 2 0 5 0 / B a 3 5 / C o 5 . 1 9 / F e 8 8 / M n 3 0 9 / T l 0 . 2 1 / V 0 . 3 2 3 M W - 2 3 E : S b < 1 / A s < 1 / B 2 5 0 0 / B a < 5 / C o < 1 / F e 4 8 / M n 5 / T l < 0 . 2 / V 0 . 9 9 3 W A T E R L E V E L ( J U N E 2 0 1 5 ) 1 3 7 / 2 . 3 250 2 5 0 C H L O R I D E C O N C E N T R A T I O N C O N T O U R L E G E N D S U R F I C I A L S A N D ( W E L L S O R T E D - S I L T Y S A N D - M E D I U M T O F I N E G R A I N E D S A N D ) S U R F I C I A L S A N D ( P O O R L Y S O R T E D - M E D I U M T O C O A R S E G R A I N E D S A N D ) C O A L A S H C O A R S E S A N D W I T H F I N E G R A V E L S A N D ( P E E D E E ) C L A Y R I C H F A C I E S C O N C E N T R A T I O N C O N T O U R N O D A T A N D 2 L S T A N D A R D C O N T O U R C H L O R I D E CHLORIDE700 7 0 0 B O R O N BORON 2 5 0 0 / 5 0 0 B O R O N / C H L O R I D E B O R O N BORON F I L L M A T E R I A L S C A L E : A S S H O W N A W - 0 1 A W - 0 1 B : G R O U N D W A T E R A N A L Y T I C A L R E S U L T S F O R S U R F I C I A L A Q U I F E R I N M I C R O G R A M S P E R L I T E R A W - 0 1 C : G R O U N D W A T E R A N A L Y T I C A L R E S U L T S F O R P E E D E E I N M I C R O G R A M S P E R L I T E R 0 - 2 ' : S O I L T O T A L A N A L Y T I C A L R E S U L T S I N m g / k g Elevation Elevation S t a t i o n -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 - 1 4 0 - 1 3 0 - 1 2 0 - 1 1 0 - 1 0 0 - 9 0 - 8 0 - 7 0 - 6 0 - 5 0 - 4 0 - 3 0 - 2 0 - 1 0 0 1 0 2 0 3 0 4 0 5 0 6 0 0+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 53+50 Elevation Elevation S t a t i o n -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 - 1 4 0 - 1 3 0 - 1 2 0 - 1 1 0 - 1 0 0 - 9 0 - 8 0 - 7 0 - 6 0 - 5 0 - 4 0 - 3 0 - 2 0 - 1 0 0 1 0 2 0 3 0 4 0 5 0 6 0 0+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 53+50 5 / 2 2 / 2 0 1 5 5 / 2 2 / 2 0 1 5 P . W A L D R E P C . N E W E L L P R O J E C T M A N A G E R : L A Y O U T N A M E : D R A W N B Y : C H E C K E D B Y : K A T H Y W E B B D A T E : D A T E : F I G U R E 1 1 - 2 G E O L O G I C C R O S S S E C T I O N S W I T H I R O N A N D C O B A L T F I G U R E 1 1 - 2 w w w . s y n t e r r a c o r p . c o m 1 4 8 R i v e r S t r e e t , S u i t e 2 2 0 G r e e n v i l l e , S o u t h C a r o l i n a 2 9 6 0 1 8 6 4 - 4 2 1 - 9 9 9 9 L . V . S U T T O N E N E R G Y C O M P L E X 8 0 1 S U T T O N S T E A M P L A N T R D W I L M I N G T O N , N O R T H C A R O L I N A B O R I N G S Y M B O L S S O I L S A M P L E 3 0 0 0 3 0 0 6 0 0 G R A P H I C S C A L E I N F E E T 3 0 0 3 0 6 0 I N F E E T H O R I Z O N T A L : 1 " = 3 0 0 ' V E R T I C A L : 1 " = 3 0 ' S E C T I O N B - B ' - I R O N F A C I N G N O R T H (MSL) (MSL)COOLING POND GP-03 C O N C E N T R A T I O N C O N T O U R COAL ASH S U R F I C I A L S U R F I C I A L P E E D E E S E C T I O N B - B ' - C O B A L T F A C I N G N O R T H (MSL) (MSL)COOLING POND GP-03COAL ASH S U R F I C I A L S U R F I C I A L P E E D E E P:\DUKE ENERGY PROGRESS.1026\108. SUTTON ASH BASIN GW ASSESSMENT PLAN\1.11 CSA REPORTING\FIGURES\SUTTON-CSA-FIGURES.DWG08/02/2015 1:55 PM AB-01ABMW-01S: Sb<1 / As634 / B3940 / Ba585 / Co<1 / F e 1 5 2 / M n 8 8 / T l < 0 . 2 / V 3 . 4 5 ABMW-01D: Sb<1 / As1.03 / B167 / Ba16 / Co<1 / F e 4 7 5 / M n 8 2 / T l < 0 . 2 / V 0 . 6 4 2 3'-5': Sb<3.4 / As22.1 / B8.7j / Co6.7 / Fe9590 / Mn3 5 . 2 / V 3 4 . 4 78'-80': Sb<2.8 / As16.8 / N7.2j / Co2.5j / Fe5110 / M n 2 4 . 2 / V 1 5 . 7 82'-84': Sb<3.4 / As3.3j / B12.6j / Co<3.4 / Fe6500 / M n 2 8 . 9 / V 7 . 9 96'-98': Sb<3.3 / As2.1j / B12.5j / Co3.3 / Fe6050 / M n 3 9 . 3 / V 8 . 8 A W - 0 4 A W - 0 4 B : S b < 1 / A s < 1 / B < 5 0 / B a 1 1 / C o < 1 / F e 4 1 / M n 2 2 / T l < 0 . 2 / V < 0 . 3 A W - 0 4 C : S b < 1 / A s < 1 / B 1 4 5 0 / B a 3 9 / C o < 1 / F e 3 9 9 0 / M n 7 8 7 / T l < 0 . 2 / V 0 . 5 1 8 0 - 2 ' : S b < 1 / A s < 1 / B < 2 . 6 / C o < 1 / F e 8 1 5 / M n 1 . 4 / V 2 . 2 9 ' - 1 0 ' : S b < 1 . 1 / A s < 1 . 1 / B 2 < 2 . 8 / C o < 1 . 1 / F e 2 9 7 / M n 1 / V < 1 . 1 4 7 ' - 4 8 ' : S b < 1 . 1 / A s < 1 . 1 / B < 2 . 8 / C o < 1 . 1 / F e 1 9 5 0 / M n 1 9 . 5 / V < 1 . 1 S M W - 0 1 S M W - 0 1 B : S b < 1 / A s < 1 / B 1 0 0 / B a 7 4 / C o < 1 / F e 3 0 / M n 1 4 / T l < 0 . 2 / V < 0 . 3 S M W - 0 1 C : S b < 1 / A s < 1 / B 7 7 6 / B a 3 5 / C o < 1 / F e 4 2 5 0 / M n 8 0 7 / T l < 0 . 2 / V 0 . 4 0 2 0 - 2 ' : S b < 6 . 9 / A s < 6 . 9 / B < 1 7 . 2 / C o < 6 . 9 / F e 6 0 9 / M n 2 . 1 / V < 6 . 9 8 ' - 1 0 ' : S b < 6 . 1 / A s < 6 . 1 / B < 1 5 . 3 / C o < 6 . 1 / F e 8 2 . 3 / M n < 1 . 5 / V < 6 . 1 4 2 ' - 4 4 ' : S b < 6 . 2 / A s < 6 . 2 / B < 1 5 . 4 / C o < 6 . 2 / F e 1 8 7 0 / M n 7 . 5 / V < 6 . 2 AB-01ABMW-01S: Sb<1 / As634 / B3940 / Ba585 / Co<1 / F e 1 5 2 / M n 8 8 / T l < 0 . 2 / V 3 . 4 5 ABMW-01D: Sb<1 / As1.03 / B167 / Ba16 / Co<1 / F e 4 7 5 / M n 8 2 / T l < 0 . 2 / V 0 . 6 4 2 3'-5': Sb<3.4 / As22.1 / B8.7j / Co6.7 / Fe9590 / Mn3 5 . 2 / V 3 4 . 4 78'-80': Sb<2.8 / As16.8 / N7.2j / Co2.5j / Fe5110 / M n 2 4 . 2 / V 1 5 . 7 82'-84': Sb<3.4 / As3.3j / B12.6j / Co<3.4 / Fe6500 / M n 2 8 . 9 / V 7 . 9 96'-98': Sb<3.3 / As2.1j / B12.5j / Co3.3 / Fe6050 / M n 3 9 . 3 / V 8 . 8 A W - 0 4 A W - 0 4 B : S b < 1 / A s < 1 / B < 5 0 / B a 1 1 / C o < 1 / F e 4 1 / M n 2 2 / T l < 0 . 2 / V < 0 . 3 A W - 0 4 C : S b < 1 / A s < 1 / B 1 4 5 0 / B a 3 9 / C o < 1 / F e 3 9 9 0 / M n 7 8 7 / T l < 0 . 2 / V 0 . 5 1 8 0 - 2 ' : S b < 1 / A s < 1 / B < 2 . 6 / C o < 1 / F e 8 1 5 / M n 1 . 4 / V 2 . 2 9 ' - 1 0 ' : S b < 1 . 1 / A s < 1 . 1 / B 2 < 2 . 8 / C o < 1 . 1 / F e 2 9 7 / M n 1 / V < 1 . 1 4 7 ' - 4 8 ' : S b < 1 . 1 / A s < 1 . 1 / B < 2 . 8 / C o < 1 . 1 / F e 1 9 5 0 / M n 1 9 . 5 / V < 1 . 1 S M W - 0 1 S M W - 0 1 B : S b < 1 / A s < 1 / B 1 0 0 / B a 7 4 / C o < 1 / F e 3 0 / M n 1 4 / T l < 0 . 2 / V < 0 . 3 S M W - 0 1 C : S b < 1 / A s < 1 / B 7 7 6 / B a 3 5 / C o < 1 / F e 4 2 5 0 / M n 8 0 7 / T l < 0 . 2 / V 0 . 4 0 2 0 - 2 ' : S b < 6 . 9 / A s < 6 . 9 / B < 1 7 . 2 / C o < 6 . 9 / F e 6 0 9 / M n 2 . 1 / V < 6 . 9 8 ' - 1 0 ' : S b < 6 . 1 / A s < 6 . 1 / B < 1 5 . 3 / C o < 6 . 1 / F e 8 2 . 3 / M n < 1 . 5 / V < 6 . 1 4 2 ' - 4 4 ' : S b < 6 . 2 / A s < 6 . 2 / B < 1 5 . 4 / C o < 6 . 2 / F e 1 8 7 0 / M n 7 . 5 / V < 6 . 2 N D 5 . 1 9 N D 1 . 0 1 5 2 8 8 2 0 4 1 3 9 9 0 3 0 4 2 5 0 3 0 0 0 3 0 0 0 3 0 0 3 0 0 W E L L S C R E E N W I T H C O N C E N T R A T I O N O F C O I ( m i c r o g r a m s p e r l i t e r ) S O U R C E S : 1 . D R A W I N G H A S B E E N S E T W I T H A P R O J E C T I O N O F N O R T H C A R O L I N A S T A T E P L A N E C O O R D I N A T E S Y S T E M F I P S 3 2 0 0 ( N A D 8 3 ) . 2 . 2 f t C O N T O U R I N T E R V A L S F R O M N C D O T L I D A R D A T E D 2 0 0 7 h t t p s : / / c o n n e c t . n c d o t . g o v / r e s o u r c e s / g i s / p a g e s / c o n t - e l e v _ v 2 . a s p x 3 . S E L E C T T O P O G R A P H I C A D J U S T M E N T S B A S E D O N S I T E S U R V E Y A N D C O M P A R I S O N T O A E R I A L P H O T O G R A P H . N O T E : 1 . C O N T O U R L I N E S A R E U S E D F O R R E P R E S E N T A T I V E P U R P O S E S O N L Y A N D A R E N O T T O B E U S E D F O R D E S I G N O R C O N S T R U C T I O N P U R P O S E S . 2 . C R O S S S E C T I O N L O C A T I O N S A R E S H O W N O N F I G U R E 1 - 2 . M W - 2 3 B : S b < 1 / A s < 1 / B 1 4 4 / B a 3 8 / C o < 1 / F e 2 0 / M n 9 / T l < 0 . 2 / V < 0 . 3 M W - 2 3 C : S b < 1 / A s < 1 / B 2 0 5 0 / B a 3 5 / C o 5 . 1 9 / F e 8 8 / M n 3 0 9 / T l 0 . 2 1 / V 0 . 3 2 3 M W - 2 3 E : S b < 1 / A s < 1 / B 2 5 0 0 / B a < 5 / C o < 1 / F e 4 8 / M n 5 / T l < 0 . 2 / V 0 . 9 9 3 M W - 2 3 B : S b < 1 / A s < 1 / B 1 4 4 / B a 3 8 / C o < 1 / F e 2 0 / M n 9 / T l < 0 . 2 / V < 0 . 3 M W - 2 3 C : S b < 1 / A s < 1 / B 2 0 5 0 / B a 3 5 / C o 5 . 1 9 / F e 8 8 / M n 3 0 9 / T l 0 . 2 1 / V 0 . 3 2 3 M W - 2 3 E : S b < 1 / A s < 1 / B 2 5 0 0 / B a < 5 / C o < 1 / F e 4 8 / M n 5 / T l < 0 . 2 / V 0 . 9 9 3 W A T E R L E V E L ( J U N E 2 0 1 5 ) L E G E N D S U R F I C I A L S A N D ( W E L L S O R T E D - S I L T Y S A N D - M E D I U M T O F I N E G R A I N E D S A N D ) S U R F I C I A L S A N D ( P O O R L Y S O R T E D - M E D I U M T O C O A R S E G R A I N E D S A N D ) C O A L A S H C O A R S E S A N D W I T H F I N E G R A V E L S A N D ( P E E D E E ) C L A Y R I C H F A C I E S N O D A T A N D 2 L S T A N D A R D C O N T O U R 4 7 5 3 0 0 4 8 < 1 < 1 < 1 < 1 < 1 < 1 1 . 0 F I L L M A T E R I A L S C A L E : A S S H O W N A W - 0 1 A W - 0 1 B : G R O U N D W A T E R A N A L Y T I C A L R E S U L T S F O R S U R F I C I A L A Q U I F E R I N M I C R O G R A M S P E R L I T E R A W - 0 1 C : G R O U N D W A T E R A N A L Y T I C A L R E S U L T S F O R P E E D E E I N M I C R O G R A M S P E R L I T E R 0 - 2 ' : S O I L T O T A L A N A L Y T I C A L R E S U L T S I N m g / k g Elevation Elevation S t a t i o n -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 - 1 4 0 - 1 3 0 - 1 2 0 - 1 1 0 - 1 0 0 - 9 0 - 8 0 - 7 0 - 6 0 - 5 0 - 4 0 - 3 0 - 2 0 - 1 0 0 1 0 2 0 3 0 4 0 5 0 6 0 0+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 53+50 Elevation Elevation S t a t i o n -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 - 1 4 0 - 1 3 0 - 1 2 0 - 1 1 0 - 1 0 0 - 9 0 - 8 0 - 7 0 - 6 0 - 5 0 - 4 0 - 3 0 - 2 0 - 1 0 0 1 0 2 0 3 0 4 0 5 0 6 0 0+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 53+50 w w w . s y n t e r r a c o r p . c o m 1 4 8 R i v e r S t r e e t , S u i t e 2 2 0 G r e e n v i l l e , S o u t h C a r o l i n a 2 9 6 0 1 8 6 4 - 4 2 1 - 9 9 9 9 5 / 2 2 / 2 0 1 5 5 / 2 2 / 2 0 1 5 P . W A L D R E P C . N E W E L L P R O J E C T M A N A G E R : L A Y O U T N A M E : D R A W N B Y : C H E C K E D B Y : K A T H Y W E B B D A T E : D A T E : F I G U R E 1 1 - 3 G E O L O G I C C R O S S S E C T I O N S W I T H M A N G A N E S E A N D V A N A D I U M F I G U R E 1 1 - 3 L . V . S U T T O N E N E R G Y C O M P L E X 8 0 1 S U T T O N S T E A M P L A N T R D W I L M I N G T O N , N O R T H C A R O L I N A B O R I N G S Y M B O L S S O I L S A M P L E 3 0 0 0 3 0 0 6 0 0 G R A P H I C S C A L E I N F E E T 3 0 0 3 0 6 0 I N F E E T H O R I Z O N T A L : 1 " = 3 0 0 ' V E R T I C A L : 1 " = 3 0 ' S E C T I O N B - B ' - M A N G A N E S E F A C I N G N O R T H (MSL) (MSL)COOLING POND GP-03 C O N C E N T R A T I O N C O N T O U R COAL ASH S U R F I C I A L S U R F I C I A L P E E D E E S E C T I O N B - B ' - V A N A D I U M F A C I N G N O R T H (MSL) (MSL)COOLING POND GP-03COAL ASH S U R F I C I A L S U R F I C I A L P E E D E E P:\DUKE ENERGY PROGRESS.1026\108. SUTTON ASH BASIN GW ASSESSMENT PLAN\1.11 CSA REPORTING\FIGURES\SUTTON-CSA-FIGURES.DWG08/02/2015 1:56 PM AB-01ABMW-01S: Sb<1 / As634 / B3940 / Ba585 / Co<1 / F e 1 5 2 / M n 8 8 / T l < 0 . 2 / V 3 . 4 5 ABMW-01D: Sb<1 / As1.03 / B167 / Ba16 / Co<1 / F e 4 7 5 / M n 8 2 / T l < 0 . 2 / V 0 . 6 4 2 3'-5': Sb<3.4 / As22.1 / B8.7j / Co6.7 / Fe9590 / Mn3 5 . 2 / V 3 4 . 4 78'-80': Sb<2.8 / As16.8 / N7.2j / Co2.5j / Fe5110 / M n 2 4 . 2 / V 1 5 . 7 82'-84': Sb<3.4 / As3.3j / B12.6j / Co<3.4 / Fe6500 / M n 2 8 . 9 / V 7 . 9 96'-98': Sb<3.3 / As2.1j / B12.5j / Co3.3 / Fe6050 / M n 3 9 . 3 / V 8 . 8 A W - 0 4 A W - 0 4 B : S b < 1 / A s < 1 / B < 5 0 / B a 1 1 / C o < 1 / F e 4 1 / M n 2 2 / T l < 0 . 2 / V < 0 . 3 A W - 0 4 C : S b < 1 / A s < 1 / B 1 4 5 0 / B a 3 9 / C o < 1 / F e 3 9 9 0 / M n 7 8 7 / T l < 0 . 2 / V 0 . 5 1 8 0 - 2 ' : S b < 1 / A s < 1 / B < 2 . 6 / C o < 1 / F e 8 1 5 / M n 1 . 4 / V 2 . 2 9 ' - 1 0 ' : S b < 1 . 1 / A s < 1 . 1 / B 2 < 2 . 8 / C o < 1 . 1 / F e 2 9 7 / M n 1 / V < 1 . 1 4 7 ' - 4 8 ' : S b < 1 . 1 / A s < 1 . 1 / B < 2 . 8 / C o < 1 . 1 / F e 1 9 5 0 / M n 1 9 . 5 / V < 1 . 1 S M W - 0 1 S M W - 0 1 B : S b < 1 / A s < 1 / B 1 0 0 / B a 7 4 / C o < 1 / F e 3 0 / M n 1 4 / T l < 0 . 2 / V < 0 . 3 S M W - 0 1 C : S b < 1 / A s < 1 / B 7 7 6 / B a 3 5 / C o < 1 / F e 4 2 5 0 / M n 8 0 7 / T l < 0 . 2 / V 0 . 4 0 2 0 - 2 ' : S b < 6 . 9 / A s < 6 . 9 / B < 1 7 . 2 / C o < 6 . 9 / F e 6 0 9 / M n 2 . 1 / V < 6 . 9 8 ' - 1 0 ' : S b < 6 . 1 / A s < 6 . 1 / B < 1 5 . 3 / C o < 6 . 1 / F e 8 2 . 3 / M n < 1 . 5 / V < 6 . 1 4 2 ' - 4 4 ' : S b < 6 . 2 / A s < 6 . 2 / B < 1 5 . 4 / C o < 6 . 2 / F e 1 8 7 0 / M n 7 . 5 / V < 6 . 2 AB-01ABMW-01S: Sb<1 / As634 / B3940 / Ba585 / Co<1 / F e 1 5 2 / M n 8 8 / T l < 0 . 2 / V 3 . 4 5 ABMW-01D: Sb<1 / As1.03 / B167 / Ba16 / Co<1 / F e 4 7 5 / M n 8 2 / T l < 0 . 2 / V 0 . 6 4 2 3'-5': Sb<3.4 / As22.1 / B8.7j / Co6.7 / Fe9590 / Mn3 5 . 2 / V 3 4 . 4 78'-80': Sb<2.8 / As16.8 / N7.2j / Co2.5j / Fe5110 / M n 2 4 . 2 / V 1 5 . 7 82'-84': Sb<3.4 / As3.3j / B12.6j / Co<3.4 / Fe6500 / M n 2 8 . 9 / V 7 . 9 96'-98': Sb<3.3 / As2.1j / B12.5j / Co3.3 / Fe6050 / M n 3 9 . 3 / V 8 . 8 A W - 0 4 A W - 0 4 B : S b < 1 / A s < 1 / B < 5 0 / B a 1 1 / C o < 1 / F e 4 1 / M n 2 2 / T l < 0 . 2 / V < 0 . 3 A W - 0 4 C : S b < 1 / A s < 1 / B 1 4 5 0 / B a 3 9 / C o < 1 / F e 3 9 9 0 / M n 7 8 7 / T l < 0 . 2 / V 0 . 5 1 8 0 - 2 ' : S b < 1 / A s < 1 / B < 2 . 6 / C o < 1 / F e 8 1 5 / M n 1 . 4 / V 2 . 2 9 ' - 1 0 ' : S b < 1 . 1 / A s < 1 . 1 / B 2 < 2 . 8 / C o < 1 . 1 / F e 2 9 7 / M n 1 / V < 1 . 1 4 7 ' - 4 8 ' : S b < 1 . 1 / A s < 1 . 1 / B < 2 . 8 / C o < 1 . 1 / F e 1 9 5 0 / M n 1 9 . 5 / V < 1 . 1 S M W - 0 1 S M W - 0 1 B : S b < 1 / A s < 1 / B 1 0 0 / B a 7 4 / C o < 1 / F e 3 0 / M n 1 4 / T l < 0 . 2 / V < 0 . 3 S M W - 0 1 C : S b < 1 / A s < 1 / B 7 7 6 / B a 3 5 / C o < 1 / F e 4 2 5 0 / M n 8 0 7 / T l < 0 . 2 / V 0 . 4 0 2 0 - 2 ' : S b < 6 . 9 / A s < 6 . 9 / B < 1 7 . 2 / C o < 6 . 9 / F e 6 0 9 / M n 2 . 1 / V < 6 . 9 8 ' - 1 0 ' : S b < 6 . 1 / A s < 6 . 1 / B < 1 5 . 3 / C o < 6 . 1 / F e 8 2 . 3 / M n < 1 . 5 / V < 6 . 1 4 2 ' - 4 4 ' : S b < 6 . 2 / A s < 6 . 2 / B < 1 5 . 4 / C o < 6 . 2 / F e 1 8 7 0 / M n 7 . 5 / V < 6 . 2 8 2 8 8 5 3 0 9 9 7 8 7 2 2 8 0 7 1 4 5 0 5 0 5 0 5 0 5 0 0 5 0 0 0 . 6 4 2 3 . 4 5 0 . 3 2 3 N D 0 . 5 1 8 < 0 . 3 0 . 4 0 2 < 0 . 3 0 . 3 0 . 3 0.3 W E L L S C R E E N W I T H C O N C E N T R A T I O N O F C O I ( m i c r o g r a m s p e r l i t e r ) S O U R C E S : 1 . D R A W I N G H A S B E E N S E T W I T H A P R O J E C T I O N O F N O R T H C A R O L I N A S T A T E P L A N E C O O R D I N A T E S Y S T E M F I P S 3 2 0 0 ( N A D 8 3 ) . 2 . 2 f t C O N T O U R I N T E R V A L S F R O M N C D O T L I D A R D A T E D 2 0 0 7 h t t p s : / / c o n n e c t . n c d o t . g o v / r e s o u r c e s / g i s / p a g e s / c o n t - e l e v _ v 2 . a s p x 3 . S E L E C T T O P O G R A P H I C A D J U S T M E N T S B A S E D O N S I T E S U R V E Y A N D C O M P A R I S O N T O A E R I A L P H O T O G R A P H . N O T E : 1 . C O N T O U R L I N E S A R E U S E D F O R R E P R E S E N T A T I V E P U R P O S E S O N L Y A N D A R E N O T T O B E U S E D F O R D E S I G N O R C O N S T R U C T I O N P U R P O S E S . 2 . C R O S S S E C T I O N L O C A T I O N S A R E S H O W N O N F I G U R E 1 - 2 . M W - 2 3 B : S b < 1 / A s < 1 / B 1 4 4 / B a 3 8 / C o < 1 / F e 2 0 / M n 9 / T l < 0 . 2 / V < 0 . 3 M W - 2 3 C : S b < 1 / A s < 1 / B 2 0 5 0 / B a 3 5 / C o 5 . 1 9 / F e 8 8 / M n 3 0 9 / T l 0 . 2 1 / V 0 . 3 2 3 M W - 2 3 E : S b < 1 / A s < 1 / B 2 5 0 0 / B a < 5 / C o < 1 / F e 4 8 / M n 5 / T l < 0 . 2 / V 0 . 9 9 3 M W - 2 3 B : S b < 1 / A s < 1 / B 1 4 4 / B a 3 8 / C o < 1 / F e 2 0 / M n 9 / T l < 0 . 2 / V < 0 . 3 M W - 2 3 C : S b < 1 / A s < 1 / B 2 0 5 0 / B a 3 5 / C o 5 . 1 9 / F e 8 8 / M n 3 0 9 / T l 0 . 2 1 / V 0 . 3 2 3 M W - 2 3 E : S b < 1 / A s < 1 / B 2 5 0 0 / B a < 5 / C o < 1 / F e 4 8 / M n 5 / T l < 0 . 2 / V 0 . 9 9 3 W A T E R L E V E L ( J U N E 2 0 1 5 ) L E G E N D S U R F I C I A L S A N D ( W E L L S O R T E D - S I L T Y S A N D - M E D I U M T O F I N E G R A I N E D S A N D ) S U R F I C I A L S A N D ( P O O R L Y S O R T E D - M E D I U M T O C O A R S E G R A I N E D S A N D ) C O A L A S H C O A R S E S A N D W I T H F I N E G R A V E L S A N D ( P E E D E E ) C L A Y R I C H F A C I E S N O D A T A N D 2 L S T A N D A R D C O N T O U R 0 . 5 0.3 F I L L M A T E R I A L S C A L E : A S S H O W N A W - 0 1 A W - 0 1 B : G R O U N D W A T E R A N A L Y T I C A L R E S U L T S F O R S U R F I C I A L A Q U I F E R I N M I C R O G R A M S P E R L I T E R A W - 0 1 C : G R O U N D W A T E R A N A L Y T I C A L R E S U L T S F O R P E E D E E I N M I C R O G R A M S P E R L I T E R 0 - 2 ' : S O I L T O T A L A N A L Y T I C A L R E S U L T S I N m g / k g 3.0 Elevation Elevation S t a t i o n -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 - 1 4 0 - 1 3 0 - 1 2 0 - 1 1 0 - 1 0 0 - 9 0 - 8 0 - 7 0 - 6 0 - 5 0 - 4 0 - 3 0 - 2 0 - 1 0 0 1 0 2 0 3 0 4 0 5 0 6 0 0+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 53+50 5 / 2 2 / 2 0 1 5 5 / 2 2 / 2 0 1 5 P . W A L D R E P C . N E W E L L P R O J E C T M A N A G E R : L A Y O U T N A M E : D R A W N B Y : C H E C K E D B Y : K A T H Y W E B B D A T E : D A T E : F I G U R E 1 1 - 4 G E O L O G I C C R O S S S E C T I O N S W I T H T H A L L I U M F I G U R E 1 1 - 4 w w w . s y n t e r r a c o r p . c o m 1 4 8 R i v e r S t r e e t , S u i t e 2 2 0 G r e e n v i l l e , S o u t h C a r o l i n a 2 9 6 0 1 8 6 4 - 4 2 1 - 9 9 9 9 L . V . S U T T O N E N E R G Y C O M P L E X 8 0 1 S U T T O N S T E A M P L A N T R D W I L M I N G T O N , N O R T H C A R O L I N A B O R I N G S Y M B O L S S O I L S A M P L E 3 0 0 0 3 0 0 6 0 0 G R A P H I C S C A L E I N F E E T 3 0 0 3 0 6 0 I N F E E T H O R I Z O N T A L : 1 " = 3 0 0 ' V E R T I C A L : 1 " = 3 0 ' S E C T I O N B - B ' - T H A L L I U M F A C I N G N O R T H (MSL) (MSL)COOLING POND GP-03 C O N C E N T R A T I O N C O N T O U R COAL ASH S U R F I C I A L S U R F I C I A L P E E D E E P:\DUKE ENERGY PROGRESS.1026\108. SUTTON ASH BASIN GW ASSESSMENT PLAN\1.11 CSA REPORTING\FIGURES\SUTTON-CSA-FIGURES.DWG08/02/2015 1:58 PM AB-01ABMW-01S: Sb<1 / As634 / B3940 / Ba585 / Co<1 / F e 1 5 2 / M n 8 8 / T l < 0 . 2 / V 3 . 4 5 ABMW-01D: Sb<1 / As1.03 / B167 / Ba16 / Co<1 / F e 4 7 5 / M n 8 2 / T l < 0 . 2 / V 0 . 6 4 2 3'-5': Sb<3.4 / As22.1 / B8.7j / Co6.7 / Fe9590 / Mn3 5 . 2 / V 3 4 . 4 78'-80': Sb<2.8 / As16.8 / N7.2j / Co2.5j / Fe5110 / M n 2 4 . 2 / V 1 5 . 7 82'-84': Sb<3.4 / As3.3j / B12.6j / Co<3.4 / Fe6500 / M n 2 8 . 9 / V 7 . 9 96'-98': Sb<3.3 / As2.1j / B12.5j / Co3.3 / Fe6050 / M n 3 9 . 3 / V 8 . 8 A W - 0 4 A W - 0 4 B : S b < 1 / A s < 1 / B < 5 0 / B a 1 1 / C o < 1 / F e 4 1 / M n 2 2 / T l < 0 . 2 / V < 0 . 3 A W - 0 4 C : S b < 1 / A s < 1 / B 1 4 5 0 / B a 3 9 / C o < 1 / F e 3 9 9 0 / M n 7 8 7 / T l < 0 . 2 / V 0 . 5 1 8 0 - 2 ' : S b < 1 / A s < 1 / B < 2 . 6 / C o < 1 / F e 8 1 5 / M n 1 . 4 / V 2 . 2 9 ' - 1 0 ' : S b < 1 . 1 / A s < 1 . 1 / B 2 < 2 . 8 / C o < 1 . 1 / F e 2 9 7 / M n 1 / V < 1 . 1 4 7 ' - 4 8 ' : S b < 1 . 1 / A s < 1 . 1 / B < 2 . 8 / C o < 1 . 1 / F e 1 9 5 0 / M n 1 9 . 5 / V < 1 . 1 S M W - 0 1 S M W - 0 1 B : S b < 1 / A s < 1 / B 1 0 0 / B a 7 4 / C o < 1 / F e 3 0 / M n 1 4 / T l < 0 . 2 / V < 0 . 3 S M W - 0 1 C : S b < 1 / A s < 1 / B 7 7 6 / B a 3 5 / C o < 1 / F e 4 2 5 0 / M n 8 0 7 / T l < 0 . 2 / V 0 . 4 0 2 0 - 2 ' : S b < 6 . 9 / A s < 6 . 9 / B < 1 7 . 2 / C o < 6 . 9 / F e 6 0 9 / M n 2 . 1 / V < 6 . 9 8 ' - 1 0 ' : S b < 6 . 1 / A s < 6 . 1 / B < 1 5 . 3 / C o < 6 . 1 / F e 8 2 . 3 / M n < 1 . 5 / V < 6 . 1 4 2 ' - 4 4 ' : S b < 6 . 2 / A s < 6 . 2 / B < 1 5 . 4 / C o < 6 . 2 / F e 1 8 7 0 / M n 7 . 5 / V < 6 . 2 < 0 . 2 < 0 . 2 < 0 . 2 0 . 2 1 < 0 . 2 < 0 . 2 < 0 . 2 < 0 . 2 < 0 . 2 0 . 2 W E L L S C R E E N W I T H C O N C E N T R A T I O N O F C O I ( m i c r o g r a m s p e r l i t e r ) S O U R C E S : 1 . D R A W I N G H A S B E E N S E T W I T H A P R O J E C T I O N O F N O R T H C A R O L I N A S T A T E P L A N E C O O R D I N A T E S Y S T E M F I P S 3 2 0 0 ( N A D 8 3 ) . 2 . 2 f t C O N T O U R I N T E R V A L S F R O M N C D O T L I D A R D A T E D 2 0 0 7 h t t p s : / / c o n n e c t . n c d o t . g o v / r e s o u r c e s / g i s / p a g e s / c o n t - e l e v _ v 2 . a s p x 3 . S E L E C T T O P O G R A P H I C A D J U S T M E N T S B A S E D O N S I T E S U R V E Y A N D C O M P A R I S O N T O A E R I A L P H O T O G R A P H . N O T E : 1 . C O N T O U R L I N E S A R E U S E D F O R R E P R E S E N T A T I V E P U R P O S E S O N L Y A N D A R E N O T T O B E U S E D F O R D E S I G N O R C O N S T R U C T I O N P U R P O S E S . 2 . C R O S S S E C T I O N L O C A T I O N S A R E S H O W N O N F I G U R E 1 - 2 . M W - 2 3 B : S b < 1 / A s < 1 / B 1 4 4 / B a 3 8 / C o < 1 / F e 2 0 / M n 9 / T l < 0 . 2 / V < 0 . 3 M W - 2 3 C : S b < 1 / A s < 1 / B 2 0 5 0 / B a 3 5 / C o 5 . 1 9 / F e 8 8 / M n 3 0 9 / T l 0 . 2 1 / V 0 . 3 2 3 M W - 2 3 E : S b < 1 / A s < 1 / B 2 5 0 0 / B a < 5 / C o < 1 / F e 4 8 / M n 5 / T l < 0 . 2 / V 0 . 9 9 3 W A T E R L E V E L ( J U N E 2 0 1 5 ) L E G E N D S U R F I C I A L S A N D ( W E L L S O R T E D - S I L T Y S A N D - M E D I U M T O F I N E G R A I N E D S A N D ) S U R F I C I A L S A N D ( P O O R L Y S O R T E D - M E D I U M T O C O A R S E G R A I N E D S A N D ) C O A L A S H C O A R S E S A N D W I T H F I N E G R A V E L S A N D ( P E E D E E ) C L A Y R I C H F A C I E S N O D A T A N D 2 L S T A N D A R D C O N T O U R F I L L M A T E R I A L S C A L E : A S S H O W N A W - 0 1 A W - 0 1 B : G R O U N D W A T E R A N A L Y T I C A L R E S U L T S F O R S U R F I C I A L A Q U I F E R I N M I C R O G R A M S P E R L I T E R A W - 0 1 C : G R O U N D W A T E R A N A L Y T I C A L R E S U L T S F O R P E E D E E I N M I C R O G R A M S P E R L I T E R 0 - 2 ' : S O I L T O T A L A N A L Y T I C A L R E S U L T S I N m g / k g Primary Sources Exposure Medium Exposure Route Re c r e a t i o n a l U s e r - F i s h e r m a n Re c r e a t i o n a l U s e r - H u n t e r Re c r e a t i o n a l U s e r - S w i m m e r In d u s t r i a l W o r k e r ( A d u l t ) Re c r e a t i o n a l U s e r - F i s h e r m a n Re c r e a t i o n a l U s e r - H u n t e r Re c r e a t i o n a l U s e r - S w i m m e r Re s i d e n t i a l ( A d u l t & C h i l d ) In d u s t r i a l W o r k e r ( A d u l t ) Soil Surface Water Sediment Groundwater Dermal Inhalation Ingestion Dermal Inhalation Ingestion Dermal Inhalation Incomplete Exposure Pathway 1984 Ash Basin Groundwater 1971 Ash Basin NPDES Stormwater Discharge Sediment Potential Human Receptors Potentially Complete Exposure Pathway Current Land Use Hypothetical Future Land Use Former Ash Disposal Area (FADA) NPDES Direct Discharge Surface Water (Sutton Lake & Cape Fear River) Secondary Sources Ingestion Dermal Inhalation Ingestion Figure 12-1 Human Health Conceptual Exposure Model L. V. Sutton Energy Complex Wilmington, North Carolina 0 148 River Street, Suite 220 Greenville, SC 29601 Phone: (864) 421-9999 Existing Primary Release Mechanisms Inactive Ash Basin Active Ash Basin Lay Of Land Area Former Primary Release Mechanism No longer used P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\Report Figures\Figure 12-1 Sutton HH CEM8/4/2015 &< &< U S-421 PRJ-I-140 SR-1394 P R J -I -1 4 0 S R -2 1 4 5 P R J -I -1 4 0 FORMER ASHDISPOSAL AREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNELCOOLINGPOND COOLINGPOND COOLINGPOND ABMW-01SpHAsBMnTDSV ABMW-02SAsBaBFeMnTDSV ±NOTES:1 CONSTITUENTS IDENTIFIED AS A SITE SPECIFICCONSTITUENT OF POTENTIAL CONCERN (COPC). 2 NC2L STANDARDS FOR ANTIMONY, BERYLLIUM,COBALT, THALLIUM, AND VANADIUM ARE "INTERIMMAXIMUM ALLOWABLE CONCENTRATIONS" (IMAC). 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011). GRAPHIC SCALE 600 0 600 1,200 1,800 2,400 (IN FEET) L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com LEGEND FIG URE 12-2COPC LOCATIONS FLAGGEDGROUNDWATER - ASH PO RE WATER -HUMAN HEALTHL.V. SUTTON ENERGY COMPLEX &<MONITORING WELL ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGESS SUTTON PLANT SITE BOUNDARY NC2L OR IMAC EXCEEDANCE -BOLDED IF COAL ASH COPC(SEE TABLES 12-1 AND 12-2)1, 2 PROJECT MANAGER: P. WALDREP DRAWN BY: R. SPRING DATE: 08/01/2015 DATE: 08/02/2015 CHECKED BY: J. MEADOWS P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 12-2 - COPC LOCATIONS FLAGGED - GROUNDWATER - ASH PORE WATER - HUMAN HEALTH.MXD Constituent Full NamepHArsenicBariumBoronIronLeadManganeseTotal Dissolved SolidsVanadium Constituent AbbreviationpHAsBaBFePbMnTDSV &< &< &< &< &< &< &< &< &< &< &< &< &< &< &< &< &< &< &< &< &< &< &<&< &< &< &< &< &< PRJ-I-140 U S-421 S R-2 1 6 9 SR-1394 S R -2 7 7 9 S R -2 1 4 5 P R J -I -1 4 0 P R J -I -1 4 0 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN 421-Well 3pHMn 421-Well 4pHMn AW-01BpHCoFePbMnTDSV AW-02BpHCoFeMnV AW-03BpHFeMnV AW-04BpHCoFeMn AW-05BFeMn AW-06BpHFeMn AW-08BpHCoFeV AW-09BpHFeMnVCr(VI) MW-07ApH MW-07BpH MW-15AsFeMnV MW-16pHV MW-19pHBCoFeMnTl MW-20FeMnV MW-22BpH MW-23BpHCr(VI)3 MW-24BMnVCr(VI)3 MW-27BpHCoMnSe MW-28BpH MW-31BpHFeMnV MW-37BpHCoFeMn SMW-01BpHFe SMW-02BpHCoFeMnV SMW-03BpHCoFeMnNO3+NO2V SMW-04BpHCoFeMnV SMW-05BpHFeMnV SMW-06BpHFe COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNELCOOLINGPOND COOLINGPOND COOLINGPOND ± L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA &<MONITORING WELL ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGESS SUTTON PLANT SITE BOUNDARY 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com LEGEND NC2L OR IMAC EXCEEDANCE -BOLDED IF COAL ASH COPC(SEE TABLES 12-2, 12-3 AND 12-4)1, 2 P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 12-3 - COPC LOCATIONS FLAGGED - GROUNDWATER - UPPER SURFICIAL AQUIFER - HUMAN HEALTH.MXD GRAPHIC SCALE 600 0 600 1,200 1,800 2,400 (IN FEET) FIG URE 12-3COPC LOCATIONS FLAGGEDGROUNDWATER - UPPER SURFICIALAQUIFER - HUMAN HEALTHL.V. SUTTON ENERGY COMPLEXPROJECT MANAGER: P. WALDREP DRAWN BY: R. SPRING DATE: 08/01/2015 DATE: 08/02/2015 CHECKED BY: J. MEADOWS Constituent Full NamepHAntimonyArsenicBoronCobaltIronLeadManganeseNitrate+NitriteSeleniumThalliumTotal Dissolved SolidsVanadiumChromium (VI)3 Constituent AbbreviationpHSbAsBCoFePbMnNO3+NO2SeTlTDSVCr(VI)3 NOTES:1 CONSTITUENTS IDENTIFIED AS A SITE SPECIFICCONSTITUENT OF POTENTIAL CONCERN (COPC). 2 NC2L STANDARDS FOR ANTIMONY, BERYLLIUM,COBALT, THALLIUM, AND VANADIUM ARE "INTERIMMAXIMUM ALLOWABLE CONCENTRATIONS" (IMAC). 3 USEPA.NATIONAL RECOMMENDED WATER CRITERIA.ACCESSED 07/26/2015.(http://water.epa.gov/scitech/swguidance/standards/criteria) 4 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 5 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 6 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 7 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011). &< &< &< &< &< &< &< &< &<&< &< &< &< &< &< &< &< &< &< &< &< &< &< &< &< &< &< &< PRJ-I-140 U S-421 SR-1394 S R-2 1 6 9 S R -2 7 7 9 S R -2 1 4 5 P R J -I -1 4 0 P R J -I -1 4 0 FORMER ASHDISPOSAL AREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNELCOOLINGPOND COOLINGPOND COOLINGPOND ABMW-02DAsFeMnV AW-01CpHCoFeMn AW-02CpHCoFeMn AW-03CpHBCoFeMnTDSV AW-04CpHBCoFeMnV AW-05CpH AW-08CpHCoMn AW-09CpHCoFeMnVCr(VI) MW-04BFeMn MW-05CpHCoMn MW-07CpHMnTlV MW-11pH MW-12BCoFeMn MW-21CAsBCoFeMn MW-22CpHBCoFeMnTl MW-23CpHBCoMnTlV MW-24CpHBCoFeMnV MW-28CpH MW-31CpHBCoFeMnTDS MW-32CpH MW-33CpH MW-37CpHCoFeMnV SMW-01CpHBCoFeMnV SMW-02CpHCoFeMnV SMW-03CpHCoFeMnV SMW-04CFeMnV SMW-05CpHCoFeMn SMW-06CpHCoFeMnV R M P -5 8 1 5 ± GRAPHIC SCALE 600 0 600 1,200 1,800 2,400 (IN FEET) L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com FIG URE 12-4COPC LOCATIONS FLAGGEDGROUNDWATER - LOWER SURFICIALAQUIFER - HUMAN HEALTHL.V. SUTTON ENERGY COMPLEXPROJECT MANAGER: P. WALDREP DRAWN BY: R. SPRING DATE: 08/01/2015 DATE: 08/02/2015 CHECKED BY: J. MEADOWS P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 12-4 - COPC LOCATIONS FLAGGED - GROUNDWATER - LOWER SURFICIAL AQUIFER - HUMAN HEALTH.MXD Constituent Full NamepHArsenicBoronCobaltIronManganeseThalliumTotal Dissolved SolidsVanadiumChromium(VI) Constituent AbbreviationpHAsBCoFeMnTlTDSVCr(VI)3 LEGEND &<MONITORING WELL ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGESS SUTTON PLANT SITE BOUNDARY NC2L OR IMAC EXCEEDANCE -BOLDED IF COAL ASH COPC(SEE TABLES 12-2, 12-3 AND 12-4)1, 2 NOTES:1 CONSTITUENTS IDENTIFIED AS A SITE SPECIFICCONSTITUENT OF POTENTIAL CONCERN (COPC). 2 NC2L STANDARDS FOR ANTIMONY, BERYLLIUM,COBALT, THALLIUM, AND VANADIUM ARE "INTERIMMAXIMUM ALLOWABLE CONCENTRATIONS" (IMAC). 3 USEPA.NATIONAL RECOMMENDED WATER CRITERIA .ACCESSED 07/26/2015(http://water.epa.gov/scitech/swguidance/standards/criteria/) 4 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 5 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 6 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 7 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011). &< &< &< &< &< &< &< &> U S-421 PRJ-I-140 SR-1394 P R J -I -1 4 0 S R -2 1 4 5 P R J -I -1 4 0 FORMER ASHDISPOSAL AREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN ABMW-01DFeMnV AW-02DFeMnTDSV AW-05DFeV AW-06DpHBFeTDSV AW-07DpHBTDSV AW-09DpHFeTDSV PZ-10DFeMnV SMW-06DpHSbBFeTDSV COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNELCOOLINGPOND COOLINGPOND COOLINGPOND ± GRAPHIC SCALE 600 0 600 1,200 1,800 2,400 (IN FEET) L. V. SUTTON ENERGY COMPLEX801 SUTTON POWER PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com LEGEND FIG URE 12-5COPC LOCATIONS FLAGGEDGROUNDWATER - UPPER PEE DEEAQUIFER - HUMAN HEALTHL.V. SUTTON ENERGY COMPLEX &<MONITORING WELL &>PIEZOMETER ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGESS SUTTON PLANT SITE BOUNDARY NC2L OR IMAC EXCEEDANCE -BOLDED IF COAL ASH COPC(SEE TABLES 12-2, 12-5)1, 2 PROJECT MANAGER: P. WALDREP DRAWN BY: R. SPRING DATE: 08/01/2015 DATE: 08/02/2015 CHECKED BY: J. MEADOWS P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 12-5 - COPC LOCATIONS FLAGGED - GROUNDWATER - UPPER PEE DEE AQUIFER - HUMAN HEALTH.MXD Constituent Full NamepHAntimonyBoronIronManganeseTotal Dissolved SolidsVanadium Constituent AbbreviationpHSbBFeMnTDSV NOTES:1 CONSTITUENTS IDENTIFIED AS A SITE SPECIFICCONSTITUENT OF POTENTIAL CONCERN (COPC). 2 NC2L STANDARDS FOR ANTIMONY, BERYLLIUM,COBALT, THALLIUM, AND VANADIUM ARE "INTERIMMAXIMUM ALLOWABLE CONCENTRATIONS" (IMAC). 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011). &< &< &< U S-421 PRJ-I-140 SR-1394 P R J -I -1 4 0 S R -2 1 4 5 P R J -I -1 4 0 FORMER ASHDISPOSAL AREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND AW-05EpHBFeTDSV AW-06EBFeTDSV MW-23EpHBTDSV ± GRAPHIC SCALE 600 0 600 1,200 1,800 2,400 (IN FEET) L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com LEGEND FIG URE 12-6COPC LOCATIONS FLAGGEDGROUNDWATER - LOWER PEE DEEAQUIFER - HUMAN HEALTHL.V. SUTTON ENERGY COMPLEX &<MONITORING WELL ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGESS SUTTON PLANT SITE BOUNDARY NC2L OR IMAC EXCEEDANCE -BOLDED IF COAL ASH COPC(SEE TABLES 12-2, 12-5)1, 2 PROJECT MANAGER: P. WALDREP DRAWN BY: R. SPRING DATE: 08/01/2015 DATE: 08/02/2015 CHECKED BY: J. MEADOWS P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 12-6 - COPC LOCATIONS FLAGGED - GROUNDWATER - LOWER PEE DEE AQUIFER - HUMAN HEALTH.MXD Constituent Full NamepHBoronIronTotal Dissolved SolidsVanadium Constituent AbbreviationpHBFeTDSV NOTES:1 CONSTITUENTS IDENTIFIED AS A SITE SPECIFICCONSTITUENT OF POTENTIAL CONCERN (COPC). 2 NC2L STANDARDS FOR ANTIMONY, BERYLLIUM,COBALT, THALLIUM, AND VANADIUM ARE "INTERIMMAXIMUM ALLOWABLE CONCENTRATIONS" (IMAC). 3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 5 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011). U S-421 PRJ-I-140 SR-1394 P R J -I -1 4 0 S R -2 1 4 5 P R J -I -1 4 0 FORMER ASHDISPOSAL AREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND ±NOTES:COPC- C ONSTITUEN T OF POTENTIAL C ONC ERN COPCs IN DENTIFIED IN THIS FIG UR E ARE O NLY THOSE D ETECTED ABOVE ASCREENING VALUE. CO NSTITU ENTS IDENTIFIED AS C OPCs BECAUSE:1) THEY H AVE N O SC REENING VALU E OR2) TH EIR ANALYTICAL DETEC TION LIMIT EXC EEDS THE SC REENING VALUE ARENOT IDENTIFIED ON THIS FIGU RE. APR IL 17, 2014 AER IAL ORTH OPHOTO GRAPH Y O BTAINED FRO M WSPwww.w spgroup.com 2012 AER IAL O RTH OPH OTO GRAPHY O BTAIN ED FROM THENC CENTER FOR GEOGR APHIC IN FO RMATION AND AN ALYSIS AThttp://services.nconemap.gov/ PARC EL BO UND ARY WAS OBTAIN EDFROM THENC CENTER FOR GEOGR APHIC IN FO RMATION AND AN ALYSIS AThttp://services.nconemap.gov/ DRAWING HAS BEEN SET W ITH A PR OJECTIO N OF NO RTH CAR OLIN A STATEPLANE C OOR DINATE SYSTEM FIPS 3200 (N AD 83/2011). ELEVATIO NS ARE BASED ON N AVD 88 GRAPHIC SCALE 600 0 600 1,200 1,800 2,400 (IN FEET) L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com LEGEND FIG URE 12-7COPC LOCATIONS FLAGGEDSOILS (0-2 FEET ) - HUMAN HEALTHL.V. SUTTON ENERGY COMPLEX ASH BASIN BOUNDARY ASH BASIN COM PLIA NCE BOUNDARY DUKE ENERGY PROGE SS SUTTON PLANT SITE BOUNDARY NO HUMAN HEALTH SOILS (0-2 FEET) EXCEEDENCES FOUND (SEE TABLE 12-6)1 PROJECT MANAGER: P. WALDREP DRAWN BY: R. SPRING DATE: 08/01/2015 DATE: 08/02/2015 CHECKED BY: J. MEADOWS NOTES:1 USEPA.REGIONAL SCREENING LEVELS FOR CHEMICALCONTAMINANTS AT SUPERFUND SITES . Accessed07/26/2015.(http://www.epa.gov/reg3hwmd/risk/human/rb-concentration_table/Generic_Tables/index.htm) 2 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 3 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 4 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 5 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011). P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 12-7 - COPC LOCATIONS FLAGGED - SOILS (0-2 FEET) - HUMAN HEALTH.MXD ") ") ") U S-421 PRJ-I-140 SR-1394 P R J -I -1 4 0 S R -2 1 4 5 P R J -I -1 4 0 FORMER ASHDISPOSAL AREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND SW-06AAs SW-CF001FeMn SW-CFPCoFeMn ± GRAPHIC SCALE 600 0 600 1,200 1,800 2,400 (IN FEET) L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com FIG URE 12-8COPC LOCATIONS FLAGGEDSEDIMENT - HUMAN HEALTHL.V SUTTON ENERG Y COMPLEX PROJECT MANAGER: P. WALDREP DRAWN BY: R. SPRING DATE: 08/01/2015 DATE: 08/02/2015 CHECKED BY: J. MEADOWS P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 12-8 - COPC LOCATIONS FLAGGED - SEDIMENT - HUMAN HEALTH.MXD NOTES:1 USEPA.REGIONAL SCREENING LEVELS FOR CHEMICALCONTAMINANTS AT SUPERFUND SITES . ACCESSED07/26/2015.(http://www.epa.gov/reg3hwmd/risk/human/rb-concentration_table/Generic_Tables/index.htm) 2 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 3 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 4 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 5 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011). Constituent Full NameArsenicCobaltIronManganese Constituent AbbreviationAsCoFeMn LEGEND ")SURFACE WATER POINT ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGESS SUTTON PLANT SITE BOUNDARY EPA RSL RESIDENTIAL SEDIMENT EXCEEDANCES -BOLDED IF COAL ASHCOPC(SEE TABLES 12-2 AND 12-7)1 ") ") ") ") ") ") U S-421 PRJ-I-140 SR-1394 P R J -I -1 4 0 S R -2 1 4 5 P R J -I -1 4 0 FORMERASH DISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN SW-004AlTl SW-06AAlTl SW-01CAl SW-08AAl SW-CFPAl SW-CFUPAl COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND ±NOTES:1 USEPA.NATIONAL RECOMMENDED WATER CRITERIA.Accessed 07/26/2015.(http://water.epa.gov/scitech/swguidance/standards/criteria/current/index.cfm) 2 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 3 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 4 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 5 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011). Constituent Full NameAluminumThallium Constituent AbbreviationAlTl GRAPHIC SCALE 600 0 600 1,200 1,800 2,400 (IN FEET) L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com LEGEND FIG URE 12-9COPC LOCATIONS FLAGGEDSURFACE WAT ER - HUMAN HEALTHL.V. SUTTON ENERGY COMPLEX ")SURFACE WATER POINT ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGESS SUTTON PLANT SITE BOUNDARY SURFACE WATER COMBINED EPA WQC AND NCAC 02B EXCEEDANCES -BOLDEDIF COAL ASH COPC (SEE TABLES 12-2 AND 12-8)1 PROJECT MANAGER: P. WALDREP DRAWN BY: R. SPRING DATE: 08/01/2015 DATE: 08/02/2015 CHECKED BY: J. MEADOWS P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 12-9 - COPC LOCATIONS FLAGGED - SURFACE WATER AND SEEPS - HUMAN HEALTH.MXD Primary Sources Exposure Medium Te r r e s t r i a l M a m m a l s Aq u a t i c M a m m a l s Bi r d s ( I n c l u d i n g w a t e r f o w l ) Aq u a t i c V e g e t a t i o n Al g a e / M o s s Be n t h i c I n v e r t e b r a t e s He r p t i l e s Fi s h In s e c t s Wo o d y P l a n t s He r b a c e o u s P l a n t s Ba c t e r i a ( M i c r o b e s ) Potential Human Receptors Potentially Complete Exposure Pathway Incomplete Exposure Pathway Exposure RouteSecondary Sources Sediment Groundwater Incidental Ingestion Ingestion of Prey or Plants Incidental Ingestion Ingestion of Prey or Plants Incidental Ingestion Ingestion of Prey or Plants Incidental Ingestion Ingestion of Prey or Plants Current and Hypothetical Future Ecological Receptors Soil 1984 Ash Basin Groundwater Sediment1971 Ash Basin NPDES Stormwater Discharge Surface Water NPDES Discharge Former Ash Disposal Area (FADA) Surface Water (Lake/River) Figure 12-10 Ecological Conceptual Exposure Model L. V. Sutton Power Plant Wilmington, North Carolina 0 148 River Street, Suite 220 Greenville, SC 29601 Phone: (864) 421-9999 Existing Primary Release Mechanisms FADA 1971 Ash Basin 1984 Ash Basin Former Primary Release Mechanism No Longer Used P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\Report Figures\Figure 12-10 ECO CEM - Sutton8/4/2015 &< &< &< &< &< &< &< &< &< &< U S-421 PRJ-I-140 SR-1394 P R J -I -1 4 0 S R -2 1 4 5 P R J -I -1 4 0 FORMER ASHDISPOSAL AREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND AW-01CAlCrFe AW-02CAlCrFeV AW-03CAlCrFeV AW-04CAlCrFeV AW-06DAlFeV AW-07DAlCrFeV SMW-01CAlFe SMW-02CAlCrFe SMW-04CAl SMW-06DAl ±NOTES:COPC- C ONSTITUEN T OF POTENTIAL C ONC ERN COPCs IN DENTIFIED IN THIS FIG UR E ARE O NLY THOSE D ETECTED ABOVE ASCREENING VALUE. CO NSTITU ENTS IDENTIFIED AS C OPCs BECAUSE:1) THEY H AVE N O SC REENING VALU E OR2) TH EIR ANALYTICAL DETEC TION LIMIT EXC EEDS THE SC REENING VALUE ARENOT IDENTIFIED ON THIS FIGU RE. APR IL 17, 2014 AER IAL ORTH OPHOTO GRAPH Y O BTAINED FRO M WSPwww.w spgroup.com 2012 AER IAL O RTH OPH OTO GRAPHY O BTAIN ED FROM THENC CENTER FOR GEOGR APHIC IN FO RMATION AND AN ALYSIS AThttp://services.nconemap.gov/ PARC EL BO UND ARY WAS OBTAIN EDFROM THENC CENTER FOR GEOGR APHIC IN FO RMATION AND AN ALYSIS AThttp://services.nconemap.gov/ DRAWING HAS BEEN SET W ITH A PR OJECTIO N OF NO RTH CAR OLIN A STATEPLANE C OOR DINATE SYSTEM FIPS 3200 (N AD 83/2011). ELEVATIO NS ARE BASED ON N AVD 88 GRAPHIC SCALE 600 0 600 1,200 1,800 2,400 (IN FEET) L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com LEGEND FIGURE 12-11COPC LOCATIONS FLAGGEDSOILS (0-2 FEET) - ECOLOGICALL.V. SUTTON ENERGY COMPLEX &<MONITORING WELL ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGESS SUTTON PLANT SITE BOUNDARY EPA REGION 4 SOIL EXCEEDENCES -BOLDED IF COAL ASH COPC(SEE TABLES 12-2 AND 12-11)1 PROJECT MANAGER: P. WALDREP DRAWN BY: M. LOVELACE DATE: 08/01/2015 DATE: 08/02/2015 CHECKED BY: J. MEADOWS P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 12-11 - COPC LOCATIONS FLAGGED - SOILS (0-2 FEET) - ECOLOGICAL.MXD NOTES:1 USEPA.SUPPLEMENTAL GUIDANCE TO RISKASSESSMENT GUIDANCE FOR SUPERFUND: REGION 4BULLETINS, ECOLOGICAL RISK ASSESSMENT. Originallypublished November 1995. Website version last updated11/30/2001:(http://www.epa.gov/region4/superfund/programs/riskassess/ecolbul.html.) 2 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 3 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 4 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 5 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM Constituent Full NameAlCrFeV Constituent AbbreviationAluminumChromiumIronVanadium ") ") ") ") ") ") ") U S-421 PRJ-I-140 SR-1394 P R J -I -1 4 0 S R -2 1 4 5 P R J -I -1 4 0 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN SW-06AAlBCrFeMnV SW-08AAlCrFeMnV SW-CFPAlCrFeMnVZ SW-CFUPAlCrFe SW-01CAlCrFeV SW-CF001AlCrFeMnV SW-004AlCrFeMoV COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNELCOOLINGPOND COOLINGPOND COOLINGPOND ±NOTES:COPC- C ONSTITUEN T OF POTENTIAL C ONC ERN COPCs IN DENTIFIED IN THIS FIG UR E ARE O NLY THOSE D ETECTED ABOVE ASCREENING VALUE. CO NSTITU ENTS IDENTIFIED AS C OPCs BECAUSE:1) THEY H AVE N O SC REENING VALU E OR2) TH EIR ANALYTICAL DETEC TION LIMIT EXC EEDS THE SC REENING VALUE ARENOT IDENTIFIED ON THIS FIGU RE. APR IL 17, 2014 AER IAL ORTH OPHOTO GRAPH Y O BTAINED FRO M WSPwww.w spgroup.com 2012 AER IAL O RTH OPH OTO GRAPHY O BTAIN ED FROM THENC CENTER FOR GEOGR APHIC IN FO RMATION AND AN ALYSIS AThttp://services.nconemap.gov/ PARC EL BO UND ARY WAS OBTAIN EDFROM THENC CENTER FOR GEOGR APHIC IN FO RMATION AND AN ALYSIS AThttp://services.nconemap.gov/ DRAWING HAS BEEN SET W ITH A PR OJECTIO N OF NO RTH CAR OLIN A STATEPLANE C OOR DINATE SYSTEM FIPS 3200 (N AD 83/2011). ELEVATIO NS ARE BASED ON N AVD 88 GRAPHIC SCALE 600 0 600 1,200 1,800 2,400 (IN FEET) L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com LEGEND FIG URE 12-12COPC LOCATIONS FLAGGEDSEDIMENT - ECOLOGICALL.V. SUTTON ENERGY COMPLEX ")SURFACE WATER POINT ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGESS SUTTON PLANT SITE BOUNDARY EPA REGION 4 SOIL EXCEEDENCES -BOLDED IF COAL ASH COPC (SEETABLES AND 12-2 AND 12-12)1 PROJECT MANAGER: P. WALDREP DRAWN BY: M. LOVELACE DATE: 08/01/2015 DATE: 08/02/2015 CHECKED BY: J. MEADOWS P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 12-12 - COPC LOCATIONS FLAGGED - SEDIMENT - ECOLOGICAL.MXD NOTES:1 USEPA.SUPPLEMENTAL GUIDANCE TO RISKASSESSMENT GUIDANCE FOR SUPERFUND: REGION 4BULLETINS, ECOLOGICAL RISK ASSESSMENT. Originallypublished November 1995. Website version last updated11/30/2001:(http://www.epa.gov/region4/superfund/programs/riskassess/ecolbul.html.) 2 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 3 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 4 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 5 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM Constituent Full NameAlBCrFeMnMoVZn Constituent AbbreviationAluminumBoronChromiumIronManganeseMolybdenumVanadiumZinc ") ") ") ") ") ") ") U S-421 PRJ-I-140 SR-1394 P R J -I -1 4 0 S R -2 1 4 5 P R J -I -1 4 0 FORMERASHDISPOSAL AREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN SW-06ACuZn SW-08ACu SW-CFPAl SW-CFUPAlZn SW-01CAlCu SW-CF001Al SW-004CuZn SW-06AZn SW-CFPAl SW-CFUPZn SW-004Zn SW-06AZn SW-CFPAl SW-CFUPAl SW-01CAl SW-CF001Al SW-004Zn SW-06ACuZn SW-08ACu SW-CFPZn SW-CFUPZn SW-01CCuZn SW-004CuZn SW-06ACuZn SW-08ACu SW-CFPZn SW-CFUPZn SW-01CCuZn SW-004CuZn COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND COOLINGPOND ± GRAPHIC SCALE 600 0 600 1,200 1,800 2,400 (IN FEET) L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com LEGEND FIG URE 12-13COPC LOCATIONS FLAGGEDSURFACE WATER - ECOLOGICALL.V. SUTTON ENERGY COMPLEX ")SURFACE WATER P OINT ASH BAS IN BOUNDA RY ASH BAS IN COMPLIANCE BOUNDARY DUKE E NE RGY PROGES S SUTTON PLANT SITE B OUNDARY PROJECT MANAGER: P. WALDREP DRAWN BY: M. LOVELACE DATE: 08/01/2015 DATE: 08/02/2015 CHECKED BY: J. MEADOWS P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 12-13 - COPC LOCATIONS FLAGGED - SEEPS AND SURFACE WATERS - ECOLOGICAL.MXD NOTES:1 USEPA.NATIONAL RECOMMENDED WATER CRITERIA.Accessed 07/26/2015.(http://water.epa.gov/scitech/swguidance/standards/criteria/current/index.cfm) 2 USEPA.SUPPLEMENTAL GUIDANCE TO RISKASSESSMENT GUIDANCE FOR SUPERFUND: REGION 4BULLETINS, ECOLOGICAL RISK ASSESSMENT. Originallypublished November 1995. Website version last updated11/30/2001:(http://www.epa.gov/region4/superfund/programs/riskassess/ecolbul.html.) 3 CLASSIFICATION AND WATER QUALITY STANDARDSAPPLICABLE TO THE SURFACE WATERS OF NORTHCAROLINA. NORTH CAROLINA ADMINISTRATIVE CEDETITLE 15A, SUBCHAPTER 2B. 2015. 4 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 5 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 6 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 7 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011). Constituent Full NameAlCuPbZn Constituent AbbreviationAluminumCopperLeadZinc ECOLOGICAL EPA AQUATIC ACUTE EXCEEDANCES -BOLDED IF COAL ASHCOPC(SEE TABLES 12-2 AND 12-10)1 ECOLOGICAL EPA AQUATIC CHRONIC EXCEEDANCES -BOLDED IF COALASH COPC (SEE TABLES 12-2 AND 12-10)1 ECOLOGICAL EPA R4 FW CHRONIC EXCEEDANCES -BOLDED IF COAL ASHCOPC(SEE TABLES 12-2 AND 12-10)2 ECOLOGICAL NC2B AQUATIC ACUTE EXCEEDANCES -BOLDED IF COALASH COPC (SEE TABLES 12-2 AND 12-10)2 ECOLOGICAL NC2B AQUATIC CHRONIC EXCEEDANCES -BOLDED IF COALASH COPC (SEE TABLES 12-2 AND 12-10)3 &< &< &<&< &<&< &<&< &<&< &< &<&< &< &<&< &< &< &< &> &>&> &>&> &>&> &>&> &<&< &<&< &<&< &> &> &< &< &< &< &< &<&< &<&< &<&< &<&<&< &<&< &<&< &<&<&<&< &<&<&< &< &<&< &<&<&< &< &<&< &<&< &<&< &<&< &<&< &<&< &<&<&< ")") ") ") &<&< &<&< &<&< &<&< &> &< &< &<&< &< &< &>&> &> &< &< &< &< &<&< &<&< &<&< &<&< &< &<&< &< &< &<&< &<&< &<&< &< &<&< &< &<&< &< &< &< &< &< &< &< C A P E F E AR RIVER U S-421 PRJ-I-140 P R J -I -1 4 0 S R-2 1 6 9 S R -2 7 7 9 SR-1394 S R -2 1 4 5 P R J -I -1 4 0 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN MW-11 MW-12 MW-19MW-21C MW-23B MW-23C MW-24B MW-24C MW-28B MW-28C MW-31C MW-32C MW-33C MW-05C MW-07C ABMW-01D ABMW-01S ABMW-02D ABMW-02S AW-06D AW-06E AW-07D AW-09C AW-09D MW-23E MW-37B MW-37C SMW-01C SMW-03C SMW-04C PZ-10D PZ-06D MW-21 MW-22 COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND FIGURE 16-1PROPOSED GROUNDWATERMONITORING LOCATIONSL.V. SUTTON ENERGY COMPLEX ± LEGEND &<PROPOSED GROUNDWATER MONITORING LOCATIONS(THE PROPOSED PEE DEE BACKGROUND WELL LOCATION HAS YET TO BE DETERMINED) &<MONITORING WELL ")PRODUCTION WELL &>PIEZOMETER ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY HALF-MILE OFFSET FROM COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY NOTES:1 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 2 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 3 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 4 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011). GRAPHIC SCALE 500 0 500 1,000 1,500 2,000 (IN FEET) L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com PROJECT MANAGER: P. WALDREP DRAWN BY: R. SPRING DATE: 08/03/2015 DATE: 08/03/2015 CHECKED BY: J. MEADOWS P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 16-1 PROPOSED GROUNDWATER MONITORING LOCATIONS.MXD