HomeMy WebLinkAboutNC0001422_Sutton CSA Report FIGURES b_20150805#
#
#
#
")
")
")
")
")")
")
")
")
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
P R J -I -1 4 0
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLING PONDCOOLING POND
FIGURE ES-1SITE CONCEPTUAL MODEL - PLAN VIEWL.V. SUTTON ENERGY COMPLEX
±
WATER SUPPLY WELLS1
WATER SUPPLY WELL IN INVENTORY (APPROXIMATE)
WOOTEN PRODUCTION WELL (APPROXIMATE)
#CFPUA PRODUCTION WELL LOCATION (APPROXIMATE)
EDR REPORTED WELL LOCATION (APPROXIMATE)
INVISTA PRODUCTION WELL (APPROXIMATE)
")DUKE ENERGY PROGRESSS PRODUCTION WELL (APPROXIMATE)
P:\D uke Energy Progress.1026\00 GIS BASE DATA\Sutton\Map_Docs\Draft_CSA_v07152015\Sutton - Figure ES-1 - Executive Summary Figure.mxd
L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
GRAPHIC SCALE
500 0 500 1,000 1,500 2,000
(IN FEET)
PROJECT MANAGER: J. MAHAN
DRAWN BY: J. MEADOWS
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: K. WEBB
NOTES:1 FROM DRINKING WATER WELL AND RECEPTOR STUDY (NOVEMBER 2014).
2 BORON EXHIBITS THE GREATEST THREE-DIMENSIONAL EXTENT OFMIGRATION FROM THE L.V. SUTTON ENERGY COMPLEX ASH BASIN. THE NORTHCAROLINA 2L (NC2L) FOR BORON IS 700 μg/L.
3 APRIL 17, 2014 AERIAL ORTHOPHOTOGRAPHY OBTAINED FROM WSP.
4 2012 AERIAL ORTHOPHOTOGRAPHY OBTAINED FROM THE NC CENTER FORGEOGRAPHIC INFORMATION AND ANALYSIS. (http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINED FROM THE NC CENTER FORGEOGRAPHIC INFORMATION AND ANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATEPLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011).
AREA OF CONCENTRATIONS IN GROUNDWATER ABOVE NC2L 2
GROUNDWATER FLOW DIRECTION (SHALLOW AQUIFER)
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
HAL F-MILE OFFSET FROM COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
LEGEND
P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\DE SUTTON FIG 1-1 (SITE LOCATION MAP).dwg
PROJECT MANAGER:
LAYOUT:
DRAWN BY:
KATHY WEBB
DATE:J. CHASTAIN
FIG 1 (USGS SITE LOCATION)
2014-12-15
CONTOUR INTERVAL:
MAP DATE:
10ft
2013
APPROXIMATE ROUTE OF THE
NEW WILLMINGTON BYPASS (I-140)
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA
PHONE 864-421-9999
www.synterracorp.com
FIGURE 1-1
SITE LOCATION MAP
L.V. SUTTON ENERGY COMPLEX
801 SUTTON STEAM PLANT RD
WILMINGTON, NORTH CAROLINA
LELAND AND CASTLE HAYNE NC QUADRANGLES
RALEIGH
WILMINGTON
GREENVILLE
GREENSBORO
3000
GRAPHIC SCALE
1500
IN FEET
15000
U
S
H
I
G
H
W
A
Y
4
2
1
PROPERTY BOUNDARY
500' COMPLIANCE BOUNDARY
WASTE BOUNDARY
L.V. SUTTON ENERGY COMPLEX
NEW HANOVER COUNTY
SOURCE:
USGS TOPOGRAPHIC MAP OBTAINED FROM THE USGS STORE AT
http://store.usgs.gov/b2c_usgs/b2c/start/%%%28xcm=r3standardpitrex_prd%%%29/.do
L.V. SUTTON
ENERGY COMPLEX
0
H
2
H
2
G
P
E
-
S
W
2
P
E
-
S
W
4
P
E
-
S
W
3
P
E
-
S
W
5
P
E
-
S
W
6
A
P
E
-
S
W
6
B
P
E
-
S
W
6
D
P
E
-
S
W
6
E
w
w
w
.
s
y
n
t
e
r
r
a
c
o
r
p
.
c
o
m
1
4
8
R
i
v
e
r
S
t
r
e
e
t
,
S
u
i
t
e
2
2
0
G
r
e
e
n
v
i
l
l
e
,
S
o
u
t
h
C
a
r
o
l
i
n
a
2
9
6
0
1
8
6
4
-
4
2
1
-
9
9
9
9
5
/
2
2
/
2
0
1
5
5
/
2
2
/
2
0
1
5
P
.
W
A
L
D
R
E
P
C
.
N
E
W
E
L
L
P
R
O
J
E
C
T
M
A
N
A
G
E
R
:
L
A
Y
O
U
T
N
A
M
E
:
D
R
A
W
N
B
Y
:
C
H
E
C
K
E
D
B
Y
:
K
A
T
H
Y
W
E
B
B
D
A
T
E
:
D
A
T
E
:
F
I
G
U
R
E
1
-
2
S
I
T
E
L
A
Y
O
U
T
M
A
P
8/2/2015 1:38 PM P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\SUTTON-CSA-FIGURES.dwg
F
I
G
U
R
E
1
-
2
1
2
0
0
G
R
A
P
H
I
C
S
C
A
L
E
(
I
N
F
E
E
T
)
0
6
0
0
3
0
0
6
0
0
L
.
V
.
S
U
T
T
O
N
E
N
E
R
G
Y
C
O
M
P
L
E
X
8
0
1
S
U
T
T
O
N
S
T
E
A
M
P
L
A
N
T
R
D
W
I
L
M
I
N
G
T
O
N
,
N
O
R
T
H
C
A
R
O
L
I
N
A
N
C
W
I
L
D
L
I
F
E
L
A
K
E
A
C
C
E
S
S
S
U
T
T
O
N
L
A
K
E
R
D
CAP
E
F
E
A
R
R
I
V
E
R
S
U
T
T
O
N
L
A
K
E
R
D
COOLING POND WATER LEVEL = 9.60 ftPROVIDED BY DUKE ENERGY 06-02-2014
M
E
T
R
O
C
I
R
C
L
E
E
Z
Z
E
L
L
T
R
U
C
K
I
N
G
L
C
H
H
O
L
D
I
N
G
S
S
.
T
.
W
O
O
T
E
N
C
O
R
P
O
R
A
T
I
O
N
N
C
H
I
G
H
W
A
Y
4
2
1
T
R
A
N
S
C
O
M
C
T
B
E
V
E
L
R
D
R
O
Y
M
A
C
D
R
N
E
W
H
A
N
O
V
E
R
C
O
U
N
T
Y
S
A
U
N
D
E
R
S
&
S
A
U
N
D
E
R
S
,
L
L
C
R
O
Y
M
A
C
B
U
S
I
N
E
S
S
P
A
R
K
R
O
Y
M
A
C
P
A
R
T
N
E
R
S
H
I
P
A
B
S
O
L
U
T
E
P
R
O
P
E
R
T
I
E
S
H
U
R
R
I
C
A
N
E
P
R
O
P
E
R
T
I
E
S
M
A
O
L
A
M
I
L
K
&
I
C
E
C
R
E
A
M
C
O
.
S
O
U
R
C
E
S
:
1
.
2
0
1
4
A
E
R
I
A
L
P
H
O
T
O
G
R
A
P
H
W
A
S
O
B
T
A
I
N
E
D
F
R
O
M
W
S
P
F
L
O
W
N
O
N
A
P
R
I
L
1
7
,
2
0
1
4
2
.
2
0
1
3
A
E
R
I
A
L
P
H
O
T
O
G
R
A
P
H
W
A
S
O
B
T
A
I
N
E
D
F
R
O
M
T
H
E
N
R
C
S
G
E
O
S
P
A
T
I
A
L
D
A
T
A
G
A
T
E
W
A
Y
A
T
h
t
t
p
:
/
/
d
a
t
a
g
a
t
e
w
a
y
.
n
r
c
s
.
u
s
d
a
.
g
o
v
/
3
.
D
R
A
W
I
N
G
H
A
S
B
E
E
N
S
E
T
W
I
T
H
A
P
R
O
J
E
C
T
I
O
N
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
S
T
A
T
E
P
L
A
N
E
C
O
O
R
D
I
N
A
T
E
S
Y
S
T
E
M
F
I
P
S
3
2
0
0
(
N
A
D
8
3
)
.
4
.
P
A
R
C
E
L
D
A
T
A
W
A
S
O
B
T
A
I
N
E
D
F
R
O
M
T
H
E
N
O
R
T
H
C
A
R
O
L
I
N
A
S
T
A
T
E
L
I
B
R
A
R
I
E
S
A
T
h
t
t
p
:
/
/
w
w
w
.
l
i
b
.
n
c
s
u
.
e
d
u
/
g
i
s
/
c
o
u
n
t
i
e
s
.
h
t
m
l
F
O
R
N
E
W
H
A
N
O
V
E
R
C
O
U
N
T
Y
.
5
.
2
f
t
C
O
N
T
O
U
R
I
N
T
E
R
V
A
L
S
F
R
O
M
N
C
D
O
T
L
I
D
A
R
D
A
T
E
D
2
0
0
7
h
t
t
p
s
:
/
/
c
o
n
n
e
c
t
.
n
c
d
o
t
.
g
o
v
/
r
e
s
o
u
r
c
e
s
/
g
i
s
/
p
a
g
e
s
/
c
o
n
t
-
e
l
e
v
_
v
2
.
a
s
p
x
6
.
W
E
L
L
L
O
C
A
T
I
O
N
S
A
N
D
M
E
A
S
U
R
I
N
G
P
O
I
N
T
S
W
E
R
E
B
A
S
E
D
O
N
A
S
U
R
V
E
Y
B
Y
J
A
M
E
S
L
.
H
A
I
N
E
S
&
A
S
S
O
C
I
A
T
E
S
F
O
R
I
S
H
,
I
N
C
.
D
A
T
E
D
D
E
C
E
M
B
E
R
2
3
,
2
0
0
8
.
I
S
H
D
R
A
W
I
N
G
I
S
T
I
T
L
E
D
"
P
O
T
E
N
T
I
A
L
L
O
C
A
T
I
O
N
S
F
O
R
P
R
O
P
O
S
E
D
G
E
O
P
R
O
B
E
A
N
D
W
E
L
L
I
N
S
T
A
L
L
A
T
I
O
N
S
"
,
D
A
T
E
D
F
E
B
R
U
A
R
Y
2
5
,
2
0
0
9
W
I
T
H
A
C
A
D
F
I
L
E
N
A
M
E
F
i
g
u
r
e
2
2
.
d
w
g
7
.
N
E
W
W
E
L
L
L
O
C
A
T
I
O
N
S
A
N
D
M
E
A
S
U
R
I
N
G
P
O
I
N
T
S
W
E
R
E
B
A
S
E
D
O
N
A
T
A
B
L
E
B
Y
P
A
R
A
M
O
U
N
T
E
E
N
G
I
N
E
E
R
I
N
G
,
W
I
L
M
I
N
G
T
O
N
N
C
D
A
T
E
D
2
0
1
2
-
0
3
-
0
5
S
U
P
P
L
I
E
D
B
Y
P
R
O
G
R
E
S
S
E
N
E
R
G
Y
.
H
O
R
I
Z
O
N
T
A
L
D
A
T
U
M
I
S
N
A
D
8
3
(
N
S
R
S
2
0
0
7
)
A
N
D
T
H
E
V
E
R
T
I
C
A
L
D
A
T
U
M
I
S
N
G
V
D
2
9
.
8
.
T
H
E
P
R
O
P
E
R
T
Y
B
O
U
N
D
A
R
Y
F
O
R
T
H
E
L
.
V
.
S
U
T
T
O
N
S
T
E
A
M
E
L
E
C
T
R
I
C
P
L
A
N
T
W
A
S
B
A
S
E
D
O
N
A
C
O
M
P
O
S
I
T
E
M
A
P
P
R
E
P
A
R
E
D
B
Y
D
A
V
I
S
-
M
A
R
T
I
N
-
P
O
W
E
L
L
&
A
S
S
O
C
.
,
I
N
C
.
T
H
E
D
R
A
W
I
N
G
S
A
R
E
D
A
T
E
D
J
U
N
E
,
1
9
9
5
W
I
T
H
R
E
V
I
S
I
O
N
N
O
T
E
F
O
R
M
A
R
C
H
4
,
2
0
0
4
.
F
I
L
E
N
A
M
E
I
S
L
-
D
-
9
0
2
2
-
7
.
D
W
G
.
H
O
R
I
Z
O
N
T
A
L
D
A
T
U
M
I
S
N
A
D
8
3
A
N
D
T
H
E
V
E
R
T
I
C
A
L
D
A
T
U
M
I
S
N
G
V
2
9
.
9
.
T
H
E
L
O
C
A
T
I
O
N
O
F
T
H
E
F
O
R
M
E
R
A
S
H
D
I
S
P
O
S
A
L
A
R
E
A
S
W
A
S
B
A
S
E
D
O
N
A
F
I
G
U
R
E
2
-
2
P
R
E
P
A
R
E
D
B
Y
B
L
A
S
L
A
N
D
,
B
O
U
C
K
&
L
E
E
,
I
N
C
.
T
H
E
F
I
G
U
R
E
I
S
T
I
T
L
E
D
"
H
O
R
I
Z
O
N
T
A
L
E
X
T
E
N
T
O
F
T
H
E
A
S
H
W
I
T
H
I
N
T
H
E
F
O
R
M
E
R
D
I
S
P
O
S
A
L
A
R
E
A
"
.
1
0
.
M
O
N
I
T
O
R
I
N
G
W
E
L
L
S
/
P
I
E
Z
O
M
E
T
E
R
S
/
S
O
I
L
B
O
R
I
N
G
S
C
O
M
P
L
E
T
E
D
A
T
P
A
R
T
O
F
P
R
E
V
I
O
U
S
A
S
S
E
S
S
M
E
N
T
A
C
T
I
V
I
T
I
E
S
.
L
O
C
A
T
I
O
N
S
A
R
E
A
P
P
R
O
X
I
M
A
T
E
.
N
O
T
E
:
1
.
C
O
N
T
O
U
R
L
I
N
E
S
A
R
E
U
S
E
D
F
O
R
R
E
P
R
E
S
E
N
T
A
T
I
V
E
P
U
R
P
O
S
E
S
O
N
L
Y
A
N
D
A
R
E
N
O
T
T
O
B
E
U
S
E
D
F
O
R
D
E
S
I
G
N
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
U
R
P
O
S
E
S
.
D
U
K
E
E
N
E
R
G
Y
P
R
O
G
R
E
S
S
P
R
O
D
U
C
T
I
O
N
W
E
L
L
(
A
P
P
R
O
X
I
M
A
T
E
)
P
E
-
S
W
2
N
H
C
-
S
W
4
C
F
P
U
A
P
R
O
D
U
C
T
I
O
N
W
E
L
L
(
A
P
P
R
O
X
I
M
A
T
E
)
0
H
2
I
N
V
I
S
T
A
R
E
P
O
R
T
E
D
P
R
O
D
U
C
T
I
O
N
W
E
L
L
L
O
C
A
T
I
O
N
D
U
K
E
E
N
E
R
G
Y
P
R
O
G
R
E
S
S
P
R
O
D
U
C
T
I
O
N
W
E
L
L
(
S
U
R
V
E
Y
E
D
)
P
E
-
S
W
2
M
W
-
3
2
C
A
S
H
/
S
O
I
L
B
O
R
I
N
G
(
A
B
)
A
N
D
M
O
N
I
T
O
R
I
N
G
W
E
L
L
(
A
B
M
W
)
L
O
C
A
T
I
O
N
(
S
U
R
V
E
Y
E
D
)
O
L
D
A
S
H
B
A
S
I
N
A
R
E
A
N
E
W
A
S
H
B
A
S
I
N
A
R
E
A
F
O
R
M
E
R
A
S
H
D
I
S
P
O
S
A
L
A
R
E
A
C
A
N
A
L
C
A
N
A
L
A
S
T
C
O
N
C
R
E
T
E
P
A
D
R
A
I
L
R
O
A
D
S
O
L
A
R
F
A
R
M
COOLINGPOND COOLINGPOND
S
U
T
T
O
N
S
T
E
A
M
P
L
A
N
T
R
D
T
R
A
N
S
C
O
M
C
T
R
O
Y
M
A
C
D
R
F
R
E
D
R
I
C
K
S
O
N
R
D
C
A
N
A
L
A
C
C
E
S
S
R
O
A
D
N
H
C
-
S
W
4
N
H
C
-
S
W
3
N
H
C
-
S
W
2
(
N
O
T
I
N
U
S
E
)
IN
T
E
R
S
T
A
T
E
1
4
0
(
U
S
H
I
G
H
W
A
Y
1
7
)
F
R
E
D
R
I
C
K
S
O
N
R
D
A
P
P
R
O
X
I
M
A
T
E
R
O
U
T
E
O
F
T
H
E
N
E
W
W
I
L
M
I
N
G
T
O
N
B
Y
P
A
S
S
(
I
-
1
4
0
)
N
C
H
I
G
H
W
A
Y
4
2
1
N
C
H
I
G
H
W
A
Y
4
2
1
N
C
H
I
G
H
W
A
Y
4
2
1
R
A
I
L
R
O
A
D
R
A
I
L
R
O
A
D
R
A
I
L
R
O
A
D
R
A
I
L
R
O
A
D
N
H
C
-
S
W
1
(
A
B
A
N
D
O
N
E
D
)
I
N
V
I
S
T
A
C
F
P
U
A
M
W
-
4
B
M
W
-
5
C
M
W
-
3
3
C
M
W
-
3
2
C
M
W
-
2
7
B
M
W
-
2
7
C
M
W
-
3
1
B
M
W
-
3
1
C
M
W
-
2
4
C
M
W
-
2
4
B
M
W
-
2
3
C
M
W
-
2
3
B
M
W
-
2
2
C
M
W
-
2
2
B
M
W
-
1
9
M
W
-
2
1
C
M
W
-
2
8
B
M
W
-
2
8
C
M
W
-
7
C
M
W
-
1
1
M
W
-
1
2
S
W
-
3
S
M
W
-
5
B
M
W
-
5
A
M
W
-
9
M
W
-
8
P
Z
-
1
P
Z
-
A
P
Z
-
B
P
Z
-
7
P
Z
-
9
P
Z
-
1
2
P
Z
-
1
0
D
P
Z
-
1
0
S
P
Z
-
1
1
M
W
-
1
0
P
Z
-
1
4
P
Z
-
1
6
M
W
-
1
3
P
Z
-
1
8
P
Z
-
1
5
P
Z
-
1
7
P
Z
-
1
9
P
Z
-
2
1
M
W
-
3
4
C
P
Z
-
2
A
P
Z
-
2
B
P
Z
-
1
P
Z
-
1
B
P
Z
-
3
B
M
W
-
3
6
C
P
Z
-
3
A
C
P
T
-
4
P
Z
-
4
B
P
Z
-
4
A
P
Z
-
5
A
S
P
T
-
6
P
Z
-
6
A
C
P
T
-
7
A
P
Z
-
I
N
T
C
P
T
-
5
S
P
T
-
3
A
S
P
T
-
8
S
C
P
T
-
5
A
S
P
T
-
6
S
P
T
-
2
P
Z
-
2
3
P
Z
-
2
2
P
Z
-
2
4
P
Z
-
2
6
S
P
T
-
4
M
W
-
6
B
M
W
-
6
A
M
W
-
6
C
P
Z
-
2
0
M
W
-
4
M
W
-
4
A
P
Z
-
1
1
D
G
P
-
5
B
-
1
H
A
-
1
-
2
H
A
-
1
-
1
G
P
-
3
G
P
-
6
G
P
-
2
S
P
T
-
7
S
P
T
-
4
C
P
T
-
3
C
P
T
-
2
B
-
1
H
A
-
2
-
1
H
A
-
2
-
2
S
P
T
-
1
B
-
3
H
A
-
3
-
1
H
A
-
3
-
2
G
P
-
1
P
Z
-
1
9
7
1
S
P
T
-
3
C
P
T
-
8
S
C
P
T
-
1
G
P
-
4
M
W
-
1
8
M
W
-
1
7
P
Z
-
3
0
M
W
-
1
4
M
W
-
1
3
M
W
-
1
3
D
M
W
-
1
6
M
W
-
1
6
D
M
W
-
3
A
M
W
-
3
B
M
W
-
2
A
M
W
-
2
B
M
W
-
2
C
S
B
-
2
M
W
-
7
B
M
W
-
7
A
M
W
-
1
5
M
W
-
1
5
D
M
W
-
2
0
M
W
-
2
0
D
A
S
H
L
A
N
D
F
I
L
L
L
E
A
C
H
A
T
E
M
O
N
I
T
O
R
I
N
G
L
O
C
A
T
I
O
N
(
A
P
P
R
O
X
I
M
A
T
E
)
P
-
2
E
X
I
S
T
I
N
G
M
O
N
I
T
O
R
I
N
G
W
E
L
L
S
/
P
I
E
Z
O
M
E
T
E
R
S
/
S
O
I
L
B
O
R
I
N
G
S
(
S
U
R
V
E
Y
E
D
)
M
W
-
5
B
L
E
G
E
N
D
B
A
C
K
G
R
O
U
N
D
M
O
N
I
T
O
R
I
N
G
W
E
L
L
(
S
U
R
V
E
Y
E
D
)
C
O
M
P
L
I
A
N
C
E
M
O
N
I
T
O
R
I
N
G
W
E
L
L
(
S
U
R
V
E
Y
E
D
)
M
W
-
1
2
M
W
-
4
B
P
R
O
P
O
S
E
D
G
E
O
L
O
G
I
C
C
R
O
S
S
S
E
C
T
I
O
N
M
O
N
I
T
O
R
I
N
G
W
E
L
L
(
S
U
R
V
E
Y
E
D
)
M
O
N
I
T
O
R
I
N
G
W
E
L
L
L
O
C
A
T
I
O
N
(
S
U
R
V
E
Y
E
D
)
B
I
-
A
N
N
U
A
L
W
A
T
E
R
L
E
V
E
L
P
I
E
Z
O
M
E
T
E
R
N
P
D
E
S
O
U
T
F
A
L
L
0
0
3
N
P
D
E
S
O
U
T
F
A
L
L
S
W
-
2
W
A
T
E
R
Q
U
A
L
I
T
Y
A
N
D
S
E
D
I
M
E
N
T
L
O
C
A
T
I
O
N
P
Z
-
1
2
SW-8A
P
Z
-
9
A
N
P
D
E
S
O
U
T
F
A
L
L
S
W
-
0
0
4
SW-CFP
S
W
-
1
C
SW-6A
N
P
D
E
S
O
U
T
F
A
L
L
S
W
-
0
0
2
N
P
D
E
S
O
U
T
F
A
L
L
S
W
-
0
0
1
S
W
-
C
F
0
0
1
C
O
O
L
I
N
G
P
O
N
D
S
W
-
6
A
S
W
-
C
F
U
P
C
A
P
E
F
E
A
R
R
I
V
E
R
I
N
S
E
T
A
U
P
S
T
R
E
A
M
S
A
M
P
L
E
L
O
C
A
T
I
O
N
O
N
T
H
E
C
A
P
E
F
E
A
R
R
I
V
E
R
1
2
0
0
G
R
A
P
H
I
C
S
C
A
L
E
(
I
N
F
E
E
T
)
0
6
0
0
3
0
0
6
0
0
SEE INSET A (THIS FIGURE) FORUPSTREAM SAMPLE LOCATIONON THE CAPE FEAR RIVER
S
W
-
0
0
4
M
W
-
2
8
T
M
I
N
E
B
O
U
N
D
A
R
Y
C
U
B
-
1
C
O
N
F
I
N
I
N
G
U
N
I
T
A
S
S
E
S
S
M
E
N
T
B
O
R
I
N
G
C
U
B
-
1
C
U
B
-
2
C
U
B
-
3
C
U
B
-
4
M
W
-
2
3
E
C
U
B
-
5
C
U
B
-
6
C
U
B
-
7
C
U
B
-
8
S
E
E
I
N
S
E
T
B
(
T
H
I
S
F
I
G
U
R
E
)
F
O
R
M
O
R
E
C
U
B
S
A
M
P
L
E
L
O
C
A
T
I
O
N
S
.
INSET BCUB SAMPLE LOCATIONS1200GRAPHIC SCALE(IN FEET)0600300600 CUB-10 CUB-9CUB-11 CUB-12 CUB-8
P
Z
-
3
A
P
Z
-
3
B
M
W
-
3
4
B
M
W
-
3
5
C
M
W
-
3
5
B
M
W
-
3
6
B
P
Z
-
1
B
P
Z
-
1
A
P
Z
-
4
A
P
Z
-
4
B
5
0
0
f
t
C
O
M
P
L
I
A
N
C
E
B
O
U
N
D
A
R
Y
D
U
K
E
E
N
E
R
G
Y
P
R
O
G
R
E
S
S
S
U
T
T
O
N
P
L
A
N
T
W
A
S
T
E
B
O
U
N
D
A
R
Y
F
L
O
W
D
I
R
E
C
T
I
O
N
(
D
A
S
H
E
D
W
H
E
R
E
L
O
C
A
T
I
O
N
A
P
P
R
O
X
I
M
A
T
E
)
C
O
N
T
O
U
R
M
A
J
O
R
C
O
N
T
O
U
R
M
I
N
O
R
1
2
0
1
/
2
M
I
L
E
O
F
F
S
E
T
F
R
O
M
C
O
M
P
L
I
A
N
C
E
B
O
U
N
D
A
R
Y
P
Z
-
6
S
P
Z
-
6
D
1
5
0
0
f
t
O
F
F
S
E
T
F
O
R
U
N
D
E
R
G
R
O
U
N
D
U
T
I
L
I
T
Y
I
N
F
O
R
M
A
T
I
O
N
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
www.synterracorp.com
PROJECT MANAGER:
LAYOUT:
DRAWN BY:
P. WALDREP
DATE:JOHN CHASTAIN
FIG 2-1 1949 AERIAL
08/02/2015
08/04/2015 1:19 PM P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\DE SUTTON HISTORIC AERIALS.dwg
FIGURE 2-1
1949 AERIAL PHOTOGRAPH
L.V. SUTTON ENERGY COMPLEX
WILMINGTON, NORTH CAROLINA
GRAPHIC SCALE
500
IN FEET
0 500 1000
SOURCE:
APRIL 19, 1949 AERIAL PHOTOGRAPH DOWNLOADED FROM THE NEW HANOVER CO GIS WEBSITE AT
ftp://ftp.nhcgov.com/Outbound/Gisdata/orthos/
FUTURE
COOLING
POND
SUTTON PLANT BOUNDARY
F
U
T
U
R
E
U
S
H
I
G
H
W
A
Y
4
2
1
CAPE F
E
A
R
R
I
V
E
R
CAT
F
I
S
H
C
R
E
E
K
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
www.synterracorp.com
PROJECT MANAGER:
LAYOUT:
DRAWN BY:
P. WALDREP
DATE:JOHN CHASTAIN
FIG 2-2 1981 AERIAL
07/27/2015
08/04/2015 1:20 PM P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\DE SUTTON HISTORIC AERIALS.dwg
FIGURE 2-2
1981 AERIAL PHOTOGRAPH
L.V. SUTTON ENERGY COMPLEX
WILMINGTON, NORTH CAROLINA
GRAPHIC SCALE
500
IN FEET
0 500 1000
SOURCE:
FEBRUARY 5, 1981 AERIAL PHOTOGRAPH DOWNLOADED FROM THE NEW HANOVER CO GIS WEBSITE AT
ftp://ftp.nhcgov.com/Outbound/Gisdata/orthos/
COOLING POND
SUTTON PLANT BOUNDARY
U
S
H
I
G
H
W
A
Y
4
2
1
CAPE F
E
A
R
R
I
V
E
R
P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\DE SUTTON FIG 2-3 HISTORICAL USGS TOPO.dwg
PROJECT MANAGER:
LAYOUT:
DRAWN BY:
P. WALDREP
DATE:JOHN CHASTAIN
FIG 2-3 HISTORICAL USGS TOPO
07/30/2015
4000
GRAPHIC SCALE
2000
IN FEET
20000CONTOUR INTERVAL:
MAP DATES:
10ft &20ft
1944 THRU 1954
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA
PHONE 864-421-9999
www.synterracorp.com
SOURCE:
USGS TOPOGRAPHIC MAP OBTAINED FROM THE NRCS GEOSPATIAL DATA
GATEWAY AT http://datagateway.nrcs.usda.gov/
FIGURE 2-3
HISTORICAL USGS TOPOGRAPHIC MAP
DUKE ENERGY PROGRESS
L. V. SUTTON ENERGY COMPLEX
801 SUTTON STEAM PLANT RD
WILMINGTON, NORTH CAROLINA
RALEIGH
WILMINGTON
GREENVILLE
GREENSBORO
SUTTON POWER PLANT
NEW HANOVER COUNTY
F
U
T
U
R
E
U
S
H
I
G
H
W
A
Y
4
2
1
FUTURE
COOLING
POND
SUTTON PLANT BOUNDARY
Fi
g
u
r
e
3
-
1
:
C
o
a
l
a
s
h
T
C
L
P
l
e
a
c
h
a
t
e
c
o
n
c
e
n
t
r
a
t
i
o
n
r
an
g
e
s
c
o
m
p
a
r
e
d
t
o
r
e
g
u
l
a
t
o
r
y
l
i
m
i
t
s
.
(
S
o
u
r
c
e
:
E
P
R
I
2
0
1
0
)
Fi
g
u
r
e
3
-
2
:
K
n
o
w
n
s
a
m
p
l
e
o
f
a
s
h
f
o
r
c
o
m
p
a
r
i
s
o
n
.
(
S
ou
r
c
e
:
D
u
k
e
E
n
e
r
g
y
2
0
1
4
)
Ra
n
g
e
(
1
0
th
p
e
r
c
e
n
t
i
l
e
–
9
0
th
p
e
r
c
e
n
t
i
l
e
)
i
n
b
u
l
k
c
o
m
p
o
s
i
t
i
o
n
o
f
f
l
y
a
s
h
,
b
o
t
t
o
m
a
s
h
,
r
o
c
k
,
a
n
d
s
o
i
l
.
(
S
o
u
r
c
e
:
E
P
R
I
2
0
0
9
a
)
Fi
g
u
r
e
3
-
3
:
E
l
e
m
e
n
t
a
l
c
o
m
p
o
s
i
t
i
o
n
f
o
r
b
o
t
t
o
m
a
s
h
,
fl
y
a
s
h
,
s
h
a
l
e
,
a
n
d
v
o
l
c
a
n
i
c
a
s
h
.
(
S
o
u
r
c
e
:
E
P
R
I
2
0
0
9a
)
Fi
g
u
r
e
3
-
4
:
T
r
a
c
e
e
l
e
m
e
n
t
c
o
n
c
e
n
t
r
a
t
i
o
n
r
a
n
g
e
s
i
n
fl
y
a
s
h
c
o
m
p
a
r
e
d
t
o
E
P
A
r
e
s
i
d
e
n
t
i
a
l
s
o
i
l
s
c
r
e
e
n
i
n
g
le
v
e
l
s
.
(
S
o
u
r
c
e
:
E
P
R
I
2
0
0
9
b
)
Tr
a
c
e
e
l
e
m
e
n
t
c
o
n
c
e
n
t
r
a
t
i
o
n
r
a
n
g
e
s
i
n
b
o
t
t
o
m
a
s
h
c
o
mp
a
r
e
d
t
o
E
P
A
r
e
s
i
d
e
n
t
i
a
l
s
o
i
l
s
c
r
e
e
n
i
n
g
l
e
v
e
l
s
.
(
S
ou
r
c
e
:
E
P
R
I
2
0
0
9
b
)
Elevation
S
t
a
t
i
o
n
-110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 600+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+0016+0017+0018+0019+0020+0021+0022+0023+0024+0025+0026+00
27+00
28+00
29+00
30+00
31+00
32+00
33+00
34+00
35+00
36+00
37+00
38+00
39+00
40+00
41+00
42+00
43+00
44+00
45+00
46+00
47+00
48+00
49+00
50+00
51+00
52+00
53+00
54+00
55+00
56+00
57+00
58+00
59+00
60+00
61+00
62+00
63+00
64+00
65+00
66+00
67+00
68+00
69+00
70+00
71+00
72+00
73+00
74+00
75+00
76+00
77+00
78+00
79+00
80+00
3
.
7
x
1
0
-
2
3
.
0
x
1
0
-
2
N
T
N
T
NT
4
.
3
x
1
0
-
2
2
.
6
x
1
0
-
2
Elevation
-
1
1
0
-
1
0
0
-
9
0
-
8
0
-
7
0
-
6
0
-
5
0
-
4
0
-
3
0
-
2
0
-
1
0
0
1
0
2
0
3
0
4
0
5
0
6
0
80+0081+0082+0083+0084+0085+0086+0087+0088+0089+0090+0091+0092+0093+0094+0095+0096+0097+0098+0099+00100+00101+00
102+00
103+00
104+00
105+00
106+00
107+00
108+00
109+00
110+00
111+00
112+00
113+00
114+00
115+00
116+00
117+00
118+00
119+00
120+00
121+00
122+00
123+00
124+00
125+00
126+00
127+00
128+00
129+00
130+00
131+00
132+00
133+00
134+00
135+00
136+00
137+00
138+00
139+00
140+00
141+00
142+00
143+00
144+00
145+00
146+00
146+50
6.7 x 10-42.8 x 10-2
4
.
4
x
1
0
-
2
1.1 x 10-4
7
.
2
x
1
0
-
4
3
.
8
x
1
0
-
2
6
.
2
x
1
0
-
2
1
.
2
x
1
0
-
5
2
.
6
x
1
0
-
2
5
/
2
2
/
2
0
1
5
5
/
2
2
/
2
0
1
5
P
.
W
A
L
D
R
E
P
C
.
N
E
W
E
L
L
P
R
O
J
E
C
T
M
A
N
A
G
E
R
:
L
A
Y
O
U
T
N
A
M
E
:
D
R
A
W
N
B
Y
:
C
H
E
C
K
E
D
B
Y
:
K
A
T
H
Y
W
E
B
B
D
A
T
E
:
D
A
T
E
:
F
I
G
U
R
E
6
-
1
G
E
O
L
O
G
I
C
C
R
O
S
S
S
E
C
T
I
O
N
A
-
A
'
F
I
G
U
R
E
6
-
1
w
w
w
.
s
y
n
t
e
r
r
a
c
o
r
p
.
c
o
m
1
4
8
R
i
v
e
r
S
t
r
e
e
t
,
S
u
i
t
e
2
2
0
G
r
e
e
n
v
i
l
l
e
,
S
o
u
t
h
C
a
r
o
l
i
n
a
2
9
6
0
1
8
6
4
-
4
2
1
-
9
9
9
9
L
.
V
.
S
U
T
T
O
N
E
N
E
R
G
Y
C
O
M
P
L
E
X
8
0
1
S
U
T
T
O
N
S
T
E
A
M
P
L
A
N
T
R
D
W
I
L
M
I
N
G
T
O
N
,
N
O
R
T
H
C
A
R
O
L
I
N
A
S
O
U
R
C
E
S
:
1
.
D
R
A
W
I
N
G
H
A
S
B
E
E
N
S
E
T
W
I
T
H
A
P
R
O
J
E
C
T
I
O
N
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
S
T
A
T
E
P
L
A
N
E
C
O
O
R
D
I
N
A
T
E
S
Y
S
T
E
M
F
I
P
S
3
2
0
0
(
N
A
D
8
3
)
.
2
.
2
f
t
C
O
N
T
O
U
R
I
N
T
E
R
V
A
L
S
F
R
O
M
N
C
D
O
T
L
I
D
A
R
D
A
T
E
D
2
0
0
7
h
t
t
p
s
:
/
/
c
o
n
n
e
c
t
.
n
c
d
o
t
.
g
o
v
/
r
e
s
o
u
r
c
e
s
/
g
i
s
/
p
a
g
e
s
/
c
o
n
t
-
e
l
e
v
_
v
2
.
a
s
p
x
3
.
S
E
L
E
C
T
T
O
P
O
G
R
A
P
H
I
C
A
D
J
U
S
T
M
E
N
T
S
B
A
S
E
D
O
N
S
I
T
E
S
U
R
V
E
Y
A
N
D
C
O
M
P
A
R
I
S
O
N
T
O
A
E
R
I
A
L
P
H
O
T
O
G
R
A
P
H
.
N
O
T
E
:
1
.
C
O
N
T
O
U
R
L
I
N
E
S
A
R
E
U
S
E
D
F
O
R
R
E
P
R
E
S
E
N
T
A
T
I
V
E
P
U
R
P
O
S
E
S
O
N
L
Y
A
N
D
A
R
E
N
O
T
T
O
B
E
U
S
E
D
F
O
R
D
E
S
I
G
N
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
U
R
P
O
S
E
S
.
2
.
C
R
O
S
S
S
E
C
T
I
O
N
L
O
C
A
T
I
O
N
S
A
R
E
S
H
O
W
N
O
N
F
I
G
U
R
E
1
-
2
.
L
E
G
E
N
D
S
U
R
F
I
C
I
A
L
S
A
N
D
(
W
E
L
L
S
O
R
T
E
D
-
S
I
L
T
Y
S
A
N
D
-
M
E
D
I
U
M
T
O
F
I
N
E
G
R
A
I
N
E
D
S
A
N
D
)
S
U
R
F
I
C
I
A
L
S
A
N
D
(
P
O
O
R
L
Y
S
O
R
T
E
D
-
M
E
D
I
U
M
T
O
C
O
A
R
S
E
G
R
A
I
N
E
D
S
A
N
D
)
C
O
A
L
A
S
H
C
O
A
R
S
E
S
A
N
D
W
I
T
H
F
I
N
E
G
R
A
V
E
L
S
A
N
D
(
P
E
E
D
E
E
)
C
L
A
Y
R
I
C
H
F
A
C
I
E
S
S
A
M
P
L
E
D
E
S
C
R
I
P
T
I
O
N
S
m
e
t
a
l
s
T
O
T
A
L
M
E
T
A
L
S
T
O
C
T
O
T
A
L
O
R
G
A
N
I
C
C
A
R
B
O
N
I
P
G
R
A
I
N
S
I
Z
E
,
M
O
I
S
T
U
R
E
C
O
N
T
E
X
T
I
I
N
D
E
X
S
O
I
L
S
A
M
P
L
E
(
M
O
I
S
T
U
R
E
,
S
P
E
C
I
F
I
C
G
R
A
V
I
T
Y
,
G
R
A
I
N
S
I
Z
E
)
S
P
L
P
S
Y
N
T
H
E
T
I
C
P
R
E
C
I
P
I
T
A
T
I
O
N
L
E
A
C
H
I
N
G
P
R
O
C
E
D
U
R
E
K
d
S
O
R
P
T
I
O
N
C
O
E
F
F
I
C
I
E
N
T
S
H
F
O
H
Y
D
R
O
U
S
F
E
R
R
I
C
O
X
I
D
E
S
m
i
n
M
I
N
E
R
A
L
O
G
Y
B
Y
X
-
R
A
Y
D
I
F
F
R
A
C
T
I
O
N
A
N
D
W
H
O
L
E
R
O
C
K
C
H
E
M
I
S
T
R
Y
3
0
0
0
3
0
0
6
0
0
G
R
A
P
H
I
C
S
C
A
L
E
I
N
F
E
E
T
3
0
0
3
0
6
0
I
N
F
E
E
T
H
O
R
I
Z
O
N
T
A
L
:
1
"
=
3
0
0
'
V
E
R
T
I
C
A
L
:
1
"
=
3
0
'
S
E
C
T
I
O
N
A
-
A
'
F
A
C
I
N
G
E
A
S
T
S
E
C
T
I
O
N
A
-
A
'
F
A
C
I
N
G
E
A
S
T
MATCH LINE
MATCH LINE (MSL)
(MSL)
MW-5C
MW-27C
CANAL
CANAL
A
S
H
B
A
S
I
N
MW-36C
GP-01 AW-
0
8
0-2':
m
e
t
a
l
s
,
T
O
C
,
S
P
L
P
,
I
8'-10
'
:
m
e
t
a
l
s
,
T
O
C
,
S
P
L
P
,
I
40'-4
2
'
:
m
e
t
a
l
s
,
T
O
C
,
S
P
L
P
,
I
AB-020-8': Kd3'-5': metals,TOC6'-8': SPLP,min10'-12': metals,TOC,SPLP,Kd,I,min49.5'-52': I53'-55': SPLP,I,min,metals53'-60': Kd
A
W
-
0
9
2
'
-
4
'
:
m
e
t
a
l
s
,
T
O
C
,
S
P
L
P
,
I
1
0
'
-
1
2
'
:
H
F
O
1
4
'
-
1
6
'
:
m
e
t
a
l
s
,
T
O
C
,
S
P
L
P
2
3
'
-
2
5
'
:
I
4
3
'
-
4
5
'
:
m
e
t
a
l
s
,
T
O
C
,
S
P
L
P
4
7
'
-
5
0
'
:
H
F
O
5
5
'
-
5
7
'
:
H
F
O
C
O
A
L
A
S
H
C
O
A
L
A
S
H
COALASHCOAL ASHSURFICIAL
S
U
R
F
I
C
I
A
L
S
U
R
F
I
C
I
A
L
SURFICIAL
P
E
E
D
E
E
P
E
E
D
E
E
M
W
-
3
7
0
-
2
'
:
m
e
t
a
l
s
,
T
O
C
,
S
P
L
P
4
'
-
6
'
:
m
e
t
a
l
s
,
T
O
C
,
S
P
L
P
4
3
'
-
4
5
'
:
m
e
t
a
l
s
,
T
O
C
,
S
P
L
P
4
5
'
-
4
7
'
:
I
P:\DUKE ENERGY PROGRESS.1026\108. SUTTON ASH BASIN GW ASSESSMENT PLAN\1.11 CSA REPORTING\FIGURES\SUTTON-CSA-FIGURES.DWG08/02/2015 1:41 PM
C
O
A
L
A
S
H
C
L
A
Y
L
I
N
E
R
(
1
2
"
)
R
O
A
D
W
A
T
E
R
L
E
V
E
L
(
J
U
N
E
2
0
1
5
)
N
O
T
T
E
S
T
E
D
N
T
F
I
L
L
M
A
T
E
R
I
A
L
S
C
A
L
E
:
A
S
S
H
O
W
N
B
O
R
I
N
G
S
Y
M
B
O
L
S
W
E
L
L
S
C
R
E
E
N
W
I
T
H
H
Y
D
R
A
U
L
I
C
C
O
N
D
U
C
T
I
V
I
T
Y
I
N
C
E
N
T
I
M
E
T
E
R
S
P
E
R
S
E
C
O
N
D
(
S
O
U
R
C
E
:
S
Y
N
T
E
R
R
A
)
U
N
D
I
S
T
U
R
B
E
D
S
O
I
L
S
A
M
P
L
E
W
I
T
H
V
E
R
T
I
C
A
L
H
Y
D
R
A
U
L
I
C
C
O
N
D
U
C
T
I
V
I
T
Y
(
S
O
U
R
C
E
:
B
L
E
)
S
O
I
L
S
A
M
P
L
E
(
G
R
A
B
)
K
V
a
l
u
e
4
.
4
x
1
0
-
4
A
B
M
W
-
0
1
3
'
-
5
'
:
I
,
m
e
t
a
l
s
3
8
'
-
4
8
'
:
K
d
4
3
'
-
4
5
'
:
I
,
m
i
n
7
8
'
-
8
6
'
:
m
e
t
a
l
s
8
2
'
-
8
4
'
:
m
e
t
a
l
s
8
3
'
-
8
8
'
:
K
d
8
4
'
-
8
6
'
:
I
,
m
i
n
8
8
'
-
9
0
'
:
I
9
6
'
-
9
8
'
:
m
e
t
a
l
s
Elevation
Elevation
S
t
a
t
i
o
n
-100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60
-
1
0
0
-
9
0
-
8
0
-
7
0
-
6
0
-
5
0
-
4
0
-
3
0
-
2
0
-
1
0
0
1
0
2
0
3
0
4
0
5
0
6
0
0+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+00
16+00
17+00
18+00
19+00
20+00
21+00
22+00
23+00
24+00
25+00
26+00
27+00
28+00
29+00
30+00
31+00
32+00
33+00
34+00
35+00
36+00
37+00
38+00
39+00
40+00
41+00
42+00
43+00
44+00
45+00
46+00
47+00
48+00
49+00
50+00
51+00
52+00
53+00
54+00
54+50
N
T
N
T
1
.
7
x
1
0
-
5
1
.
5
x
1
0
-
7
8
.
2
x
1
0
-
3
6
.
7
x
1
0
-
4
4
.
2
x
1
0
-
2
4
.
7
x
1
0
-
2
Elevation
Elevation
S
t
a
t
i
o
n
-140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60
-
1
4
0
-
1
3
0
-
1
2
0
-
1
1
0
-
1
0
0
-
9
0
-
8
0
-
7
0
-
6
0
-
5
0
-
4
0
-
3
0
-
2
0
-
1
0
0
1
0
2
0
3
0
4
0
5
0
6
0
0+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+00
16+00
17+00
18+00
19+00
20+00
21+00
22+00
23+00
24+00
25+00
26+00
27+00
28+00
29+00
30+00
31+00
32+00
33+00
34+00
35+00
36+00
37+00
38+00
39+00
40+00
41+00
42+00
43+00
44+00
45+00
46+00
47+00
48+00
49+00
50+00
51+00
52+00
53+00
53+50
3
.
7
x
1
0
-
5
9
.
0
x
1
0
-
5
1
.
9
x
1
0
-
7
5
.
7
x
1
0
-
2
3
.
6
x
1
0
-
2
N
T
N
T
4
.
7
x
1
0
-
2
4
.
5
x
1
0
-
2
5
/
2
2
/
2
0
1
5
5
/
2
2
/
2
0
1
5
P
.
W
A
L
D
R
E
P
C
.
N
E
W
E
L
L
P
R
O
J
E
C
T
M
A
N
A
G
E
R
:
L
A
Y
O
U
T
N
A
M
E
:
D
R
A
W
N
B
Y
:
C
H
E
C
K
E
D
B
Y
:
K
A
T
H
Y
W
E
B
B
D
A
T
E
:
D
A
T
E
:
F
I
G
U
R
E
6
-
2
G
E
O
L
O
G
I
C
C
R
O
S
S
S
E
C
T
I
O
N
S
B
-
B
'
A
N
D
C
-
C
'
F
I
G
U
R
E
6
-
2
w
w
w
.
s
y
n
t
e
r
r
a
c
o
r
p
.
c
o
m
1
4
8
R
i
v
e
r
S
t
r
e
e
t
,
S
u
i
t
e
2
2
0
G
r
e
e
n
v
i
l
l
e
,
S
o
u
t
h
C
a
r
o
l
i
n
a
2
9
6
0
1
8
6
4
-
4
2
1
-
9
9
9
9
L
.
V
.
S
U
T
T
O
N
E
N
E
R
G
Y
C
O
M
P
L
E
X
8
0
1
S
U
T
T
O
N
S
T
E
A
M
P
L
A
N
T
R
D
W
I
L
M
I
N
G
T
O
N
,
N
O
R
T
H
C
A
R
O
L
I
N
A
3
0
0
0
3
0
0
6
0
0
G
R
A
P
H
I
C
S
C
A
L
E
I
N
F
E
E
T
3
0
0
3
0
6
0
I
N
F
E
E
T
H
O
R
I
Z
O
N
T
A
L
:
1
"
=
3
0
0
'
V
E
R
T
I
C
A
L
:
1
"
=
3
0
'
S
E
C
T
I
O
N
C
-
C
'
F
A
C
I
N
G
N
O
R
T
H
(MSL)
(MSL)
MW-24C
PZ-INT
S
E
C
T
I
O
N
B
-
B
'
F
A
C
I
N
G
N
O
R
T
H
(MSL)
(MSL)COOLING POND GP-03
P
E
E
D
E
E
COAL ASH
S
U
R
F
I
C
I
A
L
M
W
-
2
3
E
8
'
-
1
0
'
:
H
F
O
4
3
'
-
4
5
'
:
H
F
O
6
0
'
-
6
2
'
:
H
F
O
1
4
5
'
-
1
4
7
'
:
K
d
,
I
A
W
-
0
4
0
-
2
'
:
m
e
t
a
l
s
,
T
O
C
9
'
-
1
0
'
:
m
e
t
a
l
s
,
T
O
C
4
7
'
-
4
8
'
:
m
e
t
a
l
s
,
T
O
C
S
M
W
-
0
1
0
-
2
'
:
m
e
t
a
l
s
,
T
O
C
8
'
-
1
0
'
:
m
e
t
a
l
s
,
T
O
C
1
2
'
-
1
5
'
:
H
F
O
4
0
'
-
4
4
'
:
H
F
O
4
2
'
-
4
4
'
:
m
e
t
a
l
s
,
T
O
C
4
5
'
-
4
8
'
:
H
F
O
COAL ASH
S
U
R
F
I
C
I
A
L
S
U
R
F
I
C
I
A
L
P
E
E
D
E
E
ABMW-0
1
3'-5': I, m
e
t
a
l
s
38'-48':
K
d
43'-45': I,
m
i
n
78'-86':
m
e
t
a
l
s
82'-84':
m
e
t
a
l
s
83'-88':
K
d
84'-86': I,
m
i
n
88'-90': I96'-98':
m
e
t
a
l
s
A
W
-
0
7
0
-
2
'
:
m
e
t
a
l
s
,
T
O
C
8
'
-
1
0
'
:
m
e
t
a
l
s
,
T
O
C
1
5
'
-
1
7
'
:
m
e
t
a
l
s
,
T
O
C
4
6
'
-
4
7
'
:
m
e
t
a
l
s
,
T
O
C
4
7
'
-
4
9
'
:
I
9
7
'
-
9
9
'
:
I
S
M
W
-
0
5
0
-
2
'
:
m
e
t
a
l
s
,
T
O
C
6
'
-
8
'
:
m
e
t
a
l
s
,
T
O
C
4
1
'
-
4
3
'
:
m
e
t
a
l
s
,
T
O
C
,
I
P:\DUKE ENERGY PROGRESS.1026\108. SUTTON ASH BASIN GW ASSESSMENT PLAN\1.11 CSA REPORTING\FIGURES\SUTTON-CSA-FIGURES.DWG08/02/2015 1:42 PM
S
O
U
R
C
E
S
:
1
.
D
R
A
W
I
N
G
H
A
S
B
E
E
N
S
E
T
W
I
T
H
A
P
R
O
J
E
C
T
I
O
N
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
S
T
A
T
E
P
L
A
N
E
C
O
O
R
D
I
N
A
T
E
S
Y
S
T
E
M
F
I
P
S
3
2
0
0
(
N
A
D
8
3
)
.
2
.
2
f
t
C
O
N
T
O
U
R
I
N
T
E
R
V
A
L
S
F
R
O
M
N
C
D
O
T
L
I
D
A
R
D
A
T
E
D
2
0
0
7
h
t
t
p
s
:
/
/
c
o
n
n
e
c
t
.
n
c
d
o
t
.
g
o
v
/
r
e
s
o
u
r
c
e
s
/
g
i
s
/
p
a
g
e
s
/
c
o
n
t
-
e
l
e
v
_
v
2
.
a
s
p
x
3
.
S
E
L
E
C
T
T
O
P
O
G
R
A
P
H
I
C
A
D
J
U
S
T
M
E
N
T
S
B
A
S
E
D
O
N
S
I
T
E
S
U
R
V
E
Y
A
N
D
C
O
M
P
A
R
I
S
O
N
T
O
A
E
R
I
A
L
P
H
O
T
O
G
R
A
P
H
.
N
O
T
E
:
1
.
C
O
N
T
O
U
R
L
I
N
E
S
A
R
E
U
S
E
D
F
O
R
R
E
P
R
E
S
E
N
T
A
T
I
V
E
P
U
R
P
O
S
E
S
O
N
L
Y
A
N
D
A
R
E
N
O
T
T
O
B
E
U
S
E
D
F
O
R
D
E
S
I
G
N
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
U
R
P
O
S
E
S
.
2
.
C
R
O
S
S
S
E
C
T
I
O
N
L
O
C
A
T
I
O
N
S
A
R
E
S
H
O
W
N
O
N
F
I
G
U
R
E
1
-
2
.
W
A
T
E
R
L
E
V
E
L
(
J
U
N
E
2
0
1
5
)
L
E
G
E
N
D
S
U
R
F
I
C
I
A
L
S
A
N
D
(
W
E
L
L
S
O
R
T
E
D
-
S
I
L
T
Y
S
A
N
D
-
M
E
D
I
U
M
T
O
F
I
N
E
G
R
A
I
N
E
D
S
A
N
D
)
S
U
R
F
I
C
I
A
L
S
A
N
D
(
P
O
O
R
L
Y
S
O
R
T
E
D
-
M
E
D
I
U
M
T
O
C
O
A
R
S
E
G
R
A
I
N
E
D
S
A
N
D
)
C
O
A
L
A
S
H
C
O
A
R
S
E
S
A
N
D
W
I
T
H
F
I
N
E
G
R
A
V
E
L
S
A
N
D
(
P
E
E
D
E
E
)
C
L
A
Y
R
I
C
H
F
A
C
I
E
S
N
O
T
T
E
S
T
E
D
N
T
CLAY LINER (12")
F
I
L
L
M
A
T
E
R
I
A
L
S
C
A
L
E
:
A
S
S
H
O
W
N
S
A
M
P
L
E
D
E
S
C
R
I
P
T
I
O
N
S
m
e
t
a
l
s
T
O
T
A
L
M
E
T
A
L
S
T
O
C
T
O
T
A
L
O
R
G
A
N
I
C
C
A
R
B
O
N
I
P
G
R
A
I
N
S
I
Z
E
,
M
O
I
S
T
U
R
E
C
O
N
T
E
X
T
I
I
N
D
E
X
S
O
I
L
S
A
M
P
L
E
(
M
O
I
S
T
U
R
E
,
S
P
E
C
I
F
I
C
G
R
A
V
I
T
Y
,
G
R
A
I
N
S
I
Z
E
)
S
P
L
P
S
Y
N
T
H
E
T
I
C
P
R
E
C
I
P
I
T
A
T
I
O
N
L
E
A
C
H
I
N
G
P
R
O
C
E
D
U
R
E
K
d
S
O
R
P
T
I
O
N
C
O
E
F
F
I
C
I
E
N
T
S
H
F
O
H
Y
D
R
O
U
S
F
E
R
R
I
C
O
X
I
D
E
S
m
i
n
M
I
N
E
R
A
L
O
G
Y
B
Y
X
-
R
A
Y
D
I
F
F
R
A
C
T
I
O
N
A
N
D
W
H
O
L
E
R
O
C
K
C
H
E
M
I
S
T
R
Y
B
O
R
I
N
G
S
Y
M
B
O
L
S
W
E
L
L
S
C
R
E
E
N
W
I
T
H
H
Y
D
R
A
U
L
I
C
C
O
N
D
U
C
T
I
V
I
T
Y
I
N
C
E
N
T
I
M
E
T
E
R
S
P
E
R
S
E
C
O
N
D
(
S
O
U
R
C
E
:
S
Y
N
T
E
R
R
A
)
U
N
D
I
S
T
U
R
B
E
D
S
O
I
L
S
A
M
P
L
E
W
I
T
H
V
E
R
T
I
C
A
L
H
Y
D
R
A
U
L
I
C
C
O
N
D
U
C
T
I
V
I
T
Y
(
S
O
U
R
C
E
:
B
L
E
)
S
O
I
L
S
A
M
P
L
E
(
G
R
A
B
)
K
V
a
l
u
e
4
.
4
x
1
0
-
4
Elevation
S
t
a
t
i
o
n
-110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 600+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+0016+0017+0018+0019+0020+0021+0022+0023+0024+0025+0026+00
27+00
28+00
29+00
30+00
31+00
32+00
33+00
34+00
35+00
36+00
37+00
38+00
39+00
40+00
41+00
42+00
43+00
44+00
45+00
46+00
47+00
48+00
49+00
50+00
51+00
52+00
53+00
54+00
55+00
56+00
57+00
58+00
59+00
60+00
61+00
62+00
63+00
64+00
65+00
66+00
67+00
68+00
69+00
70+00
71+00
72+00
73+00
74+00
75+00
76+00
77+00
78+00
79+00
80+00
3
.
7
x
1
0
-
2
3
.
0
x
1
0
-
2
N
T
N
T
NT
4
.
3
x
1
0
-
2
2
.
6
x
1
0
-
2
5
/
2
2
/
2
0
1
5
5
/
2
2
/
2
0
1
5
P
.
W
A
L
D
R
E
P
C
.
N
E
W
E
L
L
P
R
O
J
E
C
T
M
A
N
A
G
E
R
:
L
A
Y
O
U
T
N
A
M
E
:
D
R
A
W
N
B
Y
:
C
H
E
C
K
E
D
B
Y
:
K
A
T
H
Y
W
E
B
B
D
A
T
E
:
D
A
T
E
:
F
I
G
U
R
E
6
-
3
w
w
w
.
s
y
n
t
e
r
r
a
c
o
r
p
.
c
o
m
1
4
8
R
i
v
e
r
S
t
r
e
e
t
,
S
u
i
t
e
2
2
0
G
r
e
e
n
v
i
l
l
e
,
S
o
u
t
h
C
a
r
o
l
i
n
a
2
9
6
0
1
8
6
4
-
4
2
1
-
9
9
9
9
L
.
V
.
S
U
T
T
O
N
E
N
E
R
G
Y
C
O
M
P
L
E
X
8
0
1
S
U
T
T
O
N
S
T
E
A
M
P
L
A
N
T
R
D
W
I
L
M
I
N
G
T
O
N
,
N
O
R
T
H
C
A
R
O
L
I
N
A
3
0
0
0
3
0
0
6
0
0
G
R
A
P
H
I
C
S
C
A
L
E
I
N
F
E
E
T
3
0
0
3
0
6
0
I
N
F
E
E
T
H
O
R
I
Z
O
N
T
A
L
:
1
"
=
3
0
0
'
V
E
R
T
I
C
A
L
:
1
"
=
3
0
'
S
E
C
T
I
O
N
A
-
A
'
F
A
C
I
N
G
E
A
S
T
MATCH LINE - SEE FIGURE 6-2
(MSL)MW-5C
MW-27C
MW-36C
AW-
0
8
0-2':
m
e
t
a
l
s
,
T
O
C
,
S
P
L
P
,
H
C
8'-10
'
:
m
e
t
a
l
s
,
T
O
C
,
S
P
L
P
,
H
C
40'-4
2
'
:
m
e
t
a
l
s
,
T
O
C
,
S
P
L
P
,
H
C
C
O
A
L
A
S
H
C
O
A
L
A
S
H
S
U
R
F
I
C
I
A
L
SURFICIAL
P
E
E
D
E
E
F
I
G
U
R
E
6
-
3
G
E
O
L
O
G
I
C
C
R
O
S
S
S
E
C
T
I
O
N
A
-
A
'
N
O
R
T
H
E
N
D
W
I
T
H
P
H
O
T
O
G
R
A
P
H
S
COARSE S
A
N
D
/
F
I
N
E
G
R
A
V
E
L
L
A
Y
E
R
TYPICAL O
F
L
O
W
E
R
S
U
R
F
I
C
I
A
L
Z
O
N
E
F
L
Y
A
S
H
I
N
U
P
P
E
R
1
0
'
TYPICAL SANDS OF LOWER SURFICIAL ZONE
S
U
R
F
I
C
I
A
L
/
P
E
E
D
E
E
C
O
N
T
A
C
T
C
O
N
T
A
C
T
B
E
T
W
E
E
N
F
L
Y
A
S
H
A
N
D
S
U
R
F
I
C
I
A
L
S
A
N
D
T
Y
P
I
C
A
L
F
I
N
E
S
A
N
D
/
S
I
L
T
O
F
T
H
E
U
P
P
E
R
P
E
E
D
E
E
F
O
R
M
A
T
I
O
N
P:\DUKE ENERGY PROGRESS.1026\108. SUTTON ASH BASIN GW ASSESSMENT PLAN\1.11 CSA REPORTING\FIGURES\SUTTON-CSA-FIGURES.DWG08/02/2015 1:44 PM
S
O
U
R
C
E
S
:
1
.
D
R
A
W
I
N
G
H
A
S
B
E
E
N
S
E
T
W
I
T
H
A
P
R
O
J
E
C
T
I
O
N
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
S
T
A
T
E
P
L
A
N
E
C
O
O
R
D
I
N
A
T
E
S
Y
S
T
E
M
F
I
P
S
3
2
0
0
(
N
A
D
8
3
)
.
2
.
2
f
t
C
O
N
T
O
U
R
I
N
T
E
R
V
A
L
S
F
R
O
M
N
C
D
O
T
L
I
D
A
R
D
A
T
E
D
2
0
0
7
h
t
t
p
s
:
/
/
c
o
n
n
e
c
t
.
n
c
d
o
t
.
g
o
v
/
r
e
s
o
u
r
c
e
s
/
g
i
s
/
p
a
g
e
s
/
c
o
n
t
-
e
l
e
v
_
v
2
.
a
s
p
x
3
.
S
E
L
E
C
T
T
O
P
O
G
R
A
P
H
I
C
A
D
J
U
S
T
M
E
N
T
S
B
A
S
E
D
O
N
S
I
T
E
S
U
R
V
E
Y
A
N
D
C
O
M
P
A
R
I
S
O
N
T
O
A
E
R
I
A
L
P
H
O
T
O
G
R
A
P
H
.
N
O
T
E
:
1
.
C
O
N
T
O
U
R
L
I
N
E
S
A
R
E
U
S
E
D
F
O
R
R
E
P
R
E
S
E
N
T
A
T
I
V
E
P
U
R
P
O
S
E
S
O
N
L
Y
A
N
D
A
R
E
N
O
T
T
O
B
E
U
S
E
D
F
O
R
D
E
S
I
G
N
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
U
R
P
O
S
E
S
.
2
.
C
R
O
S
S
S
E
C
T
I
O
N
L
O
C
A
T
I
O
N
S
A
R
E
S
H
O
W
N
O
N
F
I
G
U
R
E
1
-
2
.
A
S
H
B
A
S
I
N
C
O
A
L
A
S
H
C
L
A
Y
L
I
N
E
R
(
1
2
"
)
R
O
A
D
W
A
T
E
R
L
E
V
E
L
(
J
U
N
E
2
0
1
5
)
L
E
G
E
N
D
S
U
R
F
I
C
I
A
L
S
A
N
D
(
W
E
L
L
S
O
R
T
E
D
-
S
I
L
T
Y
S
A
N
D
-
M
E
D
I
U
M
T
O
F
I
N
E
G
R
A
I
N
E
D
S
A
N
D
)
S
U
R
F
I
C
I
A
L
S
A
N
D
(
P
O
O
R
L
Y
S
O
R
T
E
D
-
M
E
D
I
U
M
T
O
C
O
A
R
S
E
G
R
A
I
N
E
D
S
A
N
D
)
C
O
A
L
A
S
H
C
O
A
R
S
E
S
A
N
D
W
I
T
H
F
I
N
E
G
R
A
V
E
L
S
A
N
D
(
P
E
E
D
E
E
)
C
L
A
Y
R
I
C
H
F
A
C
I
E
S
N
O
T
T
E
S
T
E
D
N
T
F
I
L
L
M
A
T
E
R
I
A
L
S
C
A
L
E
:
A
S
S
H
O
W
N
S
A
M
P
L
E
D
E
S
C
R
I
P
T
I
O
N
S
m
e
t
a
l
s
T
O
T
A
L
M
E
T
A
L
S
T
O
C
T
O
T
A
L
O
R
G
A
N
I
C
C
A
R
B
O
N
I
P
G
R
A
I
N
S
I
Z
E
,
M
O
I
S
T
U
R
E
C
O
N
T
E
X
T
I
I
N
D
E
X
S
O
I
L
S
A
M
P
L
E
(
M
O
I
S
T
U
R
E
,
S
P
E
C
I
F
I
C
G
R
A
V
I
T
Y
,
G
R
A
I
N
S
I
Z
E
)
S
P
L
P
S
Y
N
T
H
E
T
I
C
P
R
E
C
I
P
I
T
A
T
I
O
N
L
E
A
C
H
I
N
G
P
R
O
C
E
D
U
R
E
K
d
S
O
R
P
T
I
O
N
C
O
E
F
F
I
C
I
E
N
T
S
H
F
O
H
Y
D
R
O
U
S
F
E
R
R
I
C
O
X
I
D
E
S
m
i
n
M
I
N
E
R
A
L
O
G
Y
B
Y
X
-
R
A
Y
D
I
F
F
R
A
C
T
I
O
N
A
N
D
W
H
O
L
E
R
O
C
K
C
H
E
M
I
S
T
R
Y
B
O
R
I
N
G
S
Y
M
B
O
L
S
W
E
L
L
S
C
R
E
E
N
W
I
T
H
H
Y
D
R
A
U
L
I
C
C
O
N
D
U
C
T
I
V
I
T
Y
I
N
C
E
N
T
I
M
E
T
E
R
S
P
E
R
S
E
C
O
N
D
(
S
O
U
R
C
E
:
S
Y
N
T
E
R
R
A
)
U
N
D
I
S
T
U
R
B
E
D
S
O
I
L
S
A
M
P
L
E
W
I
T
H
V
E
R
T
I
C
A
L
H
Y
D
R
A
U
L
I
C
C
O
N
D
U
C
T
I
V
I
T
Y
(
S
O
U
R
C
E
:
B
L
E
)
S
O
I
L
S
A
M
P
L
E
(
G
R
A
B
)
K
V
a
l
u
e
4
.
4
x
1
0
-
4
A
B
M
W
-
0
1
3
'
-
5
'
:
I
,
m
e
t
a
l
s
3
8
'
-
4
8
'
:
K
d
4
3
'
-
4
5
'
:
I
,
m
i
n
7
8
'
-
8
6
'
:
m
e
t
a
l
s
8
2
'
-
8
4
'
:
m
e
t
a
l
s
8
3
'
-
8
8
'
:
K
d
8
4
'
-
8
6
'
:
I
,
m
i
n
8
8
'
-
9
0
'
:
I
9
6
'
-
9
8
'
:
m
e
t
a
l
s
Elevation
-
1
1
0
-
1
0
0
-
9
0
-
8
0
-
7
0
-
6
0
-
5
0
-
4
0
-
3
0
-
2
0
-
1
0
0
1
0
2
0
3
0
4
0
5
0
6
0
80+0081+0082+0083+0084+0085+0086+0087+0088+0089+0090+0091+0092+0093+0094+0095+0096+0097+0098+0099+00100+00101+00
102+00
103+00
104+00
105+00
106+00
107+00
108+00
109+00
110+00
111+00
112+00
113+00
114+00
115+00
116+00
117+00
118+00
119+00
120+00
121+00
122+00
123+00
124+00
125+00
126+00
127+00
128+00
129+00
130+00
131+00
132+00
133+00
134+00
135+00
136+00
137+00
138+00
139+00
140+00
141+00
142+00
143+00
144+00
145+00
146+00
146+50
6.7 x 10-42.8 x 10-2
4
.
4
x
1
0
-
2
1.1 x 10-4
7
.
2
x
1
0
-
4
3
.
8
x
1
0
-
2
6
.
2
x
1
0
-
2
1
.
2
x
1
0
-
5
2
.
6
x
1
0
-
2
5
/
2
2
/
2
0
1
5
5
/
2
2
/
2
0
1
5
P
.
W
A
L
D
R
E
P
C
.
N
E
W
E
L
L
P
R
O
J
E
C
T
M
A
N
A
G
E
R
:
L
A
Y
O
U
T
N
A
M
E
:
D
R
A
W
N
B
Y
:
C
H
E
C
K
E
D
B
Y
:
K
A
T
H
Y
W
E
B
B
D
A
T
E
:
D
A
T
E
:
F
I
G
U
R
E
6
-
4
G
E
O
L
O
G
I
C
C
R
O
S
S
S
E
C
T
I
O
N
A
-
A
'
S
O
U
T
H
E
N
D
W
I
T
H
P
H
O
T
O
G
R
A
P
H
S
F
I
G
U
R
E
6
-
4
w
w
w
.
s
y
n
t
e
r
r
a
c
o
r
p
.
c
o
m
1
4
8
R
i
v
e
r
S
t
r
e
e
t
,
S
u
i
t
e
2
2
0
G
r
e
e
n
v
i
l
l
e
,
S
o
u
t
h
C
a
r
o
l
i
n
a
2
9
6
0
1
8
6
4
-
4
2
1
-
9
9
9
9
L
.
V
.
S
U
T
T
O
N
E
N
E
R
G
Y
C
O
M
P
L
E
X
8
0
1
S
U
T
T
O
N
S
T
E
A
M
P
L
A
N
T
R
D
W
I
L
M
I
N
G
T
O
N
,
N
O
R
T
H
C
A
R
O
L
I
N
A
3
0
0
0
3
0
0
6
0
0
G
R
A
P
H
I
C
S
C
A
L
E
I
N
F
E
E
T
3
0
0
3
0
6
0
I
N
F
E
E
T
H
O
R
I
Z
O
N
T
A
L
:
1
"
=
3
0
0
'
V
E
R
T
I
C
A
L
:
1
"
=
3
0
'
S
E
C
T
I
O
N
A
-
A
'
F
A
C
I
N
G
E
A
S
T
MATCH LINE - SEE FIGURE 6-1
(MSL)
CANAL
CANAL
GP-01AB-020-8': Kd3'-5': metals,TOC6'-8': SPLP,min10'-12': metals,TOC,SPLP,Kd,I,min49.5'-52': I53'-55': SPLP,I,min, metals53'-60': Kd
A
W
-
0
9
2
'
-
4
'
:
m
e
t
a
l
s
,
T
O
C
,
S
P
L
P
,
I
1
0
'
-
1
2
'
:
H
F
O
1
4
'
-
1
6
'
:
m
e
t
a
l
s
,
T
O
C
,
S
P
L
P
2
3
'
-
2
5
'
:
I
4
3
'
-
4
5
'
:
m
e
t
a
l
s
,
T
O
C
,
S
P
L
P
4
7
'
-
5
0
'
:
H
F
O
5
5
'
-
5
7
'
:
H
F
O
COALASHCOAL ASHSURFICIAL
S
U
R
F
I
C
I
A
L
P
E
E
D
E
E
M
W
-
3
7
0
-
2
'
:
m
e
t
a
l
s
,
T
O
C
,
S
P
L
P
4
'
-
6
'
:
m
e
t
a
l
s
,
T
O
C
,
S
P
L
P
4
3
'
-
4
5
'
:
m
e
t
a
l
s
,
T
O
C
,
S
P
L
P
4
5
'
-
4
7
'
:
I
P:\DUKE ENERGY PROGRESS.1026\108. SUTTON ASH BASIN GW ASSESSMENT PLAN\1.11 CSA REPORTING\FIGURES\SUTTON-CSA-FIGURES.DWG08/02/2015 1:45 PM TYPICAL FLYASH IN THE FADATYPICAL UPPER SURFICIAL SANDSFINE
S
A
N
D
/
S
I
L
T
U
N
D
E
R
L
Y
I
N
G
SURFI
C
I
A
L
A
Q
U
I
F
E
R
I
N
T
H
E
F
A
D
A
S
O
U
R
C
E
S
:
1
.
D
R
A
W
I
N
G
H
A
S
B
E
E
N
S
E
T
W
I
T
H
A
P
R
O
J
E
C
T
I
O
N
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
S
T
A
T
E
P
L
A
N
E
C
O
O
R
D
I
N
A
T
E
S
Y
S
T
E
M
F
I
P
S
3
2
0
0
(
N
A
D
8
3
)
.
2
.
2
f
t
C
O
N
T
O
U
R
I
N
T
E
R
V
A
L
S
F
R
O
M
N
C
D
O
T
L
I
D
A
R
D
A
T
E
D
2
0
0
7
h
t
t
p
s
:
/
/
c
o
n
n
e
c
t
.
n
c
d
o
t
.
g
o
v
/
r
e
s
o
u
r
c
e
s
/
g
i
s
/
p
a
g
e
s
/
c
o
n
t
-
e
l
e
v
_
v
2
.
a
s
p
x
3
.
S
E
L
E
C
T
T
O
P
O
G
R
A
P
H
I
C
A
D
J
U
S
T
M
E
N
T
S
B
A
S
E
D
O
N
S
I
T
E
S
U
R
V
E
Y
A
N
D
C
O
M
P
A
R
I
S
O
N
T
O
A
E
R
I
A
L
P
H
O
T
O
G
R
A
P
H
.
N
O
T
E
:
1
.
C
O
N
T
O
U
R
L
I
N
E
S
A
R
E
U
S
E
D
F
O
R
R
E
P
R
E
S
E
N
T
A
T
I
V
E
P
U
R
P
O
S
E
S
O
N
L
Y
A
N
D
A
R
E
N
O
T
T
O
B
E
U
S
E
D
F
O
R
D
E
S
I
G
N
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
U
R
P
O
S
E
S
.
2
.
C
R
O
S
S
S
E
C
T
I
O
N
L
O
C
A
T
I
O
N
S
A
R
E
S
H
O
W
N
O
N
F
I
G
U
R
E
1
-
2
.
W
A
T
E
R
L
E
V
E
L
(
J
U
N
E
2
0
1
5
)
L
E
G
E
N
D
S
U
R
F
I
C
I
A
L
S
A
N
D
(
W
E
L
L
S
O
R
T
E
D
-
S
I
L
T
Y
S
A
N
D
-
M
E
D
I
U
M
T
O
F
I
N
E
G
R
A
I
N
E
D
S
A
N
D
)
S
U
R
F
I
C
I
A
L
S
A
N
D
(
P
O
O
R
L
Y
S
O
R
T
E
D
-
M
E
D
I
U
M
T
O
C
O
A
R
S
E
G
R
A
I
N
E
D
S
A
N
D
)
C
O
A
L
A
S
H
C
O
A
R
S
E
S
A
N
D
W
I
T
H
F
I
N
E
G
R
A
V
E
L
S
A
N
D
(
P
E
E
D
E
E
)
C
L
A
Y
R
I
C
H
F
A
C
I
E
S
N
O
T
T
E
S
T
E
D
N
T
F
I
L
L
M
A
T
E
R
I
A
L
S
C
A
L
E
:
A
S
S
H
O
W
N
S
A
M
P
L
E
D
E
S
C
R
I
P
T
I
O
N
S
m
e
t
a
l
s
T
O
T
A
L
M
E
T
A
L
S
T
O
C
T
O
T
A
L
O
R
G
A
N
I
C
C
A
R
B
O
N
I
P
G
R
A
I
N
S
I
Z
E
,
M
O
I
S
T
U
R
E
C
O
N
T
E
X
T
I
I
N
D
E
X
S
O
I
L
S
A
M
P
L
E
(
M
O
I
S
T
U
R
E
,
S
P
E
C
I
F
I
C
G
R
A
V
I
T
Y
,
G
R
A
I
N
S
I
Z
E
)
S
P
L
P
S
Y
N
T
H
E
T
I
C
P
R
E
C
I
P
I
T
A
T
I
O
N
L
E
A
C
H
I
N
G
P
R
O
C
E
D
U
R
E
K
d
S
O
R
P
T
I
O
N
C
O
E
F
F
I
C
I
E
N
T
S
H
F
O
H
Y
D
R
O
U
S
F
E
R
R
I
C
O
X
I
D
E
S
m
i
n
M
I
N
E
R
A
L
O
G
Y
B
Y
X
-
R
A
Y
D
I
F
F
R
A
C
T
I
O
N
A
N
D
W
H
O
L
E
R
O
C
K
C
H
E
M
I
S
T
R
Y
B
O
R
I
N
G
S
Y
M
B
O
L
S
W
E
L
L
S
C
R
E
E
N
W
I
T
H
H
Y
D
R
A
U
L
I
C
C
O
N
D
U
C
T
I
V
I
T
Y
I
N
C
E
N
T
I
M
E
T
E
R
S
P
E
R
S
E
C
O
N
D
(
S
O
U
R
C
E
:
S
Y
N
T
E
R
R
A
)
U
N
D
I
S
T
U
R
B
E
D
S
O
I
L
S
A
M
P
L
E
W
I
T
H
V
E
R
T
I
C
A
L
H
Y
D
R
A
U
L
I
C
C
O
N
D
U
C
T
I
V
I
T
Y
(
S
O
U
R
C
E
:
B
L
E
)
S
O
I
L
S
A
M
P
L
E
(
G
R
A
B
)
K
V
a
l
u
e
4
.
4
x
1
0
-
4
Elevation
Elevation
S
t
a
t
i
o
n
-100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60
-
1
0
0
-
9
0
-
8
0
-
7
0
-
6
0
-
5
0
-
4
0
-
3
0
-
2
0
-
1
0
0
1
0
2
0
3
0
4
0
5
0
6
0
0+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+00
16+00
17+00
18+00
19+00
20+00
21+00
22+00
23+00
24+00
25+00
26+00
27+00
28+00
29+00
30+00
31+00
32+00
33+00
34+00
35+00
36+00
37+00
38+00
39+00
40+00
41+00
42+00
43+00
44+00
45+00
46+00
47+00
48+00
49+00
50+00
51+00
52+00
53+00
54+00
54+50
N
T
N
T
1
.
7
x
1
0
-
5
1
.
5
x
1
0
-
7
8
.
2
x
1
0
-
3
6
.
7
x
1
0
-
4
4
.
2
x
1
0
-
2
4
.
7
x
1
0
-
2
5
/
2
2
/
2
0
1
5
5
/
2
2
/
2
0
1
5
P
.
W
A
L
D
R
E
P
C
.
N
E
W
E
L
L
P
R
O
J
E
C
T
M
A
N
A
G
E
R
:
L
A
Y
O
U
T
N
A
M
E
:
D
R
A
W
N
B
Y
:
C
H
E
C
K
E
D
B
Y
:
K
A
T
H
Y
W
E
B
B
D
A
T
E
:
D
A
T
E
:
F
I
G
U
R
E
6
-
5
w
w
w
.
s
y
n
t
e
r
r
a
c
o
r
p
.
c
o
m
1
4
8
R
i
v
e
r
S
t
r
e
e
t
,
S
u
i
t
e
2
2
0
G
r
e
e
n
v
i
l
l
e
,
S
o
u
t
h
C
a
r
o
l
i
n
a
2
9
6
0
1
8
6
4
-
4
2
1
-
9
9
9
9
L
.
V
.
S
U
T
T
O
N
E
N
E
R
G
Y
C
O
M
P
L
E
X
8
0
1
S
U
T
T
O
N
S
T
E
A
M
P
L
A
N
T
R
D
W
I
L
M
I
N
G
T
O
N
,
N
O
R
T
H
C
A
R
O
L
I
N
A
3
0
0
0
3
0
0
6
0
0
G
R
A
P
H
I
C
S
C
A
L
E
I
N
F
E
E
T
3
0
0
3
0
6
0
I
N
F
E
E
T
H
O
R
I
Z
O
N
T
A
L
:
1
"
=
3
0
0
'
V
E
R
T
I
C
A
L
:
1
"
=
3
0
'
S
E
C
T
I
O
N
C
-
C
'
F
A
C
I
N
G
N
O
R
T
H
(MSL)
(MSL)
MW-24C
PZ-INT
P
E
E
D
E
E
COAL ASH
S
U
R
F
I
C
I
A
L
A
W
-
0
7
0
-
2
'
:
m
e
t
a
l
s
,
T
O
C
8
'
-
1
0
'
:
m
e
t
a
l
s
,
T
O
C
1
5
'
-
1
7
'
:
m
e
t
a
l
s
,
T
O
C
4
6
'
-
4
7
'
:
m
e
t
a
l
s
,
T
O
C
4
7
'
-
4
9
'
:
I
9
7
'
-
9
9
'
:
I
S
M
W
-
0
5
0
-
2
'
:
m
e
t
a
l
s
,
T
O
C
6
'
-
8
'
:
m
e
t
a
l
s
,
T
O
C
4
1
'
-
4
3
'
:
m
e
t
a
l
s
,
T
O
C
,
I
F
I
G
U
R
E
6
-
5
G
E
O
L
O
G
I
C
C
R
O
S
S
S
E
C
T
I
O
N
C
-
C
'
W
I
T
H
P
H
O
T
O
G
R
A
P
H
S
TYPICAL
U
P
P
E
R
S
U
R
F
I
C
I
A
L
S
A
N
D
S
T
Y
P
I
C
A
L
U
P
P
E
R
S
U
R
F
I
C
I
A
L
A
Q
U
I
F
E
R
S
A
N
D
S
TYPICAL MID-LOWER SURFICIAL SANDSWITH COURSE SAND LAYERSFINE SAND / SILT OF THE PEE DEE FORMATION
C
O
A
R
S
E
S
A
N
D
/
F
I
N
E
G
R
A
V
E
L
L
A
Y
E
R
A
T
T
H
E
B
A
S
E
O
F
T
H
E
S
U
R
F
I
C
I
A
L
A
Q
U
I
F
E
R
S
H
A
R
P
C
O
N
T
A
C
T
B
E
T
W
E
E
N
T
H
E
P
E
E
D
E
E
F
O
R
M
A
T
I
O
N
(
L
E
F
T
)
A
N
D
T
H
E
S
U
R
F
I
C
I
A
L
S
A
N
D
S
(
R
I
G
H
T
)
P:\DUKE ENERGY PROGRESS.1026\108. SUTTON ASH BASIN GW ASSESSMENT PLAN\1.11 CSA REPORTING\FIGURES\SUTTON-CSA-FIGURES.DWG08/02/2015 1:47 PM
S
O
U
R
C
E
S
:
1
.
D
R
A
W
I
N
G
H
A
S
B
E
E
N
S
E
T
W
I
T
H
A
P
R
O
J
E
C
T
I
O
N
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
S
T
A
T
E
P
L
A
N
E
C
O
O
R
D
I
N
A
T
E
S
Y
S
T
E
M
F
I
P
S
3
2
0
0
(
N
A
D
8
3
)
.
2
.
2
f
t
C
O
N
T
O
U
R
I
N
T
E
R
V
A
L
S
F
R
O
M
N
C
D
O
T
L
I
D
A
R
D
A
T
E
D
2
0
0
7
h
t
t
p
s
:
/
/
c
o
n
n
e
c
t
.
n
c
d
o
t
.
g
o
v
/
r
e
s
o
u
r
c
e
s
/
g
i
s
/
p
a
g
e
s
/
c
o
n
t
-
e
l
e
v
_
v
2
.
a
s
p
x
3
.
S
E
L
E
C
T
T
O
P
O
G
R
A
P
H
I
C
A
D
J
U
S
T
M
E
N
T
S
B
A
S
E
D
O
N
S
I
T
E
S
U
R
V
E
Y
A
N
D
C
O
M
P
A
R
I
S
O
N
T
O
A
E
R
I
A
L
P
H
O
T
O
G
R
A
P
H
.
N
O
T
E
:
1
.
C
O
N
T
O
U
R
L
I
N
E
S
A
R
E
U
S
E
D
F
O
R
R
E
P
R
E
S
E
N
T
A
T
I
V
E
P
U
R
P
O
S
E
S
O
N
L
Y
A
N
D
A
R
E
N
O
T
T
O
B
E
U
S
E
D
F
O
R
D
E
S
I
G
N
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
U
R
P
O
S
E
S
.
2
.
C
R
O
S
S
S
E
C
T
I
O
N
L
O
C
A
T
I
O
N
S
A
R
E
S
H
O
W
N
O
N
F
I
G
U
R
E
1
-
2
.
W
A
T
E
R
L
E
V
E
L
(
J
U
N
E
2
0
1
5
)
L
E
G
E
N
D
S
U
R
F
I
C
I
A
L
S
A
N
D
(
W
E
L
L
S
O
R
T
E
D
-
S
I
L
T
Y
S
A
N
D
-
M
E
D
I
U
M
T
O
F
I
N
E
G
R
A
I
N
E
D
S
A
N
D
)
S
U
R
F
I
C
I
A
L
S
A
N
D
(
P
O
O
R
L
Y
S
O
R
T
E
D
-
M
E
D
I
U
M
T
O
C
O
A
R
S
E
G
R
A
I
N
E
D
S
A
N
D
)
C
O
A
L
A
S
H
C
O
A
R
S
E
S
A
N
D
W
I
T
H
F
I
N
E
G
R
A
V
E
L
S
A
N
D
(
P
E
E
D
E
E
)
C
L
A
Y
R
I
C
H
F
A
C
I
E
S
N
O
T
T
E
S
T
E
D
N
T
CLAY LINER (12")
F
I
L
L
M
A
T
E
R
I
A
L
S
C
A
L
E
:
A
S
S
H
O
W
N
S
A
M
P
L
E
D
E
S
C
R
I
P
T
I
O
N
S
m
e
t
a
l
s
T
O
T
A
L
M
E
T
A
L
S
T
O
C
T
O
T
A
L
O
R
G
A
N
I
C
C
A
R
B
O
N
I
P
G
R
A
I
N
S
I
Z
E
,
M
O
I
S
T
U
R
E
C
O
N
T
E
X
T
I
I
N
D
E
X
S
O
I
L
S
A
M
P
L
E
(
M
O
I
S
T
U
R
E
,
S
P
E
C
I
F
I
C
G
R
A
V
I
T
Y
,
G
R
A
I
N
S
I
Z
E
)
S
P
L
P
S
Y
N
T
H
E
T
I
C
P
R
E
C
I
P
I
T
A
T
I
O
N
L
E
A
C
H
I
N
G
P
R
O
C
E
D
U
R
E
K
d
S
O
R
P
T
I
O
N
C
O
E
F
F
I
C
I
E
N
T
S
H
F
O
H
Y
D
R
O
U
S
F
E
R
R
I
C
O
X
I
D
E
S
m
i
n
M
I
N
E
R
A
L
O
G
Y
B
Y
X
-
R
A
Y
D
I
F
F
R
A
C
T
I
O
N
A
N
D
W
H
O
L
E
R
O
C
K
C
H
E
M
I
S
T
R
Y
B
O
R
I
N
G
S
Y
M
B
O
L
S
W
E
L
L
S
C
R
E
E
N
W
I
T
H
H
Y
D
R
A
U
L
I
C
C
O
N
D
U
C
T
I
V
I
T
Y
I
N
C
E
N
T
I
M
E
T
E
R
S
P
E
R
S
E
C
O
N
D
(
S
O
U
R
C
E
:
S
Y
N
T
E
R
R
A
)
U
N
D
I
S
T
U
R
B
E
D
S
O
I
L
S
A
M
P
L
E
W
I
T
H
V
E
R
T
I
C
A
L
H
Y
D
R
A
U
L
I
C
C
O
N
D
U
C
T
I
V
I
T
Y
(
S
O
U
R
C
E
:
B
L
E
)
S
O
I
L
S
A
M
P
L
E
(
G
R
A
B
)
K
V
a
l
u
e
4
.
4
x
1
0
-
4
EDR 11
EDR 5
EDR 3
C
A
N
A
L
8/2/2015
8/2/2015P. WALDREP
J. CHASTAIN
PROJECT MANAGER:
LAYOUT NAME:
DRAWN BY:
CHECKED BY:
KATHY WEBB
DATE:
DATE:
FIGURE 6-6
POTENTIOMETRIC SURFACE
UPPER SURFICIAL AQUIFER
JUNE 1, 20158/
4
/
2
0
1
5
1
:
2
6
P
M
P:
\
D
u
k
e
E
n
e
r
g
y
P
r
o
g
r
e
s
s
.
1
0
2
6
\
1
0
8
.
S
u
t
t
o
n
A
s
h
B
a
s
i
n
G
W
A
s
s
e
s
s
m
e
n
t
P
l
a
n
\
1
.
1
1
C
S
A
R
e
p
o
r
t
i
n
g
\
F
I
G
U
R
E
S
\
D
E
S
U
T
T
O
N
W
A
T
E
R
L
E
V
E
L
B
A
S
E
M
A
P
2
0
1
5
-
0
8
-
0
2
.
d
w
g
FIG 6-6 UPPER SURFICIAL AQUIFER
1200
GRAPHIC SCALE
(IN FEET)
0 600300600
www.synterracorp.com
148 River Street, Suite 220
Greenville, South Carolina 29601
864-421-9999
L.V. SUTTON ENERGY COMPLEX
801 SUTTON STEAM PLANT RD
WILMINGTON, NORTH CAROLINA
SOURCES:
1.2014 AERIAL PHOTOGRAPH WAS OBTAINED FROM WSP
FLOWN ON APRIL 17, 2014
2.MAY 23, 2014 AERIAL PHOTOGRAPH WAS OBTAINED FROM
THE NRCS GEOSPATIAL DATA GATEWAY AT
http://datagateway.nrcs.usda.gov/
3.DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH
CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200
HORIZONTAL DATUM (NAD 83) AND VERTICAL DATUM
(NGVD88).
4.PARCEL DATA WAS OBTAINED FROM THE NORTH CAROLINA
STATE LIBRARIES AT http://www.lib.ncsu.edu/gis/counties.html
FOR NEW HANOVER COUNTY.
5.NEW WELL LOCATIONS SURVEYED BY McKIM & CREED.
HORIZONTAL DATUM IS NAD83 AND THE VERTICAL DATUM IS
NGVD88.
6.WELL LOCATIONS AND MEASURING POINTS WERE BASED ON
A SURVEY BY JAMES L. HAINES & ASSOCIATES FOR ISH, INC.
DATED DECEMBER 23, 2008. ISH DRAWING IS TITLED
"POTENTIAL LOCATIONS FOR PROPOSED GEOPROBE AND
WELL INSTALLATIONS", DATED FEBRUARY 25, 2009 WITH A
CAD FILE NAME Figure 22.dwg
7. WELL LOCATIONS AND MEASURING POINTS WERE BASED ON
A TABLE BY PARAMOUNTE ENGINEERING, WILMINGTON NC
DATED 2012-03-05 SUPPLIED BY PROGRESS ENERGY.
HORIZONTAL DATUM IS NAD83(NSRS2007) AND THE
VERTICAL DATUM IS NGVD29.
8.THE PROPERTY BOUNDARY FOR THE L.V. SUTTON STEAM
ELECTRIC PLANT WAS BASED ON A COMPOSITE MAP
PREPARED BY DAVIS-MARTIN-POWELL & ASSOC., INC. THE
DRAWINGS ARE DATED JUNE, 1995 WITH REVISION NOTE FOR
MARCH 4, 2004. FILE NAME IS L-D-9022-7.DWG. HORIZONTAL
DATUM IS NAD83 AND THE VERTICAL DATUM IS NGV 29.
9.THE LOCATION OF THE FORMER ASH DISPOSAL AREAS WAS
BASED ON A FIGURE 2-2 PREPARED BY BLASLAND, BOUCK &
LEE, INC. THE FIGURE IS TITLED "HORIZONTAL EXTENT OF
THE ASH WITHIN THE FORMER DISPOSAL AREA".
10.MONITORING WELLS/PIEZOMETERS/SOIL BORINGS
COMPLETED AS PART OF PREVIOUS ASSESSMENT
ACTIVITIES. LOCATIONS ARE APPROXIMATE.
LEGEND
AMW-15S
71.18
BACKGROUND COMPLIANCE WELL
WATER LEVEL IN FEET (msl.)
BGMW-10
73.01
CMW-6R
69.12
DOWNGRADIENT COMPLIANCE WELL
WATER LVEL ELEVATION IN FEET (msl.)
ASSESSMENT WELL WELL
WATER LEVEL ELEVATION IN FEET (msl.)
DMW-1
66.84
MONITORING WELL
WATER LVEL ELEVATION IN FEET (msl.)
WATER LEVEL CONTOUR IN FEET (msl.)
INFERRED WATER LEVEL CONTOUR (msl.)
500 ft COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS
WASTE BOUNDARY
SMW-06C
SMW-06DSMW-06B
9.96
SMW-05CSMW-05B
10.28
SMW-01B
10.02 SMW-01C
SMW-02B
10.03
SMW-02C
SMW-03B
9.61
SMW-03C
SMW-04B
10.70
SMW-04C
PZ-INT GWPZ-3BGWPZ-3A
GWPZ-2A
GWPZ-2B
MW-23C
MW-23B
10.88
MW-22CMW-22B
10.43
GWPZ-4A
GWPZ-4BABMW-01S
ABMW-01D
ABMW-02D ABMW-02S
7.42
MW-14
9.20
MW-16
8.45
MW-16D
MW-15
7.27
MW-15D
MW-20DMW-20
3.73 AW-09B
8.61AW-09D
AW-09C
MW-7C MW-7B
9.13
MW-7A
9.08
MW-19MW-21C
MW-18
MW-28C
MW-28B
9.66
MW-28T
LA-PZ-5
MW-33C
MW-32C
MW-34B
MW-35B
MW-35C
MW-34C
MW-36C
MW-36B
MW-27B
9.99
PZ-10S
10.72
PZ-10D
LA-PZ-1
AW-08B
9.70
MW-11
PZ-6S
10.30
MW-9
LA-PZ-2
LA-PZ-4
LA-PZ-3
MW-24C
MW-24B
11.03
MW-12
AW-02CAW-02B
10.85
AW-02D
AW-03B
11.02AW-03C
AW-01C
AW-01B
10.67
MW-8
MW-5A
9.36 MW-5B
9.36
MW-5C
MW-37C
MW-37B
8.03
AW-05D
AW-05B
10.18
AW-05E AW-05C
AW-04B
10.75
AW-04C
MW-4
11.28
MW-4A
11.31 MW-4B
MW-31B
11.03
MW-31C
AW-07D
4
5 6
PE-SW2
PE-SW6E
PE-SW6C
(ABANDONED)PE-SW6B
PE-SW6APE-SW5
PE-SW4
PE-SW3
CA
N
A
L
C
A
N
A
L
NC WILDLIFE
LAKE ACCESS
S
U
T
T
O
N
L
A
K
E
R
D
COOLING POND
N
C
H
I
G
H
W
A
Y
4
2
1
N
C
H
I
G
H
W
A
Y
4
2
1
R
A
I
L
R
O
A
D
R
A
I
L
R
O
A
D
SUTT
O
N
L
A
K
E
R
D
SUTTON STEAM
P
L
A
N
T
R
D
ROYMAC
D
R
F
R
E
D
R
I
C
K
S
O
N
R
D
METR
O
C
I
R
C
L
E
F
R
E
D
R
I
C
K
S
O
N
R
D
APPROXIMATE ROUTE OF THE
NEW WILLMINGTON BYPASS (I-140)
N
C
H
I
G
H
W
A
Y
4
2
1
R
A
I
L
R
O
A
D
R
A
I
L
R
O
A
D
NHC-SW1
(ABANDONED)
OLD ASH POND AREA
NEW ASH POND AREA - LINED
FORMER ASH
DISPOSAL AREA
CAPE FEAR RIVER
CA
P
E
F
E
A
R
R
I
V
E
R
WOOTEN PRODUCTION WELL (APPROXIMATE)
PE-SW2 DUKE ENERGY PROGRESS
PRODUCTION WELL (APPROXIMATE)
NHC-SW4 CFPUA PRODUCTION WELL (APPROXIMATE)
PARCEL LINE (APPROXIMATE)
6
EDR 3 EDR REPORTED WELL LOCATION (APPROXIMATE)
INVISTA 3
INVISTA 6
INVISTA 5
INVISTA 4
INVISTA 3
INVISTA 2
INVISTA 1
INVISTA PRODUCTION WELL (APPROXIMATE)
PRODUCTION WELLS
PREVIOUSLY REPORTED OR OBSERVED PRODUCTION WELLS SHOWN.
SOME WELLS MAY NO LONGER EXIST OR BE OPERATIONAL. ALL PRIVATE
WATER SUPPLY WELLS ARE NOT SHOWN ON THIS DRAWING.
S. T. WOOTEN CORPORATION
S. T. WOOTEN CORPORATION
MINE BOUNDARY
IN
T
E
R
S
T
A
T
E
1
4
0
(
U
S
H
I
G
H
W
A
Y
1
7
)
PE-SW6D
COOLING POND WATER LEVEL = 9.7 ft
PROVIDED BY DUKE ENERGY 06-01-2015
NPDES
OUTFALL SW-004
NPDES
OUTFALL SW-002
NPDES
OUTFALL SW-001
NHC-SW
(NOT IN USE)
NHC-SW4
NHC-SW3
SOLAR FARM
GWPZ-1B
10.20
GWPZ-1A
10.29
MW-27C
AW-08C
MW-10
PZ-6D
MW-23E
AW-06B
11.06
AW-06D AW-06E
1
1
.
0
1
1
.
0
1
0
.
5
10
.
5
10
.
0
10.5
10.0
9.5
9.5
9.5
9.0
9.0
9.5
6
.
0
10.0
9.
0
12.0
5
.
0
7
.
0
8
.
0
9.5
9.0
11
.
0
11.0
5.0
6.0
8.0
9.0
6.0
4.0
8.0NOTE:
WATER LEVEL CONTOURS IN THE FORMER
ASH DISPOSAL AREA MAY BE AFFECTED BY
DISCREPANCIES IN WELL ELEVATION
SURVEY DATA.
7.0
EDR 11
EDR 5
EDR 3
C
A
N
A
L
8/2/2015
8/2/2015P. WALDREP
J. CHASTAIN
PROJECT MANAGER:
LAYOUT NAME:
DRAWN BY:
CHECKED BY:
KATHY WEBB
DATE:
DATE:
FIGURE 6-7
POTENTIOMETRIC SURFACE
LOWER SURFICIAL AQUIFER
JUNE 1, 20158/
4
/
2
0
1
5
1
:
3
0
P
M
P:
\
D
u
k
e
E
n
e
r
g
y
P
r
o
g
r
e
s
s
.
1
0
2
6
\
1
0
8
.
S
u
t
t
o
n
A
s
h
B
a
s
i
n
G
W
A
s
s
e
s
s
m
e
n
t
P
l
a
n
\
1
.
1
1
C
S
A
R
e
p
o
r
t
i
n
g
\
F
I
G
U
R
E
S
\
D
E
S
U
T
T
O
N
W
A
T
E
R
L
E
V
E
L
B
A
S
E
M
A
P
2
0
1
5
-
0
8
-
0
2
.
d
w
g
FIG 6-7 LOWER SURFICIAL AQUIFER
1200
GRAPHIC SCALE
(IN FEET)
0 600300600
www.synterracorp.com
148 River Street, Suite 220
Greenville, South Carolina 29601
864-421-9999
L.V. SUTTON ENERGY COMPLEX
801 SUTTON STEAM PLANT RD
WILMINGTON, NORTH CAROLINA
LEGEND
AMW-15S
71.18
BACKGROUND COMPLIANCE WELL
WATER LEVEL IN FEET (msl.)
BGMW-10
73.01
CMW-6R
69.12
DOWNGRADIENT COMPLIANCE WELL
WATER LVEL ELEVATION IN FEET (msl.)
ASSESSMENT WELL WELL
WATER LEVEL ELEVATION IN FEET (msl.)
DMW-1
66.84
MONITORING WELL
WATER LVEL ELEVATION IN FEET (msl.)
WATER LEVEL CONTOUR IN FEET (msl.)
INFERRED WATER LEVEL CONTOUR (msl.)
500 ft COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS
WASTE BOUNDARY
SMW-06C
9.92
SMW-06DSMW-06B
SMW-05C
10.48SMW-05B
SMW-01B SMW-01C
10.10
SMW-02B
SMW-02C
10.01
SMW-03B
SMW-03C
9.63
SMW-04B
SMW-04C
10.69
PZ-INT GWPZ-3BGWPZ-3A
GWPZ-2A
GWPZ-2B
MW-23C
10.89
MW-23B
MW-22C
10.39MW-22B
GWPZ-4A
GWPZ-4BABMW-01S
11.16
ABMW-01D
ABMW-02D
7.39 ABMW-02S
MW-14
MW-16
MW-16D
8.39
MW-15
MW-15D
7.21
MW-20D
4.11
MW-20
AW-09BAW-09D
AW-09C
8.63
MW-7C
9.04
MW-7B
MW-7A
MW-19
9.78MW-21C
9.79
MW-18
MW-28C
9.66
MW-28BMW-28T
LA-PZ-5
MW-33C
10.02
MW-32C
10.32
MW-34B
MW-35B
MW-35C
MW-34C
MW-36C
MW-36B
MW-27B
PZ-10S
PZ-10D
LA-PZ-1
AW-08B
MW-11
11.86
PZ-6S
MW-9
10.74
LA-PZ-2
LA-PZ-4
LA-PZ-3
MW-24C
11.02
MW-24B
MW-12
10.96
AW-02C
10.87
AW-02B
AW-02D
AW-03B
AW-03C
10.97
AW-01C
10.70
AW-01B
MW-8
9.87
MW-5A MW-5B
MW-5C
9.32
MW-37C
8.62
MW-37B
AW-05D
AW-05B
AW-05E AW-05C
10.17
AW-04B
AW-04C
10.67
MW-4MW-4A
MW-4B
8.31
MW-31B
MW-31C
11.03
AW-07D
CA
N
A
L
C
A
N
A
L
NHC-SW4
NHC-SW3
NHC-SW
(NOT IN USE)
INVISTA 1
INVISTA 2
INVISTA 3
INVISTA 4
INVISTA 5
INVISTA 6
PE-SW2
PE-SW4
PE-SW3
PE-SW5 PE-SW6A
PE-SW6B
PE-SW6C
(ABANDONED)
PE-SW6E
10
.
5
10
9.5
9.0
9.0
9.5
10.
0
10.
5
11
.
0
10.5
10.
0
9.5
9.5
11.
0
4
5 6
8.5
NC WILDLIFE
LAKE ACCESS
S
U
T
T
O
N
L
A
K
E
R
D
COOLING POND
N
C
H
I
G
H
W
A
Y
4
2
1
N
C
H
I
G
H
W
A
Y
4
2
1
R
A
I
L
R
O
A
D
R
A
I
L
R
O
A
D
SUTT
O
N
L
A
K
E
R
D
SUTTON STEAM
P
L
A
N
T
R
D
ROYMAC
D
R
F
R
E
D
R
I
C
K
S
O
N
R
D
METR
O
C
I
R
C
L
E
F
R
E
D
R
I
C
K
S
O
N
R
D
APPROXIMATE ROUTE OF THE
NEW WILLMINGTON BYPASS (I-140)
N
C
H
I
G
H
W
A
Y
4
2
1
R
A
I
L
R
O
A
D
R
A
I
L
R
O
A
D
NHC-SW1
(ABANDONED)
OLD ASH POND AREA
NEW ASH POND AREA - LINED
FORMER ASH
DISPOSAL AREA
CAPE FEAR RIVER
CA
P
E
F
E
A
R
R
I
V
E
R
WOOTEN PRODUCTION WELL (APPROXIMATE)
PE-SW2 DUKE ENERGY PROGRESS
PRODUCTION WELL (APPROXIMATE)
NHC-SW4 CFPUA PRODUCTION WELL (APPROXIMATE)
PARCEL LINE (APPROXIMATE)
6
EDR 3 EDR REPORTED WELL LOCATION (APPROXIMATE)
INVISTA 3 INVISTA PRODUCTION WELL (APPROXIMATE)
S. T. WOOTEN CORPORATION
S. T. WOOTEN CORPORATION
MINE BOUNDARY
IN
T
E
R
S
T
A
T
E
1
4
0
(
U
S
H
I
G
H
W
A
Y
1
7
)
PE-SW6D
COOLING POND WATER LEVEL = 9.7 ft
PROVIDED BY DUKE ENERGY 06-01-2015
NPDES
OUTFALL SW-004
NPDES
OUTFALL SW-002
NPDES
OUTFALL SW-001
SOLAR FARM
GWPZ-1B
GWPZ-1A
MW-27C
9.97
AW-08C
9.77
MW-10
9.95
PZ-6D
MW-23E
AW-06B
AW-06D AW-06E
6.0
4.0
7.0
NOTE:
WATER LEVEL CONTOURS IN THE FORMER
ASH DISPOSAL AREA MAY BE AFFECTED BY
DISCREPANCIES IN SURVEY DATA.
8.0
5.0
SOURCES:
1.2014 AERIAL PHOTOGRAPH WAS OBTAINED FROM WSP
FLOWN ON APRIL 17, 2014
2.MAY 23, 2014 AERIAL PHOTOGRAPH WAS OBTAINED FROM
THE NRCS GEOSPATIAL DATA GATEWAY AT
http://datagateway.nrcs.usda.gov/
3.DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH
CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200
HORIZONTAL DATUM (NAD 83) AND VERTICAL DATUM
(NGVD88).
4.PARCEL DATA WAS OBTAINED FROM THE NORTH CAROLINA
STATE LIBRARIES AT http://www.lib.ncsu.edu/gis/counties.html
FOR NEW HANOVER COUNTY.
5.NEW WELL LOCATIONS SURVEYED BY McKIM & CREED.
HORIZONTAL DATUM IS NAD83 AND THE VERTICAL DATUM IS
NGVD88.
6.WELL LOCATIONS AND MEASURING POINTS WERE BASED ON
A SURVEY BY JAMES L. HAINES & ASSOCIATES FOR ISH, INC.
DATED DECEMBER 23, 2008. ISH DRAWING IS TITLED
"POTENTIAL LOCATIONS FOR PROPOSED GEOPROBE AND
WELL INSTALLATIONS", DATED FEBRUARY 25, 2009 WITH A
CAD FILE NAME Figure 22.dwg
7. WELL LOCATIONS AND MEASURING POINTS WERE BASED ON
A TABLE BY PARAMOUNTE ENGINEERING, WILMINGTON NC
DATED 2012-03-05 SUPPLIED BY PROGRESS ENERGY.
HORIZONTAL DATUM IS NAD83(NSRS2007) AND THE
VERTICAL DATUM IS NGVD29.
8.THE PROPERTY BOUNDARY FOR THE L.V. SUTTON STEAM
ELECTRIC PLANT WAS BASED ON A COMPOSITE MAP
PREPARED BY DAVIS-MARTIN-POWELL & ASSOC., INC. THE
DRAWINGS ARE DATED JUNE, 1995 WITH REVISION NOTE FOR
MARCH 4, 2004. FILE NAME IS L-D-9022-7.DWG. HORIZONTAL
DATUM IS NAD83 AND THE VERTICAL DATUM IS NGV 29.
9.THE LOCATION OF THE FORMER ASH DISPOSAL AREAS WAS
BASED ON A FIGURE 2-2 PREPARED BY BLASLAND, BOUCK &
LEE, INC. THE FIGURE IS TITLED "HORIZONTAL EXTENT OF
THE ASH WITHIN THE FORMER DISPOSAL AREA".
10.MONITORING WELLS/PIEZOMETERS/SOIL BORINGS
COMPLETED AS PART OF PREVIOUS ASSESSMENT
ACTIVITIES. LOCATIONS ARE APPROXIMATE.
EDR 11
EDR 5
EDR 3
C
A
N
A
L
8/2/2015
8/2/2015P. WALDREP
J. CHASTAIN
PROJECT MANAGER:
LAYOUT NAME:
DRAWN BY:
CHECKED BY:
KATHY WEBB
DATE:
DATE:
FIGURE 6-8
POTENTIOMETRIC SURFACE
PEE DEE AQUIFER
JUNE 1, 20158/
4
/
2
0
1
5
1
:
3
4
P
M
P:
\
D
u
k
e
E
n
e
r
g
y
P
r
o
g
r
e
s
s
.
1
0
2
6
\
1
0
8
.
S
u
t
t
o
n
A
s
h
B
a
s
i
n
G
W
A
s
s
e
s
s
m
e
n
t
P
l
a
n
\
1
.
1
1
C
S
A
R
e
p
o
r
t
i
n
g
\
F
I
G
U
R
E
S
\
D
E
S
U
T
T
O
N
W
A
T
E
R
L
E
V
E
L
B
A
S
E
M
A
P
2
0
1
5
-
0
8
-
0
2
.
d
w
g
FIG 6-8 PEE DEE AQUIFER
1200
GRAPHIC SCALE
(IN FEET)
0 600300600
www.synterracorp.com
148 River Street, Suite 220
Greenville, South Carolina 29601
864-421-9999
L.V. SUTTON ENERGY COMPLEX
801 SUTTON STEAM PLANT RD
WILMINGTON, NORTH CAROLINA
LEGEND
BACKGROUND COMPLIANCE WELL
WATER LEVEL IN FEET (msl.)
DOWNGRADIENT COMPLIANCE WELL
WATER LVEL ELEVATION IN FEET (msl.)
ASSESSMENT WELL WELL
WATER LEVEL ELEVATION IN FEET (msl.)
MONITORING WELL
WATER LVEL ELEVATION IN FEET (msl.)
WATER LEVEL CONTOUR IN FEET (msl.)
INFERRED WATER LEVEL CONTOUR (msl.)
500 ft COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS
WASTE BOUNDARY
SMW-06C
SMW-06D
10.17
SMW-06B
SMW-05CSMW-05B
SMW-01B SMW-01C
SMW-02B
SMW-02C
SMW-03B
SMW-03C
SMW-04B
SMW-04C
PZ-INT GWPZ-3BGWPZ-3A
GWPZ-2A
GWPZ-2B
MW-23C
MW-23B
MW-22CMW-22B
GWPZ-4B
GWPZ-4BABMW-01S
ABMW-01D
10.55
ABMW-02D ABMW-02S
MW-14
MW-16
MW-16D
MW-15 MW-15D
MW-20DMW-20 AW-09BAW-09D
8.55
AW-09C
MW-7C MW-7B
MW-7A
MW-19MW-21C
MW-18
MW-28C
MW-28B
MW-28T
9.66
LA-PZ-5
MW-33C
MW-32C
MW-34B
MW-35B
MW-35C
MW-34C
MW-36C
MW-36B
MW-27B
PZ-10S
PZ-10D
10.55
LA-PZ-1
AW-08B
MW-11
PZ-6S
MW-9
LA-PZ-2
LA-PZ-4
LA-PZ-3
MW-24C
MW-24B
MW-12
AW-02C
AW-02B
AW-02D
10.85
AW-03B
AW-03C
AW-01C
AW-01B
MW-8
MW-5A MW-5B
MW-5C
MW-37CMW-37B
AW-05D
10.20 AW-05B
AW-05E
10.09
AW-05C
AW-04B
AW-04C
MW-4MW-4A
MW-4B
MW-31B
MW-31C
AW-07D
11.02
4
5 6
PE-SW2
PE-SW6E
PE-SW6C
(ABANDONED)PE-SW6B
PE-SW6APE-SW5
PE-SW4
PE-SW3
CA
N
A
L
C
A
N
A
L
NC WILDLIFE
LAKE ACCESS
S
U
T
T
O
N
L
A
K
E
R
D
COOLING POND
N
C
H
I
G
H
W
A
Y
4
2
1
N
C
H
I
G
H
W
A
Y
4
2
1
R
A
I
L
R
O
A
D
R
A
I
L
R
O
A
D
SUTT
O
N
L
A
K
E
R
D
SUTTON STEAM
P
L
A
N
T
R
D
ROYMAC
D
R
F
R
E
D
R
I
C
K
S
O
N
R
D
METR
O
C
I
R
C
L
E
F
R
E
D
R
I
C
K
S
O
N
R
D
APPROXIMATE ROUTE OF THE
NEW WILLMINGTON BYPASS (I-140)
N
C
H
I
G
H
W
A
Y
4
2
1
R
A
I
L
R
O
A
D
R
A
I
L
R
O
A
D
NHC-SW1
(ABANDONED)
OLD ASH POND AREA
NEW ASH POND AREA - LINED
FORMER ASH
DISPOSAL AREA
CAPE FEAR RIVER
CA
P
E
F
E
A
R
R
I
V
E
R
WOOTEN PRODUCTION WELL (APPROXIMATE)
PE-SW2 DUKE ENERGY PROGRESS
PRODUCTION WELL (APPROXIMATE)
NHC-SW4 CFPUA PRODUCTION WELL (APPROXIMATE)
PARCEL LINE (APPROXIMATE)
6
EDR 3 EDR REPORTED WELL LOCATION (APPROXIMATE)
INVISTA 3
INVISTA 6
INVISTA 5
INVISTA 4
INVISTA 3
INVISTA 2
INVISTA 1
INVISTA PRODUCTION WELL (APPROXIMATE)
PRODUCTION WELLS
PREVIOUSLY REPORTED OR OBSERVED PRODUCTION WELLS SHOWN.
SOME WELLS MAY NO LONGER EXIST OR BE OPERATIONAL. ALL PRIVATE
WATER WELL SUPPLY WELLS ARE NOT SHOWN ON THIS DRAWING.
S. T. WOOTEN CORPORATION
S. T. WOOTEN CORPORATION
MINE BOUNDARY
IN
T
E
R
S
T
A
T
E
1
4
0
(
U
S
H
I
G
H
W
A
Y
1
7
)
PE-SW6D
COOLING POND WATER LEVEL = 9.7 ft
PROVIDED BY DUKE ENERGY 06-01-2015
NPDES
OUTFALL SW-004
NPDES
OUTFALL SW-002
NPDES
OUTFALL SW-001
NHC-SW
(NOT IN USE)
NHC-SW4
NHC-SW3
SOLAR FARM
MW-27C
AW-08C
MW-10
PZ-6D
10.62
MW-23E
10.41
SMW-06D
10.17
MW-4B
MW-23B
PZ-10D
10.55
AW-06B
AW-06D
10.99 AW-06E
10.82
1
0
.
5
1
1
.
0
10
.
5
10
.
5
10
.
0
9
.
0
9
.
5
10
.
0
10
.
0
GWPZ-1B
GWPZ-1A SOURCES:
1.2014 AERIAL PHOTOGRAPH WAS OBTAINED FROM WSP
FLOWN ON APRIL 17, 2014
2.MAY 23, 2014 AERIAL PHOTOGRAPH WAS OBTAINED FROM
THE NRCS GEOSPATIAL DATA GATEWAY AT
http://datagateway.nrcs.usda.gov/
3.DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH
CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200
HORIZONTAL DATUM (NAD 83) AND VERTICAL DATUM
(NGVD88).
4.PARCEL DATA WAS OBTAINED FROM THE NORTH CAROLINA
STATE LIBRARIES AT http://www.lib.ncsu.edu/gis/counties.html
FOR NEW HANOVER COUNTY.
5.NEW WELL LOCATIONS SURVEYED BY McKIM & CREED.
HORIZONTAL DATUM IS NAD83 AND THE VERTICAL DATUM IS
NGVD88.
6.WELL LOCATIONS AND MEASURING POINTS WERE BASED ON
A SURVEY BY JAMES L. HAINES & ASSOCIATES FOR ISH, INC.
DATED DECEMBER 23, 2008. ISH DRAWING IS TITLED
"POTENTIAL LOCATIONS FOR PROPOSED GEOPROBE AND
WELL INSTALLATIONS", DATED FEBRUARY 25, 2009 WITH A
CAD FILE NAME Figure 22.dwg
7. WELL LOCATIONS AND MEASURING POINTS WERE BASED ON
A TABLE BY PARAMOUNTE ENGINEERING, WILMINGTON NC
DATED 2012-03-05 SUPPLIED BY PROGRESS ENERGY.
HORIZONTAL DATUM IS NAD83(NSRS2007) AND THE
VERTICAL DATUM IS NGVD29.
8.THE PROPERTY BOUNDARY FOR THE L.V. SUTTON STEAM
ELECTRIC PLANT WAS BASED ON A COMPOSITE MAP
PREPARED BY DAVIS-MARTIN-POWELL & ASSOC., INC. THE
DRAWINGS ARE DATED JUNE, 1995 WITH REVISION NOTE FOR
MARCH 4, 2004. FILE NAME IS L-D-9022-7.DWG. HORIZONTAL
DATUM IS NAD83 AND THE VERTICAL DATUM IS NGV 29.
9.THE LOCATION OF THE FORMER ASH DISPOSAL AREAS WAS
BASED ON A FIGURE 2-2 PREPARED BY BLASLAND, BOUCK &
LEE, INC. THE FIGURE IS TITLED "HORIZONTAL EXTENT OF
THE ASH WITHIN THE FORMER DISPOSAL AREA".
10.MONITORING WELLS/PIEZOMETERS/SOIL BORINGS
COMPLETED AS PART OF PREVIOUS ASSESSMENT
ACTIVITIES. LOCATIONS ARE APPROXIMATE.
0
8
/
0
4
/
2
0
1
5
1
:
3
7
P
M
P
:
\
D
u
k
e
E
n
e
r
g
y
P
r
o
g
r
e
s
s
.
1
0
2
6
\
1
0
8
.
S
u
t
t
o
n
A
s
h
B
a
s
i
n
G
W
A
s
s
e
s
s
m
e
n
t
P
l
a
n
\
1
.
1
1
C
S
A
R
e
p
o
r
t
i
n
g
\
F
I
G
U
R
E
S
\
D
E
S
U
T
T
O
N
F
I
G
U
R
E
6
-
9
X
-
S
E
C
T
I
O
N
S
I
T
E
C
O
N
C
E
P
T
U
A
L
M
O
D
E
L
.
d
w
g
1
4
8
R
I
V
E
R
S
T
R
E
E
T
,
S
U
I
T
E
2
2
0
G
R
E
E
N
V
I
L
L
E
,
S
O
U
T
H
C
A
R
O
L
I
N
A
2
9
6
0
1
P
H
O
N
E
8
6
4
-
4
2
1
-
9
9
9
9
w
w
w
.
s
y
n
t
e
r
r
a
c
o
r
p
.
c
o
m
P
R
O
J
E
C
T
M
A
N
A
G
E
R
:
L
A
Y
O
U
T
:
D
R
A
W
N
B
Y
:
P
.
W
A
L
D
R
E
P
D
A
T
E
:
J
O
H
N
C
H
A
S
T
A
I
N
F
I
G
6
-
9
X
-
S
E
C
T
I
O
N
C
O
N
C
E
P
T
U
A
L
M
O
D
E
L
0
7
/
3
0
/
2
0
1
5
1
9
7
1
A
S
H
B
A
S
I
N
(
S
O
U
R
C
E
)
A
S
H
COOLI
N
G
P
O
N
D
L
A
K
E
S
U
T
T
O
N
R
D
S
A
N
D
H
I
L
L
S
W
I
T
H
P
O
S
S
I
B
L
E
R
E
C
H
A
R
G
E
Z
O
N
E
S
PROPERTY LINE
A
S
H
P
O
R
E
W
A
T
E
R
S
A
N
D
Q
U
A
R
R
Y
P
O
N
D
PEE DEE A
Q
U
I
F
E
R
CAPE FEAR RIVER MANMADE BERM FORTHE COOLING POND
L
E
G
E
N
D
I
N
F
E
R
R
E
D
O
R
M
E
A
S
U
R
E
D
A
P
P
R
O
X
I
M
A
T
E
W
A
T
E
R
T
A
B
L
E
N
O
T
E
:
D
A
S
H
E
D
G
R
O
U
N
D
W
A
T
E
R
F
L
O
W
D
I
R
E
C
T
I
O
N
A
R
R
O
W
S
I
N
D
I
C
A
T
E
I
N
F
E
R
R
E
D
F
R
O
M
T
O
P
O
G
R
A
P
H
Y
SEA WATER FRESH WATER
W
S
W
O
O
T
E
N
P
R
O
P
E
R
T
Y
D
U
K
E
E
N
E
R
G
Y
P
R
O
G
R
E
S
S
S
U
T
T
O
N
E
N
E
R
G
Y
C
O
M
P
L
E
X
P
R
O
D
U
C
T
I
O
N
W
E
L
L
S
P
E
E
D
E
E
A
Q
U
I
F
E
R
S
E
A
W
A
T
E
R
F
R
E
S
H
W
A
T
E
R
PEE DEE A
Q
U
I
F
E
R
P
E
E
D
E
E
A
Q
U
I
F
E
R
F
I
G
U
R
E
6
-
9
C
R
O
S
S
-
S
E
C
T
I
O
N
-
C
O
N
C
E
P
T
U
A
L
S
I
T
E
M
O
D
E
L
L
.
V
.
S
U
T
T
O
N
E
N
E
R
G
Y
C
O
M
P
L
E
X
W
I
L
M
I
N
G
T
O
N
,
N
O
R
T
H
C
A
R
O
L
I
N
A
N
O
T
T
O
S
C
A
L
E
A
R
E
A
O
F
C
O
N
C
E
N
T
R
A
T
I
O
N
S
I
N
G
R
O
U
N
D
W
A
T
E
R
A
B
O
V
E
N
C
2
L
S
T
A
N
D
A
R
D
Elevation
S
t
a
t
i
o
n
-110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 600+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+0016+0017+0018+0019+0020+0021+0022+0023+0024+0025+0026+00
27+00
28+00
29+00
30+00
31+00
32+00
33+00
34+00
35+00
36+00
37+00
38+00
39+00
40+00
41+00
42+00
43+00
44+00
45+00
46+00
47+00
48+00
49+00
50+00
51+00
52+00
53+00
54+00
55+00
56+00
57+00
58+00
59+00
60+00
61+00
62+00
63+00
64+00
65+00
66+00
67+00
68+00
69+00
70+00
71+00
72+00
73+00
74+00
75+00
76+00
77+00
78+00
79+00
80+00
3
.
7
x
1
0
-
2
3
.
0
x
1
0
-
2
N
T
N
T
NT
4
.
3
x
1
0
-
2
2
.
6
x
1
0
-
2
Elevation
-
1
1
0
-
1
0
0
-
9
0
-
8
0
-
7
0
-
6
0
-
5
0
-
4
0
-
3
0
-
2
0
-
1
0
0
1
0
2
0
3
0
4
0
5
0
6
0
80+0081+0082+0083+0084+0085+0086+0087+0088+0089+0090+0091+0092+0093+0094+0095+0096+0097+0098+0099+00100+00101+00
102+00
103+00
104+00
105+00
106+00
107+00
108+00
109+00
110+00
111+00
112+00
113+00
114+00
115+00
116+00
117+00
118+00
119+00
120+00
121+00
122+00
123+00
124+00
125+00
126+00
127+00
128+00
129+00
130+00
131+00
132+00
133+00
134+00
135+00
136+00
137+00
138+00
139+00
140+00
141+00
142+00
143+00
144+00
145+00
146+00
146+50
6.7 x 10-42.8 x 10-2
4
.
4
x
1
0
-
2
1.1 x 10-4
7
.
2
x
1
0
-
4
3
.
8
x
1
0
-
2
6
.
2
x
1
0
-
2
1
.
2
x
1
0
-
5
2
.
6
x
1
0
-
2
AW-08AW-08B: Sb<1 / As<1 / B<50 / Ba25 / Co2.53 / Fe4450 / Mn29 / Tl<0.2 / V0
.
3
3
5
AW-08C: Sb<1 / As<1 / B<50 / Ba94 / Co1.19 / Fe61 / Mn231 / Tl<0.2 / V<0
.
3
0-2': Sb<1.1 / As<1.1 / B<2.7 / Co<1.1 / Fe31.5 / Mn<0.27 / V<1.18'-10': Sb<1.2 / As<1.2 / B<3.1 / Co<1.2 / Fe85.3 / Mn0.41 / V<1.240'-42': Sb<1.1 / As<1.1 / B<2.8 / Co<1.1 / Fe392 / Mn1.5 / V1.1
M
W
-
2
7
B
:
S
b
<
1
/
A
s
<
1
/
B
1
9
5
/
C
o
1
.
6
5
/
F
e
<
1
0
/
M
n
5
5
/
T
l
<
0
.
2
/
V
<
0
.
3
ABMW-02ABMW-02S: Sb<1 / As53.4 / B234 / Ba1840 / Co<1 / Fe24100 / Mn7
8
4
/
T
l
<
0
.
2
/
V
1
.
2
8
ABMW-02D: Sb<1 / As170 / B600 / Ba65 / Co<1 / Fe1270 / Mn150 /
T
l
<
0
.
2
/
V
<
.
0
3
3'-5': Sb<4.7 / As51.4 / B21.9j / Co19.5 / Fe9860 / Mn79.5 / V7810'-12': Sb<2.8 / As<2.8 / B<14.1 / Co<2.8 / Fe211 / Mn<1.4 / V<2.8
A
W
-
0
9
A
W
-
0
9
B
:
S
b
<
1
/
A
s
<
1
/
B
<
5
0
/
B
a
1
6
/
C
o
<
1
/
F
e
2
2
5
/
M
n
1
8
/
T
l
<
0
.
2
/
V
<
0
.
3
A
W
-
0
9
C
:
S
b
<
1
/
A
s
<
1
/
B
5
5
4
/
B
a
1
0
4
/
C
o
1
.
1
3
/
F
e
1
0
2
/
M
n
2
8
9
/
T
l
<
0
.
2
/
V
<
0
.
3
A
W
-
0
9
D
:
B
a
8
2
'
-
4
'
:
S
b
<
1
/
A
s
<
1
/
B
<
2
.
6
/
C
o
<
1
.
3
/
F
e
1
1
.
9
/
M
n
0
.
5
4
/
V
<
1
1
4
'
-
1
6
'
:
S
b
<
1
.
3
/
A
s
<
1
.
3
/
B
<
3
.
2
/
C
o
<
1
.
1
/
F
e
1
9
4
/
M
n
0
.
7
2
/
V
<
1
.
3
4
3
'
-
4
5
'
:
S
b
<
1
.
3
/
A
s
<
1
.
3
/
B
<
3
.
2
/
C
o
<
1
.
3
/
F
e
2
5
3
/
M
n
3
.
1
/
V
<
1
.
3
M
W
-
3
7
M
W
-
3
7
B
:
S
b
<
1
/
A
s
3
.
0
8
/
B
<
5
0
/
C
o
2
.
5
2
/
F
e
9
5
8
0
/
M
n
2
5
4
/
T
l
<
0
.
2
/
V
<
0
.
3
M
W
-
3
7
C
:
S
b
<
1
/
A
s
<
1
/
B
<
5
0
/
C
o
<
1
/
F
e
3
3
/
M
n
6
/
T
l
<
0
.
2
/
V
1
.
2
2
0
-
2
'
:
S
b
<
1
.
1
/
A
s
<
1
.
1
/
B
<
2
.
7
/
C
o
<
1
.
1
/
F
e
5
7
.
9
/
M
n
0
.
7
2
/
V
<
1
.
1
4
'
-
6
'
:
S
b
<
1
.
1
/
A
s
<
1
.
1
/
B
<
2
.
8
/
C
o
<
1
.
1
/
F
e
8
7
5
/
M
n
3
.
9
/
V
<
1
.
1
4
3
'
-
4
5
'
:
S
b
<
1
.
2
/
A
s
1
.
2
/
B
4
.
5
/
C
o
<
1
.
2
/
F
e
1
3
0
0
/
M
n
6
.
3
/
V
7
.
6
w
w
w
.
s
y
n
t
e
r
r
a
c
o
r
p
.
c
o
m
1
4
8
R
i
v
e
r
S
t
r
e
e
t
,
S
u
i
t
e
2
2
0
G
r
e
e
n
v
i
l
l
e
,
S
o
u
t
h
C
a
r
o
l
i
n
a
2
9
6
0
1
8
6
4
-
4
2
1
-
9
9
9
9
5
/
2
2
/
2
0
1
5
5
/
2
2
/
2
0
1
5
P
.
W
A
L
D
R
E
P
C
.
N
E
W
E
L
L
P
R
O
J
E
C
T
M
A
N
A
G
E
R
:
L
A
Y
O
U
T
N
A
M
E
:
D
R
A
W
N
B
Y
:
C
H
E
C
K
E
D
B
Y
:
K
A
T
H
Y
W
E
B
B
D
A
T
E
:
D
A
T
E
:
F
I
G
U
R
E
8
-
1
G
E
O
L
O
G
I
C
C
R
O
S
S
S
E
C
T
I
O
N
A
-
A
'
C
O
I
A
N
A
L
Y
T
I
C
A
L
R
E
S
U
L
T
S
F
I
G
U
R
E
8
-
1
L
.
V
.
S
U
T
T
O
N
E
N
E
R
G
Y
C
O
M
P
L
E
X
8
0
1
S
U
T
T
O
N
S
T
E
A
M
P
L
A
N
T
R
D
W
I
L
M
I
N
G
T
O
N
,
N
O
R
T
H
C
A
R
O
L
I
N
A
B
O
R
I
N
G
S
Y
M
B
O
L
S
W
E
L
L
S
C
R
E
E
N
W
I
T
H
H
Y
D
R
A
U
L
I
C
C
O
N
D
U
C
T
I
V
I
T
Y
I
N
C
E
N
T
I
M
E
T
E
R
S
P
E
R
S
E
C
O
N
D
(
S
O
U
R
C
E
:
S
Y
N
T
E
R
R
A
)
3
0
0
0
3
0
0
6
0
0
G
R
A
P
H
I
C
S
C
A
L
E
I
N
F
E
E
T
3
0
0
3
0
6
0
I
N
F
E
E
T
H
O
R
I
Z
O
N
T
A
L
:
1
"
=
3
0
0
'
V
E
R
T
I
C
A
L
:
1
"
=
3
0
'
S
E
C
T
I
O
N
A
-
A
'
F
A
C
I
N
G
E
A
S
T
S
E
C
T
I
O
N
A
-
A
'
F
A
C
I
N
G
E
A
S
T
MATCH LINE
MATCH LINE (MSL)
(MSL)
CANAL
CANAL
MW-36C
GP-01
C
O
A
L
A
S
H
C
O
A
L
A
S
H
COALASHCOAL ASHSURFICIAL
S
U
R
F
I
C
I
A
L
S
U
R
F
I
C
I
A
L
SURFICIAL
P
E
E
D
E
E
P
E
E
D
E
E
U
N
D
I
S
T
U
R
B
E
D
S
O
I
L
S
A
M
P
L
E
W
I
T
H
V
E
R
T
I
C
A
L
H
Y
D
R
A
U
L
I
C
C
O
N
D
U
C
T
I
V
I
T
Y
(
S
O
U
R
C
E
:
B
L
E
)
MW-5C: Sb<1 / As<1 / B<50 / Co1.62 / Fe<10 / Mn441 / Tl<0.2 / VNAP:\DUKE ENERGY PROGRESS.1026\108. SUTTON ASH BASIN GW ASSESSMENT PLAN\1.11 CSA REPORTING\FIGURES\SUTTON-CSA-FIGURES.DWG08/02/2015 1:49 PM
S
O
U
R
C
E
S
:
1
.
D
R
A
W
I
N
G
H
A
S
B
E
E
N
S
E
T
W
I
T
H
A
P
R
O
J
E
C
T
I
O
N
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
S
T
A
T
E
P
L
A
N
E
C
O
O
R
D
I
N
A
T
E
S
Y
S
T
E
M
F
I
P
S
3
2
0
0
(
N
A
D
8
3
)
.
2
.
2
f
t
C
O
N
T
O
U
R
I
N
T
E
R
V
A
L
S
F
R
O
M
N
C
D
O
T
L
I
D
A
R
D
A
T
E
D
2
0
0
7
h
t
t
p
s
:
/
/
c
o
n
n
e
c
t
.
n
c
d
o
t
.
g
o
v
/
r
e
s
o
u
r
c
e
s
/
g
i
s
/
p
a
g
e
s
/
c
o
n
t
-
e
l
e
v
_
v
2
.
a
s
p
x
3
.
S
E
L
E
C
T
T
O
P
O
G
R
A
P
H
I
C
A
D
J
U
S
T
M
E
N
T
S
B
A
S
E
D
O
N
S
I
T
E
S
U
R
V
E
Y
A
N
D
C
O
M
P
A
R
I
S
O
N
T
O
A
E
R
I
A
L
P
H
O
T
O
G
R
A
P
H
.
N
O
T
E
:
1
.
C
O
N
T
O
U
R
L
I
N
E
S
A
R
E
U
S
E
D
F
O
R
R
E
P
R
E
S
E
N
T
A
T
I
V
E
P
U
R
P
O
S
E
S
O
N
L
Y
A
N
D
A
R
E
N
O
T
T
O
B
E
U
S
E
D
F
O
R
D
E
S
I
G
N
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
U
R
P
O
S
E
S
.
2
.
C
R
O
S
S
S
E
C
T
I
O
N
L
O
C
A
T
I
O
N
S
A
R
E
S
H
O
W
N
O
N
F
I
G
U
R
E
1
-
2
.
A
S
H
B
A
S
I
N
C
O
A
L
A
S
H
C
L
A
Y
L
I
N
E
R
(
1
2
"
)
R
O
A
D
W
A
T
E
R
L
E
V
E
L
(
J
U
N
E
2
0
1
5
)
L
E
G
E
N
D
S
U
R
F
I
C
I
A
L
S
A
N
D
(
W
E
L
L
S
O
R
T
E
D
-
S
I
L
T
Y
S
A
N
D
-
M
E
D
I
U
M
T
O
F
I
N
E
G
R
A
I
N
E
D
S
A
N
D
)
S
U
R
F
I
C
I
A
L
S
A
N
D
(
P
O
O
R
L
Y
S
O
R
T
E
D
-
M
E
D
I
U
M
T
O
C
O
A
R
S
E
G
R
A
I
N
E
D
S
A
N
D
)
C
O
A
L
A
S
H
C
O
A
R
S
E
S
A
N
D
W
I
T
H
F
I
N
E
G
R
A
V
E
L
S
A
N
D
(
P
E
E
D
E
E
)
C
L
A
Y
R
I
C
H
F
A
C
I
E
S
N
O
T
T
E
S
T
E
D
N
T
F
I
L
L
M
A
T
E
R
I
A
L
S
C
A
L
E
:
A
S
S
H
O
W
N
S
O
I
L
S
A
M
P
L
E
(
G
R
A
B
)
K
V
a
l
u
e
A
W
-
0
1
A
W
-
0
1
B
:
G
R
O
U
N
D
W
A
T
E
R
A
N
A
L
Y
T
I
C
A
L
R
E
S
U
L
T
S
F
O
R
S
U
R
F
I
C
I
A
L
A
Q
U
I
F
E
R
I
N
M
I
C
R
O
G
R
A
M
S
P
E
R
L
I
T
E
R
A
W
-
0
1
C
:
G
R
O
U
N
D
W
A
T
E
R
A
N
A
L
Y
T
I
C
A
L
R
E
S
U
L
T
S
F
O
R
P
E
E
D
E
E
I
N
M
I
C
R
O
G
R
A
M
S
P
E
R
L
I
T
E
R
0
-
2
'
:
S
O
I
L
T
O
T
A
L
A
N
A
L
Y
T
I
C
A
L
R
E
S
U
L
T
S
I
N
m
g
/
k
g
4
.
4
x
1
0
-
4
A
B
M
W
-
0
1
A
B
M
W
-
0
1
S
:
S
b
<
1
/
A
s
6
3
4
/
B
3
9
4
0
/
B
a
5
8
5
/
C
o
<
1
/
F
e
1
5
2
/
M
n
8
8
/
T
l
<
0
.
2
/
V
3
.
4
5
A
B
M
W
-
0
1
D
:
S
b
<
1
/
A
s
1
.
0
3
/
B
1
6
7
/
B
a
1
6
/
C
o
<
1
/
F
e
4
7
5
/
M
n
8
2
/
T
l
<
0
.
2
/
V
0
.
6
4
2
3
'
-
5
'
:
S
b
<
3
.
4
/
A
s
2
2
.
1
/
B
8
.
7
j
/
C
o
6
.
7
/
F
e
9
5
9
0
/
M
n
3
5
.
2
/
V
3
4
.
4
7
8
'
-
8
0
'
:
S
b
<
2
.
8
/
A
s
1
6
.
8
/
N
7
.
2
j
/
C
o
2
.
5
j
/
F
e
5
1
1
0
/
M
n
2
4
.
2
/
V
1
5
.
7
8
2
'
-
8
4
'
:
S
b
<
3
.
4
/
A
s
3
.
3
j
/
B
1
2
.
6
j
/
C
o
<
3
.
4
/
F
e
6
5
0
0
/
M
n
2
8
.
9
/
V
7
.
9
9
6
'
-
9
8
'
:
S
b
<
3
.
3
/
A
s
2
.
1
j
/
B
1
2
.
5
j
/
C
o
3
.
3
/
F
e
6
0
5
0
/
M
n
3
9
.
3
/
V
8
.
8
Elevation
Elevation
S
t
a
t
i
o
n
-100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60
-
1
0
0
-
9
0
-
8
0
-
7
0
-
6
0
-
5
0
-
4
0
-
3
0
-
2
0
-
1
0
0
1
0
2
0
3
0
4
0
5
0
6
0
0+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+00
16+00
17+00
18+00
19+00
20+00
21+00
22+00
23+00
24+00
25+00
26+00
27+00
28+00
29+00
30+00
31+00
32+00
33+00
34+00
35+00
36+00
37+00
38+00
39+00
40+00
41+00
42+00
43+00
44+00
45+00
46+00
47+00
48+00
49+00
50+00
51+00
52+00
53+00
54+00
54+50
N
T
N
T
1
.
7
x
1
0
-
5
1
.
5
x
1
0
-
7
8
.
2
x
1
0
-
3
6
.
7
x
1
0
-
4
4
.
2
x
1
0
-
2
4
.
7
x
1
0
-
2
Elevation
Elevation
S
t
a
t
i
o
n
-140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60
-
1
4
0
-
1
3
0
-
1
2
0
-
1
1
0
-
1
0
0
-
9
0
-
8
0
-
7
0
-
6
0
-
5
0
-
4
0
-
3
0
-
2
0
-
1
0
0
1
0
2
0
3
0
4
0
5
0
6
0
0+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+00
16+00
17+00
18+00
19+00
20+00
21+00
22+00
23+00
24+00
25+00
26+00
27+00
28+00
29+00
30+00
31+00
32+00
33+00
34+00
35+00
36+00
37+00
38+00
39+00
40+00
41+00
42+00
43+00
44+00
45+00
46+00
47+00
48+00
49+00
50+00
51+00
52+00
53+00
53+50
3
.
7
x
1
0
-
5
9
.
0
x
1
0
-
5
1
.
9
x
1
0
-
7
5
.
7
x
1
0
-
2
3
.
6
x
1
0
-
2
N
T
N
T
4
.
7
x
1
0
-
2
4
.
5
x
1
0
-
2
5
/
2
2
/
2
0
1
5
5
/
2
2
/
2
0
1
5
P
.
W
A
L
D
R
E
P
C
.
N
E
W
E
L
L
P
R
O
J
E
C
T
M
A
N
A
G
E
R
:
L
A
Y
O
U
T
N
A
M
E
:
D
R
A
W
N
B
Y
:
C
H
E
C
K
E
D
B
Y
:
K
A
T
H
Y
W
E
B
B
D
A
T
E
:
D
A
T
E
:
F
I
G
U
R
E
8
-
2
w
w
w
.
s
y
n
t
e
r
r
a
c
o
r
p
.
c
o
m
1
4
8
R
i
v
e
r
S
t
r
e
e
t
,
S
u
i
t
e
2
2
0
G
r
e
e
n
v
i
l
l
e
,
S
o
u
t
h
C
a
r
o
l
i
n
a
2
9
6
0
1
8
6
4
-
4
2
1
-
9
9
9
9
L
.
V
.
S
U
T
T
O
N
E
N
E
R
G
Y
C
O
M
P
L
E
X
8
0
1
S
U
T
T
O
N
S
T
E
A
M
P
L
A
N
T
R
D
W
I
L
M
I
N
G
T
O
N
,
N
O
R
T
H
C
A
R
O
L
I
N
A
3
0
0
0
3
0
0
6
0
0
G
R
A
P
H
I
C
S
C
A
L
E
I
N
F
E
E
T
3
0
0
3
0
6
0
I
N
F
E
E
T
H
O
R
I
Z
O
N
T
A
L
:
1
"
=
3
0
0
'
V
E
R
T
I
C
A
L
:
1
"
=
3
0
'
S
E
C
T
I
O
N
C
-
C
'
F
A
C
I
N
G
N
O
R
T
H
(MSL)
(MSL)
PZ-INT
S
E
C
T
I
O
N
B
-
B
'
F
A
C
I
N
G
N
O
R
T
H
(MSL)
(MSL)COOLING POND GP-03
P
E
E
D
E
E
COAL ASH
S
U
R
F
I
C
I
A
L
COAL ASH
S
U
R
F
I
C
I
A
L
S
U
R
F
I
C
I
A
L
P
E
E
D
E
E
M
W
-
2
3
B
:
S
b
<
1
/
A
s
<
1
/
B
1
4
4
/
B
a
3
8
/
C
o
<
1
/
F
e
2
0
/
M
n
9
/
T
l
<
0
.
2
/
V
<
0
.
3
M
W
-
2
3
C
:
S
b
<
1
/
A
s
<
1
/
B
2
0
5
0
/
B
a
3
5
/
C
o
5
.
1
9
/
F
e
8
8
/
M
n
3
0
9
/
T
l
0
.
2
1
/
V
0
.
3
2
3
M
W
-
2
3
E
:
S
b
<
1
/
A
s
<
1
/
B
2
5
0
0
/
B
a
<
5
/
C
o
<
1
/
F
e
4
8
/
M
n
5
/
T
l
<
0
.
2
/
V
0
.
9
9
3
ABMW-01ABMW-01S: Sb<1 / As634 / B3940 / Ba585 / Co<1 /
F
e
1
5
2
/
M
n
8
8
/
T
l
<
0
.
2
/
V
3
.
4
5
ABMW-01D: Sb<1 / As1.03 / B167 / Ba16 / Co<1 / F
e
4
7
5
/
M
n
8
2
/
T
l
<
0
.
2
/
V
0
.
6
4
2
3'-5': Sb<3.4 / As22.1 / B8.7j / Co6.7 / Fe9590 / Mn3
5
.
2
/
V
3
4
.
4
78'-80': Sb<2.8 / As16.8 / N7.2j / Co2.5j / Fe5110 / M
n
2
4
.
2
/
V
1
5
.
7
82'-84': Sb<3.4 / As3.3j / B12.6j / Co<3.4 / Fe6500 /
M
n
2
8
.
9
/
V
7
.
9
96'-98': Sb<3.3 / As2.1j / B12.5j / Co3.3 / Fe6050 / M
n
3
9
.
3
/
V
8
.
8
A
W
-
0
4
A
W
-
0
4
B
:
S
b
<
1
/
A
s
<
1
/
B
<
5
0
/
B
a
1
1
/
C
o
<
1
/
F
e
4
1
/
M
n
2
2
/
T
l
<
0
.
2
/
V
<
0
.
3
A
W
-
0
4
C
:
S
b
<
1
/
A
s
<
1
/
B
1
4
5
0
/
B
a
3
9
/
C
o
<
1
/
F
e
3
9
9
0
/
M
n
7
8
7
/
T
l
<
0
.
2
/
V
0
.
5
1
8
0
-
2
'
:
S
b
<
1
/
A
s
<
1
/
B
<
2
.
6
/
C
o
<
1
/
F
e
8
1
5
/
M
n
1
.
4
/
V
2
.
2
9
'
-
1
0
'
:
S
b
<
1
.
1
/
A
s
<
1
.
1
/
B
2
<
2
.
8
/
C
o
<
1
.
1
/
F
e
2
9
7
/
M
n
1
/
V
<
1
.
1
4
7
'
-
4
8
'
:
S
b
<
1
.
1
/
A
s
<
1
.
1
/
B
<
2
.
8
/
C
o
<
1
.
1
/
F
e
1
9
5
0
/
M
n
1
9
.
5
/
V
<
1
.
1
A
W
-
0
7
A
W
-
0
7
D
:
S
b
<
1
/
A
s
<
1
/
B
8
1
5
/
B
a
<
5
/
C
o
<
1
/
F
e
2
2
0
/
M
n
1
4
/
T
l
<
0
.
2
/
V
0
.
9
9
2
M
W
-
3
1
C
:
S
b
<
1
/
A
s
<
1
/
B
1
1
8
0
/
B
a
5
7
/
C
o
1
.
1
/
F
e
2
6
9
0
/
M
n
1
7
4
0
/
T
l
<
0
.
2
/
V
<
0
.
3
0
-
2
'
:
S
b
<
1
.
1
/
A
s
<
1
.
1
/
B
<
2
.
7
/
C
o
<
1
.
1
/
F
e
1
3
3
0
/
M
n
1
.
4
/
V
2
.
9
8
'
-
1
0
'
:
S
b
<
1
.
1
/
A
s
<
1
.
1
/
B
<
2
.
9
/
C
o
<
1
.
1
/
F
e
7
8
2
/
M
n
7
.
3
/
V
<
1
.
1
1
5
'
-
1
7
'
:
S
b
<
1
.
2
/
A
s
<
1
.
2
/
B
<
2
.
9
/
C
o
<
1
.
2
/
F
e
1
0
1
/
M
n
0
.
5
6
/
V
<
1
.
2
4
6
'
-
4
7
'
:
S
b
<
1
.
1
/
A
s
4
.
5
/
B
2
0
.
8
/
C
o
<
1
.
1
/
F
e
1
8
0
0
0
/
M
n
2
0
4
/
V
9
S
M
W
-
0
1
S
M
W
-
0
1
B
:
S
b
<
1
/
A
s
<
1
/
B
1
0
0
/
B
a
7
4
/
C
o
<
1
/
F
e
3
0
/
M
n
1
4
/
T
l
<
0
.
2
/
V
<
0
.
3
S
M
W
-
0
1
C
:
S
b
<
1
/
A
s
<
1
/
B
7
7
6
/
B
a
3
5
/
C
o
<
1
/
F
e
4
2
5
0
/
M
n
8
0
7
/
T
l
<
0
.
2
/
V
0
.
4
0
2
0
-
2
'
:
S
b
<
6
.
9
/
A
s
<
6
.
9
/
B
<
1
7
.
2
/
C
o
<
6
.
9
/
F
e
6
0
9
/
M
n
2
.
1
/
V
<
6
.
9
8
'
-
1
0
'
:
S
b
<
6
.
1
/
A
s
<
6
.
1
/
B
<
1
5
.
3
/
C
o
<
6
.
1
/
F
e
8
2
.
3
/
M
n
<
1
.
5
/
V
<
6
.
1
4
2
'
-
4
4
'
:
S
b
<
6
.
2
/
A
s
<
6
.
2
/
B
<
1
5
.
4
/
C
o
<
6
.
2
/
F
e
1
8
7
0
/
M
n
7
.
5
/
V
<
6
.
2
S
M
W
-
0
5
S
M
W
-
0
5
B
:
S
b
<
1
/
A
s
1
.
4
7
/
B
<
5
0
/
B
a
3
6
/
C
o
<
1
/
F
e
9
9
1
0
/
M
n
1
3
9
/
T
l
<
0
.
2
/
V
0
.
8
1
S
M
W
-
0
5
C
:
S
b
<
1
/
A
s
<
1
/
B
3
6
2
/
B
a
7
6
/
C
o
2
.
6
/
F
e
1
7
5
/
M
n
1
3
0
/
T
l
<
0
.
2
/
V
<
0
.
3
0
-
2
'
:
S
b
<
7
.
2
/
A
s
<
7
.
2
/
B
<
1
7
.
9
/
C
o
<
7
.
2
/
F
e
4
3
.
8
/
M
n
<
1
.
8
/
V
<
7
.
2
6
'
-
8
'
:
S
b
<
6
.
1
/
A
s
<
6
.
1
/
B
<
1
5
.
3
/
C
o
<
6
.
1
/
F
e
5
4
.
6
/
M
n
<
1
.
5
/
V
<
6
.
1
4
1
'
-
4
3
'
:
S
b
<
5
.
8
/
A
s
<
5
.
8
/
B
<
1
4
.
6
/
C
o
<
5
.
8
/
F
e
1
2
4
/
M
n
4
.
3
/
V
<
5
.
8
MW-24B: Sb<
1
/
A
s
<
1
/
B
4
0
9
/
C
o
<
1
/
F
e
<
1
0
/
M
n
3
5
/
T
l
<
0
.
2
/
V
0
.
5
5
5
MW-24C: Sb<
1
/
A
s
3
.
4
2
/
B
1
0
4
0
/
C
o
1
8
.
6
/
F
e
4
1
8
0
/
M
n
1
1
2
0
/
T
l
<
0
.
2
/
V
0
.
5
4
3
P:\DUKE ENERGY PROGRESS.1026\108. SUTTON ASH BASIN GW ASSESSMENT PLAN\1.11 CSA REPORTING\FIGURES\SUTTON-CSA-FIGURES.DWG08/02/2015 1:50 PM
S
O
U
R
C
E
S
:
1
.
D
R
A
W
I
N
G
H
A
S
B
E
E
N
S
E
T
W
I
T
H
A
P
R
O
J
E
C
T
I
O
N
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
S
T
A
T
E
P
L
A
N
E
C
O
O
R
D
I
N
A
T
E
S
Y
S
T
E
M
F
I
P
S
3
2
0
0
(
N
A
D
8
3
)
.
2
.
2
f
t
C
O
N
T
O
U
R
I
N
T
E
R
V
A
L
S
F
R
O
M
N
C
D
O
T
L
I
D
A
R
D
A
T
E
D
2
0
0
7
h
t
t
p
s
:
/
/
c
o
n
n
e
c
t
.
n
c
d
o
t
.
g
o
v
/
r
e
s
o
u
r
c
e
s
/
g
i
s
/
p
a
g
e
s
/
c
o
n
t
-
e
l
e
v
_
v
2
.
a
s
p
x
3
.
S
E
L
E
C
T
T
O
P
O
G
R
A
P
H
I
C
A
D
J
U
S
T
M
E
N
T
S
B
A
S
E
D
O
N
S
I
T
E
S
U
R
V
E
Y
A
N
D
C
O
M
P
A
R
I
S
O
N
T
O
A
E
R
I
A
L
P
H
O
T
O
G
R
A
P
H
.
N
O
T
E
:
1
.
C
O
N
T
O
U
R
L
I
N
E
S
A
R
E
U
S
E
D
F
O
R
R
E
P
R
E
S
E
N
T
A
T
I
V
E
P
U
R
P
O
S
E
S
O
N
L
Y
A
N
D
A
R
E
N
O
T
T
O
B
E
U
S
E
D
F
O
R
D
E
S
I
G
N
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
U
R
P
O
S
E
S
.
2
.
C
R
O
S
S
S
E
C
T
I
O
N
L
O
C
A
T
I
O
N
S
A
R
E
S
H
O
W
N
O
N
F
I
G
U
R
E
1
-
2
.
W
A
T
E
R
L
E
V
E
L
(
J
U
N
E
2
0
1
5
)
F
I
G
U
R
E
8
-
2
G
E
O
L
O
G
I
C
C
R
O
S
S
S
E
C
T
I
O
N
S
B
-
B
'
A
N
D
C
-
C
'
C
O
I
A
N
A
L
Y
T
I
C
A
L
R
E
S
U
L
T
S
L
E
G
E
N
D
S
U
R
F
I
C
I
A
L
S
A
N
D
(
W
E
L
L
S
O
R
T
E
D
-
S
I
L
T
Y
S
A
N
D
-
M
E
D
I
U
M
T
O
F
I
N
E
G
R
A
I
N
E
D
S
A
N
D
)
S
U
R
F
I
C
I
A
L
S
A
N
D
(
P
O
O
R
L
Y
S
O
R
T
E
D
-
M
E
D
I
U
M
T
O
C
O
A
R
S
E
G
R
A
I
N
E
D
S
A
N
D
)
C
O
A
L
A
S
H
C
O
A
R
S
E
S
A
N
D
W
I
T
H
F
I
N
E
G
R
A
V
E
L
S
A
N
D
(
P
E
E
D
E
E
)
C
L
A
Y
R
I
C
H
F
A
C
I
E
S
N
O
T
T
E
S
T
E
D
N
T
CLAY LINER (12")
F
I
L
L
M
A
T
E
R
I
A
L
S
C
A
L
E
:
A
S
S
H
O
W
N
B
O
R
I
N
G
S
Y
M
B
O
L
S
W
E
L
L
S
C
R
E
E
N
W
I
T
H
H
Y
D
R
A
U
L
I
C
C
O
N
D
U
C
T
I
V
I
T
Y
I
N
C
E
N
T
I
M
E
T
E
R
S
P
E
R
S
E
C
O
N
D
(
S
O
U
R
C
E
:
S
Y
N
T
E
R
R
A
)
U
N
D
I
S
T
U
R
B
E
D
S
O
I
L
S
A
M
P
L
E
W
I
T
H
V
E
R
T
I
C
A
L
H
Y
D
R
A
U
L
I
C
C
O
N
D
U
C
T
I
V
I
T
Y
(
S
O
U
R
C
E
:
B
L
E
)
S
O
I
L
S
A
M
P
L
E
(
G
R
A
B
)
K
V
a
l
u
e
A
W
-
0
1
A
W
-
0
1
B
:
G
R
O
U
N
D
W
A
T
E
R
A
N
A
L
Y
T
I
C
A
L
R
E
S
U
L
T
S
F
O
R
S
U
R
F
I
C
I
A
L
A
Q
U
I
F
E
R
I
N
M
I
C
R
O
G
R
A
M
S
P
E
R
L
I
T
E
R
A
W
-
0
1
C
:
G
R
O
U
N
D
W
A
T
E
R
A
N
A
L
Y
T
I
C
A
L
R
E
S
U
L
T
S
F
O
R
P
E
E
D
E
E
I
N
M
I
C
R
O
G
R
A
M
S
P
E
R
L
I
T
E
R
0
-
2
'
:
S
O
I
L
T
O
T
A
L
A
N
A
L
Y
T
I
C
A
L
R
E
S
U
L
T
S
I
N
m
g
/
k
g
4
.
4
x
1
0
-
4
C A P E F E A R R I V E R
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
C O O L
I
N
G
P O N
D
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 8-3-Site M ap with Soil Exceedances_v08012015.mxd
PROJECT MANAGER: J MAHAN
DRAWN BY: T KING
DATE: 08/01/2015
DATE: 08/01/2015
CHECKED BY: J. MEADOWS
FIGURE 8-3SITE MAP W IT H SOIL EXCEEDANCESL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
LEGEND
NOTES:1 APRIL 17, 2014 AERIAL ORTHOPHOTOGRAPHY OBTAINED FROM WSP
2 2013 AERIAL ORTHOPHOTOGRAPHY OBTAINED FROM NC CENTER FOR GEOGRAPHIC INFORMATION AND ANALYSIS, AT (http://services.nconemap.gov/)
3 PARCEL BOUNDARY WAS OBTAINED FROM THE NC CENTER FOR GEOGRAPHIC INFORMATION AND ANALYSIS, AT (http://services.nconemap.gov/) 4 DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83).
5 j = INDICATES CONCENTRATION REPORTED BELOW PQL, BUT ABOVE MDL AND THEREFORE CONCENTRATION IS ESTIMATED
MONITORI NG WEL L
SOI L BORING
ASH BASIN BOUNDARY
ASH BASIN CO MPLIANCE BO UNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
Ana lytica l Parameter Reporting Units 01-Industrial Health EPA RSL 2015-06
02-Residential Health EPA RSL 2015-06
03-Protection of Groundwa ter EPA RSL 2015-06
Aluminum mg/kg 110000 7700
Arsenic mg/kg 3 0.68 0.29
Ba rium mg/kg 22000 1500 82
Beryllium mg/kg 230 16 3.2
Coba lt mg/kg 35 2.3
Copper mg/kg 4700 310 46
Iron mg/kg 82000 5500
Lead mg/kg 800 400 14
Manganese mg/kg 2600 180
Mercury mg/kg 4 0.94 0.1
Selenium mg/kg 580 39 0.26
Va na dium mg/kg 580 39
DEPTH(82-84)(96-98)
Arsenic3.3 j2.1 j
Iron65006050
AB-01
DEPTH(53-55)Arsenic2 j Iron5640
AB-02
DEPTH(108-110)Arsenic2.2 Iron11000
AW-06D
DEPTH(46-47)Arsenic4.5 Iron18000 Manganese204
AW-07D
DEPTH(101-103)Iron9000
SMW-06D
Se rvice L ayer Cre dits: NC One Ma p, NCCenter for Geo graphic Info rma tio n a ndAnalysis, NC 911 Board
PRJ-I-140 SR-1347
S R -1 3 8 5
SR-1430
RMP-5815
U
S-421
SR-1394
SR-2836
R M P -5 8 2 1
S R -2 8 3 8
S
R-2
1
6
9
U
S-17
S R -2 7 7 9
S R -2 1 4 5
P R J -I -1 4 0
SR-2000
I -1 4 0
I -1 4 0
R M P -5 8 1 4
S R -1 4 3 1
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
P:\DU KE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-1-SITE LAYOUT WITH 2L EXCEEDANCES-UPPER SURFICIAL AQUIFER_V07302015.MXD
LEGEND
MONITORING WELL
PIEZOMETER
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITEBOUNDARY
148 River S treet, Su ite 220Greenville, SC 29601864-421-9999www.syn terraco rp .com DATE: 08/01/201 5CHECKED BY: J. MEAD OWSDRAWN BY: T. KING
PR OJECT MANAGER: P. WAL DREP
400 0 400 800 1,200 1,600 2,000
(IN FEET)
GRAPHIC SCALE
L. V. SUT TON ENE RGY COM P LE X801 SU TTON ST EA M P LA NT RDWILMINGTON, NORT H CAROL INA
FIG URE 10-1SITE LAYOUT WITH 2 L EXC EEDA NCESUPPER SURFICIAL AQUIFER
NOT ES:1 AP RIL 17, 2014 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM WS P
2 2013 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/)
3 PARCEL B OUNDA RY WA S OB TAINED FROM THE NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 4 DRAW ING HA S BE EN SE T W ITH A PROJE CTION O F NO RTH CA ROLINA S TAT E PLANE COORDINATE SYS TEM FIPS 3200 (NA D83).
5 NORTH CA RO LINA 2L INTERIM MA XIMUM A LLOWABLE CONCENTRATION DATE: 08/01/201 5
Constitue nt Abbreviati on Uppe r Limit Units Lower Li mitAntimony5Sb1µg/L ---Arseni c As 10 µg/L ---Boron B 700 µg/L ---Chlori de Cl 250 mg/L ---Chromi um Cr 10 µg/L ---Cobal t5 Co 1 µg/L ---Iron Fe 300 µg/L ---Mangane se Mn 50 µg/L ---pH pH 8.5 S.U.6.5SeleniumSe20µg/L ---Sul fate SO4 250 mg/L ---Thal lium5 Tl 0.2 µg/L ---Total Di ssol ved Solids TDS 500 mg/L ---Vanadium5 V 0.3 µg/L ---
North Carol i na 2L Standards
ConstituentMnpH
Result845.7
421-Well 3
ConstituentMnpH
Result575.3
421-Well 4
ConstituentAsBMnpHTDSV
Result6343940888.976803.45
ABMW-01S
ConstituentAsBaFeMnV
Result53.41810241007841.28
ABMW-02S
ConstituentCoFeMnpH
Result1.4426801055.8
AW-01B
ConstituentFeMnpH
Result13202046.1
AW-02B
ConstituentFepHV
Result62905.80.427
AW-03B
ConstituentpH Result6.16
AW-04B
ConstituentpH Result4.8
AW-06B
ConstituentCoFepHV
Result2.5344505.10.335
AW-08B
ConstituentCr(VI)pH
Result0.0384.6
AW-09B
ConstituentpH Result4.1
MW-07A
ConstituentpH Result4.3
MW-07B
ConstituentAsFeMnV
Result23.63690763.88
MW-15 ConstituentpHV
Result5.90.316
MW-16
ConstituentBCoFeMnpHTl
Result20805.279143866.40.458
MW-19
ConstituentFeMnV
Result74710739.6
MW-20
ConstituentpH Result5.71
MW-22B
ConstituentCr(VI)pH
Result0.0516.3
MW-23B
ConstituentBCoCr(VI)FeMnV
Result103017.90.098356010400.555
MW-24B
ConstituentCoMnpHSe
Result1.95554.727.1
MW-27B
ConstituentpH Result6.3
MW-28B
ConstituentFeMnpHV
Result11807360.378
MW-31B
ConstituentCoFeMnpH
Result2.5295802544.3
MW-37B
ConstituentpH Result4.6
SMW-01B
ConstituentFeMnpHV
Result288004136.41.42
SMW-02B
ConstituentFeMnNO2+NO3pH
Result131091155.5
SMW-03B
ConstituentFeMnpH
Result7590855.7
SMW-04B
ConstituentFeMnpHV
Result99101395.70.81
SMW-05B
ConstituentpH Result5.66
SMW-06B
Se rvice L ayer Cre dits: NC One Ma p, NCCenter for Geo graphic Info rma tio n a ndAnalysis, NC 911 Board
PRJ-I-140 SR-1347
S R -1 3 8 5
SR-1430
RMP-5815
U
S-421
SR-1394
SR-2836
R M P -5 8 2 1
S R -2 8 3 8
S
R-2
1
6
9
U
S-17
S R -2 7 7 9
S R -2 1 4 5
P R J -I -1 4 0
SR-2000
I -1 4 0
I -1 4 0
R M P -5 8 1 4
S R -1 4 3 1
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
P:\DU KE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-2-SITE LAYOUT WITH 2L EXCEEDANCES-LOWER SURFICIAL AQUIFER_V07302015.MXD
LEGEND
MONITORING WELL
PIEZOMETER
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGESS SUTTON PLANT SITEBOUNDARY
148 River S treet, Su ite 220Greenville, SC 29601864-421-9999www.syn terraco rp .com DATE: 08/01/201 5CHECKED BY: J. MEAD OWSDRAWN BY: T. KING
PR OJECT MANAGER: P. WAL DREP
400 0 400 800 1,200 1,600 2,000
(IN FEET)
GRAPHIC SCALE
L. V. SUT TON ENE RGY COM P LE X801 SU TTON ST EA M P LA NT RDWILMINGTON, NORT H CAROL INA
FIG URE 10-2SITE LAYOUT WITH 2 L EXC EEDA NCESLOWER SURFICIAL AQUIFER
NOT ES:1 AP RIL 17, 2014 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM WS P
2 2013 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/)
3 PARCEL B OUNDA RY WA S OB TAINED FROM THE NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 4 DRAW ING HA S BE EN SE T W ITH A PROJE CTION O F NO RTH CA ROLINA S TAT E PLANE COORDINATE SYS TEM FIPS 3200 (NA D83).
5 NORTH CA RO LINA 2L INTERIM MA XIMUM A LLOWABLE CONCENTRATION DATE: 08/01/201 5
Constitue nt Abbreviati on Uppe r Limit Units Lower Li mitAntimony5Sb1µg/L ---Arseni c As 10 µg/L ---Boron B 700 µg/L ---Chlori de Cl 250 mg/L ---Chromi um Cr 10 µg/L ---Cobal t5 Co 1 µg/L ---Iron Fe 300 µg/L ---Mangane se Mn 50 µg/L ---pH pH 8.5 S.U.6.5SeleniumSe20µg/L ---Sul fate SO4 250 mg/L ---Thal lium5 Tl 0.2 µg/L ---Total Di ssol ved Solids TDS 500 mg/L ---Vanadium5 V 0.3 µg/L ---
North Carol i na 2L Standards
ConstituentAsFeMn
Result1701270150
ABM W-02D
ConstituentFeMnpH
Result4701794.8
AW-01C
ConstituentFeMnpH
Result7610575.9
AW-02C
ConstituentBCoFeMnpHTDSV
Result13706.911130018305.95100.75
AW-03C
ConstituentBFeMnpHV
Result145039907876.20.518
AW-04C
ConstituentpH Result4.7
AW-05C
ConstituentCopH
Result1.194.4
AW-08C
ConstituentCoCr(VI)MnpH
Result1.130.0462895.1
AW-09C
ConstituentFeMn
Result128059
MW-04B
ConstituentCoMnpH
Result1.624415.5
MW-05C
ConstituentMnpHTl
Result36850.405
MW-07C
ConstituentpH Result4.5
MW-11
ConstituentBCoFeMn
Result14701.265690691
MW-12
ConstituentCoMnpH
Result13.59406.4
MW-15D ConstituentCoFeMnpHV
Result5.2210203115.42.09
MW-16DConstituentFeMn
Result864131
MW-20D
ConstituentAsBCoFeMn
Result53.8212010.65110430
MW-21C
ConstituentBCoMnpHTl
Result25604.777326.430.398
MW-22C
ConstituentBCoMnTl
Result20505.193090.21
MW-23C
ConstituentBCoFeMnpHV
Result104018.6418011205.50.543
MW-24C
ConstituentpH Result5.62
MW-28C
ConstituentBFeMnpHTDS
Result1180285016805.2540
MW-31C
ConstituentpH Result4.97
MW-32C
ConstituentpH Result4.6
MW-33C
ConstituentCoFeMnpHV
Result2.7395802445.71.22
MW-37C
ConstituentBFeMnpHV
Result77642508075.50.402
SM W-01C
ConstituentCoFeMnpH
Result3.3753705395.7
SM W-02C
ConstituentCoFeMnpH
Result9.2115105844.9
SM W-03C
ConstituentFeMnV
Result96601320.803
SM W-04C
ConstituentCoMnpH
Result2.61304.9
SM W-05C
ConstituentCoFeMnpH
Result3.6513202735
SM W-06C
Se rvice L ayer Cre dits: NC One Ma p, NCCenter for Geo graphic Info rma tio n a ndAnalysis, NC 911 Board
PRJ-I-140 SR-1347
S R -1 3 8 5
SR-1430
RMP-5815
U
S-421
SR-1394
SR-2836
R M P -5 8 2 1
S R -2 8 3 8
S
R-2
1
6
9
U
S-17
S R -2 7 7 9
S R -2 1 4 5
P R J -I -1 4 0
SR-2000
I -1 4 0
I -1 4 0
R M P -5 8 1 4
S R -1 4 3 1
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
P:\DU KE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-3-SITE LAYOUT WITH 2L EXCEEDANCES-UPPER PEE DEE WELLS_V07302015.MXD
LEGEND
MONITORING WELL
PIEZOMETER
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGESS SUTTON PLANT SITEBOUNDARY
148 River S treet, Su ite 220Greenville, SC 29601864-421-9999www.syn terraco rp .com DATE: 08/01/201 5CHECKED BY: J. MEAD OWSDRAWN BY: T. KING
PR OJECT MANAGER: P. WAL DREP
400 0 400 800 1,200 1,600 2,000
(IN FEET)
GRAPHIC SCALE
L. V. SUT TON ENE RGY COM P LE X801 SU TTON ST EA M P LA NT RDWILMINGTON, NORT H CAROL INA
FIG URE 10-3SITE LAYOUT WITH 2 L EXC EEDA NCESUPPER PEE DEE WELLS
NOT ES:1 AP RIL 17, 2014 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM WS P
2 2013 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/)
3 PARCEL B OUNDA RY WA S OB TAINED FROM THE NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 4 DRAW ING HA S BE EN SE T W ITH A PROJE CTION O F NO RTH CA ROLINA S TAT E PLANE COORDINATE SYS TEM FIPS 3200 (NA D83).
5 NORTH CA RO LINA 2L INTERIM MA XIMUM A LLOWABLE CONCENTRATION DATE: 08/01/201 5
Constitue nt Abbreviati on Uppe r Limit Units Lower Li mitAntimony5Sb1µg/L ---Arseni c As 10 µg/L ---Boron B 700 µg/L ---Chlori de Cl 250 mg/L ---Chromi um Cr 10 µg/L ---Cobal t5 Co 1 µg/L ---Iron Fe 300 µg/L ---Mangane se Mn 50 µg/L ---pH pH 8.5 S.U.6.5SeleniumSe20µg/L ---Sul fate SO4 250 mg/L ---Thal lium5 Tl 0.2 µg/L ---Total Di ssol ved Solids TDS 500 mg/L ---Vanadium5 V 0.3 µg/L ---
North Carol i na 2L Standards
ConstituentFeMnV
Result475820.642
ABM W-01D
ConstituentFeMnTDS
Result43859510
AW-02D
ConstituentBTDS
Result980720
AW-06D
ConstituentBpHTDSV
Result8159.975100.992
AW-07D
ConstituentTDS Result630
AW-09D
ConstituentFeMnV
Result347530.397
PZ -10D
ConstituentBCr(VI)pHTDSV
Result9900.0729.86701.61
SM W-06D
Service Layer Credits: NC OneMap, NCCenter for Geographic Information andAnalysis, NC 911 Board
PRJ-I-140 SR-1347
S R -1 3 8 5
SR-1430
RMP-5815
U
S-421
SR-1394
SR-2836
R M P -5 8 2 1
S R -2 8 3 8
S
R-2169
U
S-17
S R -2 7 7 9
S R -2 1 4 5
P R J -I -1 4 0
SR-2000
I -1 4 0
I -1 4 0
R M P -5 8 1 4
S R -1 4 3 1
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-4-SITE LAYOUT WITH 2L EXCEEDANCES-LOWER PEE DEE WELLS_V07302015.MXD
LEGEND
MONITORING WELL
PIEZOMETER
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGESS SUTTON PLANT SITEBOUNDARY
148 River Street, Suite 220Greenville, SC 29601864-421-9999www.synterracorp.com DATE: 08/01/2015CHECKED BY: J. MEADOWSDRAWN BY: T. KING
PROJECT MANAGER: P. WALDREP
400 0 400 800 1,200 1,600 2,000
(IN FEET)
GRAPHIC SCALE
L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
FIGURE 10-4SITE LAYOUT WITH 2L EXCEEDANCESLOWER PEE DEE WELLS
NOTES:1 APRIL 17, 2014 AERIAL ORTHOPHOTOGRAPHY OBTAINED FROM WSP
2 2013 AERIAL ORTHOPHOTOGRAPHY OBTAINED FROM NC CENTER FOR GEOGRAPHIC INFORMATION AND ANALYSIS, AT (http://services.nconemap.gov/)
3 PARCEL BOUNDARY WAS OBTAINED FROM THE NC CENTER FOR GEOGRAPHIC INFORMATION AND ANALYSIS, AT (http://services.nconemap.gov/) 4 DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83).
5 NORTH CAROLINA 2L INTERIM MAXIMUM ALLOWABLE CONCENTRATION DATE: 08/01/2015
Constituent Abbreviation Upper Limit Units Lower LimitAntimony5Sb1µg/L ---Arsenic As 10 µg/L ---Boron B 700 µg/L ---Chloride Cl 250 mg/L ---Chromium Cr 10 µg/L ---Cobalt5 Co 1 µg/L ---Iron Fe 300 µg/L ---Manganese Mn 50 µg/L ---pH pH 8.5 S.U.6.5SeleniumSe20µg/L ---Sulfate SO4 250 mg/L ---Thallium5 Tl 0.2 µg/L ---Total Dissolved Solids TDS 500 mg/L ---Vanadium5 V 0.3 µg/L ---
North Carolina 2L Standards
ConstituentBClpHTDS
Result19505408.71500
AW-05E
ConstituentBClCrCr(VI)FeTDSV
Result247049014.70.06470415001.77
AW-06E
ConstituentBClCr(VI)pHTDSV
Result25005000.0471015000.993
MW-23E
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
1 0
1 0
10
1 0 0
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-24B< 1 (2.91)
AW-08B< 1 (< 1)
MW-07B< 1 (< 1)
MW-23B< 1 (< 1)
MW-27B< 1 (< 1)
AW-01B< 1 (< 1)
AW-02B< 1 (< 1)
AW-05B< 1 (< 1)
AW-06B< 1 (< 1)
421-Well 3< 1 (NS)
421-Well 4< 1 (NS)
SMW-06B< 1 (< 1)
ABMW-01S634 (654)
ABMW-02S53.4 (54.6)
AW-09B< 1 (< 1)
SMW-02B< 1 (1.04)
SMW-03B< 1 (< 1)
MW-31B< 1 (< 1)
AW-04B< 1 (< 1)
SMW-01B< 1 (< 1)
SMW-04B< 1 (< 1)
SMW-05B1.47 (1.34)
AW-03B< 1 (< 1)
MW-1523.6 (20.5)
MW-161.49 (1.59)
MW-201.12 (1)
MW-37B3.08 (< 1)
MW-07A< 1 (< 1)
MW-192.62 (NS)
MW-22B< 1 (NS)
MW-28B< 1 (NS)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR ARSENIC IS 10 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-5JUNE 2015 ISOCONCENTRATION MAPARSENIC IN UPPER SURFICIAL W EL LSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(10)(10)
1010
DISSOLVED ARSENIC CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL ARSENIC CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
700
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-24B47 (40)
AW-08B25 (25)
MW-07B22 (22)
MW-23B40 (38)
MW-27B41 (39)
AW-01B< 5 (< 5)
AW-02B16 (15)
AW-05B25 (21)
AW-06B32 (30)
421-Well 344 (NS)
421-Well 444 (NS)
SMW-06B48 (43)
ABMW-01S594 (585)
ABMW-02S1810 (1840)AW-09B18 (16)
SMW-02B61 (59)
SMW-03B53 (52)
MW-31B35 (36)
AW-04B12 (11)
SMW-01B78 (74)
SMW-04B17 (16)
SMW-05B36 (36)
AW-03B10 (9)
MW-1530 (31)
MW-1620 (20)
MW-2055 (59)
MW-37B39 (8)
MW-07A6 (6)
MW-1973 (NS)
MW-22B9 (NS)
MW-28B28 (NS)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR BARIUM IS 700 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-6JUNE 2015 ISOCONCENTRATION MAPBARIUM IN UPPER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(700)(700)
700700
DISSOLVED BARIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL BARIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
700
700
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-24B409 (1080)
AW-08B< 50 (< 50)
MW-07B< 50 (< 50)
MW-23B145 (144)
MW-27B198 (193)
AW-01B< 50 (< 50)
AW-02B< 50 (< 50)
AW-05B< 50 (< 50)
AW-06B< 50 (< 50)
421-Well 373 (NS)
421-Well 454 (NS)
SMW-06B60 (59)
ABMW-01S3940 (3950)
ABMW-02S234 (237)
AW-09B< 50 (< 50)
SMW-02B< 50 (< 50)
SMW-03B50 (52)
MW-31B< 50 (54)
AW-04B< 50 (< 50)
SMW-01B100 (99)
SMW-04B< 50 (< 50)
SMW-05B< 50 (< 50)
AW-03B< 50 (< 50)
MW-1554 (64)
MW-1690 (98)
MW-2052 (65)
MW-37B< 50 (< 50)
MW-07A< 50 (< 50)
MW-192080 (NS)
MW-22B< 50 (NS)
MW-28B< 50 (NS)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR BORON IS 700 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-7JUNE 2015 ISOCONCENTRATION MAPBORON IN UPPER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(700)(700)
700700
DISSOLVED BORON CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL BORON CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
1 1
1
1
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-24B< 1 (14)
AW-08B2.53 (2.55)
MW-07B< 1 (< 1)
MW-23B< 1 (< 1)
MW-27B1.95 (1.79)
AW-01B1.44 (1.24)
AW-02B< 1 (< 1)
AW-05B< 1 (< 1)
AW-06B< 1 (< 1)
421-Well 3< 1 (NS)
421-Well 4< 1 (NS)
SMW-06B< 1 (< 1)
ABMW-01S< 1 (< 1)
ABMW-02S< 1 (< 1)
AW-09B< 1 (< 1)
SMW-02B< 1 (< 1)
SMW-03B< 1 (< 1)
MW-31B< 1 (< 1)
AW-04B< 1 (< 1)
SMW-01B< 1 (< 1)
SMW-04B< 1 (< 1)
SMW-05B< 1 (< 1)
AW-03B< 1 (< 1)
MW-15< 1 (< 1)
MW-16< 1 (< 1)
MW-20< 1 (< 1)
MW-37B2.52 (< 1)
MW-07A< 1 (< 1)
MW-195.27 (NS)
MW-22B< 1 (NS)
MW-28B< 1 (NS)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) FOR COBALT IS 1 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-8JUNE 2015 ISOCONCENTRATION MAPCOBALT IN UPPER SURFICIAL W EL LSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(1.0)(1.0)
11
DISSOLVED COBALT CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL COBALT CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
3
0
0
300
300
3 0 0
3 0 0
3 0 0
300
300
3
0
0
0
3000
3 0 0 0
3 0 0 0
30 0 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-24B< 10 (2830)
AW-08B4450 (4160)
MW-07B15 (< 10)
MW-23B< 10 (< 10)
MW-27B21 (< 10)
AW-01B2680 (2160)
AW-02B1320 (1630)
AW-05B281 (33)
AW-06B71 (< 10)
421-Well 337 (NS)
421-Well 471 (NS)
SMW-06B22 (16)
ABMW-01S152 (94)
ABMW-02S24100 (24700)
AW-09B225 (39)
SMW-02B28800 (27900)
SMW-03B1310 (1320)
MW-31B1180 (649)
AW-04B41 (< 10)
SMW-01B30 (14)
SMW-04B7590 (7470)
SMW-05B9910 (11400)
AW-03B6290 (6600)
MW-153690 (3230)
MW-16113 (95)
MW-20747 (607)
MW-37B9580 (22)
MW-07A93 (< 10)
MW-19914 (NS)
MW-22B< 10 (NS)
MW-28B10 (NS)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR IRON IS 300 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-9JUNE 2015 ISOCONCENTRATION MAPIRON IN UPPER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(300)(300)
300300
DISSOLVED IRON CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL IRON CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
5 0
50
50
5 0
5 0
50
5 0
5 0 0
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-24B35 (868)
AW-08B29 (28)
MW-07B9 (7)
MW-23B7 (< 5)
MW-27B55 (54)
AW-01B105 (89)
AW-02B204 (202)
AW-05B26 (17)
AW-06B17 (17)
421-Well 384 (NS)
421-Well 457 (NS)
SMW-06B30 (30)
ABMW-01S88 (88)
ABMW-02S784 (812)
AW-09B18 (18)
SMW-02B413 (412)
SMW-03B91 (92)
MW-31B73 (68)
AW-04B22 (23)
SMW-01B14 (13)
SMW-04B85 (83)
SMW-05B139 (148)
AW-03B13 (15)
MW-1576 (79)
MW-169 (10)
MW-20107 (114)
MW-37B254 (8)
MW-07A< 5 (< 5)
MW-19386 (NS)
MW-22B< 5 (NS)
MW-28B10 (NS)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR MANGANESE IS 50 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-10JUNE 2015 ISOCONCENTRATION MAPMANGANESE IN UPPER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(50)(50)
5050
DISSOLVED MANGANESE CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL MANGANESE CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
8.5
6.5
6 .5
6
.
5
6.5
6.5
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-24B6.6
AW-08B5.1
MW-07B4.3
MW-23B6.3
MW-27B4.7
AW-01B5.8
AW-02B6.1
AW-05B8.5
AW-06B4.8
421-Well3 5.7
421-Well4 5.3
SMW-06B5.66
ABMW-01S8.97
ABMW-02S7.48
AW-09B4.6
SMW-02B6.4
SMW-03B5.5
MW-31B6
AW-04B6.16
SMW-01B4.6
SMW-04B5.7
SMW-05B5.7
AW-03B5.8
MW-156.8
MW-165.9
MW-207
MW-37B4.3
MW-07A4.1
MW-196.4
MW-22B5.71
MW-28B6.3
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L RANGE FOR pH IS 6.5 TO 8.5S.U..
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIGURE 10-11JUNE 2015 ISOCONCENTRATION MAPpH IN UPPER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(8.5)(8.5)
8.58.5
DISSOLVED pH CONCENTRATION (S.U.)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL pH CONCENTRATION1 (S.U.)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
0.2
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-24B< 0.2 (< 0.2)
AW-08B< 0.2 (0.258)
MW-07B< 0.2 (< 0.2)
MW-23B< 0.2 (< 0.2)
MW-27B< 0.2 (0.291)
AW-01B< 0.2 (< 0.2)
AW-02B< 0.2 (< 0.2)
AW-05B< 0.2 (< 0.2)
AW-06B< 0.2 (< 0.2)
421-Well 3< 0.2 (NS)
421-Well 4< 0.2 (NS)
SMW-06B< 0.2 (< 0.2)
ABMW-01S< 0.2 (< 0.2)
ABMW-02S< 0.2 (< 0.2)
AW-09B< 0.2 (0.272)
SMW-02B< 0.2 (< 0.2)
SMW-03B< 0.2 (< 0.2)
MW-31B< 0.2 (< 0.2)
AW-04B< 0.2 (< 0.2)
SMW-01B< 0.2 (< 0.2)
SMW-04B< 0.2 (< 0.2)
SMW-05B< 0.2 (< 0.2)
AW-03B< 0.2 (< 0.2)
MW-15< 0.2 (< 0.2)MW-16< 0.2 (< 0.2)MW-20< 0.2 (< 0.2)
MW-37B< 0.2 (< 0.2)
MW-07A< 0.2 (< 0.2)
MW-190.458 (NS)
MW-22B< 0.2 (NS)
MW-28B< 0.2 (NS)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) THALLIUM IS 0.2 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-12JUNE 2015 ISOCONCENTRATION MAPTHALLIUM IN UPPER SURF ICIAL W ELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(0.2)(0.2)
0.20.2
DISSOLVED THALLIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL THALLIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
500
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-24B140
AW-08B26
MW-07B< 25
MW-23B55
MW-27B110
AW-01B44
AW-02B< 25
AW-05B50
AW-06B< 25
421-Well3 66
421-Well4 45
SMW-06B83
ABMW-01S680
ABMW-02S330
AW-09B< 25
SMW-02B140
SMW-03B250
MW-31B40
AW-04B< 25
SMW-01B57
SMW-04B42
SMW-05B150
AW-03B29
MW-15250
MW-1684
MW-20220
MW-37B< 25
MW-07A< 25
MW-19380
MW-22B< 25
MW-28B40
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR TOTAL DISSOLVEDSOLIDS IS 500 mg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-13JUNE 2015 ISOCONCENTRATION MAPTOTAL DISSO LVED SOL IDS IN UPPER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
500500
LEGEND
TOTAL DISSOLVED SOLIDS CONCENTRATION1 (mg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
0 .3
0.3
0 .3
0 .3
0 .3
0 .3
3
3
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-24B0.555 (0.318)
AW-08B0.335 (0.346)
MW-07B< 0.3 (< 0.3)
MW-23B< 0.3 (< 0.3)
MW-27B< 0.3 (< 0.3)
AW-01B< 0.3 (< 0.3)
AW-02B< 0.3 (< 0.3)
AW-05B< 0.3 (< 0.3)
AW-06B< 0.3 (< 0.3)
SMW-06B< 0.3 (< 0.3)
ABMW-01S3.45 (2.87)
ABMW-02S1.28 (1.46)
AW-09B< 0.3 (< 0.3)
SMW-02B1.42 (1.61)
SMW-03B< 0.3 (< 0.3)
MW-31B0.378 (< 0.3)
AW-04B< 0.3 (< 0.3)
SMW-01B< 0.3 (< 0.3)
SMW-04B< 0.3 (< 0.3)
SMW-05B0.81 (0.77)
AW-03B0.427 (0.421)
MW-153.88 (2.19)
MW-160.316 (< 0.3)
MW-2039.6 (26)
MW-37B< 0.3 (< 0.3)
MW-07A< 0.3 (< 0.3)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) FOR VANADIUM IS 0.3 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-14JUNE 2015 ISOCONCENTRATION MAPVANADIUM IN UPPER SURFICIAL W ELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(0.3)(0.3)
0.30.3
DISSOLVED VANADIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL VANADIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
10
10
1
0
1
0
1 0
100
100
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-12< 1 (< 1)
MW-23C< 1 (< 1)
MW-24C3.42 (< 1)
MW-31C< 1 (< 1)
MW-07C< 1 (< 1)
AW-01C< 1 (< 1)
AW-02C< 1 (< 1)
AW-05C< 1 (< 1)
MW-32C< 1 (NS)
MW-33C< 1 (NS)ABMW-02D170 (167)
AW-09C< 1 (< 1)
SMW-02C< 1 (< 1)
SMW-03C< 1 (< 1)
SMW-06C2.79 (2.55)
AW-04C< 1 (< 1)
SMW-01C< 1 (< 1)
SMW-04C2.56 (2.09)
SMW-05C< 1 (< 1)
AW-03C1.54 (1.54)
MW-15D< 1 (< 1)
MW-16D< 1 (< 1)MW-20D2.25 (1.8)
AW-08C< 1 (< 1)
MW-37C< 1 (2.56)
MW-11< 1 (NS)
MW-21C53.8 (NS)
MW-22C< 1 (NS)
MW-28C< 1 (NS)
MW-04B< 1 (NS)
MW-05C< 1 (NS)
ABMW-01S634 (654)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR ARSENIC IS 10 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-15JUNE 2015 ISOCONCENTRATION MAPARSENIC IN LOWER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(10)(10)
1010
DISSOLVED ARSENIC CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL ARSENIC CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-1229 (30)
MW-23C36 (35)
MW-24C39 (46)
MW-31C55 (57)
MW-07C75 (76)
AW-01C141 (136)
AW-02C55 (49)
AW-05C36 (32)
MW-32C27 (NS)
MW-33C21 (NS)ABMW-02D65 (65)
AW-09C118 (104)
SMW-02C37 (35)
SMW-03C86 (84)
SMW-06C53 (51)
AW-04C37 (39)
SMW-01C34 (35)
SMW-04C36 (32)
SMW-05C79 (76)
AW-03C96 (98)
MW-15D41 (42)
MW-16D40 (41)
MW-20D51 (49)
AW-08C40 (37)
MW-37C8 (39)
MW-1182 (NS)
MW-21C66 (NS)
MW-22C95 (NS)
MW-28C51 (NS)
MW-04B68 (NS)
MW-05C27 (NS)
ABMW-01S594 (585)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR BARIUM IS 700 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-16JUNE 2015 ISOCONCENTRATION MAPBARIUM IN LOWER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(700)(700)
700700
DISSOLVED BARIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL BARIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
7 0 0
7 0 0
7 0 0
2 0 0 0
1 0 0 0
1 0 0 0
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-121470 (1490)
MW-23C2050 (1980)
MW-24C1040 (415)
MW-31C1180 (1190)
MW-07C560 (571)
AW-01C98 (111)
AW-02C< 50 (< 50)
AW-05C69 (65)
MW-32C115 (NS)
MW-33C< 50 (NS)ABMW-02D600 (604)
AW-09C554 (566)
SMW-02C337 (329)
SMW-03C417 (418)
SMW-06C197 (199)
AW-04C1450 (1440)
SMW-01C776 (791)
SMW-04C85 (79)
SMW-05C362 (365)
AW-03C1370 (1430)
MW-15D560 (555)
MW-16D680 (733)
MW-20D305 (313)
AW-08C< 50 (< 50)
MW-37C< 50 (< 50)
MW-11< 50 (NS)
MW-21C2120 (NS)
MW-22C2560 (NS)
MW-28C< 50 (NS)
MW-04B< 50 (NS)
MW-05C< 50 (NS)
ABMW-01S3940 (3950)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR BORON IS 700 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-17JUNE 2015 ISOCONCENTRATION MAPBORON IN LOWER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(700)(700)
700700
DISSOLVED BORON CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL BORON CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
1
1
1
1
1
1
1FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-121.26 (1.21)
MW-23C5.19 (3.79)
MW-24C18.6 (< 1)
MW-31C< 1 (< 1)
MW-07C< 1 (< 1)
AW-01C< 1 (< 1)
AW-02C< 1 (< 1)
AW-05C< 1 (< 1)
MW-32C< 1 (NS)
MW-33C< 1 (NS)ABMW-02D< 1 (< 1)
AW-09C1.13 (1.18)
SMW-02C3.37 (2.85)
SMW-03C9.21 (9.95)
SMW-06C3.65 (3.69)
AW-04C< 1 (< 1)
SMW-01C< 1 (< 1)
SMW-04C< 1 (< 1)
SMW-05C2.6 (2.44)AW-03C6.91 (6.35)
MW-15D13.5 (10.9)
MW-16D5.22 (5.18)
MW-20D< 1 (< 1)
AW-08C1.19 (1.07)
MW-37C< 1 (2.35)
MW-11< 1 (NS)
MW-21C10.6 (NS)
MW-22C4.77 (NS)
MW-28C< 1 (NS)
MW-04B< 1 (NS)
MW-05C1.62 (NS)
ABMW-01S< 1 (< 1)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) FOR COBALT IS 1 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-18JUNE 2015 ISOCONCENTRATION MAPCOBALT IN LOWER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(1)(1)
11
DISSOLVED COBALT CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL COBALT CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
300
3 0 0
300
3
0
0
3 0 0
300
300
300
3000
3 0 0 0
3000
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-125690 (5660)
MW-23C88 (31)
MW-24C4180 (< 10)
MW-31C2850 (2700)
MW-07C166 (< 10)
AW-01C470 (67)
AW-02C7610 (6840)
AW-05C128 (< 10)
MW-32C30 (NS)MW-33C20 (NS)
ABMW-02D1270 (1230)
AW-09C102 (< 10)
SMW-02C5370 (5310)
SMW-03C1510 (1490)
SMW-06C1320 (1310)
AW-04C3990 (4420)
SMW-01C4250 (4210)
SMW-04C9660 (8860)
SMW-05C175 (78)
AW-03C11300 (11700)
MW-15D85 (21)
MW-16D1020 (517)MW-20D864 (324)
AW-08C61 (61)
MW-37C33 (8550)
MW-1148 (NS)
MW-21C5110 (NS)
MW-22C141 (NS)
MW-28C< 10 (NS)
MW-04B1280 (NS)
MW-05C< 10 (NS)
ABMW-01S152 (94)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR IRON IS 300 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-19JUNE 2015 ISOCONCENTRATION MAPIRON IN LOWER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(300)(300)
300300
DISSOLVED IRON CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL IRON CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
50
50
5 0
50
50
50
50
1000
500500
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-12691 (677)
MW-23C309 (280)
MW-24C1120 (37)
MW-31C1680 (1750)
MW-07C368 (343)
AW-01C179 (171)
AW-02C57 (54)
AW-05C21 (20)
MW-32C30 (NS)
MW-33C30 (NS)ABMW-02D150 (150)
AW-09C289 (304)
SMW-02C539 (539)
SMW-03C584 (591)
SMW-06C273 (276)
AW-04C787 (797)
SMW-01C807 (810)
SMW-04C132 (124)
SMW-05C130 (131)
AW-03C1830 (1940)
MW-15D940 (811)
MW-16D311 (345)
MW-20D131 (115)
AW-08C23 (22)
MW-37C6 (249)
MW-1130 (NS)
MW-21C430 (NS)
MW-22C732 (NS)
MW-28C8 (NS)
MW-04B59 (NS)
MW-05C441 (NS)
ABMW-01S88 (88)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR MANGANESE IS 50 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-20JUNE 2015 ISOCONCENTRATION MAPMANGANESE IN LOW ER SURFICIAL W ELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(50)(50)
5050
DISSOLVED MANGANESE CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL MANGANESE CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
8 .5
6 .5
6 .5
6 .5
6.5
6.5
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-128.5
MW-23C6.61
MW-24C5.5
MW-31C5.2
MW-07C5
AW-01C4.8
AW-02C5.9
AW-05C4.7
MW-32C4.97
MW-33C4.6ABMW-02D8.16
AW-09C5.1
SMW-02C5.7
SMW-03C4.9
SMW-06C5
AW-04C6.2
SMW-01C5.5
SMW-04C6.6
SMW-05C4.9
AW-03C5.9
MW-15D6.4
MW-16D5.4
MW-20D7
AW-08C4.4
MW-37C5.7
MW-114.5
MW-21C6.5
MW-22C6.43
MW-28C5.62
MW-04B6.8
MW-05C5.5
ABMW-01S8.97
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L RANGE FOR pH IS 6.5 TO 8.5S.U..
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-21JUNE 2015 ISOCONCENTRATION MAPpH IN LOWER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(8.5)(8.5)
8.58.5
DISSOLVED pH CONCENTRATION (S.U.)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL pH CONCENTRATION1 (S.U.)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
0 .2
0.2
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-12< 0.2 (< 0.2)MW-23C0.21 (< 0.2)
MW-24C< 0.2 (< 0.2)
MW-31C< 0.2 (< 0.2)
MW-07C0.405 (< 0.2)
AW-01C< 0.2 (< 0.2)
AW-02C< 0.2 (< 0.2)
AW-05C< 0.2 (< 0.2)
MW-32C< 0.2 (NS)
MW-33C< 0.2 (NS)ABMW-02D< 0.2 (< 0.2)
AW-09C< 0.2 (< 0.2)
SMW-02C< 0.2 (< 0.2)
SMW-03C< 0.2 (< 0.2)
SMW-06C< 0.2 (< 0.2)
AW-04C< 0.2 (< 0.2)
SMW-01C< 0.2 (< 0.2)
SMW-04C< 0.2 (< 0.2)
SMW-05C< 0.2 (0.26)
AW-03C< 0.2 (< 0.2)
MW-15D< 0.2 (< 0.2)
MW-16D< 0.2 (< 0.2)
MW-20D< 0.2 (< 0.2)
AW-08C< 0.2 (< 0.2)
MW-37C< 0.2 (< 0.2)
MW-11< 0.2 (NS)
MW-21C< 0.2 (NS)
MW-22C0.398 (NS)
MW-28C< 0.2 (NS)
MW-04B< 0.2 (NS)
MW-05C< 0.2 (NS)
ABMW-01S< 0.2 (< 0.2)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) THALLIUM IS 0.2 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-22JUNE 2015 ISOCONCENTRATION MAPTHALLIUM IN LOWER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(0.2)(0.2)
0.20.2
DISSOLVED THALLIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL THALLIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
5 0 0
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-12410
MW-23C280
MW-24C500
MW-31C540
MW-07C200
AW-01C84
AW-02C38
AW-05C40
MW-32C31
MW-33C30ABMW-02D300
AW-09C190
SMW-02C130
SMW-03C190
SMW-06C110
AW-04C310
SMW-01C340
SMW-04C110
SMW-05C120
AW-03C510
MW-15D430
MW-16D350
MW-20D340
AW-08C30
MW-37C81
MW-11< 25
MW-21C420
MW-22C440
MW-28C26
MW-04B210
MW-05C69
ABMW-01S680
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR TOTAL DISSOLVEDSOLIDS IS 500 mg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-23JUNE 2015 ISOCONCENTRATION MAPTOTAL DISSOLVED SOLIDS IN LO WER SURFICIAL W EL LSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
500500
LEGEND
TOTAL DISSOLVED SOLIDS CONCENTRATION1 (mg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
0.3
0 .3
0 .3
0 .3
0 .3
3
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-12< 0.3 (< 0.3)
MW-23C0.323 (< 0.3)
MW-24C0.543 (0.366)
MW-07C0.573 (< 0.3)
AW-01C< 0.3 (< 0.3)
AW-02C< 0.3 (< 0.3)
AW-05C< 0.3 (< 0.3)
ABMW-02D< 0.3 (0.504)
AW-09C< 0.3 (< 0.3)
SMW-02C< 0.3 (< 0.3)
SMW-03C< 0.3 (0.424)
SMW-06C< 0.3 (< 0.3)
MW-31C< 0.3 (0.316)
AW-04C0.518 (0.394)
SMW-01C0.402 (< 0.3)
SMW-04C0.803 (0.328)
SMW-05C< 0.3 (< 0.3)
AW-03C0.75 (0.596)
MW-15D< 0.3 (< 0.3)
MW-16D2.09 (0.534)
MW-20D< 0.3 (< 0.3)
AW-08C< 0.3 (< 0.3)
MW-37C1.22 (0.795)
ABMW-01S3.45 (2.87)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) FOR VANADIUM IS 0.3 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-24JUNE 2015 ISOCONCENTRATION MAPVANADIUM IN LOWER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(0.3)(0.3)
0.30.3
DISSOLVED VANADIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL VANADIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-02D< 1 (< 1)
AW-06D1.57 (2.14)
SMW-06D3.76 (3.82)
AW-05D1.36 (1.32)
AW-09D< 1 (< 1)
AW-07D< 1 (< 1)
PZ-10D< 1 (< 1)
ABMW-01D1.03 (< 1)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR ARSENIC IS 10 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-25JUNE 2015 ISOCONCENTRATION MAPARSENIC IN UPPER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(10)(10)
1010
DISSOLVED ARSENIC CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL ARSENIC CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-02D12 (11)
AW-06D16 (15)
SMW-06D15 (14)
AW-05D9 (8)
AW-09D7 (8)
AW-07D< 5 (< 5)
PZ-10D55 (53)
ABMW-01D17 (16)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR BARIUM IS 700 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-26JUNE 2015 ISOCONCENTRATION MAPBARIUM IN UPPER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(700)(700)
700700
DISSOLVED BARIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL BARIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
700
7 0 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-02D666 (652)
AW-06D980 (934)
SMW-06D990 (987)
AW-05D306 (301)
AW-09D581 (590)
AW-07D815 (804)
PZ-10D368 (363)
ABMW-01D167 (176)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR BORON IS 700 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-27JUNE 2015 ISOCONCENTRATION MAPBORON IN UPPER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(700)(700)
700700
DISSOLVED BORON CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL BORON CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-02D< 1 (< 1)
AW-06D< 1 (< 1)
SMW-06D< 1 (< 1)
AW-05D< 1 (< 1)
AW-09D< 1 (< 1)
AW-07D< 1 (< 1)
PZ-10D< 1 (< 1)
ABMW-01D< 1 (< 1)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) COBALT IS 1 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-28JUNE 2015 ISOCONCENTRATION MAPCOBALT IN UPPER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(1)(1)
11
DISSOLVED COBALT CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL COBALT CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
3 0 0
3 0 0
3 0 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-02D438 (174)
AW-06D102 (13)
SMW-06D300 (58)
AW-05D298 (27)
AW-09D194 (62)
AW-07D220 (33)
PZ-10D347 (244)
ABMW-01D475 (42)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR IRON IS 300 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-29JUNE 2015 ISOCONCENTRATION MAPIRON IN UPPER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(300)(300)
300300
DISSOLVED IRON CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL IRON CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
50
5 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-02D59 (56)
AW-06D18 (16)
SMW-06D37 (31)
AW-05D38 (37)
AW-09D40 (39)
AW-07D14 (13)
PZ-10D53 (52)
ABMW-01D82 (79)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR MANGANESE IS 50 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-30JUNE 2015 ISOCONCENTRATION MAPMANGANESE IN UPPER PEE DEE W ELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(50)(50)
5050
DISSOLVED MANGANESE CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL MANGANESE CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
8.5
8.5
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-02D8
AW-06D8.2
SMW-06D9.8
AW-05D8.4
AW-09D8.2
AW-07D9.97
PZ-10D7.7
ABMW-01D7.8
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L RANGE FOR pH IS 6.5 TO 8.5S.U..
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-31JUNE 2015 ISOCONCENTRATION MAPpH IN UPPER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(8.5)(8.5)
8.58.5
DISSOLVED pH CONCENTRATION (S.U.)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL pH CONCENTRATION1 (S.U.)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-02D< 0.2 (< 0.2)
AW-06D< 0.2 (< 0.2)
SMW-06D< 0.2 (< 0.2)
AW-05D< 0.2 (< 0.2)
AW-09D< 0.2 (< 0.2)
AW-07D< 0.2 (< 0.2)
PZ-10D< 0.2 (< 0.2)
ABMW-01D< 0.2 (< 0.2)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) THALLIUM IS 0.2 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-32JUNE 2015 ISOCONCENTRATION MAPTHALIUM IN UPPER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(0.2)(0.2)
0.20.2
DISSOLVED THALIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL THALIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
500
5 0 0
5 0 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-02D510
AW-06D720
SMW-06D670
AW-05D330
AW-09D630
AW-07D510
PZ-10D380
ABMW-01D350
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR TOTAL DISSOLVEDSOLIDS IS 500 mg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-33JUNE 2015 ISOCONCENTRATION MAPTOTAL DISSOLVED SOLIDS IN UPPER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
500500
LEGEND
TOTAL DISSOLVED SOLIDS CONCENTRATION1 (mg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
0 .3
0.3
0
.
3
0
.
3
0.9
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-02D< 0.3 (< 0.3)
AW-06D< 0.3 (0.38)
SMW-06D1.61 (1.19)
AW-05D< 0.3 (< 0.3)
AW-09D< 0.3 (< 0.3)
AW-07D0.992 (0.626)
PZ-10D0.397 (< 0.3)
ABMW-01D0.642 (0.38)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) FOR VANADIUM IS 0.3 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-34JUNE 2015 ISOCONCENTRATION MAPVANADIUM IN UPPER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(0.3)(0.3)
0.30.3
DISSOLVED VANADIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL VANADIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-05E1.37 (1.24)
MW-23E< 1 (< 1)
AW-06E< 1 (< 1)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR ARSENIC IS 10 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-35JUNE 2015 ISOCONCENTRATION MAPARSENIC IN LOWER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(10)(10)
1010
DISSOLVED ARSENIC CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL ARSENIC CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-05E8 (9)
MW-23E< 5 (< 5)
AW-06E8 (5)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR BARIUM IS 700 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-36JUNE 2015 ISOCONCENTRATION MAPBARIUM IN LO WER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(700)(700)
700700
DISSOLVED BARIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL BARIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
700
7 0 0
2000
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-05E1950 (1920)
MW-23E2500 (2420)
AW-06E2470 (2490)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR BORON IS 700 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-37JUNE 2015 ISOCONCENTRATION MAPBORON IN LOWER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(700)(700)
700700
DISSOLVED BORON CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL BORON CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-05E< 1 (< 1)
MW-23E< 1 (< 1)
AW-06E< 1 (< 1)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) COBALT IS 1 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-38JUNE 2015 ISOCONCENTRATION MAPCOBALT IN LOWER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(1)(1)
11
DISSOLVED COBALT CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL COBALT CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-05E276 (66)
MW-23E48 (< 10)
AW-06E704 (< 10)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR IRON IS 300 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-39JUNE 2015 ISOCONCENTRATION MAPIRON IN L OWER PEE DEE WELL SL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(300)(300)
300300
DISSOLVED IRON CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL IRON CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-05E9 (7)
MW-23E5 (< 5)
AW-06E24 (16)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR MANGANESE IS 50 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-40JUNE 2015 ISOCONCENTRATION MAPMANGANESE IN LOW ER PEE DEE W EL LSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(50)(50)
5050
DISSOLVED MANGANESE CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL MANGANESE CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
8 .5
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-05E8.7
MW-23E10
AW-06E8.1
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L RANGE FOR pH IS 6.5 TO 8.5S.U..
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-41JUNE 2015 ISOCONCENTRATION MAPpH IN LOWER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(8.5)(8.5)
8.58.5
DISSOLVED pH CONCENTRATION (S.U.)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL pH CONCENTRATION1 (S.U.)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-05E< 0.2 (< 0.2)
MW-23E< 0.2 (< 0.2)
AW-06E< 0.2 (< 0.2)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) THALLIUM IS 0.2 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-42JUNE 2015 ISOCONCENTRATION MAPTHALLIUM IN LOWER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(0.2)(0.2)
0.20.2
DISSOLVED THALLIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL THALLIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
500
5 0 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-05E1500
MW-23E1500
AW-06E1500
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR TOTAL DISSOLVEDSOLIDS IS 500 mg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-43JUNE 2015 ISOCONCENTRATION MAPTOTAL DISSOLVED SOLIDS IN LOWER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
500500
LEGEND
TOTAL DISSOLVED SOLIDS CONCENTRATION1 (mg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
0.3
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-05E< 0.3 (< 0.3)
MW-23E0.993 (1.16)
AW-06E1.77 (0.711)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) FOR VANADIUM IS 0.3 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-44JUNE 2015 ISOCONCENTRATION MAPVANADIUM IN LOWER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(0.3)(0.3)
0.30.3
DISSOLVED VANADIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL VANADIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
Se rvice L ayer Cre dits: NC One Ma p, NCCenter for Geo graphic Info rma tio n a ndAnalysis, NC 911 Board
PRJ-I-140 SR-1347
S R -1 3 8 5
SR-1430
RMP-5815
U
S-421
SR-1394
SR-2836
R M P -5 8 2 1
S R -2 8 3 8
S
R-2
1
6
9
U
S-17
S R -2 7 7 9
S R -2 1 4 5
P R J -I -1 4 0
SR-2000
I -1 4 0
I -1 4 0
R M P -5 8 1 4
S R -1 4 3 1
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
P:\DU KE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-45-DETECTION MONITORING CONSTITUENT MAP-UPPER SURFICIAL AQUIFER_V07302015.MXD
LEGEND
MONITORING WELL
PIEZOMETER
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE
DUKE ENERGY PROGESS SUTTON PLANT SITEBOUNDARY
148 River S treet, Su ite 220Greenville, SC 29601864-421-9999www.syn terraco rp .com DATE: 08/01/201 5CHECKED BY: J. MEAD OWSDRAWN BY: T. KING
PR OJECT MANAGER: P. WAL DREP
400 0 400 800 1,200 1,600 2,000
(IN FEET)
GRAPHIC SCALE
L. V. SUT TON ENE RGY COM P LE X801 SU TTON ST EA M P LA NT RDWILMINGTON, NORT H CAROL INA
FIGURE 10-45CCR RULE DETECTION MONITORING CONSTITUENT MAPUPPER SURFICIAL AQUIFER
NOT ES:1 CCR RULE AS INDENTIFIE D IN THE US EPA A PRIL 2015 FINAL RULING 40 CFR PA RTS 257 AND 261
2 AP RIL 17, 2014 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM WS P
3 2013 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/)
4 PARCEL B OUNDA RY WA S OB TAINED FROM THE NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 5 DRAW ING HA S BE EN SE T W ITH A PROJE CTION O F NO RTH CA ROLINA S TAT E PLANE COORDINATE SYS TEM FIPS 3200 (NA D83).DATE: 08/01/201 5
Consti tue nt Abbre vi ati on Uni tsBoronBµg/LCalciumCamg/LChlorideClmg/LSpecific Conductance Sp Cond µmhos/cmpHpHSUSulfateSO4mg/LTotal Di ssol ve d Sol i ds TDS mg/L
ConstituentBCaClpHSO4Sp CondTDS
Result7313.27.25.724137.666
421-Well 3
ConstituentBCaClpHSO4Sp CondTDS
Result547.017.55.3178845
421-Well 4
ConstituentBCaClpHSO4Sp CondTDS
Result3940128838.97831162680
ABM W-01S
ConstituentBCaClpHSO4Sp CondTDS
Result23460.8147.48<0.1635330
ABMW-02S
ConstituentBCaClpHSO4Sp CondTDS
Result<501.012.35.84.54244
AW-01B ConstituentBCaClpHSO4Sp CondTDS
Result<501.61.36.12.924<25
AW-02B
ConstituentBCaClpHSO4Sp CondTDS
Result<500.6073.85.8448.829
AW-03B
ConstituentBCaClpHSO4Sp CondTDS
Result<504.283.96.165.443.3<25
AW-04B
ConstituentBCaClpHSO4Sp CondTDS
Result<506.141.68.58.78650
AW-05B
ConstituentBCaClpHSO4Sp CondTDS
Result<501.713.64.81438<25
AW-06B
ConstituentBCaClpHSO4Sp CondTDS
Result<500.5032.35.1164326
AW-08B
ConstituentBCaClpHSO4Sp CondTDS
Result<501.214.44.61844<25
AW-09B ConstituentBCaClpHSO4Sp CondTDS
Result<500.7941.14.11428<25
MW-07A
ConstituentBCaClpHSO4Sp CondTDS
Result<502.2924.31739<25
MW-07BConstituentBCaClpHSO4Sp CondTDS
Result5477.47.66.817408250
MW-15 ConstituentBCaClpHSO4Sp CondTDS
Result905.55195.922150.584
MW-16
ConstituentBCaClpHSO4Sp CondTDS
Result208061.5286.4140630380
MW-19
ConstituentBCaClpHSO4Sp CondTDS
Result5249.126745385220
MW-20
ConstituentBCaClpHSO4Sp CondTDS
Result<502.152.75.714.831.1<25
MW-22B
ConstituentBCaClpHSO4Sp CondTDS
Result14512.92.36.39.890.455
MW-23B
ConstituentBCaClpHSO4Sp CondTDS
Result40922.8116.628265.3140
MW-24B
ConstituentBCaClpHSO4Sp CondTDS
Result19813144.762196110
MW-27B
ConstituentBCaClpHSO4Sp CondTDS
Result<506.014.86.31068.840
MW-28B
ConstituentBCaClpHSO4Sp CondTDS
Result<505.613.76861.240
MW-31B
ConstituentBCaClpHSO4Sp CondTDS
Result<508.933.84.37.232<25
MW-37B
ConstituentBCaClpHSO4Sp CondTDS
Result1009.296.24.64510657
SM W-01B
ConstituentBCaClpHSO4Sp CondTDS
Result<5028.38.36.43.2281140
SM W-02B
ConstituentBCaClpHSO4Sp CondTDS
Result50416.95.538342250
SM W-03B
ConstituentBCaClpHSO4Sp CondTDS
Result<505.424.35.76.63042
SM W-04B
ConstituentBCaClpHSO4Sp CondTDS
Result<5027.35.25.749237150
SM W-05B
ConstituentBCaClpHSO4Sp CondTDS
Result605.365.85.664217183
SM W-06B
Service Layer Credits: NC OneMap, NCCenter for Geographic Information andAnalysis, NC 911 Board
PRJ-I-140 SR-1347
S R -1 3 8 5
SR-1430
RMP-5815
U
S-421
SR-1394
SR-2836
R M P -5 8 2 1
S R -2 8 3 8
S
R-2169
U
S-17
S R -2 7 7 9
S R -2 1 4 5
P R J -I -1 4 0
SR-2000
I -1 4 0
I -1 4 0
R M P -5 8 1 4
S R -1 4 3 1
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-46-DETECTION MONITORING CONSTITUENT MAP-LOWER SURFICIAL AQUIFER_V07302015.MXD
LEGEND
MONITORING WELL
PIEZOMETER
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGESS SUTTON PLANT SITEBOUNDARY
148 River Street, Suite 220Greenville, SC 29601864-421-9999www.synterracorp.com DATE: 08/01/2015CHECKED BY: J. MEADOWSDRAWN BY: T. KING
PROJECT MANAGER: P. WALDREP
400 0 400 800 1,200 1,600 2,000
(IN FEET)
GRAPHIC SCALE
L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
FIGURE 10-46CCR RULE DETECTION MONITORING CONSTITUENT MAPLOWER SURFICIAL AQUIFER
DATE: 08/01/2015
NOTES:1 CCR RULE AS INDENTIFIED IN THE USEPA APRIL 2015 FINAL RULING 40 CFR PARTS 257 AND 261
2 APRIL 17, 2014 AERIAL ORTHOPHOTOGRAPHY OBTAINED FROM WSP
3 2013 AERIAL ORTHOPHOTOGRAPHY OBTAINED FROM NC CENTER FOR GEOGRAPHIC INFORMATION AND ANALYSIS, AT (http://services.nconemap.gov/)
4 PARCEL BOUNDARY WAS OBTAINED FROM THE NC CENTER FOR GEOGRAPHIC INFORMATION AND ANALYSIS, AT (http://services.nconemap.gov/) 5 DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83).
Constituent Abbreviation UnitsBoronBµg/LCalciumCamg/LChlorideClmg/LSpecific Conductance Sp Cond µmhos/cmpHpHSUSulfateSO4mg/LTotal Dissolved Solids TDS mg/L
ConstituentBCaClpHSO4Sp CondTDS
Result60034.8437.9191524.3300
ABMW-02D
ConstituentBCaClpHSO4Sp CondTDS
Result985.24294.8329784
AW-01C
ConstituentBCaClpHSO4Sp CondTDS
Result<501.964.75.936038
AW-02C
ConstituentBCaClpHSO4Sp CondTDS
Result137046.81605.9140874510
AW-03C
ConstituentBCaClpHSO4Sp CondTDS
Result145041.7496.2120525310
AW-04C
ConstituentBCaClpHSO4Sp CondTDS
Result696.244.7236940
AW-05C
ConstituentBCaClpHSO4Sp CondTDS
Result<501.946.54.4216230
AW-08C
ConstituentBCaClpHSO4Sp CondTDS
Result55419.8315.199314190
AW-09C
ConstituentBCaClpHSO4Sp CondTDS
Result<5060.1136.810385.1210
MW-04B
ConstituentBCaClpHSO4Sp CondTDS
Result<503.89215.51413569
MW-05C
ConstituentBCaClpHSO4Sp CondTDS
Result56019.638583299200
MW-07C
ConstituentBCaClpHSO4Sp CondTDS
Result<501.8344.51248<25
MW-11
ConstituentBCaClpHSO4Sp CondTDS
Result147051.61008.5130264410
MW-12
ConstituentBCaClpHSO4Sp CondTDS
Result56057.41306.485721430
MW-15D
ConstituentBCaClpHSO4Sp CondTDS
Result68026.81105.4120637350
MW-16D
ConstituentBCaClpHSO4Sp CondTDS
Result3055578766605340
MW-20D
ConstituentBCaClpHSO4Sp CondTDS
Result212070.3346.5140697420
MW-21C
ConstituentBCaClpHSO4Sp CondTDS
Result256069.9416.43160684440
MW-22C
ConstituentBCaClpHSO4Sp CondTDS
Result205047.5296.6169454280
MW-23C
ConstituentBCaClpHSO4Sp CondTDS
Result104049.91505.5150858500
MW-24C
ConstituentBCaClpHSO4Sp CondTDS
Result<5042.65.621055.426
MW-28C
ConstituentBCaClpHSO4Sp CondTDS
Result118054.81705.2160908540
MW-31C
ConstituentBCaClpHSO4Sp CondTDS
Result1155.24.24.97167031
MW-32C
ConstituentBCaClpHSO4Sp CondTDS
Result<504.014.54.61255.330
MW-33C
ConstituentBCaCaClpHSO4Sp CondTDS
Result<500.5178.483.55.79.812081
MW-37C
ConstituentBCaClpHSO4Sp CondTDS
Result77639665.5140561340
SMW-01C
ConstituentBCaClpHSO4Sp CondTDS
Result33719.5235.749215130
SMW-02C
ConstituentBCaClpHSO4Sp CondTDS
Result41724.9354.993333190
SMW-03C
ConstituentBCaClpHSO4Sp CondTDS
Result859.59186.616203.4110
SMW-04C
ConstituentBCaClpHSO4Sp CondTDS
Result36215.2334.953230120
SMW-05C
ConstituentBCaClpHSO4Sp CondTDS
Result19715.520540194110
SMW-06C
Se rvice L ayer Cre dits: NC One Ma p, NCCenter for Geo graphic Info rma tio n a ndAnalysis, NC 911 Board
PRJ-I-140 SR-1347
S R -1 3 8 5
SR-1430
RMP-5815
U
S-421
SR-1394
SR-2836
R M P -5 8 2 1
S R -2 8 3 8
S
R-2
1
6
9
U
S-17
S R -2 7 7 9
S R -2 1 4 5
P R J -I -1 4 0
SR-2000
I -1 4 0
I -1 4 0
R M P -5 8 1 4
S R -1 4 3 1
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
P:\DU KE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-47-DETECTION MONITORING CONSTITUENT MAP-UPPER PEE DEE WELLS_V07302015.MXD
LEGEND
MONITORING WELL
PIEZOMETER
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE
DUKE ENERGY PROGESS SUTTON PLANT SITEBOUNDARY
148 River S treet, Su ite 220Greenville, SC 29601864-421-9999www.syn terraco rp .com DATE: 08/01/201 5CHECKED BY: J. MEAD OWSDRAWN BY: T. KING
PR OJECT MANAGER: P. WAL DREP
400 0 400 800 1,200 1,600 2,000
(IN FEET)
GRAPHIC SCALE
L. V. SUT TON ENE RGY COM P LE X801 SU TTON ST EA M P LA NT RDWILMINGTON, NORT H CAROL INA
FIGURE 10-47CCR RULE DETECTION MONITORING CONSTITUENT MAPUPPER PEE DEE WELLS
DATE: 08/01/201 5
NOT ES:1 CCR RULE AS INDENTIFIE D IN THE US EPA A PRIL 2015 FINAL RULING 40 CFR PA RTS 257 AND 261
2 AP RIL 17, 2014 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM WS P
3 2013 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/)
4 PARCEL B OUNDA RY WA S OB TAINED FROM THE NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 5 DRAW ING HA S BE EN SE T W ITH A PROJE CTION O F NO RTH CA ROLINA S TAT E PLANE COORDINATE SYS TEM FIPS 3200 (NA D83).
Consti tue nt Abbre vi ati on Uni tsBoronBµg/LCalciumCamg/LChlorideClmg/LSpecific Conductance Sp Cond µmhos/cmpHpHSUSulfateSO4mg/LTotal Di ssol ve d Sol i ds TDS mg/L
ConstituentBCaClpHSO4Sp CondTDS
Result16731.7537.81.6505350
ABM W-01D
ConstituentBCaClpHSO4Sp CondTDS
Result66613.3160835965510
AW-02D
ConstituentBCaClpHSO4Sp CondTDS
Result30612.9968.424612330
AW-05D
ConstituentBCaClpHSO4Sp CondTDS
Result9807.331908.2151208720
AW-06D
ConstituentBCaClpHSO4Sp CondTDS
Result81511.41209.975.7872510
AW-07D
ConstituentBCaClpHSO4Sp CondTDS
Result58116.72208.2531140630
AW-09D
ConstituentBCaClpHSO4Sp CondTDS
Result36816.11207.725727380
PZ -10D
ConstituentBCaClpHSO4Sp CondTDS
Result9906.791909.8261195670
SM W-06D
Se rvice L ayer Cre dits: NC One Ma p, NCCenter for Geo graphic Info rma tio n a ndAnalysis, NC 911 Board
PRJ-I-140 SR-1347
S R -1 3 8 5
SR-1430
RMP-5815
U
S-421
SR-1394
SR-2836
R M P -5 8 2 1
S R -2 8 3 8
S
R-2
1
6
9
U
S-17
S R -2 7 7 9
S R -2 1 4 5
P R J -I -1 4 0
SR-2000
I -1 4 0
I -1 4 0
R M P -5 8 1 4
S R -1 4 3 1
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
P:\DU KE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-48-DETECTION MONITORING CONSTITUENT MAP-LOWER PEE DEE WELLS_V07302015.MXD
LEGEND
MONITORING WELL
PIEZOMETER
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE
DUKE ENERGY PROGESS SUTTON PLANT SITEBOUNDARY
148 River S treet, Su ite 220Greenville, SC 29601864-421-9999www.syn terraco rp .com DATE: 08/01/201 5CHECKED BY: J. MEAD OWSDRAWN BY: T. KING
PR OJECT MANAGER: P. WAL DREP
400 0 400 800 1,200 1,600 2,000
(IN FEET)
GRAPHIC SCALE
L. V. SUT TON ENE RGY COM P LE X801 SU TTON ST EA M P LA NT RDWILMINGTON, NORT H CAROL INA
FIGURE 10-48CCR RULE DETECTION MONITORING CONSTITUENT MAPLOWER PEE DEE W ELLS
DATE: 08/01/201 5
NOT ES:1 CCR RULE AS INDENTIFIE D IN THE US EPA A PRIL 2015 FINAL RULING 40 CFR PA RTS 257 AND 261
2 AP RIL 17, 2014 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM WS P
3 2013 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/)
4 PARCEL B OUNDA RY WA S OB TAINED FROM THE NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 5 DRAW ING HA S BE EN SE T W ITH A PROJE CTION O F NO RTH CA ROLINA S TAT E PLANE COORDINATE SYS TEM FIPS 3200 (NA D83).
Consti tue nt Abbre vi ati on Uni tsBoronBµg/LCalciumCamg/LChlorideClmg/LSpecific Conductance Sp Cond µmhos/cmpHpHSUSulfateSO4mg/LTotal Di ssol ve d Sol i ds TDS mg/L
ConstituentBCaClpHSO4Sp CondTDS
Result195012.65408.712027661500
AW-05E
ConstituentBCaClpHSO4Sp CondTDS
Result247013.84908.112026481500
AW-06E
ConstituentBCaClpHSO4Sp CondTDS
Result25004.965001011026271500
MW-23E
Se rvice L ayer Cre dits: NC One Ma p, NCCenter for Geo graphic Info rma tio n a ndAnalysis, NC 911 Board
PRJ-I-140 SR-1347
S R -1 3 8 5
SR-1430
RMP-5815
U
S-421
SR-1394
SR-2836
R M P -5 8 2 1
S R -2 8 3 8
S
R-2
1
6
9
U
S-17
S R -2 7 7 9
S R -2 1 4 5
P R J -I -1 4 0
SR-2000
I -1 4 0
I -1 4 0
R M P -5 8 1 4
S R -1 4 3 1
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
P:\DU KE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-49-ASSESSMENT MONITORING CONSTITUENT MAP-UPPER SURFICIAL AQUIFER_V07302015.MXD
LEGEND
MONITORING WELL
PIEZOMETER
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGESS SUTTON PLANT SITEBOUNDARY
148 River S treet, Su ite 220Greenville, SC 29601864-421-9999www.syn terraco rp .com DATE: 08/01/201 5CHECKED BY: J. MEAD OWSDRAWN BY: T. KING
PR OJECT MANAGER: P. WAL DREP
400 0 400 800 1,200 1,600 2,000
(IN FEET)
GRAPHIC SCALE
L. V. SUT TON ENE RGY COM P LE X801 SU TTON ST EA M P LA NT RDWILMINGTON, NORT H CAROL INA
FIGURE 10-49CCR RULE ASSESSMENT MONITORING CONSTITUENT MAPUPPER SURFICIAL AQUIFER
NOT ES:1 AP RIL 17, 2014 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM WS P
2 2013 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/)
3 PARCEL B OUNDA RY WA S OB TAINED FROM THE NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 4 DRAW ING HA S BE EN SE T W ITH A PROJE CTION O F NO RTH CA ROLINA S TAT E PLANE COORDINATE SYS TEM FIPS 3200 (NA D83).
DATE: 08/01/201 5
Consti tue nt A bbre vi ati on Uni tsAluminumAlµg/LAntimonySbµg/LArsenicAsµg/LBariumBaµg/LBerylliumBeµg/LCadmiumCdµg/LChromiumCrµg/LCopperCumg/LIronFeµg/LLeadPbµg/LManganeseMnµg/LMercuryHgµg/LMolybdenumMoµg/LSeleniumSeµg/LSulfateSO4mg/LSulfideSulfidemg/LThalliumTlµg/LVandadiumVµg/L
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4Tl
Result182<144<1<1<5<0.00537<0.0584<1<1<1<124<0.2
421-Well 3
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4Tl
Result239<144<1<1<5<0.00571<0.0557<1<1<1<117<0.2
421-Well 4
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result143634594<1<1<1<0.001152<0.0588162<1<1<183<0.1<0.23.45
ABMW-01S
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result6453.41810<1<1<1<0.00124100<0.057845.18<1<1<1<0.1<0.2<0.21.28
ABMW-02S
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result522<1<5<1<1<1<0.0012680<0.051051.37<1<1<14.5<1<0.2<0.3
AW-01B ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result35<116<1<1<1<0.0011320<0.052041.4<1<1<12.9<0.1<0.2<0.3
AW-02B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result32<110<1<1<1<0.0016290<0.0513<1<1<1<140.439<0.20.427
AW-03B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result7<112<1<1<1<0.00141<0.0522<1<1<1<15.4<0.1<0.2<0.3
AW-04B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result45<125<1<1<1<0.001281<0.05268.54<1<1<18.70.173<0.2<0.3
AW-05B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result890<132<1<1<1<0.00171<0.0517<1<1<1<114<0.1<0.2<0.3
AW-06B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result276<125<1<11.65<0.0014450<0.0529<1<1<1<1160.527<0.20.335
AW-08B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result1420<118<1<1<1<0.001225<0.0518<1<1<1<118<0.1<0.2<0.3
AW-09B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result1130<16<1<1<1<0.00193<0.05<5<1<1<1<114<0.1<0.2<0.3
MW-07A
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result590<122<1<1<1<0.00115<0.059<1<1<1<117<0.1<0.2<0.3
MW-07B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result9023.630<1<1<1<0.0013690<0.05769.6<1<1<117<0.1<0.23.88
MW-15
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result1231.4920<1<1<1<0.001113<0.0593<1<1<122<0.1<0.20.316
MW-16
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4Tl
Result92.6273<1<1<5<0.005914<0.05386112<1<1<11400.458
MW-19
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result391.1255<1<1<1<0.001747<0.051076.53<1<1<1450.19<0.239.6
MW-20
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4Tl
Result24<19<1<1<5<0.005<10<0.05<51.5<1<1<14.8<0.2
MW-22B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4TlV
Result14<140<1<1<5<0.005<10<0.057126<1<14.259.8<0.20.3
MW-23B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4TlV
Result7<147<1<1<5<0.005<10<0.053597<1<1<128<0.20.555
MW-24B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4TlV
Result267<141<1<1<5<0.00521<0.0555<1<1<127.162<0.20.3
MW-27B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4Tl
Result23<128<1<1<5<0.00510<0.0510<1<1<1<110<0.2
MW-28B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result203<135<1<1<1<0.0011180<0.0573<1<1<1<18<0.1<0.20.378
MW-31B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4TlV
Result703.0839<1<1<5<0.0059580<0.05254<1<1<1<17.2<0.20.3
MW-37B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result769<178<1<1<1<0.00130<0.0514<1<1<1<145<0.1<0.2<0.3
SMW-01B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result84<161<1<12.29<0.00128800<0.054131.01<1<1<13.20.473<0.21.42
SMW-02B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result25<153<1<1<1<0.0011310<0.0591<1<1<1<138<0.1<0.2<0.3
SMW-03B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result86<117<1<1<1<0.0017590<0.05852.66<1<1<16.60.652<0.2<0.3
SMW-04B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result421.4736<1<1<1<0.0019910<0.05139<1<1<1<1490.399<0.20.81
SMW-05B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result73<148<1<1<1<0.00122<0.0530<1<1<1<142<0.1<0.2<0.3
SMW-06B
Service Layer Credits: NC OneMap, NCCenter for Geographic Information andAnalysis, NC 911 Board
PRJ-I-140 SR-1347
S R -1 3 8 5
SR-1430
RMP-5815
U
S-421
SR-1394
SR-2836
R M P -5 8 2 1
S R -2 8 3 8
S
R-2169
U
S-17
S R -2 7 7 9
S R -2 1 4 5
P R J -I -1 4 0
SR-2000
I -1 4 0
I -1 4 0
R M P -5 8 1 4
S R -1 4 3 1
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-50-ASSESSMENT MONITORING CONSTITUENT MAP-LOWER SURFICIAL AQUIFER_V07302015.MXD
LEGEND
MONITORING WELL
PIEZOMETER
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGESS SUTTON PLANT SITEBOUNDARY 148 River Street, Suite 220Greenville, SC 29601864-421-9999www.synterracorp.com DATE: 08/01/2015CHECKED BY: J. MEADOWSDRAWN BY: T. KING
PROJECT MANAGER: P. WALDREP
400 0 400 800 1,200 1,600 2,000
(IN FEET)
GRAPHIC SCALE
L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
FIGURE 10-50CCR RULE ASSESSMENT MONITORING CONSTITUENT MAPLOWER SURFICIAL AQUIFER
DATE: 08/01/2015
NOTES:1 APRIL 17, 2014 AERIAL ORTHOPHOTOGRAPHY OBTAINED FROM WSP
2 2013 AERIAL ORTHOPHOTOGRAPHY OBTAINED FROM NC CENTER FOR GEOGRAPHIC INFORMATION AND ANALYSIS, AT (http://services.nconemap.gov/)
3 PARCEL BOUNDARY WAS OBTAINED FROM THE NC CENTER FOR GEOGRAPHIC INFORMATION AND ANALYSIS, AT (http://services.nconemap.gov/) 4 DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83).
Constitue nt Abbreviation UnitsAluminumAlµg/LAntimonySbµg/LArsenicAsµg/LBariumBaµg/LBerylliumBeµg/LCadmiumCdµg/LChromiumCrµg/LCopperCumg/LIronFeµg/LLeadPbµg/LManganeseMnµg/LMercuryHgµg/LMolybdenumMoµg/LSeleniumSeµg/LSulfateSO4mg/LSulfideSulfidemg/LThalliumTlµg/LVandadiumVµg/L
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result2317065<1<1<1<0.0011270150117<1<1<191<0.2<0.2<0.3
ABMW-02D
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result472<1141<1<1<1<0.001470179<1<1<12.632<0.5<0.2<0.3
AW-01C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result117<155<1<1<1<0.001761057<1<1<1<132.43<0.2<0.3
AW-02C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result221.5496<1<1<1<0.001113001830<1<1<1<11402.29<0.20.75
AW-03C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result38<137<1<1<1<0.0013990787<1<1<1<11203.89<0.20.518
AW-04C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result256<136<1<1<1<0.00112821<1<1<1<123<0.1<0.2<0.3
AW-05C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result339<140<1<1<1<0.0016123<1<1<1<121<0.1<0.2<0.3
AW-08C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result199<1118<1<1<1<0.001102289<1<1<1<199<0.1<0.2<0.3
AW-09C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4Tl
Result7<168<1<1<5<0.005128059<1<1<1<110<0.2
MW-04B
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4Tl
Result6<127<1<1<5<0.005<10441<1<1<1<114<0.2
MW-05C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4TlV
Result154<175<1<1<5<0.005166368<1<1<1<1830.4050.573
MW-07C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4Tl
Result289<182<1<1<5<0.0054830<1<1<1<112<0.2
MW-11
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4TlV
Result22<129<1<1<5<0.005569069115.2<1<1<1130<0.20.3
MW-12
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result5<141<1<1<1<0.00185940<1<1<1<185<0.1<0.2<0.3
MW-15D
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result106<140<1<1<1<0.0011020311<1<1<1<1120<0.1<0.22.09
MW-16D
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result102.2551<1<1<1<0.00186413114<1<1<166<0.1<0.2<0.3
MW-20D
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4Tl
Result1353.866<1<1<5<0.0055110430191<1<1<1140<0.2
MW-21C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4Tl
Result<5<195<1<1<5<0.005141732169<1<1<11600.398
MW-22C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4TlV
Result22<136<1<1<5<0.00588309396<1<1<1690.210.323
MW-23C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4TlV
Result313.4239<1<1<5<0.00541801120<1<1<1<1150<0.20.543
MW-24C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4Tl
Result37<151<1<1<5<0.005<1086.23<1<1<110<0.2
MW-28C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4TlV
Result29<155<1<1<5<0.00528501680<1<1<1<1160<0.20.3
MW-31C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4Tl
Result171<127<1<1<5<0.0053030<1<1<1<116<0.2
MW-32C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4Tl
Result136<121<1<1<5<0.0052030<1<1<1<112<0.2
MW-33C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4TlV
Result746<18<1<1<5<0.005336<1<1<1<19.8<0.21.22
MW-37C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result99<134<1<1<1<0.0014250807<1<1<1<11401.87<0.20.402
SMW-01C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result142<137<1<1<1<0.0015370539<1<1<1<149<0.1<0.2<0.3
SMW-02C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result163<186<1<1<1<0.0011510584<1<1<1<1930.177<0.2<0.3
SMW-03C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result2602.5636<1<1<1<0.00196601322.69<1<1<1160.147<0.20.803
SMW-04C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result121<179<1<1<1<0.001175130<1<1<1<153<0.1<0.2<0.3
SMW-05C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result632.7953<1<1<1<0.0011320273<1<1<1<1402.95<0.2<0.3
SMW-06C
Se rvice L ayer Cre dits: NC One Ma p, NCCenter for Geo graphic Info rma tio n a ndAnalysis, NC 911 Board
PRJ-I-140 SR-1347
S R -1 3 8 5
SR-1430
RMP-5815
U
S-421
SR-1394
SR-2836
R M P -5 8 2 1
S R -2 8 3 8
S
R-2
1
6
9
U
S-17
S R -2 7 7 9
S R -2 1 4 5
P R J -I -1 4 0
SR-2000
I -1 4 0
I -1 4 0
R M P -5 8 1 4
S R -1 4 3 1
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
P:\DU KE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-51-ASSESSMENT MONITORING CONSTITUENT MAP-UPPER PEE DEE WELLS_V07302015.MXD
LEGEND
MONITORING WELL
PIEZOMETER
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGESS SUTTON PLANT SITEBOUNDARY
148 River S treet, Su ite 220Greenville, SC 29601864-421-9999www.syn terraco rp .com DATE: 08/01/201 5CHECKED BY: J. MEAD OWSDRAWN BY: T. KING
PR OJECT MANAGER: P. WAL DREP
400 0 400 800 1,200 1,600 2,000
(IN FEET)
GRAPHIC SCALE
L. V. SUT TON ENE RGY COM P LE X801 SU TTON ST EA M P LA NT RDWILMINGTON, NORT H CAROL INA
FIGURE 10-51CCR RULEASSESSMENT MONITORING CONSTITUENT MAPUPPER PEE DEE WELLS
DATE: 08/01/201 5
NOT ES:1 AP RIL 17, 2014 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM WS P
2 2013 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/)
3 PARCEL B OUNDA RY WA S OB TAINED FROM THE NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 4 DRAW ING HA S BE EN SE T W ITH A PROJE CTION O F NO RTH CA ROLINA S TAT E PLANE COORDINATE SYS TEM FIPS 3200 (NA D83).
Consti tue nt A bbre vi ati on Uni tsAluminumAlµg/LAntimonySbµg/LArsenicAsµg/LBariumBaµg/LBerylliumBeµg/LCadmiumCdµg/LChromiumCrµg/LCopperCumg/LIronFeµg/LLeadPbµg/LManganeseMnµg/LMercuryHgµg/LMolybdenumMoµg/LSeleniumSeµg/LSulfateSO4mg/LSulfideSulfidemg/LThalliumTlµg/LVandadiumVµg/L
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result521.0317<1<1<1<0.0014758211.2<1<1<11.62.9<0.20.642
ABM W-01D
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result104<112<1<1<1<0.001438593.15<1<1<135<0.1<0.2<0.3
AW-02D
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result1491.369<1<1<1<0.0012983850.7<1<1<124<0.2<0.2<0.3
AW-05D
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result431.5716<1<1<1<0.0011021818.1<1<1<115<0.1<0.2<0.3
AW-06D
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result136<1<5<1<1<1<0.001220148.53<1<1<15.72.09<0.20.992
AW-07D
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result46<17<1<1<1<0.001194408.23<1<1<153<0.5<0.2<0.3
AW-09D
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result91<155<1<1<1<0.001347532.38<1<1<125<0.1<0.20.397
PZ -10D
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result2213.7615<1<1<1<0.00130037110<1<1<1263.24<0.21.61
SMW-06D
Se rvice L ayer Cre dits: NC One Ma p, NCCenter for Geo graphic Info rma tio n a ndAnalysis, NC 911 Board
PRJ-I-140 SR-1347
S R -1 3 8 5
SR-1430
RMP-5815
U
S-421
SR-1394
SR-2836
R M P -5 8 2 1
S R -2 8 3 8
S
R-2
1
6
9
U
S-17
S R -2 7 7 9
S R -2 1 4 5
P R J -I -1 4 0
SR-2000
I -1 4 0
I -1 4 0
R M P -5 8 1 4
S R -1 4 3 1
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
P:\DU KE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-52-ASSESSMENT MONITORING CONSTITUENT MAP-LOWER PEE DEE WELLS_V07302015.MXD
LEGEND
MONITORING WELL
PIEZOMETER
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE
DUKE ENERGY PROGESS SUTTON PLANT SITEBOUNDARY
148 River S treet, Su ite 220Greenville, SC 29601864-421-9999www.syn terraco rp .com DATE: 08/01/201 5CHECKED BY: J. MEAD OWSDRAWN BY: T. KING
PR OJECT MANAGER: P. WAL DREP
400 0 400 800 1,200 1,600 2,000
(IN FEET)
GRAPHIC SCALE
L. V. SUT TON ENE RGY COM P LE X801 SU TTON ST EA M P LA NT RDWILMINGTON, NORT H CAROL INA
FIGURE 10-52CCR RULE ASSESSMENT MONITORING CONSTITUENT MAPLOWER PEE DEE WELLS
DATE: 08/01/201 5
NOTES:1 APRIL 17, 2014 AERIAL ORTHOPHOTOGRAPHY OBTAINED FROM WSP
2 2013 AERIAL ORTHOPHOTOGRAPHY OBTAINED FROM NC CENTER FOR GEOGRAPHIC INFORMATION AND ANALYSIS, AT (http://services.nconemap.gov/)
3 PARCEL BOUNDARY WAS OBTAINED FROM THE NC CENTER FOR GEOGRAPHIC INFORMATION AND ANALYSIS, AT (http://services.nconemap.gov/) 4 DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83).
Consti tue nt A bbre vi ati on Uni tsAluminumAlµg/LAntimonySbµg/LArsenicAsµg/LBariumBaµg/LBerylliumBeµg/LCadmiumCdµg/LChromiumCrµg/LCopperCumg/LIronFeµg/LLeadPbµg/LManganeseMnµg/LMercuryHgµg/LMolybdenumMoµg/LSeleniumSeµg/LSulfateSO4mg/LSulfideSulfidemg/LThalliumTlµg/LVandadiumVµg/L
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result971.378<1<1<1<0.001276921.3<1<1<1120<0.1<0.2<0.3
AW-05E
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result577<18<1<114.7<0.001704246.63<1<1<1120<0.2<0.21.77
AW-06E
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result41<1<5<1<1<1<0.00148515.6<1<1<1110<0.1<0.20.993
MW-23E
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
www.synterracorp.com
DRAWN BY: J. GILMER
PROJECT MANAGER: P. WALDREP
LAYOUT:
DATE: JUNE 2015
FIGURE 10-53
PIPER DIAGRAM – ASH PORE WATER
L.V. SUTTON ENERGY COMPLEX
801 SUTTON STEAM PLANT ROAD
WILMINGTON, NORTH CAROLINA 28401
P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\Stats Figures\Piper Diagrams
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
www.synterracorp.com
DRAWN BY: J. GILMER
PROJECT MANAGER: P. WALDREP
LAYOUT:
DATE: JUNE 2015
FIGURE 10-54
PIPER DIAGRAM – PEE DEE
L.V. SUTTON ENERGY COMPLEX
801 SUTTON STEAM PLANT ROAD
WILMINGTON, NORTH CAROLINA 28401
P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\Stats Figures\Piper Diagrams
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
www.synterracorp.com
DRAWN BY: J. GILMER
PROJECT MANAGER: P. WALDREP
LAYOUT:
DATE: JUNE 2015
FIGURE 10-55
PIPER DIAGRAM – SURFICIAL AQUIFER
(SHALLOW)
L.V. SUTTON ENERGY COMPLEX
801 SUTTON STEAM PLANT ROAD
WILMINGTON, NORTH CAROLINA 28401
P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\Stats Figures\Piper Diagrams
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
www.synterracorp.com
DRAWN BY: J. GILMER
PROJECT MANAGER: P. WALDREP
LAYOUT:
DATE: JUNE 2015
FIGURE 10-56
PIPER DIAGRAM – SURFICIAL AQUIFER
(INTERMEDIATE)
L.V. SUTTON ENERGY COMPLEX
801 SUTTON STEAM PLANT ROAD
WILMINGTON, NORTH CAROLINA 28401
P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\Stats Figures\Piper Diagrams
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
www.synterracorp.com
DRAWN BY: J. GILMER
PROJECT MANAGER: P. WALDREP
LAYOUT:
DATE: JUNE 2015
FIGURE 10-57
PIPER DIAGRAM – SURFICIAL AQUIFER
(DEEP)
L.V. SUTTON ENERGY COMPLEX
801 SUTTON STEAM PLANT ROAD
WILMINGTON, NORTH CAROLINA 28401
P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\Stats Figures\Piper Diagrams
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
www.synterracorp.com
DRAWN BY: J. GILMER
PROJECT MANAGER: P. WALDREP
LAYOUT:
DATE: JUNE 2015
FIGURE 10-58
PIPER DIAGRAM – SURFACE WATER
L.V. SUTTON ENERGY COMPLEX
801 SUTTON STEAM PLANT ROAD
WILMINGTON, NORTH CAROLINA 28401
P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\Stats Figures\Piper Diagrams
15 NCAC 02L Standard = 10 ug/L
Ar
s
e
n
i
c
(
µ
g
/
L
)
Ba
r
i
u
m
(
µ
g
/
L
)
Bo
r
o
n
(
µ
g
/
L
)
15 NCAC 02L Standard = 700 ug/L
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
www.synterracorp.com
DRAWN BY: J. GILMER
PROJECT MANAGER: P. WALDREP
LAYOUT:
DATE: JUNE 2015
P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW
Assessment Plan\1.11 CSA Reporting\FIGURES\Stats
Figures\Boxplots
FIGURE 10-59
COMPLIANCE WELL BOX AND WHISKER PLOTS
ARSENIC, BARIUM, BORON
L.V. SUTTON ENERGY COMPLEX
801 SUTTON STEAM PLANT ROAD
WILMINGTON, NORTH CAROLINA 28401
Note: 15 NCAC 02L Standard = 700 µg/L
15 NCAC 02L Standard = 300 ug/L
Ir
o
n
(
µ
g
/
L
)
15 NCAC 02L
Standard = 50 ug/L
Ma
n
g
a
n
e
s
e
(
µ
g
/
L
)
15 NCAC 02L Standard = 250 mg/L
Ch
l
o
r
i
d
e
(
m
g
/
L
)
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
www.synterracorp.com
DRAWN BY: J. GILMER
PROJECT MANAGER: P. WALDREP
LAYOUT:
DATE: JUNE 2015
P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW
Assessment Plan\1.11 CSA Reporting\FIGURES\Stats
Figures\Boxplots
FIGURE 10-60
COMPLIANCE WELL BOX AND WHISKER PLOTS
CHLORIDE, IRON, MANGANESE
L.V. SUTTON ENERGY COMPLEX
801 SUTTON STEAM PLANT ROAD
WILMINGTON, NORTH CAROLINA 28401
15 NCAC 02L Standard = 250 mg/L Su
l
f
a
t
e
(
m
g
/
L
)
15 NCAC 02L Standard = 20 ug/L Se
l
e
n
i
u
m
(
µ
g
/
L
)
Ni
t
r
a
t
e
(
µ
g
/
L
)
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
www.synterracorp.com
DRAWN BY: J. GILMER
PROJECT MANAGER: P. WALDREP
LAYOUT:
DATE: JUNE 2015
P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW
Assessment Plan\1.11 CSA Reporting\FIGURES\Stats
Figures\Boxplots
FIGURE 10-61
COMPLIANCE WELL BOX AND WHISKER PLOTS
NITRATE, SELENIUM, SULFATE
L.V. SUTTON ENERGY COMPLEX
801 SUTTON STEAM PLANT ROAD
WILMINGTON, NORTH CAROLINA 28401
Note: 15 NCAC 02L Standard = 10 µg/L
Zi
n
c
(
µ
g
/
L
)
15 NCAC 02L Standard = 0.2 ug/L
Th
a
l
l
i
u
m
(
µ
g
/
L
)
15 NCAC 02L Standard = 500 mg/L
To
t
a
l
D
i
s
s
o
l
v
e
d
S
o
l
i
d
s
(
m
g
/
L
)
1.5e+003
2e+003
1e+003
500
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
www.synterracorp.com
DRAWN BY: J. GILMER
PROJECT MANAGER: P. WALDREP
LAYOUT:
DATE: JUNE 2015
P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW
Assessment Plan\1.11 CSA Reporting\FIGURES\Stats
Figures\Boxplots
FIGURE 10-62
COMPLIANCE WELL BOX AND WHISKER PLOTS
TOTAL DISSOLVED SOLIDS, THALLIUM, ZINC
L.V. SUTTON ENERGY COMPLEX
801 SUTTON STEAM PLANT ROAD
WILMINGTON, NORTH CAROLINA 28401
Note: 15 NCAC 02L Standard = 1000 µg/L
Tu
r
b
i
d
i
t
y
(
N
T
U
)
pH
(
S
.
U
.
)
Di
s
s
o
l
v
e
d
O
x
y
g
e
n
(
µ
g
/
L
)
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
www.synterracorp.com
DRAWN BY: J. GILMER
PROJECT MANAGER: P. WALDREP
LAYOUT:
DATE: JUNE 2015
P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW
Assessment Plan\1.11 CSA Reporting\FIGURES\Stats
Figures\Boxplots
FIGURE 10-63
COMPLIANCE WELL BOX AND WHISKER PLOTS
DISSOLVED OXYGEN, pH, TURBIDITY
L.V. SUTTON ENERGY COMPLEX
801 SUTTON STEAM PLANT ROAD
WILMINGTON, NORTH CAROLINA 28401
Elevation
Elevation
S
t
a
t
i
o
n
-140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60
-
1
4
0
-
1
3
0
-
1
2
0
-
1
1
0
-
1
0
0
-
9
0
-
8
0
-
7
0
-
6
0
-
5
0
-
4
0
-
3
0
-
2
0
-
1
0
0
1
0
2
0
3
0
4
0
5
0
6
0
0+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+00
16+00
17+00
18+00
19+00
20+00
21+00
22+00
23+00
24+00
25+00
26+00
27+00
28+00
29+00
30+00
31+00
32+00
33+00
34+00
35+00
36+00
37+00
38+00
39+00
40+00
41+00
42+00
43+00
44+00
45+00
46+00
47+00
48+00
49+00
50+00
51+00
52+00
53+00
53+50
Elevation
Elevation
S
t
a
t
i
o
n
-140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60
-
1
4
0
-
1
3
0
-
1
2
0
-
1
1
0
-
1
0
0
-
9
0
-
8
0
-
7
0
-
6
0
-
5
0
-
4
0
-
3
0
-
2
0
-
1
0
0
1
0
2
0
3
0
4
0
5
0
6
0
0+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+00
16+00
17+00
18+00
19+00
20+00
21+00
22+00
23+00
24+00
25+00
26+00
27+00
28+00
29+00
30+00
31+00
32+00
33+00
34+00
35+00
36+00
37+00
38+00
39+00
40+00
41+00
42+00
43+00
44+00
45+00
46+00
47+00
48+00
49+00
50+00
51+00
52+00
53+00
53+50
5
/
2
2
/
2
0
1
5
5
/
2
2
/
2
0
1
5
P
.
W
A
L
D
R
E
P
C
.
N
E
W
E
L
L
P
R
O
J
E
C
T
M
A
N
A
G
E
R
:
L
A
Y
O
U
T
N
A
M
E
:
D
R
A
W
N
B
Y
:
C
H
E
C
K
E
D
B
Y
:
K
A
T
H
Y
W
E
B
B
D
A
T
E
:
D
A
T
E
:
F
I
G
U
R
E
1
1
-
1
G
E
O
L
O
G
I
C
C
R
O
S
S
S
E
C
T
I
O
N
S
W
I
T
H
B
O
R
O
N
&
C
H
L
O
R
I
D
E
A
N
D
A
R
S
E
N
I
C
F
I
G
U
R
E
1
1
-
1
w
w
w
.
s
y
n
t
e
r
r
a
c
o
r
p
.
c
o
m
1
4
8
R
i
v
e
r
S
t
r
e
e
t
,
S
u
i
t
e
2
2
0
G
r
e
e
n
v
i
l
l
e
,
S
o
u
t
h
C
a
r
o
l
i
n
a
2
9
6
0
1
8
6
4
-
4
2
1
-
9
9
9
9
L
.
V
.
S
U
T
T
O
N
E
N
E
R
G
Y
C
O
M
P
L
E
X
8
0
1
S
U
T
T
O
N
S
T
E
A
M
P
L
A
N
T
R
D
W
I
L
M
I
N
G
T
O
N
,
N
O
R
T
H
C
A
R
O
L
I
N
A
B
O
R
I
N
G
S
Y
M
B
O
L
S
S
O
I
L
S
A
M
P
L
E
W
E
L
L
S
C
R
E
E
N
W
I
T
H
C
O
N
C
E
N
T
R
A
T
I
O
N
O
F
C
O
I
(
m
i
c
r
o
g
r
a
m
s
p
e
r
l
i
t
e
r
)
(
m
i
l
i
g
r
a
m
s
p
e
r
l
i
t
e
r
f
o
r
C
h
l
o
r
i
d
e
)
3
0
0
0
3
0
0
6
0
0
G
R
A
P
H
I
C
S
C
A
L
E
I
N
F
E
E
T
3
0
0
3
0
6
0
I
N
F
E
E
T
H
O
R
I
Z
O
N
T
A
L
:
1
"
=
3
0
0
'
V
E
R
T
I
C
A
L
:
1
"
=
3
0
'
S
E
C
T
I
O
N
B
-
B
'
-
B
O
R
O
N
&
C
H
L
O
R
I
D
E
F
A
C
I
N
G
N
O
R
T
H
(MSL)
(MSL)COOLING POND GP-03COAL ASH
S
U
R
F
I
C
I
A
L
S
U
R
F
I
C
I
A
L
P
E
E
D
E
E
S
E
C
T
I
O
N
B
-
B
'
-
A
R
S
E
N
I
C
F
A
C
I
N
G
N
O
R
T
H
(MSL)
(MSL)COOLING POND GP-03COAL ASH
S
U
R
F
I
C
I
A
L
S
U
R
F
I
C
I
A
L
P
E
E
D
E
E
P:\DUKE ENERGY PROGRESS.1026\108. SUTTON ASH BASIN GW ASSESSMENT PLAN\1.11 CSA REPORTING\FIGURES\SUTTON-CSA-FIGURES.DWG08/02/2015 1:52 PM AB-01ABMW-01S: Sb<1 / As634 / B3940 / Ba585 / Cl83 /
C
o
<
1
/
F
e
1
5
2
/
M
n
8
8
/
T
l
<
0
.
2
/
V
3
.
4
5
ABMW-01D: Sb<1 / As1.03 / B167 / Ba16 / Cl53 / C
o
<
1
/
F
e
4
7
5
/
M
n
8
2
/
T
l
<
0
.
2
/
V
0
.
6
4
2
3'-5': Sb<3.4 / As22.1 / B8.7j / Co6.7 / Fe9590 / Mn3
5
.
2
/
V
3
4
.
4
78'-80': Sb<2.8 / As16.8 / N7.2j / Co2.5j / Fe5110 / M
n
2
4
.
2
/
V
1
5
.
7
82'-84': Sb<3.4 / As3.3j / B12.6j / Co<3.4 / Fe6500 /
M
n
2
8
.
9
/
V
7
.
9
96'-98': Sb<3.3 / As2.1j / B12.5j / Co3.3 / Fe6050 / M
n
3
9
.
3
/
V
8
.
8
A
W
-
0
4
A
W
-
0
4
B
:
S
b
<
1
/
A
s
<
1
/
B
<
5
0
/
B
a
1
1
/
C
l
3
.
9
/
C
o
<
1
/
F
e
4
1
/
M
n
2
2
/
T
l
<
0
.
2
/
V
<
0
.
3
A
W
-
0
4
C
:
S
b
<
1
/
A
s
<
1
/
B
1
4
5
0
/
B
a
3
9
/
C
l
4
9
/
C
o
<
1
/
F
e
3
9
9
0
/
M
n
7
8
7
/
T
l
<
0
.
2
/
V
0
.
5
1
8
0
-
2
'
:
S
b
<
1
/
A
s
<
1
/
B
<
2
.
6
/
C
o
<
1
/
F
e
8
1
5
/
M
n
1
.
4
/
V
2
.
2
9
'
-
1
0
'
:
S
b
<
1
.
1
/
A
s
<
1
.
1
/
B
2
<
2
.
8
/
C
o
<
1
.
1
/
F
e
2
9
7
/
M
n
1
/
V
<
1
.
1
4
7
'
-
4
8
'
:
S
b
<
1
.
1
/
A
s
<
1
.
1
/
B
<
2
.
8
/
C
o
<
1
.
1
/
F
e
1
9
5
0
/
M
n
1
9
.
5
/
V
<
1
.
1
S
M
W
-
0
1
S
M
W
-
0
1
B
:
S
b
<
1
/
A
s
<
1
/
B
1
0
0
/
B
a
7
4
/
C
l
6
.
2
/
C
o
<
1
/
F
e
3
0
/
M
n
1
4
/
T
l
<
0
.
2
/
V
<
0
.
3
S
M
W
-
0
1
C
:
S
b
<
1
/
A
s
<
1
/
B
7
7
6
/
B
a
3
5
/
C
l
6
6
/
C
o
<
1
/
F
e
4
2
5
0
/
M
n
8
0
7
/
T
l
<
0
.
2
/
V
0
.
4
0
2
0
-
2
'
:
S
b
<
6
.
9
/
A
s
<
6
.
9
/
B
<
1
7
.
2
/
C
o
<
6
.
9
/
F
e
6
0
9
/
M
n
2
.
1
/
V
<
6
.
9
8
'
-
1
0
'
:
S
b
<
6
.
1
/
A
s
<
6
.
1
/
B
<
1
5
.
3
/
C
o
<
6
.
1
/
F
e
8
2
.
3
/
M
n
<
1
.
5
/
V
<
6
.
1
4
2
'
-
4
4
'
:
S
b
<
6
.
2
/
A
s
<
6
.
2
/
B
<
1
5
.
4
/
C
o
<
6
.
2
/
F
e
1
8
7
0
/
M
n
7
.
5
/
V
<
6
.
2
AB-01ABMW-01S: Sb<1 / As634 / B3940 / Ba585 / Co<1 /
F
e
1
5
2
/
M
n
8
8
/
T
l
<
0
.
2
/
V
3
.
4
5
ABMW-01D: Sb<1 / As1.03 / B167 / Ba16 / Co<1 / F
e
4
7
5
/
M
n
8
2
/
T
l
<
0
.
2
/
V
0
.
6
4
2
3'-5': Sb<3.4 / As22.1 / B8.7j / Co6.7 / Fe9590 / Mn3
5
.
2
/
V
3
4
.
4
78'-80': Sb<2.8 / As16.8 / N7.2j / Co2.5j / Fe5110 / M
n
2
4
.
2
/
V
1
5
.
7
82'-84': Sb<3.4 / As3.3j / B12.6j / Co<3.4 / Fe6500 /
M
n
2
8
.
9
/
V
7
.
9
96'-98': Sb<3.3 / As2.1j / B12.5j / Co3.3 / Fe6050 / M
n
3
9
.
3
/
V
8
.
8
A
W
-
0
4
A
W
-
0
4
B
:
S
b
<
1
/
A
s
<
1
/
B
<
5
0
/
B
a
1
1
/
C
o
<
1
/
F
e
4
1
/
M
n
2
2
/
T
l
<
0
.
2
/
V
<
0
.
3
A
W
-
0
4
C
:
S
b
<
1
/
A
s
<
1
/
B
1
4
5
0
/
B
a
3
9
/
C
o
<
1
/
F
e
3
9
9
0
/
M
n
7
8
7
/
T
l
<
0
.
2
/
V
0
.
5
1
8
0
-
2
'
:
S
b
<
1
/
A
s
<
1
/
B
<
2
.
6
/
C
o
<
1
/
F
e
8
1
5
/
M
n
1
.
4
/
V
2
.
2
9
'
-
1
0
'
:
S
b
<
1
.
1
/
A
s
<
1
.
1
/
B
2
<
2
.
8
/
C
o
<
1
.
1
/
F
e
2
9
7
/
M
n
1
/
V
<
1
.
1
4
7
'
-
4
8
'
:
S
b
<
1
.
1
/
A
s
<
1
.
1
/
B
<
2
.
8
/
C
o
<
1
.
1
/
F
e
1
9
5
0
/
M
n
1
9
.
5
/
V
<
1
.
1
S
M
W
-
0
1
S
M
W
-
0
1
B
:
S
b
<
1
/
A
s
<
1
/
B
1
0
0
/
B
a
7
4
/
C
o
<
1
/
F
e
3
0
/
M
n
1
4
/
T
l
<
0
.
2
/
V
<
0
.
3
S
M
W
-
0
1
C
:
S
b
<
1
/
A
s
<
1
/
B
7
7
6
/
B
a
3
5
/
C
o
<
1
/
F
e
4
2
5
0
/
M
n
8
0
7
/
T
l
<
0
.
2
/
V
0
.
4
0
2
0
-
2
'
:
S
b
<
6
.
9
/
A
s
<
6
.
9
/
B
<
1
7
.
2
/
C
o
<
6
.
9
/
F
e
6
0
9
/
M
n
2
.
1
/
V
<
6
.
9
8
'
-
1
0
'
:
S
b
<
6
.
1
/
A
s
<
6
.
1
/
B
<
1
5
.
3
/
C
o
<
6
.
1
/
F
e
8
2
.
3
/
M
n
<
1
.
5
/
V
<
6
.
1
4
2
'
-
4
4
'
:
S
b
<
6
.
2
/
A
s
<
6
.
2
/
B
<
1
5
.
4
/
C
o
<
6
.
2
/
F
e
1
8
7
0
/
M
n
7
.
5
/
V
<
6
.
2
7
0
0
7
0
0
1
6
7
/
5
3
3
9
4
0
/
8
3
2
5
0
0
/
5
0
0
2
0
5
0
/
2
9
7
0
0
<
5
0
/
3
.
9
1
4
5
0
/
4
9
1
0
0
/
6
.
2
7
7
6
/
6
6
6
3
4
1
.
0
3
<
1
<
1
N
D
<
1
<
1
<
1
<
1
10
S
O
U
R
C
E
S
:
1
.
D
R
A
W
I
N
G
H
A
S
B
E
E
N
S
E
T
W
I
T
H
A
P
R
O
J
E
C
T
I
O
N
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
S
T
A
T
E
P
L
A
N
E
C
O
O
R
D
I
N
A
T
E
S
Y
S
T
E
M
F
I
P
S
3
2
0
0
(
N
A
D
8
3
)
.
2
.
2
f
t
C
O
N
T
O
U
R
I
N
T
E
R
V
A
L
S
F
R
O
M
N
C
D
O
T
L
I
D
A
R
D
A
T
E
D
2
0
0
7
h
t
t
p
s
:
/
/
c
o
n
n
e
c
t
.
n
c
d
o
t
.
g
o
v
/
r
e
s
o
u
r
c
e
s
/
g
i
s
/
p
a
g
e
s
/
c
o
n
t
-
e
l
e
v
_
v
2
.
a
s
p
x
3
.
S
E
L
E
C
T
T
O
P
O
G
R
A
P
H
I
C
A
D
J
U
S
T
M
E
N
T
S
B
A
S
E
D
O
N
S
I
T
E
S
U
R
V
E
Y
A
N
D
C
O
M
P
A
R
I
S
O
N
T
O
A
E
R
I
A
L
P
H
O
T
O
G
R
A
P
H
.
N
O
T
E
:
1
.
C
O
N
T
O
U
R
L
I
N
E
S
A
R
E
U
S
E
D
F
O
R
R
E
P
R
E
S
E
N
T
A
T
I
V
E
P
U
R
P
O
S
E
S
O
N
L
Y
A
N
D
A
R
E
N
O
T
T
O
B
E
U
S
E
D
F
O
R
D
E
S
I
G
N
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
U
R
P
O
S
E
S
.
2
.
C
R
O
S
S
S
E
C
T
I
O
N
L
O
C
A
T
I
O
N
S
A
R
E
S
H
O
W
N
O
N
F
I
G
U
R
E
1
-
2
.
M
W
-
2
3
B
:
S
b
<
1
/
A
s
<
1
/
B
1
3
7
/
B
a
3
9
/
C
l
2
.
5
/
C
o
<
1
/
F
e
2
0
/
M
n
9
/
T
l
<
0
.
2
/
V
<
0
.
3
M
W
-
2
3
C
:
S
b
<
1
/
A
s
<
1
/
B
2
0
5
0
/
B
a
3
5
/
C
l
2
9
/
C
o
5
.
1
9
/
F
e
8
8
/
M
n
3
0
9
/
T
l
0
.
2
1
/
V
0
.
3
2
3
M
W
-
2
3
E
:
S
b
<
1
/
A
s
<
1
/
B
2
5
0
0
/
B
a
<
5
/
C
o
<
1
/
F
e
4
8
/
M
n
5
/
T
l
<
0
.
2
/
V
0
.
9
9
3
M
W
-
2
3
B
:
S
b
<
1
/
A
s
<
1
/
B
1
4
4
/
B
a
3
8
/
C
o
<
1
/
F
e
2
0
/
M
n
9
/
T
l
<
0
.
2
/
V
<
0
.
3
M
W
-
2
3
C
:
S
b
<
1
/
A
s
<
1
/
B
2
0
5
0
/
B
a
3
5
/
C
o
5
.
1
9
/
F
e
8
8
/
M
n
3
0
9
/
T
l
0
.
2
1
/
V
0
.
3
2
3
M
W
-
2
3
E
:
S
b
<
1
/
A
s
<
1
/
B
2
5
0
0
/
B
a
<
5
/
C
o
<
1
/
F
e
4
8
/
M
n
5
/
T
l
<
0
.
2
/
V
0
.
9
9
3
W
A
T
E
R
L
E
V
E
L
(
J
U
N
E
2
0
1
5
)
1
3
7
/
2
.
3
250
2
5
0
C
H
L
O
R
I
D
E
C
O
N
C
E
N
T
R
A
T
I
O
N
C
O
N
T
O
U
R
L
E
G
E
N
D
S
U
R
F
I
C
I
A
L
S
A
N
D
(
W
E
L
L
S
O
R
T
E
D
-
S
I
L
T
Y
S
A
N
D
-
M
E
D
I
U
M
T
O
F
I
N
E
G
R
A
I
N
E
D
S
A
N
D
)
S
U
R
F
I
C
I
A
L
S
A
N
D
(
P
O
O
R
L
Y
S
O
R
T
E
D
-
M
E
D
I
U
M
T
O
C
O
A
R
S
E
G
R
A
I
N
E
D
S
A
N
D
)
C
O
A
L
A
S
H
C
O
A
R
S
E
S
A
N
D
W
I
T
H
F
I
N
E
G
R
A
V
E
L
S
A
N
D
(
P
E
E
D
E
E
)
C
L
A
Y
R
I
C
H
F
A
C
I
E
S
C
O
N
C
E
N
T
R
A
T
I
O
N
C
O
N
T
O
U
R
N
O
D
A
T
A
N
D
2
L
S
T
A
N
D
A
R
D
C
O
N
T
O
U
R
C
H
L
O
R
I
D
E
CHLORIDE700
7
0
0
B
O
R
O
N
BORON
2
5
0
0
/
5
0
0
B
O
R
O
N
/
C
H
L
O
R
I
D
E
B
O
R
O
N
BORON
F
I
L
L
M
A
T
E
R
I
A
L
S
C
A
L
E
:
A
S
S
H
O
W
N
A
W
-
0
1
A
W
-
0
1
B
:
G
R
O
U
N
D
W
A
T
E
R
A
N
A
L
Y
T
I
C
A
L
R
E
S
U
L
T
S
F
O
R
S
U
R
F
I
C
I
A
L
A
Q
U
I
F
E
R
I
N
M
I
C
R
O
G
R
A
M
S
P
E
R
L
I
T
E
R
A
W
-
0
1
C
:
G
R
O
U
N
D
W
A
T
E
R
A
N
A
L
Y
T
I
C
A
L
R
E
S
U
L
T
S
F
O
R
P
E
E
D
E
E
I
N
M
I
C
R
O
G
R
A
M
S
P
E
R
L
I
T
E
R
0
-
2
'
:
S
O
I
L
T
O
T
A
L
A
N
A
L
Y
T
I
C
A
L
R
E
S
U
L
T
S
I
N
m
g
/
k
g
Elevation
Elevation
S
t
a
t
i
o
n
-140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60
-
1
4
0
-
1
3
0
-
1
2
0
-
1
1
0
-
1
0
0
-
9
0
-
8
0
-
7
0
-
6
0
-
5
0
-
4
0
-
3
0
-
2
0
-
1
0
0
1
0
2
0
3
0
4
0
5
0
6
0
0+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+00
16+00
17+00
18+00
19+00
20+00
21+00
22+00
23+00
24+00
25+00
26+00
27+00
28+00
29+00
30+00
31+00
32+00
33+00
34+00
35+00
36+00
37+00
38+00
39+00
40+00
41+00
42+00
43+00
44+00
45+00
46+00
47+00
48+00
49+00
50+00
51+00
52+00
53+00
53+50
Elevation
Elevation
S
t
a
t
i
o
n
-140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60
-
1
4
0
-
1
3
0
-
1
2
0
-
1
1
0
-
1
0
0
-
9
0
-
8
0
-
7
0
-
6
0
-
5
0
-
4
0
-
3
0
-
2
0
-
1
0
0
1
0
2
0
3
0
4
0
5
0
6
0
0+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+00
16+00
17+00
18+00
19+00
20+00
21+00
22+00
23+00
24+00
25+00
26+00
27+00
28+00
29+00
30+00
31+00
32+00
33+00
34+00
35+00
36+00
37+00
38+00
39+00
40+00
41+00
42+00
43+00
44+00
45+00
46+00
47+00
48+00
49+00
50+00
51+00
52+00
53+00
53+50
5
/
2
2
/
2
0
1
5
5
/
2
2
/
2
0
1
5
P
.
W
A
L
D
R
E
P
C
.
N
E
W
E
L
L
P
R
O
J
E
C
T
M
A
N
A
G
E
R
:
L
A
Y
O
U
T
N
A
M
E
:
D
R
A
W
N
B
Y
:
C
H
E
C
K
E
D
B
Y
:
K
A
T
H
Y
W
E
B
B
D
A
T
E
:
D
A
T
E
:
F
I
G
U
R
E
1
1
-
2
G
E
O
L
O
G
I
C
C
R
O
S
S
S
E
C
T
I
O
N
S
W
I
T
H
I
R
O
N
A
N
D
C
O
B
A
L
T
F
I
G
U
R
E
1
1
-
2
w
w
w
.
s
y
n
t
e
r
r
a
c
o
r
p
.
c
o
m
1
4
8
R
i
v
e
r
S
t
r
e
e
t
,
S
u
i
t
e
2
2
0
G
r
e
e
n
v
i
l
l
e
,
S
o
u
t
h
C
a
r
o
l
i
n
a
2
9
6
0
1
8
6
4
-
4
2
1
-
9
9
9
9
L
.
V
.
S
U
T
T
O
N
E
N
E
R
G
Y
C
O
M
P
L
E
X
8
0
1
S
U
T
T
O
N
S
T
E
A
M
P
L
A
N
T
R
D
W
I
L
M
I
N
G
T
O
N
,
N
O
R
T
H
C
A
R
O
L
I
N
A
B
O
R
I
N
G
S
Y
M
B
O
L
S
S
O
I
L
S
A
M
P
L
E
3
0
0
0
3
0
0
6
0
0
G
R
A
P
H
I
C
S
C
A
L
E
I
N
F
E
E
T
3
0
0
3
0
6
0
I
N
F
E
E
T
H
O
R
I
Z
O
N
T
A
L
:
1
"
=
3
0
0
'
V
E
R
T
I
C
A
L
:
1
"
=
3
0
'
S
E
C
T
I
O
N
B
-
B
'
-
I
R
O
N
F
A
C
I
N
G
N
O
R
T
H
(MSL)
(MSL)COOLING POND GP-03
C
O
N
C
E
N
T
R
A
T
I
O
N
C
O
N
T
O
U
R
COAL ASH
S
U
R
F
I
C
I
A
L
S
U
R
F
I
C
I
A
L
P
E
E
D
E
E
S
E
C
T
I
O
N
B
-
B
'
-
C
O
B
A
L
T
F
A
C
I
N
G
N
O
R
T
H
(MSL)
(MSL)COOLING POND GP-03COAL ASH
S
U
R
F
I
C
I
A
L
S
U
R
F
I
C
I
A
L
P
E
E
D
E
E
P:\DUKE ENERGY PROGRESS.1026\108. SUTTON ASH BASIN GW ASSESSMENT PLAN\1.11 CSA REPORTING\FIGURES\SUTTON-CSA-FIGURES.DWG08/02/2015 1:55 PM AB-01ABMW-01S: Sb<1 / As634 / B3940 / Ba585 / Co<1 /
F
e
1
5
2
/
M
n
8
8
/
T
l
<
0
.
2
/
V
3
.
4
5
ABMW-01D: Sb<1 / As1.03 / B167 / Ba16 / Co<1 / F
e
4
7
5
/
M
n
8
2
/
T
l
<
0
.
2
/
V
0
.
6
4
2
3'-5': Sb<3.4 / As22.1 / B8.7j / Co6.7 / Fe9590 / Mn3
5
.
2
/
V
3
4
.
4
78'-80': Sb<2.8 / As16.8 / N7.2j / Co2.5j / Fe5110 / M
n
2
4
.
2
/
V
1
5
.
7
82'-84': Sb<3.4 / As3.3j / B12.6j / Co<3.4 / Fe6500 /
M
n
2
8
.
9
/
V
7
.
9
96'-98': Sb<3.3 / As2.1j / B12.5j / Co3.3 / Fe6050 / M
n
3
9
.
3
/
V
8
.
8
A
W
-
0
4
A
W
-
0
4
B
:
S
b
<
1
/
A
s
<
1
/
B
<
5
0
/
B
a
1
1
/
C
o
<
1
/
F
e
4
1
/
M
n
2
2
/
T
l
<
0
.
2
/
V
<
0
.
3
A
W
-
0
4
C
:
S
b
<
1
/
A
s
<
1
/
B
1
4
5
0
/
B
a
3
9
/
C
o
<
1
/
F
e
3
9
9
0
/
M
n
7
8
7
/
T
l
<
0
.
2
/
V
0
.
5
1
8
0
-
2
'
:
S
b
<
1
/
A
s
<
1
/
B
<
2
.
6
/
C
o
<
1
/
F
e
8
1
5
/
M
n
1
.
4
/
V
2
.
2
9
'
-
1
0
'
:
S
b
<
1
.
1
/
A
s
<
1
.
1
/
B
2
<
2
.
8
/
C
o
<
1
.
1
/
F
e
2
9
7
/
M
n
1
/
V
<
1
.
1
4
7
'
-
4
8
'
:
S
b
<
1
.
1
/
A
s
<
1
.
1
/
B
<
2
.
8
/
C
o
<
1
.
1
/
F
e
1
9
5
0
/
M
n
1
9
.
5
/
V
<
1
.
1
S
M
W
-
0
1
S
M
W
-
0
1
B
:
S
b
<
1
/
A
s
<
1
/
B
1
0
0
/
B
a
7
4
/
C
o
<
1
/
F
e
3
0
/
M
n
1
4
/
T
l
<
0
.
2
/
V
<
0
.
3
S
M
W
-
0
1
C
:
S
b
<
1
/
A
s
<
1
/
B
7
7
6
/
B
a
3
5
/
C
o
<
1
/
F
e
4
2
5
0
/
M
n
8
0
7
/
T
l
<
0
.
2
/
V
0
.
4
0
2
0
-
2
'
:
S
b
<
6
.
9
/
A
s
<
6
.
9
/
B
<
1
7
.
2
/
C
o
<
6
.
9
/
F
e
6
0
9
/
M
n
2
.
1
/
V
<
6
.
9
8
'
-
1
0
'
:
S
b
<
6
.
1
/
A
s
<
6
.
1
/
B
<
1
5
.
3
/
C
o
<
6
.
1
/
F
e
8
2
.
3
/
M
n
<
1
.
5
/
V
<
6
.
1
4
2
'
-
4
4
'
:
S
b
<
6
.
2
/
A
s
<
6
.
2
/
B
<
1
5
.
4
/
C
o
<
6
.
2
/
F
e
1
8
7
0
/
M
n
7
.
5
/
V
<
6
.
2
AB-01ABMW-01S: Sb<1 / As634 / B3940 / Ba585 / Co<1 /
F
e
1
5
2
/
M
n
8
8
/
T
l
<
0
.
2
/
V
3
.
4
5
ABMW-01D: Sb<1 / As1.03 / B167 / Ba16 / Co<1 / F
e
4
7
5
/
M
n
8
2
/
T
l
<
0
.
2
/
V
0
.
6
4
2
3'-5': Sb<3.4 / As22.1 / B8.7j / Co6.7 / Fe9590 / Mn3
5
.
2
/
V
3
4
.
4
78'-80': Sb<2.8 / As16.8 / N7.2j / Co2.5j / Fe5110 / M
n
2
4
.
2
/
V
1
5
.
7
82'-84': Sb<3.4 / As3.3j / B12.6j / Co<3.4 / Fe6500 /
M
n
2
8
.
9
/
V
7
.
9
96'-98': Sb<3.3 / As2.1j / B12.5j / Co3.3 / Fe6050 / M
n
3
9
.
3
/
V
8
.
8
A
W
-
0
4
A
W
-
0
4
B
:
S
b
<
1
/
A
s
<
1
/
B
<
5
0
/
B
a
1
1
/
C
o
<
1
/
F
e
4
1
/
M
n
2
2
/
T
l
<
0
.
2
/
V
<
0
.
3
A
W
-
0
4
C
:
S
b
<
1
/
A
s
<
1
/
B
1
4
5
0
/
B
a
3
9
/
C
o
<
1
/
F
e
3
9
9
0
/
M
n
7
8
7
/
T
l
<
0
.
2
/
V
0
.
5
1
8
0
-
2
'
:
S
b
<
1
/
A
s
<
1
/
B
<
2
.
6
/
C
o
<
1
/
F
e
8
1
5
/
M
n
1
.
4
/
V
2
.
2
9
'
-
1
0
'
:
S
b
<
1
.
1
/
A
s
<
1
.
1
/
B
2
<
2
.
8
/
C
o
<
1
.
1
/
F
e
2
9
7
/
M
n
1
/
V
<
1
.
1
4
7
'
-
4
8
'
:
S
b
<
1
.
1
/
A
s
<
1
.
1
/
B
<
2
.
8
/
C
o
<
1
.
1
/
F
e
1
9
5
0
/
M
n
1
9
.
5
/
V
<
1
.
1
S
M
W
-
0
1
S
M
W
-
0
1
B
:
S
b
<
1
/
A
s
<
1
/
B
1
0
0
/
B
a
7
4
/
C
o
<
1
/
F
e
3
0
/
M
n
1
4
/
T
l
<
0
.
2
/
V
<
0
.
3
S
M
W
-
0
1
C
:
S
b
<
1
/
A
s
<
1
/
B
7
7
6
/
B
a
3
5
/
C
o
<
1
/
F
e
4
2
5
0
/
M
n
8
0
7
/
T
l
<
0
.
2
/
V
0
.
4
0
2
0
-
2
'
:
S
b
<
6
.
9
/
A
s
<
6
.
9
/
B
<
1
7
.
2
/
C
o
<
6
.
9
/
F
e
6
0
9
/
M
n
2
.
1
/
V
<
6
.
9
8
'
-
1
0
'
:
S
b
<
6
.
1
/
A
s
<
6
.
1
/
B
<
1
5
.
3
/
C
o
<
6
.
1
/
F
e
8
2
.
3
/
M
n
<
1
.
5
/
V
<
6
.
1
4
2
'
-
4
4
'
:
S
b
<
6
.
2
/
A
s
<
6
.
2
/
B
<
1
5
.
4
/
C
o
<
6
.
2
/
F
e
1
8
7
0
/
M
n
7
.
5
/
V
<
6
.
2
N
D
5
.
1
9
N
D
1
.
0
1
5
2
8
8
2
0
4
1
3
9
9
0
3
0
4
2
5
0
3
0
0
0
3
0
0
0
3
0
0
3
0
0
W
E
L
L
S
C
R
E
E
N
W
I
T
H
C
O
N
C
E
N
T
R
A
T
I
O
N
O
F
C
O
I
(
m
i
c
r
o
g
r
a
m
s
p
e
r
l
i
t
e
r
)
S
O
U
R
C
E
S
:
1
.
D
R
A
W
I
N
G
H
A
S
B
E
E
N
S
E
T
W
I
T
H
A
P
R
O
J
E
C
T
I
O
N
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
S
T
A
T
E
P
L
A
N
E
C
O
O
R
D
I
N
A
T
E
S
Y
S
T
E
M
F
I
P
S
3
2
0
0
(
N
A
D
8
3
)
.
2
.
2
f
t
C
O
N
T
O
U
R
I
N
T
E
R
V
A
L
S
F
R
O
M
N
C
D
O
T
L
I
D
A
R
D
A
T
E
D
2
0
0
7
h
t
t
p
s
:
/
/
c
o
n
n
e
c
t
.
n
c
d
o
t
.
g
o
v
/
r
e
s
o
u
r
c
e
s
/
g
i
s
/
p
a
g
e
s
/
c
o
n
t
-
e
l
e
v
_
v
2
.
a
s
p
x
3
.
S
E
L
E
C
T
T
O
P
O
G
R
A
P
H
I
C
A
D
J
U
S
T
M
E
N
T
S
B
A
S
E
D
O
N
S
I
T
E
S
U
R
V
E
Y
A
N
D
C
O
M
P
A
R
I
S
O
N
T
O
A
E
R
I
A
L
P
H
O
T
O
G
R
A
P
H
.
N
O
T
E
:
1
.
C
O
N
T
O
U
R
L
I
N
E
S
A
R
E
U
S
E
D
F
O
R
R
E
P
R
E
S
E
N
T
A
T
I
V
E
P
U
R
P
O
S
E
S
O
N
L
Y
A
N
D
A
R
E
N
O
T
T
O
B
E
U
S
E
D
F
O
R
D
E
S
I
G
N
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
U
R
P
O
S
E
S
.
2
.
C
R
O
S
S
S
E
C
T
I
O
N
L
O
C
A
T
I
O
N
S
A
R
E
S
H
O
W
N
O
N
F
I
G
U
R
E
1
-
2
.
M
W
-
2
3
B
:
S
b
<
1
/
A
s
<
1
/
B
1
4
4
/
B
a
3
8
/
C
o
<
1
/
F
e
2
0
/
M
n
9
/
T
l
<
0
.
2
/
V
<
0
.
3
M
W
-
2
3
C
:
S
b
<
1
/
A
s
<
1
/
B
2
0
5
0
/
B
a
3
5
/
C
o
5
.
1
9
/
F
e
8
8
/
M
n
3
0
9
/
T
l
0
.
2
1
/
V
0
.
3
2
3
M
W
-
2
3
E
:
S
b
<
1
/
A
s
<
1
/
B
2
5
0
0
/
B
a
<
5
/
C
o
<
1
/
F
e
4
8
/
M
n
5
/
T
l
<
0
.
2
/
V
0
.
9
9
3
M
W
-
2
3
B
:
S
b
<
1
/
A
s
<
1
/
B
1
4
4
/
B
a
3
8
/
C
o
<
1
/
F
e
2
0
/
M
n
9
/
T
l
<
0
.
2
/
V
<
0
.
3
M
W
-
2
3
C
:
S
b
<
1
/
A
s
<
1
/
B
2
0
5
0
/
B
a
3
5
/
C
o
5
.
1
9
/
F
e
8
8
/
M
n
3
0
9
/
T
l
0
.
2
1
/
V
0
.
3
2
3
M
W
-
2
3
E
:
S
b
<
1
/
A
s
<
1
/
B
2
5
0
0
/
B
a
<
5
/
C
o
<
1
/
F
e
4
8
/
M
n
5
/
T
l
<
0
.
2
/
V
0
.
9
9
3
W
A
T
E
R
L
E
V
E
L
(
J
U
N
E
2
0
1
5
)
L
E
G
E
N
D
S
U
R
F
I
C
I
A
L
S
A
N
D
(
W
E
L
L
S
O
R
T
E
D
-
S
I
L
T
Y
S
A
N
D
-
M
E
D
I
U
M
T
O
F
I
N
E
G
R
A
I
N
E
D
S
A
N
D
)
S
U
R
F
I
C
I
A
L
S
A
N
D
(
P
O
O
R
L
Y
S
O
R
T
E
D
-
M
E
D
I
U
M
T
O
C
O
A
R
S
E
G
R
A
I
N
E
D
S
A
N
D
)
C
O
A
L
A
S
H
C
O
A
R
S
E
S
A
N
D
W
I
T
H
F
I
N
E
G
R
A
V
E
L
S
A
N
D
(
P
E
E
D
E
E
)
C
L
A
Y
R
I
C
H
F
A
C
I
E
S
N
O
D
A
T
A
N
D
2
L
S
T
A
N
D
A
R
D
C
O
N
T
O
U
R
4
7
5
3
0
0
4
8
<
1
<
1
<
1
<
1
<
1
<
1
1
.
0
F
I
L
L
M
A
T
E
R
I
A
L
S
C
A
L
E
:
A
S
S
H
O
W
N
A
W
-
0
1
A
W
-
0
1
B
:
G
R
O
U
N
D
W
A
T
E
R
A
N
A
L
Y
T
I
C
A
L
R
E
S
U
L
T
S
F
O
R
S
U
R
F
I
C
I
A
L
A
Q
U
I
F
E
R
I
N
M
I
C
R
O
G
R
A
M
S
P
E
R
L
I
T
E
R
A
W
-
0
1
C
:
G
R
O
U
N
D
W
A
T
E
R
A
N
A
L
Y
T
I
C
A
L
R
E
S
U
L
T
S
F
O
R
P
E
E
D
E
E
I
N
M
I
C
R
O
G
R
A
M
S
P
E
R
L
I
T
E
R
0
-
2
'
:
S
O
I
L
T
O
T
A
L
A
N
A
L
Y
T
I
C
A
L
R
E
S
U
L
T
S
I
N
m
g
/
k
g
Elevation
Elevation
S
t
a
t
i
o
n
-140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60
-
1
4
0
-
1
3
0
-
1
2
0
-
1
1
0
-
1
0
0
-
9
0
-
8
0
-
7
0
-
6
0
-
5
0
-
4
0
-
3
0
-
2
0
-
1
0
0
1
0
2
0
3
0
4
0
5
0
6
0
0+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+00
16+00
17+00
18+00
19+00
20+00
21+00
22+00
23+00
24+00
25+00
26+00
27+00
28+00
29+00
30+00
31+00
32+00
33+00
34+00
35+00
36+00
37+00
38+00
39+00
40+00
41+00
42+00
43+00
44+00
45+00
46+00
47+00
48+00
49+00
50+00
51+00
52+00
53+00
53+50
Elevation
Elevation
S
t
a
t
i
o
n
-140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60
-
1
4
0
-
1
3
0
-
1
2
0
-
1
1
0
-
1
0
0
-
9
0
-
8
0
-
7
0
-
6
0
-
5
0
-
4
0
-
3
0
-
2
0
-
1
0
0
1
0
2
0
3
0
4
0
5
0
6
0
0+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+00
16+00
17+00
18+00
19+00
20+00
21+00
22+00
23+00
24+00
25+00
26+00
27+00
28+00
29+00
30+00
31+00
32+00
33+00
34+00
35+00
36+00
37+00
38+00
39+00
40+00
41+00
42+00
43+00
44+00
45+00
46+00
47+00
48+00
49+00
50+00
51+00
52+00
53+00
53+50
w
w
w
.
s
y
n
t
e
r
r
a
c
o
r
p
.
c
o
m
1
4
8
R
i
v
e
r
S
t
r
e
e
t
,
S
u
i
t
e
2
2
0
G
r
e
e
n
v
i
l
l
e
,
S
o
u
t
h
C
a
r
o
l
i
n
a
2
9
6
0
1
8
6
4
-
4
2
1
-
9
9
9
9
5
/
2
2
/
2
0
1
5
5
/
2
2
/
2
0
1
5
P
.
W
A
L
D
R
E
P
C
.
N
E
W
E
L
L
P
R
O
J
E
C
T
M
A
N
A
G
E
R
:
L
A
Y
O
U
T
N
A
M
E
:
D
R
A
W
N
B
Y
:
C
H
E
C
K
E
D
B
Y
:
K
A
T
H
Y
W
E
B
B
D
A
T
E
:
D
A
T
E
:
F
I
G
U
R
E
1
1
-
3
G
E
O
L
O
G
I
C
C
R
O
S
S
S
E
C
T
I
O
N
S
W
I
T
H
M
A
N
G
A
N
E
S
E
A
N
D
V
A
N
A
D
I
U
M
F
I
G
U
R
E
1
1
-
3
L
.
V
.
S
U
T
T
O
N
E
N
E
R
G
Y
C
O
M
P
L
E
X
8
0
1
S
U
T
T
O
N
S
T
E
A
M
P
L
A
N
T
R
D
W
I
L
M
I
N
G
T
O
N
,
N
O
R
T
H
C
A
R
O
L
I
N
A
B
O
R
I
N
G
S
Y
M
B
O
L
S
S
O
I
L
S
A
M
P
L
E
3
0
0
0
3
0
0
6
0
0
G
R
A
P
H
I
C
S
C
A
L
E
I
N
F
E
E
T
3
0
0
3
0
6
0
I
N
F
E
E
T
H
O
R
I
Z
O
N
T
A
L
:
1
"
=
3
0
0
'
V
E
R
T
I
C
A
L
:
1
"
=
3
0
'
S
E
C
T
I
O
N
B
-
B
'
-
M
A
N
G
A
N
E
S
E
F
A
C
I
N
G
N
O
R
T
H
(MSL)
(MSL)COOLING POND GP-03
C
O
N
C
E
N
T
R
A
T
I
O
N
C
O
N
T
O
U
R
COAL ASH
S
U
R
F
I
C
I
A
L
S
U
R
F
I
C
I
A
L
P
E
E
D
E
E
S
E
C
T
I
O
N
B
-
B
'
-
V
A
N
A
D
I
U
M
F
A
C
I
N
G
N
O
R
T
H
(MSL)
(MSL)COOLING POND GP-03COAL ASH
S
U
R
F
I
C
I
A
L
S
U
R
F
I
C
I
A
L
P
E
E
D
E
E
P:\DUKE ENERGY PROGRESS.1026\108. SUTTON ASH BASIN GW ASSESSMENT PLAN\1.11 CSA REPORTING\FIGURES\SUTTON-CSA-FIGURES.DWG08/02/2015 1:56 PM AB-01ABMW-01S: Sb<1 / As634 / B3940 / Ba585 / Co<1 /
F
e
1
5
2
/
M
n
8
8
/
T
l
<
0
.
2
/
V
3
.
4
5
ABMW-01D: Sb<1 / As1.03 / B167 / Ba16 / Co<1 / F
e
4
7
5
/
M
n
8
2
/
T
l
<
0
.
2
/
V
0
.
6
4
2
3'-5': Sb<3.4 / As22.1 / B8.7j / Co6.7 / Fe9590 / Mn3
5
.
2
/
V
3
4
.
4
78'-80': Sb<2.8 / As16.8 / N7.2j / Co2.5j / Fe5110 / M
n
2
4
.
2
/
V
1
5
.
7
82'-84': Sb<3.4 / As3.3j / B12.6j / Co<3.4 / Fe6500 /
M
n
2
8
.
9
/
V
7
.
9
96'-98': Sb<3.3 / As2.1j / B12.5j / Co3.3 / Fe6050 / M
n
3
9
.
3
/
V
8
.
8
A
W
-
0
4
A
W
-
0
4
B
:
S
b
<
1
/
A
s
<
1
/
B
<
5
0
/
B
a
1
1
/
C
o
<
1
/
F
e
4
1
/
M
n
2
2
/
T
l
<
0
.
2
/
V
<
0
.
3
A
W
-
0
4
C
:
S
b
<
1
/
A
s
<
1
/
B
1
4
5
0
/
B
a
3
9
/
C
o
<
1
/
F
e
3
9
9
0
/
M
n
7
8
7
/
T
l
<
0
.
2
/
V
0
.
5
1
8
0
-
2
'
:
S
b
<
1
/
A
s
<
1
/
B
<
2
.
6
/
C
o
<
1
/
F
e
8
1
5
/
M
n
1
.
4
/
V
2
.
2
9
'
-
1
0
'
:
S
b
<
1
.
1
/
A
s
<
1
.
1
/
B
2
<
2
.
8
/
C
o
<
1
.
1
/
F
e
2
9
7
/
M
n
1
/
V
<
1
.
1
4
7
'
-
4
8
'
:
S
b
<
1
.
1
/
A
s
<
1
.
1
/
B
<
2
.
8
/
C
o
<
1
.
1
/
F
e
1
9
5
0
/
M
n
1
9
.
5
/
V
<
1
.
1
S
M
W
-
0
1
S
M
W
-
0
1
B
:
S
b
<
1
/
A
s
<
1
/
B
1
0
0
/
B
a
7
4
/
C
o
<
1
/
F
e
3
0
/
M
n
1
4
/
T
l
<
0
.
2
/
V
<
0
.
3
S
M
W
-
0
1
C
:
S
b
<
1
/
A
s
<
1
/
B
7
7
6
/
B
a
3
5
/
C
o
<
1
/
F
e
4
2
5
0
/
M
n
8
0
7
/
T
l
<
0
.
2
/
V
0
.
4
0
2
0
-
2
'
:
S
b
<
6
.
9
/
A
s
<
6
.
9
/
B
<
1
7
.
2
/
C
o
<
6
.
9
/
F
e
6
0
9
/
M
n
2
.
1
/
V
<
6
.
9
8
'
-
1
0
'
:
S
b
<
6
.
1
/
A
s
<
6
.
1
/
B
<
1
5
.
3
/
C
o
<
6
.
1
/
F
e
8
2
.
3
/
M
n
<
1
.
5
/
V
<
6
.
1
4
2
'
-
4
4
'
:
S
b
<
6
.
2
/
A
s
<
6
.
2
/
B
<
1
5
.
4
/
C
o
<
6
.
2
/
F
e
1
8
7
0
/
M
n
7
.
5
/
V
<
6
.
2
AB-01ABMW-01S: Sb<1 / As634 / B3940 / Ba585 / Co<1 /
F
e
1
5
2
/
M
n
8
8
/
T
l
<
0
.
2
/
V
3
.
4
5
ABMW-01D: Sb<1 / As1.03 / B167 / Ba16 / Co<1 / F
e
4
7
5
/
M
n
8
2
/
T
l
<
0
.
2
/
V
0
.
6
4
2
3'-5': Sb<3.4 / As22.1 / B8.7j / Co6.7 / Fe9590 / Mn3
5
.
2
/
V
3
4
.
4
78'-80': Sb<2.8 / As16.8 / N7.2j / Co2.5j / Fe5110 / M
n
2
4
.
2
/
V
1
5
.
7
82'-84': Sb<3.4 / As3.3j / B12.6j / Co<3.4 / Fe6500 /
M
n
2
8
.
9
/
V
7
.
9
96'-98': Sb<3.3 / As2.1j / B12.5j / Co3.3 / Fe6050 / M
n
3
9
.
3
/
V
8
.
8
A
W
-
0
4
A
W
-
0
4
B
:
S
b
<
1
/
A
s
<
1
/
B
<
5
0
/
B
a
1
1
/
C
o
<
1
/
F
e
4
1
/
M
n
2
2
/
T
l
<
0
.
2
/
V
<
0
.
3
A
W
-
0
4
C
:
S
b
<
1
/
A
s
<
1
/
B
1
4
5
0
/
B
a
3
9
/
C
o
<
1
/
F
e
3
9
9
0
/
M
n
7
8
7
/
T
l
<
0
.
2
/
V
0
.
5
1
8
0
-
2
'
:
S
b
<
1
/
A
s
<
1
/
B
<
2
.
6
/
C
o
<
1
/
F
e
8
1
5
/
M
n
1
.
4
/
V
2
.
2
9
'
-
1
0
'
:
S
b
<
1
.
1
/
A
s
<
1
.
1
/
B
2
<
2
.
8
/
C
o
<
1
.
1
/
F
e
2
9
7
/
M
n
1
/
V
<
1
.
1
4
7
'
-
4
8
'
:
S
b
<
1
.
1
/
A
s
<
1
.
1
/
B
<
2
.
8
/
C
o
<
1
.
1
/
F
e
1
9
5
0
/
M
n
1
9
.
5
/
V
<
1
.
1
S
M
W
-
0
1
S
M
W
-
0
1
B
:
S
b
<
1
/
A
s
<
1
/
B
1
0
0
/
B
a
7
4
/
C
o
<
1
/
F
e
3
0
/
M
n
1
4
/
T
l
<
0
.
2
/
V
<
0
.
3
S
M
W
-
0
1
C
:
S
b
<
1
/
A
s
<
1
/
B
7
7
6
/
B
a
3
5
/
C
o
<
1
/
F
e
4
2
5
0
/
M
n
8
0
7
/
T
l
<
0
.
2
/
V
0
.
4
0
2
0
-
2
'
:
S
b
<
6
.
9
/
A
s
<
6
.
9
/
B
<
1
7
.
2
/
C
o
<
6
.
9
/
F
e
6
0
9
/
M
n
2
.
1
/
V
<
6
.
9
8
'
-
1
0
'
:
S
b
<
6
.
1
/
A
s
<
6
.
1
/
B
<
1
5
.
3
/
C
o
<
6
.
1
/
F
e
8
2
.
3
/
M
n
<
1
.
5
/
V
<
6
.
1
4
2
'
-
4
4
'
:
S
b
<
6
.
2
/
A
s
<
6
.
2
/
B
<
1
5
.
4
/
C
o
<
6
.
2
/
F
e
1
8
7
0
/
M
n
7
.
5
/
V
<
6
.
2
8
2
8
8
5
3
0
9
9
7
8
7
2
2
8
0
7
1
4
5
0
5
0
5
0
5
0
5
0
0
5
0
0
0
.
6
4
2
3
.
4
5
0
.
3
2
3
N
D
0
.
5
1
8
<
0
.
3
0
.
4
0
2
<
0
.
3
0
.
3
0
.
3
0.3
W
E
L
L
S
C
R
E
E
N
W
I
T
H
C
O
N
C
E
N
T
R
A
T
I
O
N
O
F
C
O
I
(
m
i
c
r
o
g
r
a
m
s
p
e
r
l
i
t
e
r
)
S
O
U
R
C
E
S
:
1
.
D
R
A
W
I
N
G
H
A
S
B
E
E
N
S
E
T
W
I
T
H
A
P
R
O
J
E
C
T
I
O
N
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
S
T
A
T
E
P
L
A
N
E
C
O
O
R
D
I
N
A
T
E
S
Y
S
T
E
M
F
I
P
S
3
2
0
0
(
N
A
D
8
3
)
.
2
.
2
f
t
C
O
N
T
O
U
R
I
N
T
E
R
V
A
L
S
F
R
O
M
N
C
D
O
T
L
I
D
A
R
D
A
T
E
D
2
0
0
7
h
t
t
p
s
:
/
/
c
o
n
n
e
c
t
.
n
c
d
o
t
.
g
o
v
/
r
e
s
o
u
r
c
e
s
/
g
i
s
/
p
a
g
e
s
/
c
o
n
t
-
e
l
e
v
_
v
2
.
a
s
p
x
3
.
S
E
L
E
C
T
T
O
P
O
G
R
A
P
H
I
C
A
D
J
U
S
T
M
E
N
T
S
B
A
S
E
D
O
N
S
I
T
E
S
U
R
V
E
Y
A
N
D
C
O
M
P
A
R
I
S
O
N
T
O
A
E
R
I
A
L
P
H
O
T
O
G
R
A
P
H
.
N
O
T
E
:
1
.
C
O
N
T
O
U
R
L
I
N
E
S
A
R
E
U
S
E
D
F
O
R
R
E
P
R
E
S
E
N
T
A
T
I
V
E
P
U
R
P
O
S
E
S
O
N
L
Y
A
N
D
A
R
E
N
O
T
T
O
B
E
U
S
E
D
F
O
R
D
E
S
I
G
N
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
U
R
P
O
S
E
S
.
2
.
C
R
O
S
S
S
E
C
T
I
O
N
L
O
C
A
T
I
O
N
S
A
R
E
S
H
O
W
N
O
N
F
I
G
U
R
E
1
-
2
.
M
W
-
2
3
B
:
S
b
<
1
/
A
s
<
1
/
B
1
4
4
/
B
a
3
8
/
C
o
<
1
/
F
e
2
0
/
M
n
9
/
T
l
<
0
.
2
/
V
<
0
.
3
M
W
-
2
3
C
:
S
b
<
1
/
A
s
<
1
/
B
2
0
5
0
/
B
a
3
5
/
C
o
5
.
1
9
/
F
e
8
8
/
M
n
3
0
9
/
T
l
0
.
2
1
/
V
0
.
3
2
3
M
W
-
2
3
E
:
S
b
<
1
/
A
s
<
1
/
B
2
5
0
0
/
B
a
<
5
/
C
o
<
1
/
F
e
4
8
/
M
n
5
/
T
l
<
0
.
2
/
V
0
.
9
9
3
M
W
-
2
3
B
:
S
b
<
1
/
A
s
<
1
/
B
1
4
4
/
B
a
3
8
/
C
o
<
1
/
F
e
2
0
/
M
n
9
/
T
l
<
0
.
2
/
V
<
0
.
3
M
W
-
2
3
C
:
S
b
<
1
/
A
s
<
1
/
B
2
0
5
0
/
B
a
3
5
/
C
o
5
.
1
9
/
F
e
8
8
/
M
n
3
0
9
/
T
l
0
.
2
1
/
V
0
.
3
2
3
M
W
-
2
3
E
:
S
b
<
1
/
A
s
<
1
/
B
2
5
0
0
/
B
a
<
5
/
C
o
<
1
/
F
e
4
8
/
M
n
5
/
T
l
<
0
.
2
/
V
0
.
9
9
3
W
A
T
E
R
L
E
V
E
L
(
J
U
N
E
2
0
1
5
)
L
E
G
E
N
D
S
U
R
F
I
C
I
A
L
S
A
N
D
(
W
E
L
L
S
O
R
T
E
D
-
S
I
L
T
Y
S
A
N
D
-
M
E
D
I
U
M
T
O
F
I
N
E
G
R
A
I
N
E
D
S
A
N
D
)
S
U
R
F
I
C
I
A
L
S
A
N
D
(
P
O
O
R
L
Y
S
O
R
T
E
D
-
M
E
D
I
U
M
T
O
C
O
A
R
S
E
G
R
A
I
N
E
D
S
A
N
D
)
C
O
A
L
A
S
H
C
O
A
R
S
E
S
A
N
D
W
I
T
H
F
I
N
E
G
R
A
V
E
L
S
A
N
D
(
P
E
E
D
E
E
)
C
L
A
Y
R
I
C
H
F
A
C
I
E
S
N
O
D
A
T
A
N
D
2
L
S
T
A
N
D
A
R
D
C
O
N
T
O
U
R
0
.
5
0.3
F
I
L
L
M
A
T
E
R
I
A
L
S
C
A
L
E
:
A
S
S
H
O
W
N
A
W
-
0
1
A
W
-
0
1
B
:
G
R
O
U
N
D
W
A
T
E
R
A
N
A
L
Y
T
I
C
A
L
R
E
S
U
L
T
S
F
O
R
S
U
R
F
I
C
I
A
L
A
Q
U
I
F
E
R
I
N
M
I
C
R
O
G
R
A
M
S
P
E
R
L
I
T
E
R
A
W
-
0
1
C
:
G
R
O
U
N
D
W
A
T
E
R
A
N
A
L
Y
T
I
C
A
L
R
E
S
U
L
T
S
F
O
R
P
E
E
D
E
E
I
N
M
I
C
R
O
G
R
A
M
S
P
E
R
L
I
T
E
R
0
-
2
'
:
S
O
I
L
T
O
T
A
L
A
N
A
L
Y
T
I
C
A
L
R
E
S
U
L
T
S
I
N
m
g
/
k
g
3.0
Elevation
Elevation
S
t
a
t
i
o
n
-140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60
-
1
4
0
-
1
3
0
-
1
2
0
-
1
1
0
-
1
0
0
-
9
0
-
8
0
-
7
0
-
6
0
-
5
0
-
4
0
-
3
0
-
2
0
-
1
0
0
1
0
2
0
3
0
4
0
5
0
6
0
0+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+00
16+00
17+00
18+00
19+00
20+00
21+00
22+00
23+00
24+00
25+00
26+00
27+00
28+00
29+00
30+00
31+00
32+00
33+00
34+00
35+00
36+00
37+00
38+00
39+00
40+00
41+00
42+00
43+00
44+00
45+00
46+00
47+00
48+00
49+00
50+00
51+00
52+00
53+00
53+50
5
/
2
2
/
2
0
1
5
5
/
2
2
/
2
0
1
5
P
.
W
A
L
D
R
E
P
C
.
N
E
W
E
L
L
P
R
O
J
E
C
T
M
A
N
A
G
E
R
:
L
A
Y
O
U
T
N
A
M
E
:
D
R
A
W
N
B
Y
:
C
H
E
C
K
E
D
B
Y
:
K
A
T
H
Y
W
E
B
B
D
A
T
E
:
D
A
T
E
:
F
I
G
U
R
E
1
1
-
4
G
E
O
L
O
G
I
C
C
R
O
S
S
S
E
C
T
I
O
N
S
W
I
T
H
T
H
A
L
L
I
U
M
F
I
G
U
R
E
1
1
-
4
w
w
w
.
s
y
n
t
e
r
r
a
c
o
r
p
.
c
o
m
1
4
8
R
i
v
e
r
S
t
r
e
e
t
,
S
u
i
t
e
2
2
0
G
r
e
e
n
v
i
l
l
e
,
S
o
u
t
h
C
a
r
o
l
i
n
a
2
9
6
0
1
8
6
4
-
4
2
1
-
9
9
9
9
L
.
V
.
S
U
T
T
O
N
E
N
E
R
G
Y
C
O
M
P
L
E
X
8
0
1
S
U
T
T
O
N
S
T
E
A
M
P
L
A
N
T
R
D
W
I
L
M
I
N
G
T
O
N
,
N
O
R
T
H
C
A
R
O
L
I
N
A
B
O
R
I
N
G
S
Y
M
B
O
L
S
S
O
I
L
S
A
M
P
L
E
3
0
0
0
3
0
0
6
0
0
G
R
A
P
H
I
C
S
C
A
L
E
I
N
F
E
E
T
3
0
0
3
0
6
0
I
N
F
E
E
T
H
O
R
I
Z
O
N
T
A
L
:
1
"
=
3
0
0
'
V
E
R
T
I
C
A
L
:
1
"
=
3
0
'
S
E
C
T
I
O
N
B
-
B
'
-
T
H
A
L
L
I
U
M
F
A
C
I
N
G
N
O
R
T
H
(MSL)
(MSL)COOLING POND GP-03
C
O
N
C
E
N
T
R
A
T
I
O
N
C
O
N
T
O
U
R
COAL ASH
S
U
R
F
I
C
I
A
L
S
U
R
F
I
C
I
A
L
P
E
E
D
E
E
P:\DUKE ENERGY PROGRESS.1026\108. SUTTON ASH BASIN GW ASSESSMENT PLAN\1.11 CSA REPORTING\FIGURES\SUTTON-CSA-FIGURES.DWG08/02/2015 1:58 PM AB-01ABMW-01S: Sb<1 / As634 / B3940 / Ba585 / Co<1 /
F
e
1
5
2
/
M
n
8
8
/
T
l
<
0
.
2
/
V
3
.
4
5
ABMW-01D: Sb<1 / As1.03 / B167 / Ba16 / Co<1 / F
e
4
7
5
/
M
n
8
2
/
T
l
<
0
.
2
/
V
0
.
6
4
2
3'-5': Sb<3.4 / As22.1 / B8.7j / Co6.7 / Fe9590 / Mn3
5
.
2
/
V
3
4
.
4
78'-80': Sb<2.8 / As16.8 / N7.2j / Co2.5j / Fe5110 / M
n
2
4
.
2
/
V
1
5
.
7
82'-84': Sb<3.4 / As3.3j / B12.6j / Co<3.4 / Fe6500 /
M
n
2
8
.
9
/
V
7
.
9
96'-98': Sb<3.3 / As2.1j / B12.5j / Co3.3 / Fe6050 / M
n
3
9
.
3
/
V
8
.
8
A
W
-
0
4
A
W
-
0
4
B
:
S
b
<
1
/
A
s
<
1
/
B
<
5
0
/
B
a
1
1
/
C
o
<
1
/
F
e
4
1
/
M
n
2
2
/
T
l
<
0
.
2
/
V
<
0
.
3
A
W
-
0
4
C
:
S
b
<
1
/
A
s
<
1
/
B
1
4
5
0
/
B
a
3
9
/
C
o
<
1
/
F
e
3
9
9
0
/
M
n
7
8
7
/
T
l
<
0
.
2
/
V
0
.
5
1
8
0
-
2
'
:
S
b
<
1
/
A
s
<
1
/
B
<
2
.
6
/
C
o
<
1
/
F
e
8
1
5
/
M
n
1
.
4
/
V
2
.
2
9
'
-
1
0
'
:
S
b
<
1
.
1
/
A
s
<
1
.
1
/
B
2
<
2
.
8
/
C
o
<
1
.
1
/
F
e
2
9
7
/
M
n
1
/
V
<
1
.
1
4
7
'
-
4
8
'
:
S
b
<
1
.
1
/
A
s
<
1
.
1
/
B
<
2
.
8
/
C
o
<
1
.
1
/
F
e
1
9
5
0
/
M
n
1
9
.
5
/
V
<
1
.
1
S
M
W
-
0
1
S
M
W
-
0
1
B
:
S
b
<
1
/
A
s
<
1
/
B
1
0
0
/
B
a
7
4
/
C
o
<
1
/
F
e
3
0
/
M
n
1
4
/
T
l
<
0
.
2
/
V
<
0
.
3
S
M
W
-
0
1
C
:
S
b
<
1
/
A
s
<
1
/
B
7
7
6
/
B
a
3
5
/
C
o
<
1
/
F
e
4
2
5
0
/
M
n
8
0
7
/
T
l
<
0
.
2
/
V
0
.
4
0
2
0
-
2
'
:
S
b
<
6
.
9
/
A
s
<
6
.
9
/
B
<
1
7
.
2
/
C
o
<
6
.
9
/
F
e
6
0
9
/
M
n
2
.
1
/
V
<
6
.
9
8
'
-
1
0
'
:
S
b
<
6
.
1
/
A
s
<
6
.
1
/
B
<
1
5
.
3
/
C
o
<
6
.
1
/
F
e
8
2
.
3
/
M
n
<
1
.
5
/
V
<
6
.
1
4
2
'
-
4
4
'
:
S
b
<
6
.
2
/
A
s
<
6
.
2
/
B
<
1
5
.
4
/
C
o
<
6
.
2
/
F
e
1
8
7
0
/
M
n
7
.
5
/
V
<
6
.
2
<
0
.
2
<
0
.
2
<
0
.
2
0
.
2
1
<
0
.
2
<
0
.
2
<
0
.
2
<
0
.
2
<
0
.
2
0
.
2
W
E
L
L
S
C
R
E
E
N
W
I
T
H
C
O
N
C
E
N
T
R
A
T
I
O
N
O
F
C
O
I
(
m
i
c
r
o
g
r
a
m
s
p
e
r
l
i
t
e
r
)
S
O
U
R
C
E
S
:
1
.
D
R
A
W
I
N
G
H
A
S
B
E
E
N
S
E
T
W
I
T
H
A
P
R
O
J
E
C
T
I
O
N
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
S
T
A
T
E
P
L
A
N
E
C
O
O
R
D
I
N
A
T
E
S
Y
S
T
E
M
F
I
P
S
3
2
0
0
(
N
A
D
8
3
)
.
2
.
2
f
t
C
O
N
T
O
U
R
I
N
T
E
R
V
A
L
S
F
R
O
M
N
C
D
O
T
L
I
D
A
R
D
A
T
E
D
2
0
0
7
h
t
t
p
s
:
/
/
c
o
n
n
e
c
t
.
n
c
d
o
t
.
g
o
v
/
r
e
s
o
u
r
c
e
s
/
g
i
s
/
p
a
g
e
s
/
c
o
n
t
-
e
l
e
v
_
v
2
.
a
s
p
x
3
.
S
E
L
E
C
T
T
O
P
O
G
R
A
P
H
I
C
A
D
J
U
S
T
M
E
N
T
S
B
A
S
E
D
O
N
S
I
T
E
S
U
R
V
E
Y
A
N
D
C
O
M
P
A
R
I
S
O
N
T
O
A
E
R
I
A
L
P
H
O
T
O
G
R
A
P
H
.
N
O
T
E
:
1
.
C
O
N
T
O
U
R
L
I
N
E
S
A
R
E
U
S
E
D
F
O
R
R
E
P
R
E
S
E
N
T
A
T
I
V
E
P
U
R
P
O
S
E
S
O
N
L
Y
A
N
D
A
R
E
N
O
T
T
O
B
E
U
S
E
D
F
O
R
D
E
S
I
G
N
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
U
R
P
O
S
E
S
.
2
.
C
R
O
S
S
S
E
C
T
I
O
N
L
O
C
A
T
I
O
N
S
A
R
E
S
H
O
W
N
O
N
F
I
G
U
R
E
1
-
2
.
M
W
-
2
3
B
:
S
b
<
1
/
A
s
<
1
/
B
1
4
4
/
B
a
3
8
/
C
o
<
1
/
F
e
2
0
/
M
n
9
/
T
l
<
0
.
2
/
V
<
0
.
3
M
W
-
2
3
C
:
S
b
<
1
/
A
s
<
1
/
B
2
0
5
0
/
B
a
3
5
/
C
o
5
.
1
9
/
F
e
8
8
/
M
n
3
0
9
/
T
l
0
.
2
1
/
V
0
.
3
2
3
M
W
-
2
3
E
:
S
b
<
1
/
A
s
<
1
/
B
2
5
0
0
/
B
a
<
5
/
C
o
<
1
/
F
e
4
8
/
M
n
5
/
T
l
<
0
.
2
/
V
0
.
9
9
3
W
A
T
E
R
L
E
V
E
L
(
J
U
N
E
2
0
1
5
)
L
E
G
E
N
D
S
U
R
F
I
C
I
A
L
S
A
N
D
(
W
E
L
L
S
O
R
T
E
D
-
S
I
L
T
Y
S
A
N
D
-
M
E
D
I
U
M
T
O
F
I
N
E
G
R
A
I
N
E
D
S
A
N
D
)
S
U
R
F
I
C
I
A
L
S
A
N
D
(
P
O
O
R
L
Y
S
O
R
T
E
D
-
M
E
D
I
U
M
T
O
C
O
A
R
S
E
G
R
A
I
N
E
D
S
A
N
D
)
C
O
A
L
A
S
H
C
O
A
R
S
E
S
A
N
D
W
I
T
H
F
I
N
E
G
R
A
V
E
L
S
A
N
D
(
P
E
E
D
E
E
)
C
L
A
Y
R
I
C
H
F
A
C
I
E
S
N
O
D
A
T
A
N
D
2
L
S
T
A
N
D
A
R
D
C
O
N
T
O
U
R
F
I
L
L
M
A
T
E
R
I
A
L
S
C
A
L
E
:
A
S
S
H
O
W
N
A
W
-
0
1
A
W
-
0
1
B
:
G
R
O
U
N
D
W
A
T
E
R
A
N
A
L
Y
T
I
C
A
L
R
E
S
U
L
T
S
F
O
R
S
U
R
F
I
C
I
A
L
A
Q
U
I
F
E
R
I
N
M
I
C
R
O
G
R
A
M
S
P
E
R
L
I
T
E
R
A
W
-
0
1
C
:
G
R
O
U
N
D
W
A
T
E
R
A
N
A
L
Y
T
I
C
A
L
R
E
S
U
L
T
S
F
O
R
P
E
E
D
E
E
I
N
M
I
C
R
O
G
R
A
M
S
P
E
R
L
I
T
E
R
0
-
2
'
:
S
O
I
L
T
O
T
A
L
A
N
A
L
Y
T
I
C
A
L
R
E
S
U
L
T
S
I
N
m
g
/
k
g
Primary Sources Exposure Medium Exposure Route
Re
c
r
e
a
t
i
o
n
a
l
U
s
e
r
-
F
i
s
h
e
r
m
a
n
Re
c
r
e
a
t
i
o
n
a
l
U
s
e
r
-
H
u
n
t
e
r
Re
c
r
e
a
t
i
o
n
a
l
U
s
e
r
-
S
w
i
m
m
e
r
In
d
u
s
t
r
i
a
l
W
o
r
k
e
r
(
A
d
u
l
t
)
Re
c
r
e
a
t
i
o
n
a
l
U
s
e
r
-
F
i
s
h
e
r
m
a
n
Re
c
r
e
a
t
i
o
n
a
l
U
s
e
r
-
H
u
n
t
e
r
Re
c
r
e
a
t
i
o
n
a
l
U
s
e
r
-
S
w
i
m
m
e
r
Re
s
i
d
e
n
t
i
a
l
(
A
d
u
l
t
&
C
h
i
l
d
)
In
d
u
s
t
r
i
a
l
W
o
r
k
e
r
(
A
d
u
l
t
)
Soil
Surface Water
Sediment
Groundwater
Dermal
Inhalation
Ingestion
Dermal
Inhalation
Ingestion
Dermal
Inhalation
Incomplete Exposure Pathway
1984 Ash Basin Groundwater
1971 Ash Basin
NPDES
Stormwater
Discharge
Sediment
Potential Human Receptors
Potentially Complete Exposure Pathway
Current Land Use Hypothetical Future Land
Use
Former Ash
Disposal Area
(FADA)
NPDES Direct
Discharge
Surface Water
(Sutton Lake &
Cape Fear River)
Secondary Sources
Ingestion
Dermal
Inhalation
Ingestion
Figure 12-1
Human Health
Conceptual Exposure Model
L. V. Sutton Energy Complex
Wilmington, North Carolina
0
148 River Street, Suite 220
Greenville, SC 29601
Phone: (864) 421-9999
Existing Primary Release Mechanisms
Inactive Ash Basin
Active Ash Basin
Lay Of Land Area
Former Primary Release Mechanism
No longer used
P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\Report Figures\Figure 12-1 Sutton HH CEM8/4/2015
&<
&<
U
S-421
PRJ-I-140
SR-1394 P R J -I -1 4 0
S R -2 1 4 5
P R J -I -1 4 0
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNELCOOLINGPOND
COOLINGPOND
COOLINGPOND
ABMW-01SpHAsBMnTDSV
ABMW-02SAsBaBFeMnTDSV
±NOTES:1 CONSTITUENTS IDENTIFIED AS A SITE SPECIFICCONSTITUENT OF POTENTIAL CONCERN (COPC).
2 NC2L STANDARDS FOR ANTIMONY, BERYLLIUM,COBALT, THALLIUM, AND VANADIUM ARE "INTERIMMAXIMUM ALLOWABLE CONCENTRATIONS" (IMAC).
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
GRAPHIC SCALE
600 0 600 1,200 1,800 2,400
(IN FEET)
L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
LEGEND
FIG URE 12-2COPC LOCATIONS FLAGGEDGROUNDWATER - ASH PO RE WATER -HUMAN HEALTHL.V. SUTTON ENERGY COMPLEX
&<MONITORING WELL
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGESS SUTTON PLANT SITE BOUNDARY
NC2L OR IMAC EXCEEDANCE -BOLDED IF COAL ASH COPC(SEE TABLES 12-1 AND 12-2)1, 2
PROJECT MANAGER: P. WALDREP
DRAWN BY: R. SPRING
DATE: 08/01/2015
DATE: 08/02/2015
CHECKED BY: J. MEADOWS
P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 12-2 - COPC LOCATIONS FLAGGED - GROUNDWATER - ASH PORE WATER - HUMAN HEALTH.MXD
Constituent Full NamepHArsenicBariumBoronIronLeadManganeseTotal Dissolved SolidsVanadium
Constituent AbbreviationpHAsBaBFePbMnTDSV
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<&<
&<
&<
&<
&<
&<
PRJ-I-140
U
S-421
S
R-2
1
6
9
SR-1394
S R -2 7 7 9
S R -2 1 4 5
P R J -I -1 4 0
P R J -I -1 4 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
421-Well 3pHMn
421-Well 4pHMn
AW-01BpHCoFePbMnTDSV
AW-02BpHCoFeMnV
AW-03BpHFeMnV
AW-04BpHCoFeMn
AW-05BFeMn
AW-06BpHFeMn
AW-08BpHCoFeV
AW-09BpHFeMnVCr(VI)
MW-07ApH
MW-07BpH
MW-15AsFeMnV
MW-16pHV
MW-19pHBCoFeMnTl
MW-20FeMnV
MW-22BpH
MW-23BpHCr(VI)3
MW-24BMnVCr(VI)3
MW-27BpHCoMnSe
MW-28BpH
MW-31BpHFeMnV
MW-37BpHCoFeMn
SMW-01BpHFe SMW-02BpHCoFeMnV SMW-03BpHCoFeMnNO3+NO2V
SMW-04BpHCoFeMnV
SMW-05BpHFeMnV
SMW-06BpHFe
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNELCOOLINGPOND
COOLINGPOND
COOLINGPOND
±
L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
&<MONITORING WELL
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGESS SUTTON PLANT SITE BOUNDARY
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
LEGEND
NC2L OR IMAC EXCEEDANCE -BOLDED IF COAL ASH COPC(SEE TABLES 12-2, 12-3 AND 12-4)1, 2
P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 12-3 - COPC LOCATIONS FLAGGED - GROUNDWATER - UPPER SURFICIAL AQUIFER - HUMAN HEALTH.MXD
GRAPHIC SCALE
600 0 600 1,200 1,800 2,400
(IN FEET)
FIG URE 12-3COPC LOCATIONS FLAGGEDGROUNDWATER - UPPER SURFICIALAQUIFER - HUMAN HEALTHL.V. SUTTON ENERGY COMPLEXPROJECT MANAGER: P. WALDREP
DRAWN BY: R. SPRING
DATE: 08/01/2015
DATE: 08/02/2015
CHECKED BY: J. MEADOWS
Constituent Full NamepHAntimonyArsenicBoronCobaltIronLeadManganeseNitrate+NitriteSeleniumThalliumTotal Dissolved SolidsVanadiumChromium (VI)3
Constituent AbbreviationpHSbAsBCoFePbMnNO3+NO2SeTlTDSVCr(VI)3
NOTES:1 CONSTITUENTS IDENTIFIED AS A SITE SPECIFICCONSTITUENT OF POTENTIAL CONCERN (COPC).
2 NC2L STANDARDS FOR ANTIMONY, BERYLLIUM,COBALT, THALLIUM, AND VANADIUM ARE "INTERIMMAXIMUM ALLOWABLE CONCENTRATIONS" (IMAC).
3 USEPA.NATIONAL RECOMMENDED WATER CRITERIA.ACCESSED 07/26/2015.(http://water.epa.gov/scitech/swguidance/standards/criteria)
4 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
5 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
6 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
7 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
&<
&<
&<
&<
&<
&<
&<
&<
&<&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
PRJ-I-140
U
S-421
SR-1394
S
R-2
1
6
9
S R -2 7 7 9
S R -2 1 4 5
P R J -I -1 4 0
P R J -I -1 4 0
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNELCOOLINGPOND
COOLINGPOND
COOLINGPOND
ABMW-02DAsFeMnV
AW-01CpHCoFeMn
AW-02CpHCoFeMn
AW-03CpHBCoFeMnTDSV
AW-04CpHBCoFeMnV
AW-05CpH
AW-08CpHCoMn
AW-09CpHCoFeMnVCr(VI)
MW-04BFeMn
MW-05CpHCoMn
MW-07CpHMnTlV
MW-11pH
MW-12BCoFeMn
MW-21CAsBCoFeMn
MW-22CpHBCoFeMnTl
MW-23CpHBCoMnTlV
MW-24CpHBCoFeMnV
MW-28CpH
MW-31CpHBCoFeMnTDS
MW-32CpH
MW-33CpH
MW-37CpHCoFeMnV
SMW-01CpHBCoFeMnV
SMW-02CpHCoFeMnV
SMW-03CpHCoFeMnV
SMW-04CFeMnV
SMW-05CpHCoFeMn SMW-06CpHCoFeMnV
R M P -5 8 1 5
±
GRAPHIC SCALE
600 0 600 1,200 1,800 2,400
(IN FEET)
L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
FIG URE 12-4COPC LOCATIONS FLAGGEDGROUNDWATER - LOWER SURFICIALAQUIFER - HUMAN HEALTHL.V. SUTTON ENERGY COMPLEXPROJECT MANAGER: P. WALDREP
DRAWN BY: R. SPRING
DATE: 08/01/2015
DATE: 08/02/2015
CHECKED BY: J. MEADOWS
P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 12-4 - COPC LOCATIONS FLAGGED - GROUNDWATER - LOWER SURFICIAL AQUIFER - HUMAN HEALTH.MXD
Constituent Full NamepHArsenicBoronCobaltIronManganeseThalliumTotal Dissolved SolidsVanadiumChromium(VI)
Constituent AbbreviationpHAsBCoFeMnTlTDSVCr(VI)3
LEGEND
&<MONITORING WELL
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGESS SUTTON PLANT SITE BOUNDARY
NC2L OR IMAC EXCEEDANCE -BOLDED IF COAL ASH COPC(SEE TABLES 12-2, 12-3 AND 12-4)1, 2
NOTES:1 CONSTITUENTS IDENTIFIED AS A SITE SPECIFICCONSTITUENT OF POTENTIAL CONCERN (COPC).
2 NC2L STANDARDS FOR ANTIMONY, BERYLLIUM,COBALT, THALLIUM, AND VANADIUM ARE "INTERIMMAXIMUM ALLOWABLE CONCENTRATIONS" (IMAC).
3 USEPA.NATIONAL RECOMMENDED WATER CRITERIA .ACCESSED 07/26/2015(http://water.epa.gov/scitech/swguidance/standards/criteria/)
4 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
5 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
6 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
7 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
&<
&<
&<
&<
&<
&<
&<
&>
U
S-421
PRJ-I-140
SR-1394 P R J -I -1 4 0
S R -2 1 4 5
P R J -I -1 4 0
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
ABMW-01DFeMnV
AW-02DFeMnTDSV
AW-05DFeV
AW-06DpHBFeTDSV
AW-07DpHBTDSV
AW-09DpHFeTDSV
PZ-10DFeMnV
SMW-06DpHSbBFeTDSV
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNELCOOLINGPOND
COOLINGPOND
COOLINGPOND
±
GRAPHIC SCALE
600 0 600 1,200 1,800 2,400
(IN FEET)
L. V. SUTTON ENERGY COMPLEX801 SUTTON POWER PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
LEGEND
FIG URE 12-5COPC LOCATIONS FLAGGEDGROUNDWATER - UPPER PEE DEEAQUIFER - HUMAN HEALTHL.V. SUTTON ENERGY COMPLEX
&<MONITORING WELL
&>PIEZOMETER
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGESS SUTTON PLANT SITE BOUNDARY
NC2L OR IMAC EXCEEDANCE -BOLDED IF COAL ASH COPC(SEE TABLES 12-2, 12-5)1, 2
PROJECT MANAGER: P. WALDREP
DRAWN BY: R. SPRING
DATE: 08/01/2015
DATE: 08/02/2015
CHECKED BY: J. MEADOWS
P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 12-5 - COPC LOCATIONS FLAGGED - GROUNDWATER - UPPER PEE DEE AQUIFER - HUMAN HEALTH.MXD
Constituent Full NamepHAntimonyBoronIronManganeseTotal Dissolved SolidsVanadium
Constituent AbbreviationpHSbBFeMnTDSV
NOTES:1 CONSTITUENTS IDENTIFIED AS A SITE SPECIFICCONSTITUENT OF POTENTIAL CONCERN (COPC).
2 NC2L STANDARDS FOR ANTIMONY, BERYLLIUM,COBALT, THALLIUM, AND VANADIUM ARE "INTERIMMAXIMUM ALLOWABLE CONCENTRATIONS" (IMAC).
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
&<
&<
&<
U
S-421
PRJ-I-140
SR-1394 P R J -I -1 4 0
S R -2 1 4 5
P R J -I -1 4 0
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
AW-05EpHBFeTDSV
AW-06EBFeTDSV
MW-23EpHBTDSV
±
GRAPHIC SCALE
600 0 600 1,200 1,800 2,400
(IN FEET)
L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
LEGEND
FIG URE 12-6COPC LOCATIONS FLAGGEDGROUNDWATER - LOWER PEE DEEAQUIFER - HUMAN HEALTHL.V. SUTTON ENERGY COMPLEX
&<MONITORING WELL
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGESS SUTTON PLANT SITE BOUNDARY
NC2L OR IMAC EXCEEDANCE -BOLDED IF COAL ASH COPC(SEE TABLES 12-2, 12-5)1, 2
PROJECT MANAGER: P. WALDREP
DRAWN BY: R. SPRING
DATE: 08/01/2015
DATE: 08/02/2015
CHECKED BY: J. MEADOWS
P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 12-6 - COPC LOCATIONS FLAGGED - GROUNDWATER - LOWER PEE DEE AQUIFER - HUMAN HEALTH.MXD
Constituent Full NamepHBoronIronTotal Dissolved SolidsVanadium
Constituent AbbreviationpHBFeTDSV
NOTES:1 CONSTITUENTS IDENTIFIED AS A SITE SPECIFICCONSTITUENT OF POTENTIAL CONCERN (COPC).
2 NC2L STANDARDS FOR ANTIMONY, BERYLLIUM,COBALT, THALLIUM, AND VANADIUM ARE "INTERIMMAXIMUM ALLOWABLE CONCENTRATIONS" (IMAC).
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
U
S-421
PRJ-I-140
SR-1394 P R J -I -1 4 0
S R -2 1 4 5
P R J -I -1 4 0
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
±NOTES:COPC- C ONSTITUEN T OF POTENTIAL C ONC ERN
COPCs IN DENTIFIED IN THIS FIG UR E ARE O NLY THOSE D ETECTED ABOVE ASCREENING VALUE. CO NSTITU ENTS IDENTIFIED AS C OPCs BECAUSE:1) THEY H AVE N O SC REENING VALU E OR2) TH EIR ANALYTICAL DETEC TION LIMIT EXC EEDS THE SC REENING VALUE ARENOT IDENTIFIED ON THIS FIGU RE.
APR IL 17, 2014 AER IAL ORTH OPHOTO GRAPH Y O BTAINED FRO M WSPwww.w spgroup.com
2012 AER IAL O RTH OPH OTO GRAPHY O BTAIN ED FROM THENC CENTER FOR GEOGR APHIC IN FO RMATION AND AN ALYSIS AThttp://services.nconemap.gov/
PARC EL BO UND ARY WAS OBTAIN EDFROM THENC CENTER FOR GEOGR APHIC IN FO RMATION AND AN ALYSIS AThttp://services.nconemap.gov/
DRAWING HAS BEEN SET W ITH A PR OJECTIO N OF NO RTH CAR OLIN A STATEPLANE C OOR DINATE SYSTEM FIPS 3200 (N AD 83/2011).
ELEVATIO NS ARE BASED ON N AVD 88
GRAPHIC SCALE
600 0 600 1,200 1,800 2,400
(IN FEET)
L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
LEGEND
FIG URE 12-7COPC LOCATIONS FLAGGEDSOILS (0-2 FEET ) - HUMAN HEALTHL.V. SUTTON ENERGY COMPLEX
ASH BASIN BOUNDARY
ASH BASIN COM PLIA NCE BOUNDARY
DUKE ENERGY PROGE SS SUTTON PLANT SITE BOUNDARY
NO HUMAN HEALTH SOILS (0-2 FEET) EXCEEDENCES FOUND (SEE TABLE 12-6)1
PROJECT MANAGER: P. WALDREP
DRAWN BY: R. SPRING
DATE: 08/01/2015
DATE: 08/02/2015
CHECKED BY: J. MEADOWS
NOTES:1 USEPA.REGIONAL SCREENING LEVELS FOR CHEMICALCONTAMINANTS AT SUPERFUND SITES . Accessed07/26/2015.(http://www.epa.gov/reg3hwmd/risk/human/rb-concentration_table/Generic_Tables/index.htm)
2 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
3 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
4 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
5 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 12-7 - COPC LOCATIONS FLAGGED - SOILS (0-2 FEET) - HUMAN HEALTH.MXD
")
")
")
U
S-421
PRJ-I-140
SR-1394 P R J -I -1 4 0
S R -2 1 4 5
P R J -I -1 4 0
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
SW-06AAs
SW-CF001FeMn
SW-CFPCoFeMn
±
GRAPHIC SCALE
600 0 600 1,200 1,800 2,400
(IN FEET)
L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
FIG URE 12-8COPC LOCATIONS FLAGGEDSEDIMENT - HUMAN HEALTHL.V SUTTON ENERG Y COMPLEX
PROJECT MANAGER: P. WALDREP
DRAWN BY: R. SPRING
DATE: 08/01/2015
DATE: 08/02/2015
CHECKED BY: J. MEADOWS
P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 12-8 - COPC LOCATIONS FLAGGED - SEDIMENT - HUMAN HEALTH.MXD
NOTES:1 USEPA.REGIONAL SCREENING LEVELS FOR CHEMICALCONTAMINANTS AT SUPERFUND SITES . ACCESSED07/26/2015.(http://www.epa.gov/reg3hwmd/risk/human/rb-concentration_table/Generic_Tables/index.htm)
2 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
3 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
4 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
5 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
Constituent Full NameArsenicCobaltIronManganese
Constituent AbbreviationAsCoFeMn
LEGEND
")SURFACE WATER POINT
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGESS SUTTON PLANT SITE BOUNDARY
EPA RSL RESIDENTIAL SEDIMENT EXCEEDANCES -BOLDED IF COAL ASHCOPC(SEE TABLES 12-2 AND 12-7)1
")
")
")
")
")
")
U
S-421
PRJ-I-140
SR-1394 P R J -I -1 4 0
S R -2 1 4 5
P R J -I -1 4 0
FORMERASH DISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
SW-004AlTl
SW-06AAlTl
SW-01CAl
SW-08AAl
SW-CFPAl
SW-CFUPAl
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
±NOTES:1 USEPA.NATIONAL RECOMMENDED WATER CRITERIA.Accessed 07/26/2015.(http://water.epa.gov/scitech/swguidance/standards/criteria/current/index.cfm)
2 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
3 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
4 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
5 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
Constituent Full NameAluminumThallium
Constituent AbbreviationAlTl
GRAPHIC SCALE
600 0 600 1,200 1,800 2,400
(IN FEET)
L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
LEGEND
FIG URE 12-9COPC LOCATIONS FLAGGEDSURFACE WAT ER - HUMAN HEALTHL.V. SUTTON ENERGY COMPLEX
")SURFACE WATER POINT
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGESS SUTTON PLANT SITE BOUNDARY
SURFACE WATER COMBINED EPA WQC AND NCAC 02B EXCEEDANCES -BOLDEDIF COAL ASH COPC (SEE TABLES 12-2 AND 12-8)1
PROJECT MANAGER: P. WALDREP
DRAWN BY: R. SPRING
DATE: 08/01/2015
DATE: 08/02/2015
CHECKED BY: J. MEADOWS
P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 12-9 - COPC LOCATIONS FLAGGED - SURFACE WATER AND SEEPS - HUMAN HEALTH.MXD
Primary Sources Exposure Medium
Te
r
r
e
s
t
r
i
a
l
M
a
m
m
a
l
s
Aq
u
a
t
i
c
M
a
m
m
a
l
s
Bi
r
d
s
(
I
n
c
l
u
d
i
n
g
w
a
t
e
r
f
o
w
l
)
Aq
u
a
t
i
c
V
e
g
e
t
a
t
i
o
n
Al
g
a
e
/
M
o
s
s
Be
n
t
h
i
c
I
n
v
e
r
t
e
b
r
a
t
e
s
He
r
p
t
i
l
e
s
Fi
s
h
In
s
e
c
t
s
Wo
o
d
y
P
l
a
n
t
s
He
r
b
a
c
e
o
u
s
P
l
a
n
t
s
Ba
c
t
e
r
i
a
(
M
i
c
r
o
b
e
s
)
Potential Human Receptors
Potentially Complete Exposure Pathway
Incomplete Exposure Pathway
Exposure RouteSecondary Sources
Sediment
Groundwater
Incidental Ingestion
Ingestion of Prey or Plants
Incidental Ingestion
Ingestion of Prey or Plants
Incidental Ingestion
Ingestion of Prey or Plants
Incidental Ingestion
Ingestion of Prey or Plants
Current and Hypothetical Future Ecological Receptors
Soil
1984 Ash Basin Groundwater
Sediment1971 Ash Basin
NPDES
Stormwater
Discharge
Surface Water
NPDES
Discharge
Former Ash
Disposal Area
(FADA)
Surface Water
(Lake/River)
Figure 12-10
Ecological
Conceptual Exposure Model
L. V. Sutton Power Plant
Wilmington, North Carolina
0
148 River Street, Suite 220
Greenville, SC 29601
Phone: (864) 421-9999
Existing Primary Release Mechanisms
FADA
1971 Ash Basin
1984 Ash Basin
Former Primary Release Mechanism
No Longer Used
P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\Report Figures\Figure 12-10 ECO CEM - Sutton8/4/2015
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
U
S-421
PRJ-I-140
SR-1394 P R J -I -1 4 0
S R -2 1 4 5
P R J -I -1 4 0
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
AW-01CAlCrFe
AW-02CAlCrFeV
AW-03CAlCrFeV
AW-04CAlCrFeV
AW-06DAlFeV
AW-07DAlCrFeV
SMW-01CAlFe
SMW-02CAlCrFe
SMW-04CAl
SMW-06DAl
±NOTES:COPC- C ONSTITUEN T OF POTENTIAL C ONC ERN
COPCs IN DENTIFIED IN THIS FIG UR E ARE O NLY THOSE D ETECTED ABOVE ASCREENING VALUE. CO NSTITU ENTS IDENTIFIED AS C OPCs BECAUSE:1) THEY H AVE N O SC REENING VALU E OR2) TH EIR ANALYTICAL DETEC TION LIMIT EXC EEDS THE SC REENING VALUE ARENOT IDENTIFIED ON THIS FIGU RE.
APR IL 17, 2014 AER IAL ORTH OPHOTO GRAPH Y O BTAINED FRO M WSPwww.w spgroup.com
2012 AER IAL O RTH OPH OTO GRAPHY O BTAIN ED FROM THENC CENTER FOR GEOGR APHIC IN FO RMATION AND AN ALYSIS AThttp://services.nconemap.gov/
PARC EL BO UND ARY WAS OBTAIN EDFROM THENC CENTER FOR GEOGR APHIC IN FO RMATION AND AN ALYSIS AThttp://services.nconemap.gov/
DRAWING HAS BEEN SET W ITH A PR OJECTIO N OF NO RTH CAR OLIN A STATEPLANE C OOR DINATE SYSTEM FIPS 3200 (N AD 83/2011).
ELEVATIO NS ARE BASED ON N AVD 88
GRAPHIC SCALE
600 0 600 1,200 1,800 2,400
(IN FEET)
L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
LEGEND
FIGURE 12-11COPC LOCATIONS FLAGGEDSOILS (0-2 FEET) - ECOLOGICALL.V. SUTTON ENERGY COMPLEX
&<MONITORING WELL
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGESS SUTTON PLANT SITE BOUNDARY
EPA REGION 4 SOIL EXCEEDENCES -BOLDED IF COAL ASH COPC(SEE TABLES 12-2 AND 12-11)1
PROJECT MANAGER: P. WALDREP
DRAWN BY: M. LOVELACE
DATE: 08/01/2015
DATE: 08/02/2015
CHECKED BY: J. MEADOWS
P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 12-11 - COPC LOCATIONS FLAGGED - SOILS (0-2 FEET) - ECOLOGICAL.MXD
NOTES:1 USEPA.SUPPLEMENTAL GUIDANCE TO RISKASSESSMENT GUIDANCE FOR SUPERFUND: REGION 4BULLETINS, ECOLOGICAL RISK ASSESSMENT. Originallypublished November 1995. Website version last updated11/30/2001:(http://www.epa.gov/region4/superfund/programs/riskassess/ecolbul.html.)
2 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
3 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
4 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
5 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
Constituent Full NameAlCrFeV
Constituent AbbreviationAluminumChromiumIronVanadium
")
")
")
")
")
")
")
U
S-421
PRJ-I-140
SR-1394 P R J -I -1 4 0
S R -2 1 4 5
P R J -I -1 4 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
SW-06AAlBCrFeMnV
SW-08AAlCrFeMnV
SW-CFPAlCrFeMnVZ
SW-CFUPAlCrFe
SW-01CAlCrFeV
SW-CF001AlCrFeMnV
SW-004AlCrFeMoV
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNELCOOLINGPOND
COOLINGPOND
COOLINGPOND
±NOTES:COPC- C ONSTITUEN T OF POTENTIAL C ONC ERN
COPCs IN DENTIFIED IN THIS FIG UR E ARE O NLY THOSE D ETECTED ABOVE ASCREENING VALUE. CO NSTITU ENTS IDENTIFIED AS C OPCs BECAUSE:1) THEY H AVE N O SC REENING VALU E OR2) TH EIR ANALYTICAL DETEC TION LIMIT EXC EEDS THE SC REENING VALUE ARENOT IDENTIFIED ON THIS FIGU RE.
APR IL 17, 2014 AER IAL ORTH OPHOTO GRAPH Y O BTAINED FRO M WSPwww.w spgroup.com
2012 AER IAL O RTH OPH OTO GRAPHY O BTAIN ED FROM THENC CENTER FOR GEOGR APHIC IN FO RMATION AND AN ALYSIS AThttp://services.nconemap.gov/
PARC EL BO UND ARY WAS OBTAIN EDFROM THENC CENTER FOR GEOGR APHIC IN FO RMATION AND AN ALYSIS AThttp://services.nconemap.gov/
DRAWING HAS BEEN SET W ITH A PR OJECTIO N OF NO RTH CAR OLIN A STATEPLANE C OOR DINATE SYSTEM FIPS 3200 (N AD 83/2011).
ELEVATIO NS ARE BASED ON N AVD 88
GRAPHIC SCALE
600 0 600 1,200 1,800 2,400
(IN FEET)
L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
LEGEND
FIG URE 12-12COPC LOCATIONS FLAGGEDSEDIMENT - ECOLOGICALL.V. SUTTON ENERGY COMPLEX
")SURFACE WATER POINT
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGESS SUTTON PLANT SITE BOUNDARY
EPA REGION 4 SOIL EXCEEDENCES -BOLDED IF COAL ASH COPC (SEETABLES AND 12-2 AND 12-12)1
PROJECT MANAGER: P. WALDREP
DRAWN BY: M. LOVELACE
DATE: 08/01/2015
DATE: 08/02/2015
CHECKED BY: J. MEADOWS
P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 12-12 - COPC LOCATIONS FLAGGED - SEDIMENT - ECOLOGICAL.MXD
NOTES:1 USEPA.SUPPLEMENTAL GUIDANCE TO RISKASSESSMENT GUIDANCE FOR SUPERFUND: REGION 4BULLETINS, ECOLOGICAL RISK ASSESSMENT. Originallypublished November 1995. Website version last updated11/30/2001:(http://www.epa.gov/region4/superfund/programs/riskassess/ecolbul.html.)
2 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
3 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
4 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
5 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
Constituent Full NameAlBCrFeMnMoVZn
Constituent AbbreviationAluminumBoronChromiumIronManganeseMolybdenumVanadiumZinc
")
")
")
")
")
")
")
U
S-421
PRJ-I-140
SR-1394 P R J -I -1 4 0
S R -2 1 4 5
P R J -I -1 4 0
FORMERASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
SW-06ACuZn
SW-08ACu
SW-CFPAl
SW-CFUPAlZn
SW-01CAlCu
SW-CF001Al
SW-004CuZn
SW-06AZn
SW-CFPAl
SW-CFUPZn
SW-004Zn
SW-06AZn
SW-CFPAl
SW-CFUPAl
SW-01CAl
SW-CF001Al
SW-004Zn
SW-06ACuZn
SW-08ACu
SW-CFPZn
SW-CFUPZn
SW-01CCuZn
SW-004CuZn
SW-06ACuZn
SW-08ACu
SW-CFPZn
SW-CFUPZn
SW-01CCuZn
SW-004CuZn
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
±
GRAPHIC SCALE
600 0 600 1,200 1,800 2,400
(IN FEET)
L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
LEGEND
FIG URE 12-13COPC LOCATIONS FLAGGEDSURFACE WATER - ECOLOGICALL.V. SUTTON ENERGY COMPLEX
")SURFACE WATER P OINT
ASH BAS IN BOUNDA RY
ASH BAS IN COMPLIANCE BOUNDARY
DUKE E NE RGY PROGES S SUTTON PLANT SITE B OUNDARY
PROJECT MANAGER: P. WALDREP
DRAWN BY: M. LOVELACE
DATE: 08/01/2015
DATE: 08/02/2015
CHECKED BY: J. MEADOWS
P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 12-13 - COPC LOCATIONS FLAGGED - SEEPS AND SURFACE WATERS - ECOLOGICAL.MXD
NOTES:1 USEPA.NATIONAL RECOMMENDED WATER CRITERIA.Accessed 07/26/2015.(http://water.epa.gov/scitech/swguidance/standards/criteria/current/index.cfm)
2 USEPA.SUPPLEMENTAL GUIDANCE TO RISKASSESSMENT GUIDANCE FOR SUPERFUND: REGION 4BULLETINS, ECOLOGICAL RISK ASSESSMENT. Originallypublished November 1995. Website version last updated11/30/2001:(http://www.epa.gov/region4/superfund/programs/riskassess/ecolbul.html.)
3 CLASSIFICATION AND WATER QUALITY STANDARDSAPPLICABLE TO THE SURFACE WATERS OF NORTHCAROLINA. NORTH CAROLINA ADMINISTRATIVE CEDETITLE 15A, SUBCHAPTER 2B. 2015.
4 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
5 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
6 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
7 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
Constituent Full NameAlCuPbZn
Constituent AbbreviationAluminumCopperLeadZinc
ECOLOGICAL EPA AQUATIC ACUTE EXCEEDANCES -BOLDED IF COAL ASHCOPC(SEE TABLES 12-2 AND 12-10)1
ECOLOGICAL EPA AQUATIC CHRONIC EXCEEDANCES -BOLDED IF COALASH COPC (SEE TABLES 12-2 AND 12-10)1
ECOLOGICAL EPA R4 FW CHRONIC EXCEEDANCES -BOLDED IF COAL ASHCOPC(SEE TABLES 12-2 AND 12-10)2
ECOLOGICAL NC2B AQUATIC ACUTE EXCEEDANCES -BOLDED IF COALASH COPC (SEE TABLES 12-2 AND 12-10)2
ECOLOGICAL NC2B AQUATIC CHRONIC EXCEEDANCES -BOLDED IF COALASH COPC (SEE TABLES 12-2 AND 12-10)3
&<
&<
&<&<
&<&<
&<&<
&<&<
&<
&<&<
&<
&<&<
&<
&<
&<
&>
&>&>
&>&>
&>&>
&>&>
&<&<
&<&<
&<&<
&>
&>
&<
&<
&<
&<
&<
&<&<
&<&<
&<&<
&<&<&<
&<&<
&<&<
&<&<&<&<
&<&<&<
&<
&<&<
&<&<&<
&<
&<&<
&<&<
&<&<
&<&<
&<&<
&<&<
&<&<&<
")")
")
")
&<&<
&<&<
&<&<
&<&<
&>
&<
&<
&<&<
&<
&<
&>&>
&>
&<
&<
&<
&<
&<&<
&<&<
&<&<
&<&<
&<
&<&<
&<
&<
&<&<
&<&<
&<&<
&<
&<&<
&<
&<&<
&<
&<
&<
&<
&<
&<
&<
C A P E F E AR RIVER
U
S-421
PRJ-I-140
P R J -I -1 4 0
S
R-2
1
6
9
S R -2 7 7 9
SR-1394
S R -2 1 4 5
P R J -I -1 4 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-11
MW-12
MW-19MW-21C
MW-23B
MW-23C
MW-24B
MW-24C
MW-28B
MW-28C
MW-31C
MW-32C
MW-33C
MW-05C
MW-07C
ABMW-01D
ABMW-01S
ABMW-02D
ABMW-02S
AW-06D
AW-06E
AW-07D
AW-09C AW-09D
MW-23E
MW-37B
MW-37C
SMW-01C
SMW-03C
SMW-04C
PZ-10D
PZ-06D
MW-21
MW-22
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
FIGURE 16-1PROPOSED GROUNDWATERMONITORING LOCATIONSL.V. SUTTON ENERGY COMPLEX
±
LEGEND
&<PROPOSED GROUNDWATER MONITORING LOCATIONS(THE PROPOSED PEE DEE BACKGROUND WELL LOCATION HAS YET TO BE DETERMINED)
&<MONITORING WELL
")PRODUCTION WELL
&>PIEZOMETER
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
HALF-MILE OFFSET FROM COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
NOTES:1 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
2 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
3 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
4 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
GRAPHIC SCALE
500 0 500 1,000 1,500 2,000
(IN FEET)
L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com PROJECT MANAGER: P. WALDREP
DRAWN BY: R. SPRING
DATE: 08/03/2015
DATE: 08/03/2015
CHECKED BY: J. MEADOWS
P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 16-1 PROPOSED GROUNDWATER MONITORING LOCATIONS.MXD