HomeMy WebLinkAboutNC0001422_Table 7-8 2L Exceedances in Ash Pore Water_20150805TABLE 7-8
15 NCAC 2L EXCEEDANCES IN ASH PORE WATER
L.V. SUTTON ENERGY COMPLEX
DUKE ENERGY PROGRESS, INC., WILMINGTON, NC
Analytical Parameter
pH
Arsenic
Barium
Boron
Iron
Manganese
Total
Dissolved
Solids
Vanadium
Reporting Units
S.U.
ug/I
ug/I
ug/I
ug/I
ug/I
mg/I
ug/I
15A NCAC 02L Standard '>
6.5-8.5
10
700
700
1 300
50
500
0.3
Sample ID
Sample
Collection Date
Analytical Results
ABMW-015
04/28/2015
BE
858
BE
3960
BE
108
760
8.72
ABMW-015
06/04/2015
9.0
634 ;
BE
3940
BE
88
680
3.45
ABMW-025
04/27/2015
BE
57.8
1570
BE
29200
970
BE
2.21
ABMW-025
04/29/2015
BE
38.6's
1470
BE
22700
741
BE
2.24 's
ABMW-025
06/04/2015
BE
53.4;
1810
BE
I 24100'
784
BE
1.28
Prepared by: RBI Checked by: KLS DMY
Notes:
0 - Bold highlighted concentration indicates exceedance of the 15A NCAC 02L Standard, Appendix 2, April 1, 201
ug/I = microgram per liter
mg/I = milligram per liter
S.U. = Standard Unit
BE = indicates concentration was below the 15A NCAC 02B Standard, May 1, 2007.
* = Interim Maximum Allowable Concentrations (IMACs) of the 15A NCAC 02L Standard, Appendix 1, April 1, 2013.
P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\Tables\Report
Tables\Table 7-8 2L Exceedances in Ash Pore Water Page 1 of 1