Loading...
HomeMy WebLinkAboutNC0001422_Table 7-8 2L Exceedances in Ash Pore Water_20150805TABLE 7-8 15 NCAC 2L EXCEEDANCES IN ASH PORE WATER L.V. SUTTON ENERGY COMPLEX DUKE ENERGY PROGRESS, INC., WILMINGTON, NC Analytical Parameter pH Arsenic Barium Boron Iron Manganese Total Dissolved Solids Vanadium Reporting Units S.U. ug/I ug/I ug/I ug/I ug/I mg/I ug/I 15A NCAC 02L Standard '> 6.5-8.5 10 700 700 1 300 50 500 0.3 Sample ID Sample Collection Date Analytical Results ABMW-015 04/28/2015 BE 858 BE 3960 BE 108 760 8.72 ABMW-015 06/04/2015 9.0 634 ; BE 3940 BE 88 680 3.45 ABMW-025 04/27/2015 BE 57.8 1570 BE 29200 970 BE 2.21 ABMW-025 04/29/2015 BE 38.6's 1470 BE 22700 741 BE 2.24 's ABMW-025 06/04/2015 BE 53.4; 1810 BE I 24100' 784 BE 1.28 Prepared by: RBI Checked by: KLS DMY Notes: 0 - Bold highlighted concentration indicates exceedance of the 15A NCAC 02L Standard, Appendix 2, April 1, 201 ug/I = microgram per liter mg/I = milligram per liter S.U. = Standard Unit BE = indicates concentration was below the 15A NCAC 02B Standard, May 1, 2007. * = Interim Maximum Allowable Concentrations (IMACs) of the 15A NCAC 02L Standard, Appendix 1, April 1, 2013. P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\Tables\Report Tables\Table 7-8 2L Exceedances in Ash Pore Water Page 1 of 1