Loading...
HomeMy WebLinkAboutNC0001422_Table 6-4 Well Construction Details_20150805TABLE 6-4 WELL CONSTRUCTION DATA L.V. SUTTON ENERGY COMPLEX DUKE ENERGY PROGRESS, INC., WILMINGTON, NC Monitoring Moni Wetorill Aquifer Date Installed Ground Surface Elevation (Feet- MSL) Total Well Depth (Feet-ll a Screened Interval (Feet-BGS) Northing Easting SOURCE Ash Basin ABMW-01D PD 03/28/15 45.71 108 103-108 198964.17 2305386.78 McKim & Creed ABMW-01S PW 03/29/15 45.75 76 71-76 198968.22 2305388.87 McKim & Creed ABMW-02D S 03/27/15 10.10 45 41-45 197177.19 2305583.43 McKim & Creed ABMW-02S PW 03/27/15 9.98 8 3-8 197177.71 2305589.13 McKim & Creed GAP Wells AW-01B S 01/31/15 16.61 25 20-25 203061.57 2306091.71 McKim & Creed AW-01C S 01/31/15 16.55 45 40-45 203064.20 2306090.72 McKim & Creed AW-02B S 01/31/15 27.08 25 20-25 202156.49 2306450.12 McKim & Creed AW-02C S 01/31/15 27.20 48 42.4-47.4 202160.58 2306445.96 McKim & Creed AW-02D PD 05/10/15 26.62 97 92-97 202147.28 2306457.78 McKim & Creed AW-03B S 02/02/15 18.23 25 20-25 201583.66 2306678.86 McKim & Creed AW-03C S 02/02/15 18.20 48 40-45 201584.81 2306673.94 McKim & Creed AW-04B S 01/30/15 18.62 25 20.4-25.4 198812.83 2307820.78 McKim & Creed AW-04C S 01/29/15 18.43 48 40-45 198803.25 2307818.27 McKim & Creed AW-05B S 02/02/15 23.70 25 20-25 198021.26 2308134.95 McKim & Creed AW-05C S 02/02/15 23.69 47 40-45 198024.46 2308133.35 McKim & Creed AW-05D PD 06/10/15 23.78 100 90-100 198024.76 2308125.18 McKim & Creed AW-05E PD 05/08/15 23.50 150 140-150 198018.09 2308127.63 McKim & Creed AW-06B S 01/31/15 17.34 27 20-25 199639.95 2307503.39 McKim & Creed AW-06D PD 01/31/15 17.48 127 104-109 199642.47 2307502.47 McKim & Creed AW-06E PD 05/12/15 17.43 150 140-150 199648.93 2307507.34 McKim & Creed AW-07D PD 01/31/15 14.80 98 93-98 201037.19 2306853.91 McKim & Creed AW-08B S 02/05/15 13.47 25 20-25 203420.00 2304212.85 McKim & Creed AW-08C S 02/04/15 13.40 48 40-45 203419.38 2304205.34 McKim & Creed AW-09B S 02/03/15 14.13 27 18-23 196083.31 2307795.83 McKim &Creed AW-09C S 02/03/15 14.26 45 40-45 196081.45 2307793.85 McKim & Creed AW-09D S 05/07/15 14.59 97 20-25 196076.31 2307788.10 McKim & Creed SMW-01B S 4/14/2015 13.91 23.9 18.9-23.9 199292.01 2308712.96 McKim&Creed SMW-01C S 4/14/2015 13.99 48 41-46 199295.12 2308717.75 McKim & Creed SMW-02B S 3/24/2015 17.38 25 18.4-25.4 198396.18 2308908.42 McKim & Creed SMW-02C S 3/24/2015 17.50 48 40-45 198403.45 2308904.84 McKim & Creed SMW-03B S 3/25/2015 15.43 24.9 19.9-24.9 197748.56 2309459.02 McKim & Creed SMW-03C S 3/25/2015 15.33 53 41.5-46.5 197745.03 2309453.18 McKim & Creed SMW-04B S 1/30/2015 18.62 25 20-25 202569.12 2307663.93 McKim & Creed SMW-04C S 4/13/2015 12.69 45 40-45 202565.07 2307665.57 McKim & Creed SMW-05B S 4/13/2015 13.63 24.8 19.8-24.8 201027.58 2308551.36 McKim & Creed SMW-05C S 4/13/2015 13.49 43.8 38.8-43.8 201027.18 2308554.63 McKim & Creed SMW-06B S 4/10/2015 13.87 24.4 19.4-24.4 200222.83 2309008.69 McKim & Creed SMW-06C S 4/10/2015 13.03 44 39-44 200222.29 2309012.80 McKim & Creed SMW-06D PD 4/8/2015 12.80 108 103-108 200221.20 2309017.66 McKim & Creed MW-23E PD 05/12/15 13.79 150 140-150 198979.66 2306894.64 McKim & Creed MW-37B S 02/04/15 20.88 27 20-25 193820.03 2308956.68 McKim & Creed MW-37C S 02/04/15 20.94 47 38-43 193819.39 2308959.44 McKim & Creed P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Report ing\Ta bles\Repo rt Tables\Table 6-4 Well Construction Details Page 1 of 3 TABLE 6-4 WELL CONSTRUCTION DATA L.V. SUTTON ENERGY COMPLEX DUKE ENERGY PROGRESS, INC., WILMINGTON, NC Monitoring Moni Wetorill Aquifer Date Installed Ground Surface Elevation (Feet- MSL) Total Well Depth (Feet-ll a Screened Interval (Feet-BGS) Northing Easting SOURCE Previously Installed Wells MW-04 S 12/13/84 15.67 27 22-27 194238.17 2308898.63 McKim & Creed MW-04A S 12/13/86 15.51 17 12-17 194244.91 2308896.94 McKim & Creed MW-04B S 12/12/1986 15.91 45 40-45 194232.85 2308900.30 McKim & Creed MW-05A S 12/16/86 11.97 17.0 12-17 205923.44 2303854.09 McKim & Creed MW-05B S 12/15/86 12.52 27 22-27 205913.11 2303859.22 McKim & Creed MW-05C S 12/15/86 13.00 45.0 40-45 205901.75 2303862.83 McKim & Creed MW-07A S 12/14/86 15.79 17 12-17 196607.25 2307576.07 McKim & Creed MW-07B S 12/14/15 15.63 27.0 22-27 196603.05 2307572.21 McKim & Creed MW-07C S 12/14/15 15.74 45 40-45 196599.00 2307569.14 McKim & Creed MW-08 S 02/07/90 13.73 50 40-50 206893.50 2304447.55 McKim & Creed MW-09 S 02/07/90 23.25 50 40-50 204973.42 2305308.13 McKim & Creed MW-10 S 02/08/90 22.90 50 40-50 203190.66 2304860.99 McKim & Creed MW-11 S 02/06/90 22.19 50 40-50 203192.17 2304857.67 Geosyntec MW-12 S 02/06/90 17.13 50 45-50 199644.37 2307510.45 McKim & Creed MW-14 S 06/22/04 10.96 11 1.0 - 11.0 197252.17 2306178.43 Geosyntec MW-15 S 06/22/04 8.53 11 1.0-11.0 196475.65 2306044.01 Geosyntec MW-15D S 02/04/04 8.61 48 40-45 196476.98 2306061.06 Geosyntec MW-16 S 06/22/04 14.11 12 2.0-12.0 19697593.00 2306753.16 Geosyntec MW-16D S 02/04/04 10.73 47 42-47 196962.70 2306758.11 Geosyntec MW-18 S 06/22/04 19.27 50 45-50 198101.81 2306589.96 McKim & Creed MW-19 S 06/22/04 28.73 50 45-50 197831.75 2307042.61 McKim & Creed MW-20 S 02/04/05 10.78 14 4.0-14.0 196257.98 2305318.00 Geosyntec MW-20D S 02/04/05 10.73 52 43-48 1962556.89 2305326.09 Geosyntec MW-21C S 09/16/11 27.64 45 40-45 197773.24 2306913.33 McKim & Creed MW-22B S 09/15/11 16.59 27 23-27 198349.20 2307017.22 McKim & Creed MW-22C S 09/15/11 16.74 44.5 39.5-44.5 198349.58 2307023.80 McKim & Creed MW-23B S 09/06/11 14.20 26.5 21.5-26.5 198967.48 2306901.58 McKim & Creed MW-23C S 09/07/11 14.17 45 40-45 198972.43 2306903.62 McKim & Creed MW-24B S 09/09/15 12.62 27 23-27 200712.44 2306251.22 McKim & Creed MW-24C S 09/13/11 12.47 45 40-45 200716.51 2306263.95 McKim & Creed MW-27B S 09/08/11 -- 27 22-27 202583.30 2304678.40 Geosyntec MW-27C S 05/12/14 11.50 45 40-45 202583.80 2304674.50 Geosyntec MW-28B S 09/28/11 28.63 30 25-30 197368.42 2307360.26 McKim & Creed MW-28C S 09/21/11 28.17 45 40-45 197356.57 2307354.01 McKim & Creed MW-28T PD 09/27/11 29.33 60 55-60 197369.96 2307352.75 McKim & Creed MW-31B S 09/13/11 15.02 27 22-27 201044.81 2306851.38 McKim & Creed MW-31C S 09/14/11 14.96 45 40-45 201047.15 2306858.44 McKim & Creed MW-32C S 11/14/13 33.48 50 45-50 197686.00 2307878.15 McKim & Creed MW-33C S 11/13/13 22.28 45 45-50 197599.01 2308275.12 McKim & Creed PZ-06D PD 12/16/08 28.50 102 80-100 204198.98 2305619.87 McKim & Creed PZ-06S S 11/25/08 28.50 26 16-26 204190.34 2305618.11 McKim & Creed PZ-10D PD 12/03/08 23.90 102 80-100 203125.77 2305120.84 McKim & Creed PZ-010S S 11/21/08 24.80 23 13-23 203140.53 2305115.70 McKim & Creed GWPZ-lA S 05/08/14 13.30 15 10.0-15.0 202183.50 2304953.20 Geosyntec P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Report ing\Ta bles\Repo rt Tables\Table 6-4 Well Construction Details Page 2 of 3 TABLE 6-4 WELL CONSTRUCTION DATA L.V. SUTTON ENERGY COMPLEX DUKE ENERGY PROGRESS, INC., WILMINGTON, NC Monitoring Moni Wetorill Aquifer Date Installed Ground Surface Elevation (Feet- MSL) Total Well Depth (Feet-BGS) Screened Interval (Feet-BGS) Northing Easting SOURCE Previously Installed Wells (Continued) GWPZ-1B S 05/08/14 13.70 27 22-27 202181.70 2304948.20 Geosyntec GWPZ-2A S 05/08/14 15.10 15 10.0-15.0 201760.40 2305335.10 Geosyntec GWPZ-2B S 05/08/14 15.20 27 22-27 201755.60 2305337.30 Geosyntec GWPZ-3A S 05/07/14 18.60 15 10.0-15.0 200404.00 2305825.50 Geosyntec GWPZ-3B S 05/07/14 18.70 27 22-27 200405.30 2305829.60 Geosyntec GWPZ-4A S 05/07/14 18.30 15 10.0-15.0 199057.60 2306398.80 Geosyntec GWPZ-4B S 05/07/14 18.30 27 22-27 199058.80 2306403.60 Geosyntec PZ-INT S 05/07/14 39.90 15 10.0-15.0 200420.50 2304536.30 Geosyntec LA-PZ-1 S 02/10/15 19.80 50 40-50 202897.98 2305358.04 Geosyntec LA-PZ-2 S 02/11/15 26.00 50 35-45 201637.48 2306475.92 Geosyntec LA-PZ-3 S 02/13/15 22.70 50 36.5-46.5 200553.67 2306698.53 Geosyntec LA-PZ-4 S 02/16/15 18.60 50 40-50 199963.74 2306964.30 Geosyntec LA-PZ-5 S 02/12/15 22.00 50 39.5-49.5 198148.1 2307616.62 Geosyntec Prepared by: CMS/ARL Checked by RHJ PD = Pee Dee Aquifer BGS - Below ground surface PW = Pore Water NM - Not Measured S = Surfcial Aquifer MSL - Mean sea level -- = No information available P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Report ing\Ta bles\Repo rt Tables\Table 6-4 Well Construction Details Page 3 of 3