Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NC0001422_Table 6-1 Exploration and Sampling Plan_20150805
TABLE 6-1 ENVIRONMENTAL EXPLORATION AND SAMPLING PLAN L.V. SUTTON ENERGY COMPLEX DUKE ENERGY PROGRESS, INC., WILMINGTON, NC Shallow Intermediate Monitoring Wells Deep Intermediate Monitoring Wells Deep Monitoring Wells Exploration Soil Borings ("B" Series) ("C" Series) ("D" & "E" Series) Water Quality Sample Sediment Previously Existing Monitoring Wells Area 20-25' 40-45' >60' (Single Cased) (Single Cased) (Single Cased) Boring Well Screen Well Screen Well Screen Boring Quantity Depth Well IDs Quantity Depth Length Well IDs Quantity Depth Length Well IDs Quantity Depth Length Sample IDs Quantity of Quantity of Sample Quantity of Quantity of Well IDs Quantity of Quantity of ID (ft bgs) (ft bgs) (ft) (ft bgs) (ft) (ft bgs) (ft) Locations Samples IDs Locations Samples Locations Samples AB-1 ABMW-1S ABMW-1D Ash Basin and 2 40 and 2 25 10 and 2 25 5 N/A 0 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A AB-2 ABMW-2S ABMW-2D AW-1B 25 AW-1C 45 MW-27B , AW-2B 25 AW-2C 48 MW-15 cluster, AW-3B 25 AW-3C 48 AW-2D 97 MW-16 cluster, CUB-1 57 AW-4B 25 AW-4C 48 AW-5D 100 MW-20 cluster, CUB-2 77 AW-SB 25 AW-SC 47 AW-SE 150 MW-12 , CUB-3 57 AW-6B 27 AW-8C 48 AW-6D 127 SW-004, SW-004, MW-31C *, CUB-5 40 AW-8B 25 AW-9C 45 AW-6E 150 SW-1C, SW-1C, VW-7 * cluster, VW- Beyond CUB-6 57 AW-9B 27 AW-7D 98 SW-6A, SW-6A, 23E, VW-31B, VW - Waste CUB-7 10 50 13 10 and 13 5 AW_9D 9 97 5 or 10 SW-8A, 6 6 SW-8A, 6 6 37B, VW-37C, 21 21 Boundary CUB-8 60 and MW-23E 137 SW-CFP, SW-CFP, PZ-10S/D, CUB-9 60 SMW-1C 48 and and others TBD CUB-10 60 SMW-1B 23.9 SMW-2C 48 and SW-CF001 SW-CF001 and CUB-12 50 SMW-2B 25 SMW-3C 53 Product Wells SMW-3B 27.9 SMW-4C 45 SMW-6D 108 PE-SW2, PE-SW4, SMW-5B SMW-5C 43.8 PE-SWS, PE-SW6A, SMW-6B 24.8 SMW-6C 44 PE-SW6B, PE-SW6D, 24.4 PE-SW6E Background N/A 0 N/A MW-37B 1 25 10 MW-37C 1 45 5 N/A 0 N/A N/A SW-CFUP 1 1 SW-CFUP 1 1 VW-5 * cluster 3 3 Prepared by: HJF Checked by: DMY Notes: 1. Estimated boring and well depths based on data available at the time of work plan preparation and subject to change based on site -specific conditions in the field. 2. Laboratory analyses of soil, ash, groundwater, and surface water samples will be performed in accordance with the constituents and methods identified in Tables 10 and 11. 3. Additionally, soils will be tested in the laboratory to determine grain size (with hydrometer), specific gravity, and permeability. 4. During drilling operations, downhole testing will be conducted to determine in -situ soil properties such as horizontal and vertical hydraulic conductivity. 5. * = Compliance monitoring well will be sampled during routing compliance montoring event in March 2015. P:\Duke Energy Progress. 1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\Tables\Re port Tables\Table 6-1 Exploration and Sampling Plan Pagel of 1