Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NC0001422_Figures 16-1 Proposed GW Monitoring Locations_RS_20150805
&< &< &<&< &<&< &<&< &<&< &< &<&< &< &<&< &< &< &< &> &>&> &>&> &>&> &>&> &<&< &<&< &<&< &> &> &< &< &< &< &< &<&< &<&< &<&< &<&<&< &<&< &<&< &<&<&<&< &<&<&< &< &<&< &<&<&< &< &<&< &<&< &<&< &<&< &<&< &<&< &<&<&< ")") ") ") &<&< &<&< &<&< &<&< &> &< &< &<&< &< &< &>&> &> &< &< &< &< &<&< &<&< &<&< &<&< &< &<&< &< &< &<&< &<&< &<&< &< &<&< &< &<&< &< &< &< &< &< &< &< C A P E F E AR RIVER U S-421 PRJ-I-140 P R J -I -1 4 0 S R-2 1 6 9 S R -2 7 7 9 SR-1394 S R -2 1 4 5 P R J -I -1 4 0 FORMER ASHDISPOSALAREA 1984 ASHBASIN(LINED) NEW ASHBASIN AREA(LINED) 1971 ASHBASIN MW-11 MW-12 MW-19MW-21C MW-23B MW-23C MW-24B MW-24C MW-28B MW-28C MW-31C MW-32C MW-33C MW-05C MW-07C ABMW-01D ABMW-01S ABMW-02D ABMW-02S AW-06D AW-06E AW-07D AW-09C AW-09D MW-23E MW-37B MW-37C SMW-01C SMW-03C SMW-04C PZ-10D PZ-06D MW-21 MW-22 COOLINGPOND COOLINGPOND COOLINGPOND COOLINGPOND CAPE FEARRIVER DRAINAGECHANNEL COOLINGPOND COOLINGPOND FIGURE 16-1PROPOSED GROUNDWATERMONITORING LOCATIONSL.V. SUTTON ENERGY COMPLEX ± LEGEND &<PROPOSED GROUNDWATER MONITORING LOCATIONS(THE PROPOSED PEE DEE BACKGROUND WELL LOCATION HAS YET TO BE DETERMINED) &<MONITORING WELL ")PRODUCTION WELL &>PIEZOMETER ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY HALF-MILE OFFSET FROM COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY NOTES:1 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP. 2 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/) 3 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/) 4 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011). GRAPHIC SCALE 500 0 500 1,000 1,500 2,000 (IN FEET) L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA 148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com PROJECT MANAGER: P. WALDREP DRAWN BY: R. SPRING DATE: 08/03/2015 DATE: 08/03/2015 CHECKED BY: J. MEADOWS P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 16-1 PROPOSED GROUNDWATER MONITORING LOCATIONS.MXD