HomeMy WebLinkAboutNC0001422_Figures 12_20150805Primary Sources Exposure Medium Exposure Route
Re
c
r
e
a
t
i
o
n
a
l
U
s
e
r
-
F
i
s
h
e
r
m
a
n
Re
c
r
e
a
t
i
o
n
a
l
U
s
e
r
-
H
u
n
t
e
r
Re
c
r
e
a
t
i
o
n
a
l
U
s
e
r
-
S
w
i
m
m
e
r
In
d
u
s
t
r
i
a
l
W
o
r
k
e
r
(
A
d
u
l
t
)
Re
c
r
e
a
t
i
o
n
a
l
U
s
e
r
-
F
i
s
h
e
r
m
a
n
Re
c
r
e
a
t
i
o
n
a
l
U
s
e
r
-
H
u
n
t
e
r
Re
c
r
e
a
t
i
o
n
a
l
U
s
e
r
-
S
w
i
m
m
e
r
Re
s
i
d
e
n
t
i
a
l
(
A
d
u
l
t
&
C
h
i
l
d
)
In
d
u
s
t
r
i
a
l
W
o
r
k
e
r
(
A
d
u
l
t
)
Soil
Surface Water
Sediment
Groundwater
Dermal
Inhalation
Ingestion
Dermal
Inhalation
Ingestion
Dermal
Inhalation
Incomplete Exposure Pathway
1984 Ash Basin Groundwater
1971 Ash Basin
NPDES
Stormwater
Discharge
Sediment
Potential Human Receptors
Potentially Complete Exposure Pathway
Current Land Use Hypothetical Future Land
Use
Former Ash
Disposal Area
(FADA)
NPDES Direct
Discharge
Surface Water
(Sutton Lake &
Cape Fear River)
Secondary Sources
Ingestion
Dermal
Inhalation
Ingestion
Figure 12-1
Human Health
Conceptual Exposure Model
L. V. Sutton Energy Complex
Wilmington, North Carolina
0
148 River Street, Suite 220
Greenville, SC 29601
Phone: (864) 421-9999
Existing Primary Release Mechanisms
Inactive Ash Basin
Active Ash Basin
Lay Of Land Area
Former Primary Release Mechanism
No longer used
P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\Report Figures\Figure 12-1 Sutton HH CEM8/4/2015
&<
&<
U
S-421
PRJ-I-140
SR-1394 P R J -I -1 4 0
S R -2 1 4 5
P R J -I -1 4 0
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNELCOOLINGPOND
COOLINGPOND
COOLINGPOND
ABMW-01SpHAsBMnTDSV
ABMW-02SAsBaBFeMnTDSV
±NOTES:1 CONSTITUENTS IDENTIFIED AS A SITE SPECIFICCONSTITUENT OF POTENTIAL CONCERN (COPC).
2 NC2L STANDARDS FOR ANTIMONY, BERYLLIUM,COBALT, THALLIUM, AND VANADIUM ARE "INTERIMMAXIMUM ALLOWABLE CONCENTRATIONS" (IMAC).
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
GRAPHIC SCALE
600 0 600 1,200 1,800 2,400
(IN FEET)
L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
LEGEND
FIG URE 12-2COPC LOCATIONS FLAGGEDGROUNDWATER - ASH PO RE WATER -HUMAN HEALTHL.V. SUTTON ENERGY COMPLEX
&<MONITORING WELL
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGESS SUTTON PLANT SITE BOUNDARY
NC2L OR IMAC EXCEEDANCE -BOLDED IF COAL ASH COPC(SEE TABLES 12-1 AND 12-2)1, 2
PROJECT MANAGER: P. WALDREP
DRAWN BY: R. SPRING
DATE: 08/01/2015
DATE: 08/02/2015
CHECKED BY: J. MEADOWS
P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 12-2 - COPC LOCATIONS FLAGGED - GROUNDWATER - ASH PORE WATER - HUMAN HEALTH.MXD
Constituent Full NamepHArsenicBariumBoronIronLeadManganeseTotal Dissolved SolidsVanadium
Constituent AbbreviationpHAsBaBFePbMnTDSV
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<&<
&<
&<
&<
&<
&<
PRJ-I-140
U
S-421
S
R-2
1
6
9
SR-1394
S R -2 7 7 9
S R -2 1 4 5
P R J -I -1 4 0
P R J -I -1 4 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
421-Well 3pHMn
421-Well 4pHMn
AW-01BpHCoFePbMnTDSV
AW-02BpHCoFeMnV
AW-03BpHFeMnV
AW-04BpHCoFeMn
AW-05BFeMn
AW-06BpHFeMn
AW-08BpHCoFeV
AW-09BpHFeMnVCr(VI)
MW-07ApH
MW-07BpH
MW-15AsFeMnV
MW-16pHV
MW-19pHBCoFeMnTl
MW-20FeMnV
MW-22BpH
MW-23BpHCr(VI)3
MW-24BMnVCr(VI)3
MW-27BpHCoMnSe
MW-28BpH
MW-31BpHFeMnV
MW-37BpHCoFeMn
SMW-01BpHFe SMW-02BpHCoFeMnV SMW-03BpHCoFeMnNO3+NO2V
SMW-04BpHCoFeMnV
SMW-05BpHFeMnV
SMW-06BpHFe
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNELCOOLINGPOND
COOLINGPOND
COOLINGPOND
±
L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
&<MONITORING WELL
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGESS SUTTON PLANT SITE BOUNDARY
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
LEGEND
NC2L OR IMAC EXCEEDANCE -BOLDED IF COAL ASH COPC(SEE TABLES 12-2, 12-3 AND 12-4)1, 2
P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 12-3 - COPC LOCATIONS FLAGGED - GROUNDWATER - UPPER SURFICIAL AQUIFER - HUMAN HEALTH.MXD
GRAPHIC SCALE
600 0 600 1,200 1,800 2,400
(IN FEET)
FIG URE 12-3COPC LOCATIONS FLAGGEDGROUNDWATER - UPPER SURFICIALAQUIFER - HUMAN HEALTHL.V. SUTTON ENERGY COMPLEXPROJECT MANAGER: P. WALDREP
DRAWN BY: R. SPRING
DATE: 08/01/2015
DATE: 08/02/2015
CHECKED BY: J. MEADOWS
Constituent Full NamepHAntimonyArsenicBoronCobaltIronLeadManganeseNitrate+NitriteSeleniumThalliumTotal Dissolved SolidsVanadiumChromium (VI)3
Constituent AbbreviationpHSbAsBCoFePbMnNO3+NO2SeTlTDSVCr(VI)3
NOTES:1 CONSTITUENTS IDENTIFIED AS A SITE SPECIFICCONSTITUENT OF POTENTIAL CONCERN (COPC).
2 NC2L STANDARDS FOR ANTIMONY, BERYLLIUM,COBALT, THALLIUM, AND VANADIUM ARE "INTERIMMAXIMUM ALLOWABLE CONCENTRATIONS" (IMAC).
3 USEPA.NATIONAL RECOMMENDED WATER CRITERIA.ACCESSED 07/26/2015.(http://water.epa.gov/scitech/swguidance/standards/criteria)
4 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
5 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
6 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
7 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
&<
&<
&<
&<
&<
&<
&<
&<
&<&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
PRJ-I-140
U
S-421
SR-1394
S
R-2
1
6
9
S R -2 7 7 9
S R -2 1 4 5
P R J -I -1 4 0
P R J -I -1 4 0
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNELCOOLINGPOND
COOLINGPOND
COOLINGPOND
ABMW-02DAsFeMnV
AW-01CpHCoFeMn
AW-02CpHCoFeMn
AW-03CpHBCoFeMnTDSV
AW-04CpHBCoFeMnV
AW-05CpH
AW-08CpHCoMn
AW-09CpHCoFeMnVCr(VI)
MW-04BFeMn
MW-05CpHCoMn
MW-07CpHMnTlV
MW-11pH
MW-12BCoFeMn
MW-21CAsBCoFeMn
MW-22CpHBCoFeMnTl
MW-23CpHBCoMnTlV
MW-24CpHBCoFeMnV
MW-28CpH
MW-31CpHBCoFeMnTDS
MW-32CpH
MW-33CpH
MW-37CpHCoFeMnV
SMW-01CpHBCoFeMnV
SMW-02CpHCoFeMnV
SMW-03CpHCoFeMnV
SMW-04CFeMnV
SMW-05CpHCoFeMn SMW-06CpHCoFeMnV
R M P -5 8 1 5
±
GRAPHIC SCALE
600 0 600 1,200 1,800 2,400
(IN FEET)
L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
FIG URE 12-4COPC LOCATIONS FLAGGEDGROUNDWATER - LOWER SURFICIALAQUIFER - HUMAN HEALTHL.V. SUTTON ENERGY COMPLEXPROJECT MANAGER: P. WALDREP
DRAWN BY: R. SPRING
DATE: 08/01/2015
DATE: 08/02/2015
CHECKED BY: J. MEADOWS
P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 12-4 - COPC LOCATIONS FLAGGED - GROUNDWATER - LOWER SURFICIAL AQUIFER - HUMAN HEALTH.MXD
Constituent Full NamepHArsenicBoronCobaltIronManganeseThalliumTotal Dissolved SolidsVanadiumChromium(VI)
Constituent AbbreviationpHAsBCoFeMnTlTDSVCr(VI)3
LEGEND
&<MONITORING WELL
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGESS SUTTON PLANT SITE BOUNDARY
NC2L OR IMAC EXCEEDANCE -BOLDED IF COAL ASH COPC(SEE TABLES 12-2, 12-3 AND 12-4)1, 2
NOTES:1 CONSTITUENTS IDENTIFIED AS A SITE SPECIFICCONSTITUENT OF POTENTIAL CONCERN (COPC).
2 NC2L STANDARDS FOR ANTIMONY, BERYLLIUM,COBALT, THALLIUM, AND VANADIUM ARE "INTERIMMAXIMUM ALLOWABLE CONCENTRATIONS" (IMAC).
3 USEPA.NATIONAL RECOMMENDED WATER CRITERIA .ACCESSED 07/26/2015(http://water.epa.gov/scitech/swguidance/standards/criteria/)
4 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
5 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
6 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
7 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
&<
&<
&<
&<
&<
&<
&<
&>
U
S-421
PRJ-I-140
SR-1394 P R J -I -1 4 0
S R -2 1 4 5
P R J -I -1 4 0
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
ABMW-01DFeMnV
AW-02DFeMnTDSV
AW-05DFeV
AW-06DpHBFeTDSV
AW-07DpHBTDSV
AW-09DpHFeTDSV
PZ-10DFeMnV
SMW-06DpHSbBFeTDSV
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNELCOOLINGPOND
COOLINGPOND
COOLINGPOND
±
GRAPHIC SCALE
600 0 600 1,200 1,800 2,400
(IN FEET)
L. V. SUTTON ENERGY COMPLEX801 SUTTON POWER PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
LEGEND
FIG URE 12-5COPC LOCATIONS FLAGGEDGROUNDWATER - UPPER PEE DEEAQUIFER - HUMAN HEALTHL.V. SUTTON ENERGY COMPLEX
&<MONITORING WELL
&>PIEZOMETER
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGESS SUTTON PLANT SITE BOUNDARY
NC2L OR IMAC EXCEEDANCE -BOLDED IF COAL ASH COPC(SEE TABLES 12-2, 12-5)1, 2
PROJECT MANAGER: P. WALDREP
DRAWN BY: R. SPRING
DATE: 08/01/2015
DATE: 08/02/2015
CHECKED BY: J. MEADOWS
P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 12-5 - COPC LOCATIONS FLAGGED - GROUNDWATER - UPPER PEE DEE AQUIFER - HUMAN HEALTH.MXD
Constituent Full NamepHAntimonyBoronIronManganeseTotal Dissolved SolidsVanadium
Constituent AbbreviationpHSbBFeMnTDSV
NOTES:1 CONSTITUENTS IDENTIFIED AS A SITE SPECIFICCONSTITUENT OF POTENTIAL CONCERN (COPC).
2 NC2L STANDARDS FOR ANTIMONY, BERYLLIUM,COBALT, THALLIUM, AND VANADIUM ARE "INTERIMMAXIMUM ALLOWABLE CONCENTRATIONS" (IMAC).
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
&<
&<
&<
U
S-421
PRJ-I-140
SR-1394 P R J -I -1 4 0
S R -2 1 4 5
P R J -I -1 4 0
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
AW-05EpHBFeTDSV
AW-06EBFeTDSV
MW-23EpHBTDSV
±
GRAPHIC SCALE
600 0 600 1,200 1,800 2,400
(IN FEET)
L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
LEGEND
FIG URE 12-6COPC LOCATIONS FLAGGEDGROUNDWATER - LOWER PEE DEEAQUIFER - HUMAN HEALTHL.V. SUTTON ENERGY COMPLEX
&<MONITORING WELL
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGESS SUTTON PLANT SITE BOUNDARY
NC2L OR IMAC EXCEEDANCE -BOLDED IF COAL ASH COPC(SEE TABLES 12-2, 12-5)1, 2
PROJECT MANAGER: P. WALDREP
DRAWN BY: R. SPRING
DATE: 08/01/2015
DATE: 08/02/2015
CHECKED BY: J. MEADOWS
P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 12-6 - COPC LOCATIONS FLAGGED - GROUNDWATER - LOWER PEE DEE AQUIFER - HUMAN HEALTH.MXD
Constituent Full NamepHBoronIronTotal Dissolved SolidsVanadium
Constituent AbbreviationpHBFeTDSV
NOTES:1 CONSTITUENTS IDENTIFIED AS A SITE SPECIFICCONSTITUENT OF POTENTIAL CONCERN (COPC).
2 NC2L STANDARDS FOR ANTIMONY, BERYLLIUM,COBALT, THALLIUM, AND VANADIUM ARE "INTERIMMAXIMUM ALLOWABLE CONCENTRATIONS" (IMAC).
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
U
S-421
PRJ-I-140
SR-1394 P R J -I -1 4 0
S R -2 1 4 5
P R J -I -1 4 0
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
±NOTES:COPC- C ONSTITUEN T OF POTENTIAL C ONC ERN
COPCs IN DENTIFIED IN THIS FIG UR E ARE O NLY THOSE D ETECTED ABOVE ASCREENING VALUE. CO NSTITU ENTS IDENTIFIED AS C OPCs BECAUSE:1) THEY H AVE N O SC REENING VALU E OR2) TH EIR ANALYTICAL DETEC TION LIMIT EXC EEDS THE SC REENING VALUE ARENOT IDENTIFIED ON THIS FIGU RE.
APR IL 17, 2014 AER IAL ORTH OPHOTO GRAPH Y O BTAINED FRO M WSPwww.w spgroup.com
2012 AER IAL O RTH OPH OTO GRAPHY O BTAIN ED FROM THENC CENTER FOR GEOGR APHIC IN FO RMATION AND AN ALYSIS AThttp://services.nconemap.gov/
PARC EL BO UND ARY WAS OBTAIN EDFROM THENC CENTER FOR GEOGR APHIC IN FO RMATION AND AN ALYSIS AThttp://services.nconemap.gov/
DRAWING HAS BEEN SET W ITH A PR OJECTIO N OF NO RTH CAR OLIN A STATEPLANE C OOR DINATE SYSTEM FIPS 3200 (N AD 83/2011).
ELEVATIO NS ARE BASED ON N AVD 88
GRAPHIC SCALE
600 0 600 1,200 1,800 2,400
(IN FEET)
L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
LEGEND
FIG URE 12-7COPC LOCATIONS FLAGGEDSOILS (0-2 FEET ) - HUMAN HEALTHL.V. SUTTON ENERGY COMPLEX
ASH BASIN BOUNDARY
ASH BASIN COM PLIA NCE BOUNDARY
DUKE ENERGY PROGE SS SUTTON PLANT SITE BOUNDARY
NO HUMAN HEALTH SOILS (0-2 FEET) EXCEEDENCES FOUND (SEE TABLE 12-6)1
PROJECT MANAGER: P. WALDREP
DRAWN BY: R. SPRING
DATE: 08/01/2015
DATE: 08/02/2015
CHECKED BY: J. MEADOWS
NOTES:1 USEPA.REGIONAL SCREENING LEVELS FOR CHEMICALCONTAMINANTS AT SUPERFUND SITES . Accessed07/26/2015.(http://www.epa.gov/reg3hwmd/risk/human/rb-concentration_table/Generic_Tables/index.htm)
2 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
3 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
4 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
5 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 12-7 - COPC LOCATIONS FLAGGED - SOILS (0-2 FEET) - HUMAN HEALTH.MXD
")
")
")
U
S-421
PRJ-I-140
SR-1394 P R J -I -1 4 0
S R -2 1 4 5
P R J -I -1 4 0
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
SW-06AAs
SW-CF001FeMn
SW-CFPCoFeMn
±
GRAPHIC SCALE
600 0 600 1,200 1,800 2,400
(IN FEET)
L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
FIG URE 12-8COPC LOCATIONS FLAGGEDSEDIMENT - HUMAN HEALTHL.V SUTTON ENERG Y COMPLEX
PROJECT MANAGER: P. WALDREP
DRAWN BY: R. SPRING
DATE: 08/01/2015
DATE: 08/02/2015
CHECKED BY: J. MEADOWS
P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 12-8 - COPC LOCATIONS FLAGGED - SEDIMENT - HUMAN HEALTH.MXD
NOTES:1 USEPA.REGIONAL SCREENING LEVELS FOR CHEMICALCONTAMINANTS AT SUPERFUND SITES . ACCESSED07/26/2015.(http://www.epa.gov/reg3hwmd/risk/human/rb-concentration_table/Generic_Tables/index.htm)
2 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
3 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
4 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
5 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
Constituent Full NameArsenicCobaltIronManganese
Constituent AbbreviationAsCoFeMn
LEGEND
")SURFACE WATER POINT
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGESS SUTTON PLANT SITE BOUNDARY
EPA RSL RESIDENTIAL SEDIMENT EXCEEDANCES -BOLDED IF COAL ASHCOPC(SEE TABLES 12-2 AND 12-7)1
")
")
")
")
")
")
U
S-421
PRJ-I-140
SR-1394 P R J -I -1 4 0
S R -2 1 4 5
P R J -I -1 4 0
FORMERASH DISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
SW-004AlTl
SW-06AAlTl
SW-01CAl
SW-08AAl
SW-CFPAl
SW-CFUPAl
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
±NOTES:1 USEPA.NATIONAL RECOMMENDED WATER CRITERIA.Accessed 07/26/2015.(http://water.epa.gov/scitech/swguidance/standards/criteria/current/index.cfm)
2 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
3 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
4 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
5 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
Constituent Full NameAluminumThallium
Constituent AbbreviationAlTl
GRAPHIC SCALE
600 0 600 1,200 1,800 2,400
(IN FEET)
L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
LEGEND
FIG URE 12-9COPC LOCATIONS FLAGGEDSURFACE WAT ER - HUMAN HEALTHL.V. SUTTON ENERGY COMPLEX
")SURFACE WATER POINT
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGESS SUTTON PLANT SITE BOUNDARY
SURFACE WATER COMBINED EPA WQC AND NCAC 02B EXCEEDANCES -BOLDEDIF COAL ASH COPC (SEE TABLES 12-2 AND 12-8)1
PROJECT MANAGER: P. WALDREP
DRAWN BY: R. SPRING
DATE: 08/01/2015
DATE: 08/02/2015
CHECKED BY: J. MEADOWS
P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 12-9 - COPC LOCATIONS FLAGGED - SURFACE WATER AND SEEPS - HUMAN HEALTH.MXD
&<
&<
&<
&<
&<
&<
&<
&<
&<
&<
U
S-421
PRJ-I-140
SR-1394 P R J -I -1 4 0
S R -2 1 4 5
P R J -I -1 4 0
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
AW-01CAlCrFe
AW-02CAlCrFeV
AW-03CAlCrFeV
AW-04CAlCrFeV
AW-06DAlFeV
AW-07DAlCrFeV
SMW-01CAlFe
SMW-02CAlCrFe
SMW-04CAl
SMW-06DAl
±NOTES:COPC- C ONSTITUEN T OF POTENTIAL C ONC ERN
COPCs IN DENTIFIED IN THIS FIG UR E ARE O NLY THOSE D ETECTED ABOVE ASCREENING VALUE. CO NSTITU ENTS IDENTIFIED AS C OPCs BECAUSE:1) THEY H AVE N O SC REENING VALU E OR2) TH EIR ANALYTICAL DETEC TION LIMIT EXC EEDS THE SC REENING VALUE ARENOT IDENTIFIED ON THIS FIGU RE.
APR IL 17, 2014 AER IAL ORTH OPHOTO GRAPH Y O BTAINED FRO M WSPwww.w spgroup.com
2012 AER IAL O RTH OPH OTO GRAPHY O BTAIN ED FROM THENC CENTER FOR GEOGR APHIC IN FO RMATION AND AN ALYSIS AThttp://services.nconemap.gov/
PARC EL BO UND ARY WAS OBTAIN EDFROM THENC CENTER FOR GEOGR APHIC IN FO RMATION AND AN ALYSIS AThttp://services.nconemap.gov/
DRAWING HAS BEEN SET W ITH A PR OJECTIO N OF NO RTH CAR OLIN A STATEPLANE C OOR DINATE SYSTEM FIPS 3200 (N AD 83/2011).
ELEVATIO NS ARE BASED ON N AVD 88
GRAPHIC SCALE
600 0 600 1,200 1,800 2,400
(IN FEET)
L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
LEGEND
FIGURE 12-11COPC LOCATIONS FLAGGEDSOILS (0-2 FEET) - ECOLOGICALL.V. SUTTON ENERGY COMPLEX
&<MONITORING WELL
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGESS SUTTON PLANT SITE BOUNDARY
EPA REGION 4 SOIL EXCEEDENCES -BOLDED IF COAL ASH COPC(SEE TABLES 12-2 AND 12-11)1
PROJECT MANAGER: P. WALDREP
DRAWN BY: M. LOVELACE
DATE: 08/01/2015
DATE: 08/02/2015
CHECKED BY: J. MEADOWS
P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 12-11 - COPC LOCATIONS FLAGGED - SOILS (0-2 FEET) - ECOLOGICAL.MXD
NOTES:1 USEPA.SUPPLEMENTAL GUIDANCE TO RISKASSESSMENT GUIDANCE FOR SUPERFUND: REGION 4BULLETINS, ECOLOGICAL RISK ASSESSMENT. Originallypublished November 1995. Website version last updated11/30/2001:(http://www.epa.gov/region4/superfund/programs/riskassess/ecolbul.html.)
2 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
3 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
4 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
5 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
Constituent Full NameAlCrFeV
Constituent AbbreviationAluminumChromiumIronVanadium
")
")
")
")
")
")
")
U
S-421
PRJ-I-140
SR-1394 P R J -I -1 4 0
S R -2 1 4 5
P R J -I -1 4 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
SW-06AAlBCrFeMnV
SW-08AAlCrFeMnV
SW-CFPAlCrFeMnVZ
SW-CFUPAlCrFe
SW-01CAlCrFeV
SW-CF001AlCrFeMnV
SW-004AlCrFeMoV
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNELCOOLINGPOND
COOLINGPOND
COOLINGPOND
±NOTES:COPC- C ONSTITUEN T OF POTENTIAL C ONC ERN
COPCs IN DENTIFIED IN THIS FIG UR E ARE O NLY THOSE D ETECTED ABOVE ASCREENING VALUE. CO NSTITU ENTS IDENTIFIED AS C OPCs BECAUSE:1) THEY H AVE N O SC REENING VALU E OR2) TH EIR ANALYTICAL DETEC TION LIMIT EXC EEDS THE SC REENING VALUE ARENOT IDENTIFIED ON THIS FIGU RE.
APR IL 17, 2014 AER IAL ORTH OPHOTO GRAPH Y O BTAINED FRO M WSPwww.w spgroup.com
2012 AER IAL O RTH OPH OTO GRAPHY O BTAIN ED FROM THENC CENTER FOR GEOGR APHIC IN FO RMATION AND AN ALYSIS AThttp://services.nconemap.gov/
PARC EL BO UND ARY WAS OBTAIN EDFROM THENC CENTER FOR GEOGR APHIC IN FO RMATION AND AN ALYSIS AThttp://services.nconemap.gov/
DRAWING HAS BEEN SET W ITH A PR OJECTIO N OF NO RTH CAR OLIN A STATEPLANE C OOR DINATE SYSTEM FIPS 3200 (N AD 83/2011).
ELEVATIO NS ARE BASED ON N AVD 88
GRAPHIC SCALE
600 0 600 1,200 1,800 2,400
(IN FEET)
L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
LEGEND
FIG URE 12-12COPC LOCATIONS FLAGGEDSEDIMENT - ECOLOGICALL.V. SUTTON ENERGY COMPLEX
")SURFACE WATER POINT
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGESS SUTTON PLANT SITE BOUNDARY
EPA REGION 4 SOIL EXCEEDENCES -BOLDED IF COAL ASH COPC (SEETABLES AND 12-2 AND 12-12)1
PROJECT MANAGER: P. WALDREP
DRAWN BY: M. LOVELACE
DATE: 08/01/2015
DATE: 08/02/2015
CHECKED BY: J. MEADOWS
P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 12-12 - COPC LOCATIONS FLAGGED - SEDIMENT - ECOLOGICAL.MXD
NOTES:1 USEPA.SUPPLEMENTAL GUIDANCE TO RISKASSESSMENT GUIDANCE FOR SUPERFUND: REGION 4BULLETINS, ECOLOGICAL RISK ASSESSMENT. Originallypublished November 1995. Website version last updated11/30/2001:(http://www.epa.gov/region4/superfund/programs/riskassess/ecolbul.html.)
2 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
3 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
4 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
5 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
Constituent Full NameAlBCrFeMnMoVZn
Constituent AbbreviationAluminumBoronChromiumIronManganeseMolybdenumVanadiumZinc
")
")
")
")
")
")
")
U
S-421
PRJ-I-140
SR-1394 P R J -I -1 4 0
S R -2 1 4 5
P R J -I -1 4 0
FORMERASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
SW-06ACuZn
SW-08ACu
SW-CFPAl
SW-CFUPAlZn
SW-01CAlCu
SW-CF001Al
SW-004CuZn
SW-06AZn
SW-CFPAl
SW-CFUPZn
SW-004Zn
SW-06AZn
SW-CFPAl
SW-CFUPAl
SW-01CAl
SW-CF001Al
SW-004Zn
SW-06ACuZn
SW-08ACu
SW-CFPZn
SW-CFUPZn
SW-01CCuZn
SW-004CuZn
SW-06ACuZn
SW-08ACu
SW-CFPZn
SW-CFUPZn
SW-01CCuZn
SW-004CuZn
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
±
GRAPHIC SCALE
600 0 600 1,200 1,800 2,400
(IN FEET)
L. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
LEGEND
FIG URE 12-13COPC LOCATIONS FLAGGEDSURFACE WATER - ECOLOGICALL.V. SUTTON ENERGY COMPLEX
")SURFACE WATER P OINT
ASH BAS IN BOUNDA RY
ASH BAS IN COMPLIANCE BOUNDARY
DUKE E NE RGY PROGES S SUTTON PLANT SITE B OUNDARY
PROJECT MANAGER: P. WALDREP
DRAWN BY: M. LOVELACE
DATE: 08/01/2015
DATE: 08/02/2015
CHECKED BY: J. MEADOWS
P:\DUKE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 12-13 - COPC LOCATIONS FLAGGED - SEEPS AND SURFACE WATERS - ECOLOGICAL.MXD
NOTES:1 USEPA.NATIONAL RECOMMENDED WATER CRITERIA.Accessed 07/26/2015.(http://water.epa.gov/scitech/swguidance/standards/criteria/current/index.cfm)
2 USEPA.SUPPLEMENTAL GUIDANCE TO RISKASSESSMENT GUIDANCE FOR SUPERFUND: REGION 4BULLETINS, ECOLOGICAL RISK ASSESSMENT. Originallypublished November 1995. Website version last updated11/30/2001:(http://www.epa.gov/region4/superfund/programs/riskassess/ecolbul.html.)
3 CLASSIFICATION AND WATER QUALITY STANDARDSAPPLICABLE TO THE SURFACE WATERS OF NORTHCAROLINA. NORTH CAROLINA ADMINISTRATIVE CEDETITLE 15A, SUBCHAPTER 2B. 2015.
4 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
5 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
6 PARCEL BOUNDARY WAS OBTAINED FROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
7 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
Constituent Full NameAlCuPbZn
Constituent AbbreviationAluminumCopperLeadZinc
ECOLOGICAL EPA AQUATIC ACUTE EXCEEDANCES -BOLDED IF COAL ASHCOPC(SEE TABLES 12-2 AND 12-10)1
ECOLOGICAL EPA AQUATIC CHRONIC EXCEEDANCES -BOLDED IF COALASH COPC (SEE TABLES 12-2 AND 12-10)1
ECOLOGICAL EPA R4 FW CHRONIC EXCEEDANCES -BOLDED IF COAL ASHCOPC(SEE TABLES 12-2 AND 12-10)2
ECOLOGICAL NC2B AQUATIC ACUTE EXCEEDANCES -BOLDED IF COALASH COPC (SEE TABLES 12-2 AND 12-10)2
ECOLOGICAL NC2B AQUATIC CHRONIC EXCEEDANCES -BOLDED IF COALASH COPC (SEE TABLES 12-2 AND 12-10)3
Primary Sources Exposure Medium
Te
r
r
e
s
t
r
i
a
l
M
a
m
m
a
l
s
Aq
u
a
t
i
c
M
a
m
m
a
l
s
Bi
r
d
s
(
I
n
c
l
u
d
i
n
g
w
a
t
e
r
f
o
w
l
)
Aq
u
a
t
i
c
V
e
g
e
t
a
t
i
o
n
Al
g
a
e
/
M
o
s
s
Be
n
t
h
i
c
I
n
v
e
r
t
e
b
r
a
t
e
s
He
r
p
t
i
l
e
s
Fi
s
h
In
s
e
c
t
s
Wo
o
d
y
P
l
a
n
t
s
He
r
b
a
c
e
o
u
s
P
l
a
n
t
s
Ba
c
t
e
r
i
a
(
M
i
c
r
o
b
e
s
)
Potential Human Receptors
Potentially Complete Exposure Pathway
Incomplete Exposure Pathway
Exposure RouteSecondary Sources
Sediment
Groundwater
Incidental Ingestion
Ingestion of Prey or Plants
Incidental Ingestion
Ingestion of Prey or Plants
Incidental Ingestion
Ingestion of Prey or Plants
Incidental Ingestion
Ingestion of Prey or Plants
Current and Hypothetical Future Ecological Receptors
Soil
1984 Ash Basin Groundwater
Sediment1971 Ash Basin
NPDES
Stormwater
Discharge
Surface Water
NPDES
Discharge
Former Ash
Disposal Area
(FADA)
Surface Water
(Lake/River)
Figure 12-10
Ecological
Conceptual Exposure Model
L. V. Sutton Power Plant
Wilmington, North Carolina
0
148 River Street, Suite 220
Greenville, SC 29601
Phone: (864) 421-9999
Existing Primary Release Mechanisms
FADA
1971 Ash Basin
1984 Ash Basin
Former Primary Release Mechanism
No Longer Used
P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\Report Figures\Figure 12-10 ECO CEM - Sutton8/4/2015