HomeMy WebLinkAboutNC0001422_Figures 10-1 to 10-63_20150805Se rvice L ayer Cre dits: NC One Ma p, NCCenter for Geo graphic Info rma tio n a ndAnalysis, NC 911 Board
PRJ-I-140 SR-1347
S R -1 3 8 5
SR-1430
RMP-5815
U
S-421
SR-1394
SR-2836
R M P -5 8 2 1
S R -2 8 3 8
S
R-2
1
6
9
U
S-17
S R -2 7 7 9
S R -2 1 4 5
P R J -I -1 4 0
SR-2000
I -1 4 0
I -1 4 0
R M P -5 8 1 4
S R -1 4 3 1
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
P:\DU KE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-1-SITE LAYOUT WITH 2L EXCEEDANCES-UPPER SURFICIAL AQUIFER_V07302015.MXD
LEGEND
MONITORING WELL
PIEZOMETER
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITEBOUNDARY
148 River S treet, Su ite 220Greenville, SC 29601864-421-9999www.syn terraco rp .com DATE: 08/01/201 5CHECKED BY: J. MEAD OWSDRAWN BY: T. KING
PR OJECT MANAGER: P. WAL DREP
400 0 400 800 1,200 1,600 2,000
(IN FEET)
GRAPHIC SCALE
L. V. SUT TON ENE RGY COM P LE X801 SU TTON ST EA M P LA NT RDWILMINGTON, NORT H CAROL INA
FIG URE 10-1SITE LAYOUT WITH 2 L EXC EEDA NCESUPPER SURFICIAL AQUIFER
NOT ES:1 AP RIL 17, 2014 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM WS P
2 2013 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/)
3 PARCEL B OUNDA RY WA S OB TAINED FROM THE NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 4 DRAW ING HA S BE EN SE T W ITH A PROJE CTION O F NO RTH CA ROLINA S TAT E PLANE COORDINATE SYS TEM FIPS 3200 (NA D83).
5 NORTH CA RO LINA 2L INTERIM MA XIMUM A LLOWABLE CONCENTRATION DATE: 08/01/201 5
Constitue nt Abbreviati on Uppe r Limit Units Lower Li mitAntimony5Sb1µg/L ---Arseni c As 10 µg/L ---Boron B 700 µg/L ---Chlori de Cl 250 mg/L ---Chromi um Cr 10 µg/L ---Cobal t5 Co 1 µg/L ---Iron Fe 300 µg/L ---Mangane se Mn 50 µg/L ---pH pH 8.5 S.U.6.5SeleniumSe20µg/L ---Sul fate SO4 250 mg/L ---Thal lium5 Tl 0.2 µg/L ---Total Di ssol ved Solids TDS 500 mg/L ---Vanadium5 V 0.3 µg/L ---
North Carol i na 2L Standards
ConstituentMnpH
Result845.7
421-Well 3
ConstituentMnpH
Result575.3
421-Well 4
ConstituentAsBMnpHTDSV
Result6343940888.976803.45
ABMW-01S
ConstituentAsBaFeMnV
Result53.41810241007841.28
ABMW-02S
ConstituentCoFeMnpH
Result1.4426801055.8
AW-01B
ConstituentFeMnpH
Result13202046.1
AW-02B
ConstituentFepHV
Result62905.80.427
AW-03B
ConstituentpH Result6.16
AW-04B
ConstituentpH Result4.8
AW-06B
ConstituentCoFepHV
Result2.5344505.10.335
AW-08B
ConstituentCr(VI)pH
Result0.0384.6
AW-09B
ConstituentpH Result4.1
MW-07A
ConstituentpH Result4.3
MW-07B
ConstituentAsFeMnV
Result23.63690763.88
MW-15 ConstituentpHV
Result5.90.316
MW-16
ConstituentBCoFeMnpHTl
Result20805.279143866.40.458
MW-19
ConstituentFeMnV
Result74710739.6
MW-20
ConstituentpH Result5.71
MW-22B
ConstituentCr(VI)pH
Result0.0516.3
MW-23B
ConstituentBCoCr(VI)FeMnV
Result103017.90.098356010400.555
MW-24B
ConstituentCoMnpHSe
Result1.95554.727.1
MW-27B
ConstituentpH Result6.3
MW-28B
ConstituentFeMnpHV
Result11807360.378
MW-31B
ConstituentCoFeMnpH
Result2.5295802544.3
MW-37B
ConstituentpH Result4.6
SMW-01B
ConstituentFeMnpHV
Result288004136.41.42
SMW-02B
ConstituentFeMnNO2+NO3pH
Result131091155.5
SMW-03B
ConstituentFeMnpH
Result7590855.7
SMW-04B
ConstituentFeMnpHV
Result99101395.70.81
SMW-05B
ConstituentpH Result5.66
SMW-06B
Se rvice L ayer Cre dits: NC One Ma p, NCCenter for Geo graphic Info rma tio n a ndAnalysis, NC 911 Board
PRJ-I-140 SR-1347
S R -1 3 8 5
SR-1430
RMP-5815
U
S-421
SR-1394
SR-2836
R M P -5 8 2 1
S R -2 8 3 8
S
R-2
1
6
9
U
S-17
S R -2 7 7 9
S R -2 1 4 5
P R J -I -1 4 0
SR-2000
I -1 4 0
I -1 4 0
R M P -5 8 1 4
S R -1 4 3 1
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
P:\DU KE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-2-SITE LAYOUT WITH 2L EXCEEDANCES-LOWER SURFICIAL AQUIFER_V07302015.MXD
LEGEND
MONITORING WELL
PIEZOMETER
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGESS SUTTON PLANT SITEBOUNDARY
148 River S treet, Su ite 220Greenville, SC 29601864-421-9999www.syn terraco rp .com DATE: 08/01/201 5CHECKED BY: J. MEAD OWSDRAWN BY: T. KING
PR OJECT MANAGER: P. WAL DREP
400 0 400 800 1,200 1,600 2,000
(IN FEET)
GRAPHIC SCALE
L. V. SUT TON ENE RGY COM P LE X801 SU TTON ST EA M P LA NT RDWILMINGTON, NORT H CAROL INA
FIG URE 10-2SITE LAYOUT WITH 2 L EXC EEDA NCESLOWER SURFICIAL AQUIFER
NOT ES:1 AP RIL 17, 2014 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM WS P
2 2013 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/)
3 PARCEL B OUNDA RY WA S OB TAINED FROM THE NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 4 DRAW ING HA S BE EN SE T W ITH A PROJE CTION O F NO RTH CA ROLINA S TAT E PLANE COORDINATE SYS TEM FIPS 3200 (NA D83).
5 NORTH CA RO LINA 2L INTERIM MA XIMUM A LLOWABLE CONCENTRATION DATE: 08/01/201 5
Constitue nt Abbreviati on Uppe r Limit Units Lower Li mitAntimony5Sb1µg/L ---Arseni c As 10 µg/L ---Boron B 700 µg/L ---Chlori de Cl 250 mg/L ---Chromi um Cr 10 µg/L ---Cobal t5 Co 1 µg/L ---Iron Fe 300 µg/L ---Mangane se Mn 50 µg/L ---pH pH 8.5 S.U.6.5SeleniumSe20µg/L ---Sul fate SO4 250 mg/L ---Thal lium5 Tl 0.2 µg/L ---Total Di ssol ved Solids TDS 500 mg/L ---Vanadium5 V 0.3 µg/L ---
North Carol i na 2L Standards
ConstituentAsFeMn
Result1701270150
ABM W-02D
ConstituentFeMnpH
Result4701794.8
AW-01C
ConstituentFeMnpH
Result7610575.9
AW-02C
ConstituentBCoFeMnpHTDSV
Result13706.911130018305.95100.75
AW-03C
ConstituentBFeMnpHV
Result145039907876.20.518
AW-04C
ConstituentpH Result4.7
AW-05C
ConstituentCopH
Result1.194.4
AW-08C
ConstituentCoCr(VI)MnpH
Result1.130.0462895.1
AW-09C
ConstituentFeMn
Result128059
MW-04B
ConstituentCoMnpH
Result1.624415.5
MW-05C
ConstituentMnpHTl
Result36850.405
MW-07C
ConstituentpH Result4.5
MW-11
ConstituentBCoFeMn
Result14701.265690691
MW-12
ConstituentCoMnpH
Result13.59406.4
MW-15D ConstituentCoFeMnpHV
Result5.2210203115.42.09
MW-16DConstituentFeMn
Result864131
MW-20D
ConstituentAsBCoFeMn
Result53.8212010.65110430
MW-21C
ConstituentBCoMnpHTl
Result25604.777326.430.398
MW-22C
ConstituentBCoMnTl
Result20505.193090.21
MW-23C
ConstituentBCoFeMnpHV
Result104018.6418011205.50.543
MW-24C
ConstituentpH Result5.62
MW-28C
ConstituentBFeMnpHTDS
Result1180285016805.2540
MW-31C
ConstituentpH Result4.97
MW-32C
ConstituentpH Result4.6
MW-33C
ConstituentCoFeMnpHV
Result2.7395802445.71.22
MW-37C
ConstituentBFeMnpHV
Result77642508075.50.402
SM W-01C
ConstituentCoFeMnpH
Result3.3753705395.7
SM W-02C
ConstituentCoFeMnpH
Result9.2115105844.9
SM W-03C
ConstituentFeMnV
Result96601320.803
SM W-04C
ConstituentCoMnpH
Result2.61304.9
SM W-05C
ConstituentCoFeMnpH
Result3.6513202735
SM W-06C
Se rvice L ayer Cre dits: NC One Ma p, NCCenter for Geo graphic Info rma tio n a ndAnalysis, NC 911 Board
PRJ-I-140 SR-1347
S R -1 3 8 5
SR-1430
RMP-5815
U
S-421
SR-1394
SR-2836
R M P -5 8 2 1
S R -2 8 3 8
S
R-2
1
6
9
U
S-17
S R -2 7 7 9
S R -2 1 4 5
P R J -I -1 4 0
SR-2000
I -1 4 0
I -1 4 0
R M P -5 8 1 4
S R -1 4 3 1
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
P:\DU KE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-3-SITE LAYOUT WITH 2L EXCEEDANCES-UPPER PEE DEE WELLS_V07302015.MXD
LEGEND
MONITORING WELL
PIEZOMETER
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGESS SUTTON PLANT SITEBOUNDARY
148 River S treet, Su ite 220Greenville, SC 29601864-421-9999www.syn terraco rp .com DATE: 08/01/201 5CHECKED BY: J. MEAD OWSDRAWN BY: T. KING
PR OJECT MANAGER: P. WAL DREP
400 0 400 800 1,200 1,600 2,000
(IN FEET)
GRAPHIC SCALE
L. V. SUT TON ENE RGY COM P LE X801 SU TTON ST EA M P LA NT RDWILMINGTON, NORT H CAROL INA
FIG URE 10-3SITE LAYOUT WITH 2 L EXC EEDA NCESUPPER PEE DEE WELLS
NOT ES:1 AP RIL 17, 2014 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM WS P
2 2013 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/)
3 PARCEL B OUNDA RY WA S OB TAINED FROM THE NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 4 DRAW ING HA S BE EN SE T W ITH A PROJE CTION O F NO RTH CA ROLINA S TAT E PLANE COORDINATE SYS TEM FIPS 3200 (NA D83).
5 NORTH CA RO LINA 2L INTERIM MA XIMUM A LLOWABLE CONCENTRATION DATE: 08/01/201 5
Constitue nt Abbreviati on Uppe r Limit Units Lower Li mitAntimony5Sb1µg/L ---Arseni c As 10 µg/L ---Boron B 700 µg/L ---Chlori de Cl 250 mg/L ---Chromi um Cr 10 µg/L ---Cobal t5 Co 1 µg/L ---Iron Fe 300 µg/L ---Mangane se Mn 50 µg/L ---pH pH 8.5 S.U.6.5SeleniumSe20µg/L ---Sul fate SO4 250 mg/L ---Thal lium5 Tl 0.2 µg/L ---Total Di ssol ved Solids TDS 500 mg/L ---Vanadium5 V 0.3 µg/L ---
North Carol i na 2L Standards
ConstituentFeMnV
Result475820.642
ABM W-01D
ConstituentFeMnTDS
Result43859510
AW-02D
ConstituentBTDS
Result980720
AW-06D
ConstituentBpHTDSV
Result8159.975100.992
AW-07D
ConstituentTDS Result630
AW-09D
ConstituentFeMnV
Result347530.397
PZ -10D
ConstituentBCr(VI)pHTDSV
Result9900.0729.86701.61
SM W-06D
Se rvice L ayer Cre dits: NC One Ma p, NCCenter for Geo graphic Info rma tio n a ndAnalysis, NC 911 Board
PRJ-I-140 SR-1347
S R -1 3 8 5
SR-1430
RMP-5815
U
S-421
SR-1394
SR-2836
R M P -5 8 2 1
S R -2 8 3 8
S
R-2
1
6
9
U
S-17
S R -2 7 7 9
S R -2 1 4 5
P R J -I -1 4 0
SR-2000
I -1 4 0
I -1 4 0
R M P -5 8 1 4
S R -1 4 3 1
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
P:\DU KE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-4-SITE LAYOUT WITH 2L EXCEEDANCES-LOWER PEE DEE WELLS_V07302015.MXD
LEGEND
MONITORING WELL
PIEZOMETER
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGESS SUTTON PLANT SITEBOUNDARY
148 River S treet, Su ite 220Greenville, SC 29601864-421-9999www.syn terraco rp .com DATE: 08/01/201 5CHECKED BY: J. MEAD OWSDRAWN BY: T. KING
PR OJECT MANAGER: P. WAL DREP
400 0 400 800 1,200 1,600 2,000
(IN FEET)
GRAPHIC SCALE
L. V. SUT TON ENE RGY COM P LE X801 SU TTON ST EA M P LA NT RDWILMINGTON, NORT H CAROL INA
FIG URE 10-4SITE LAYOUT WITH 2 L EXC EEDA NCESLOWER PEE DEE WELLS
NOT ES:1 AP RIL 17, 2014 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM WS P
2 2013 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/)
3 PARCEL B OUNDA RY WA S OB TAINED FROM THE NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 4 DRAW ING HA S BE EN SE T W ITH A PROJE CTION O F NO RTH CA ROLINA S TAT E PLANE COORDINATE SYS TEM FIPS 3200 (NA D83).
5 NORTH CA RO LINA 2L INTERIM MA XIMUM A LLOWABLE CONCENTRATION DATE: 08/01/201 5
Constitue nt Abbreviati on Uppe r Limit Units Lower Li mitAntimony5Sb1µg/L ---Arseni c As 10 µg/L ---Boron B 700 µg/L ---Chlori de Cl 250 mg/L ---Chromi um Cr 10 µg/L ---Cobal t5 Co 1 µg/L ---Iron Fe 300 µg/L ---Mangane se Mn 50 µg/L ---pH pH 8.5 S.U.6.5SeleniumSe20µg/L ---Sul fate SO4 250 mg/L ---Thal lium5 Tl 0.2 µg/L ---Total Di ssol ved Solids TDS 500 mg/L ---Vanadium5 V 0.3 µg/L ---
North Carol i na 2L Standards
ConstituentBClpHTDS
Result19505408.71500
AW-05E
ConstituentBClCrCr(VI)FeTDSV
Result247049014.70.06470415001.77
AW-06E
ConstituentBClCr(VI)pHTDSV
Result25005000.0471015000.993
MW-23E
Se rvice L ayer Cre dits: NC One Ma p, NCCenter for Geo graphic Info rma tio n a ndAnalysis, NC 911 Board
PRJ-I-140 SR-1347
S R -1 3 8 5
SR-1430
RMP-5815
U
S-421
SR-1394
SR-2836
R M P -5 8 2 1
S R -2 8 3 8
S
R-2
1
6
9
U
S-17
S R -2 7 7 9
S R -2 1 4 5
P R J -I -1 4 0
SR-2000
I -1 4 0
I -1 4 0
R M P -5 8 1 4
S R -1 4 3 1
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
P:\DU KE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-45-DETECTION MONITORING CONSTITUENT MAP-UPPER SURFICIAL AQUIFER_V07302015.MXD
LEGEND
MONITORING WELL
PIEZOMETER
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE
DUKE ENERGY PROGESS SUTTON PLANT SITEBOUNDARY
148 River S treet, Su ite 220Greenville, SC 29601864-421-9999www.syn terraco rp .com DATE: 08/01/201 5CHECKED BY: J. MEAD OWSDRAWN BY: T. KING
PR OJECT MANAGER: P. WAL DREP
400 0 400 800 1,200 1,600 2,000
(IN FEET)
GRAPHIC SCALE
L. V. SUT TON ENE RGY COM P LE X801 SU TTON ST EA M P LA NT RDWILMINGTON, NORT H CAROL INA
FIGURE 10-45CCR RULE DETECTION MONITORING CONSTITUENT MAPUPPER SURFICIAL AQUIFER
NOT ES:1 CCR RULE AS INDENTIFIE D IN THE US EPA A PRIL 2015 FINAL RULING 40 CFR PA RTS 257 AND 261
2 AP RIL 17, 2014 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM WS P
3 2013 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/)
4 PARCEL B OUNDA RY WA S OB TAINED FROM THE NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 5 DRAW ING HA S BE EN SE T W ITH A PROJE CTION O F NO RTH CA ROLINA S TAT E PLANE COORDINATE SYS TEM FIPS 3200 (NA D83).DATE: 08/01/201 5
Consti tue nt Abbre vi ati on Uni tsBoronBµg/LCalciumCamg/LChlorideClmg/LSpecific Conductance Sp Cond µmhos/cmpHpHSUSulfateSO4mg/LTotal Di ssol ve d Sol i ds TDS mg/L
ConstituentBCaClpHSO4Sp CondTDS
Result7313.27.25.724137.666
421-Well 3
ConstituentBCaClpHSO4Sp CondTDS
Result547.017.55.3178845
421-Well 4
ConstituentBCaClpHSO4Sp CondTDS
Result3940128838.97831162680
ABM W-01S
ConstituentBCaClpHSO4Sp CondTDS
Result23460.8147.48<0.1635330
ABMW-02S
ConstituentBCaClpHSO4Sp CondTDS
Result<501.012.35.84.54244
AW-01B ConstituentBCaClpHSO4Sp CondTDS
Result<501.61.36.12.924<25
AW-02B
ConstituentBCaClpHSO4Sp CondTDS
Result<500.6073.85.8448.829
AW-03B
ConstituentBCaClpHSO4Sp CondTDS
Result<504.283.96.165.443.3<25
AW-04B
ConstituentBCaClpHSO4Sp CondTDS
Result<506.141.68.58.78650
AW-05B
ConstituentBCaClpHSO4Sp CondTDS
Result<501.713.64.81438<25
AW-06B
ConstituentBCaClpHSO4Sp CondTDS
Result<500.5032.35.1164326
AW-08B
ConstituentBCaClpHSO4Sp CondTDS
Result<501.214.44.61844<25
AW-09B ConstituentBCaClpHSO4Sp CondTDS
Result<500.7941.14.11428<25
MW-07A
ConstituentBCaClpHSO4Sp CondTDS
Result<502.2924.31739<25
MW-07BConstituentBCaClpHSO4Sp CondTDS
Result5477.47.66.817408250
MW-15 ConstituentBCaClpHSO4Sp CondTDS
Result905.55195.922150.584
MW-16
ConstituentBCaClpHSO4Sp CondTDS
Result208061.5286.4140630380
MW-19
ConstituentBCaClpHSO4Sp CondTDS
Result5249.126745385220
MW-20
ConstituentBCaClpHSO4Sp CondTDS
Result<502.152.75.714.831.1<25
MW-22B
ConstituentBCaClpHSO4Sp CondTDS
Result14512.92.36.39.890.455
MW-23B
ConstituentBCaClpHSO4Sp CondTDS
Result40922.8116.628265.3140
MW-24B
ConstituentBCaClpHSO4Sp CondTDS
Result19813144.762196110
MW-27B
ConstituentBCaClpHSO4Sp CondTDS
Result<506.014.86.31068.840
MW-28B
ConstituentBCaClpHSO4Sp CondTDS
Result<505.613.76861.240
MW-31B
ConstituentBCaClpHSO4Sp CondTDS
Result<508.933.84.37.232<25
MW-37B
ConstituentBCaClpHSO4Sp CondTDS
Result1009.296.24.64510657
SM W-01B
ConstituentBCaClpHSO4Sp CondTDS
Result<5028.38.36.43.2281140
SM W-02B
ConstituentBCaClpHSO4Sp CondTDS
Result50416.95.538342250
SM W-03B
ConstituentBCaClpHSO4Sp CondTDS
Result<505.424.35.76.63042
SM W-04B
ConstituentBCaClpHSO4Sp CondTDS
Result<5027.35.25.749237150
SM W-05B
ConstituentBCaClpHSO4Sp CondTDS
Result605.365.85.664217183
SM W-06B
Se rvice L ayer Cre dits: NC One Ma p, NCCenter for Geo graphic Info rma tio n a ndAnalysis, NC 911 Board
PRJ-I-140 SR-1347
S R -1 3 8 5
SR-1430
RMP-5815
U
S-421
SR-1394
SR-2836
R M P -5 8 2 1
S R -2 8 3 8
S
R-2
1
6
9
U
S-17
S R -2 7 7 9
S R -2 1 4 5
P R J -I -1 4 0
SR-2000
I -1 4 0
I -1 4 0
R M P -5 8 1 4
S R -1 4 3 1
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
P:\DU KE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-46-DETECTION MONITORING CONSTITUENT MAP-LOWER SURFICIAL AQUIFER_V07302015.MXD
LEGEND
MONITORING WELL
PIEZOMETER
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGESS SUTTON PLANT SITEBOUNDARY
148 River S treet, Su ite 220Greenville, SC 29601864-421-9999www.syn terraco rp .com DATE: 08/01/201 5CHECKED BY: J. MEAD OWSDRAWN BY: T. KING
PR OJECT MANAGER: P. WAL DREP
400 0 400 800 1,200 1,600 2,000
(IN FEET)
GRAPHIC SCALE
L. V. SUT TON ENE RGY COM P LE X801 SU TTON ST EA M P LA NT RDWILMINGTON, NORT H CAROL INA
FIGURE 10-46CCR RULE DETECTION MONITORING CONSTITUENT MAPLOWER SURFICIAL AQUIFER
DATE: 08/01/201 5
NOT ES:1 CCR RULE AS INDENTIFIE D IN THE US EPA A PRIL 2015 FINAL RULING 40 CFR PA RTS 257 AND 261
2 AP RIL 17, 2014 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM WS P
3 2013 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/)
4 PARCEL B OUNDA RY WA S OB TAINED FROM THE NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 5 DRAW ING HA S BE EN SE T W ITH A PROJE CTION O F NO RTH CA ROLINA S TAT E PLANE COORDINATE SYS TEM FIPS 3200 (NA D83).
Consti tue nt Abbre vi ati on Uni tsBoronBµg/LCalciumCamg/LChlorideClmg/LSpecific Conductance Sp Cond µmhos/cmpHpHSUSulfateSO4mg/LTotal Di ssol ve d Sol i ds TDS mg/L
ConstituentBCaClpHSO4Sp CondTDS
Result60034.8437.9191524.3300
ABM W-02D
ConstituentBCaClpHSO4Sp CondTDS
Result985.24294.8329784
AW-01C
ConstituentBCaClpHSO4Sp CondTDS
Result<501.964.75.936038
AW-02C
ConstituentBCaClpHSO4Sp CondTDS
Result137046.81605.9140874510
AW-03C
ConstituentBCaClpHSO4Sp CondTDS
Result145041.7496.2120525310
AW-04C
ConstituentBCaClpHSO4Sp CondTDS
Result696.244.7236940
AW-05C
ConstituentBCaClpHSO4Sp CondTDS
Result<501.946.54.4216230
AW-08C
ConstituentBCaClpHSO4Sp CondTDS
Result55419.8315.199314190
AW-09C
ConstituentBCaClpHSO4Sp CondTDS
Result<5060.1136.810385.1210
MW-04B
ConstituentBCaClpHSO4Sp CondTDS
Result<503.89215.51413569
MW-05C
ConstituentBCaClpHSO4Sp CondTDS
Result56019.638583299200
MW-07C
ConstituentBCaClpHSO4Sp CondTDS
Result<501.8344.51248<25
MW-11
ConstituentBCaClpHSO4Sp CondTDS
Result147051.61008.5130264410
MW-12
ConstituentBCaClpHSO4Sp CondTDS
Result56057.41306.485721430
MW-15D
ConstituentBCaClpHSO4Sp CondTDS
Result68026.81105.4120637350
MW-16D
ConstituentBCaClpHSO4Sp CondTDS
Result3055578766605340
MW-20D
ConstituentBCaClpHSO4Sp CondTDS
Result212070.3346.5140697420
MW-21C
ConstituentBCaClpHSO4Sp CondTDS
Result256069.9416.43160684440
MW-22C
ConstituentBCaClpHSO4Sp CondTDS
Result205047.5296.6169454280
MW-23C
ConstituentBCaClpHSO4Sp CondTDS
Result104049.91505.5150858500
MW-24C
ConstituentBCaClpHSO4Sp CondTDS
Result<5042.65.621055.426
MW-28C
ConstituentBCaClpHSO4Sp CondTDS
Result118054.81705.2160908540
MW-31C
ConstituentBCaClpHSO4Sp CondTDS
Result1155.24.24.97167031
MW-32C
ConstituentBCaClpHSO4Sp CondTDS
Result<504.014.54.61255.330
MW-33C
ConstituentBCaCaClpHSO4Sp CondTDS
Result<500.5178.483.55.79.812081
MW-37C
ConstituentBCaClpHSO4Sp CondTDS
Result77639665.5140561340
SM W-01C
ConstituentBCaClpHSO4Sp CondTDS
Result33719.5235.749215130
SM W-02C
ConstituentBCaClpHSO4Sp CondTDS
Result41724.9354.993333190
SM W-03C
ConstituentBCaClpHSO4Sp CondTDS
Result859.59186.616203.4110
SM W-04C
ConstituentBCaClpHSO4Sp CondTDS
Result36215.2334.953230120
SM W-05C
ConstituentBCaClpHSO4Sp CondTDS
Result19715.520540194110
SM W-06C
Se rvice L ayer Cre dits: NC One Ma p, NCCenter for Geo graphic Info rma tio n a ndAnalysis, NC 911 Board
PRJ-I-140 SR-1347
S R -1 3 8 5
SR-1430
RMP-5815
U
S-421
SR-1394
SR-2836
R M P -5 8 2 1
S R -2 8 3 8
S
R-2
1
6
9
U
S-17
S R -2 7 7 9
S R -2 1 4 5
P R J -I -1 4 0
SR-2000
I -1 4 0
I -1 4 0
R M P -5 8 1 4
S R -1 4 3 1
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
P:\DU KE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-47-DETECTION MONITORING CONSTITUENT MAP-UPPER PEE DEE WELLS_V07302015.MXD
LEGEND
MONITORING WELL
PIEZOMETER
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE
DUKE ENERGY PROGESS SUTTON PLANT SITEBOUNDARY
148 River S treet, Su ite 220Greenville, SC 29601864-421-9999www.syn terraco rp .com DATE: 08/01/201 5CHECKED BY: J. MEAD OWSDRAWN BY: T. KING
PR OJECT MANAGER: P. WAL DREP
400 0 400 800 1,200 1,600 2,000
(IN FEET)
GRAPHIC SCALE
L. V. SUT TON ENE RGY COM P LE X801 SU TTON ST EA M P LA NT RDWILMINGTON, NORT H CAROL INA
FIGURE 10-47CCR RULE DETECTION MONITORING CONSTITUENT MAPUPPER PEE DEE WELLS
DATE: 08/01/201 5
NOT ES:1 CCR RULE AS INDENTIFIE D IN THE US EPA A PRIL 2015 FINAL RULING 40 CFR PA RTS 257 AND 261
2 AP RIL 17, 2014 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM WS P
3 2013 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/)
4 PARCEL B OUNDA RY WA S OB TAINED FROM THE NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 5 DRAW ING HA S BE EN SE T W ITH A PROJE CTION O F NO RTH CA ROLINA S TAT E PLANE COORDINATE SYS TEM FIPS 3200 (NA D83).
Consti tue nt Abbre vi ati on Uni tsBoronBµg/LCalciumCamg/LChlorideClmg/LSpecific Conductance Sp Cond µmhos/cmpHpHSUSulfateSO4mg/LTotal Di ssol ve d Sol i ds TDS mg/L
ConstituentBCaClpHSO4Sp CondTDS
Result16731.7537.81.6505350
ABM W-01D
ConstituentBCaClpHSO4Sp CondTDS
Result66613.3160835965510
AW-02D
ConstituentBCaClpHSO4Sp CondTDS
Result30612.9968.424612330
AW-05D
ConstituentBCaClpHSO4Sp CondTDS
Result9807.331908.2151208720
AW-06D
ConstituentBCaClpHSO4Sp CondTDS
Result81511.41209.975.7872510
AW-07D
ConstituentBCaClpHSO4Sp CondTDS
Result58116.72208.2531140630
AW-09D
ConstituentBCaClpHSO4Sp CondTDS
Result36816.11207.725727380
PZ -10D
ConstituentBCaClpHSO4Sp CondTDS
Result9906.791909.8261195670
SM W-06D
Se rvice L ayer Cre dits: NC One Ma p, NCCenter for Geo graphic Info rma tio n a ndAnalysis, NC 911 Board
PRJ-I-140 SR-1347
S R -1 3 8 5
SR-1430
RMP-5815
U
S-421
SR-1394
SR-2836
R M P -5 8 2 1
S R -2 8 3 8
S
R-2
1
6
9
U
S-17
S R -2 7 7 9
S R -2 1 4 5
P R J -I -1 4 0
SR-2000
I -1 4 0
I -1 4 0
R M P -5 8 1 4
S R -1 4 3 1
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
P:\DU KE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-48-DETECTION MONITORING CONSTITUENT MAP-LOWER PEE DEE WELLS_V07302015.MXD
LEGEND
MONITORING WELL
PIEZOMETER
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE
DUKE ENERGY PROGESS SUTTON PLANT SITEBOUNDARY
148 River S treet, Su ite 220Greenville, SC 29601864-421-9999www.syn terraco rp .com DATE: 08/01/201 5CHECKED BY: J. MEAD OWSDRAWN BY: T. KING
PR OJECT MANAGER: P. WAL DREP
400 0 400 800 1,200 1,600 2,000
(IN FEET)
GRAPHIC SCALE
L. V. SUT TON ENE RGY COM P LE X801 SU TTON ST EA M P LA NT RDWILMINGTON, NORT H CAROL INA
FIGURE 10-48CCR RULE DETECTION MONITORING CONSTITUENT MAPLOWER PEE DEE W ELLS
DATE: 08/01/201 5
NOT ES:1 CCR RULE AS INDENTIFIE D IN THE US EPA A PRIL 2015 FINAL RULING 40 CFR PA RTS 257 AND 261
2 AP RIL 17, 2014 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM WS P
3 2013 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/)
4 PARCEL B OUNDA RY WA S OB TAINED FROM THE NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 5 DRAW ING HA S BE EN SE T W ITH A PROJE CTION O F NO RTH CA ROLINA S TAT E PLANE COORDINATE SYS TEM FIPS 3200 (NA D83).
Consti tue nt Abbre vi ati on Uni tsBoronBµg/LCalciumCamg/LChlorideClmg/LSpecific Conductance Sp Cond µmhos/cmpHpHSUSulfateSO4mg/LTotal Di ssol ve d Sol i ds TDS mg/L
ConstituentBCaClpHSO4Sp CondTDS
Result195012.65408.712027661500
AW-05E
ConstituentBCaClpHSO4Sp CondTDS
Result247013.84908.112026481500
AW-06E
ConstituentBCaClpHSO4Sp CondTDS
Result25004.965001011026271500
MW-23E
Se rvice L ayer Cre dits: NC One Ma p, NCCenter for Geo graphic Info rma tio n a ndAnalysis, NC 911 Board
PRJ-I-140 SR-1347
S R -1 3 8 5
SR-1430
RMP-5815
U
S-421
SR-1394
SR-2836
R M P -5 8 2 1
S R -2 8 3 8
S
R-2
1
6
9
U
S-17
S R -2 7 7 9
S R -2 1 4 5
P R J -I -1 4 0
SR-2000
I -1 4 0
I -1 4 0
R M P -5 8 1 4
S R -1 4 3 1
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
P:\DU KE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-49-ASSESSMENT MONITORING CONSTITUENT MAP-UPPER SURFICIAL AQUIFER_V07302015.MXD
LEGEND
MONITORING WELL
PIEZOMETER
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGESS SUTTON PLANT SITEBOUNDARY
148 River S treet, Su ite 220Greenville, SC 29601864-421-9999www.syn terraco rp .com DATE: 08/01/201 5CHECKED BY: J. MEAD OWSDRAWN BY: T. KING
PR OJECT MANAGER: P. WAL DREP
400 0 400 800 1,200 1,600 2,000
(IN FEET)
GRAPHIC SCALE
L. V. SUT TON ENE RGY COM P LE X801 SU TTON ST EA M P LA NT RDWILMINGTON, NORT H CAROL INA
FIGURE 10-49CCR RULE ASSESSMENT MONITORING CONSTITUENT MAPUPPER SURFICIAL AQUIFER
NOT ES:1 AP RIL 17, 2014 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM WS P
2 2013 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/)
3 PARCEL B OUNDA RY WA S OB TAINED FROM THE NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 4 DRAW ING HA S BE EN SE T W ITH A PROJE CTION O F NO RTH CA ROLINA S TAT E PLANE COORDINATE SYS TEM FIPS 3200 (NA D83).
DATE: 08/01/201 5
Consti tue nt A bbre vi ati on Uni tsAluminumAlµg/LAntimonySbµg/LArsenicAsµg/LBariumBaµg/LBerylliumBeµg/LCadmiumCdµg/LChromiumCrµg/LCopperCumg/LIronFeµg/LLeadPbµg/LManganeseMnµg/LMercuryHgµg/LMolybdenumMoµg/LSeleniumSeµg/LSulfateSO4mg/LSulfideSulfidemg/LThalliumTlµg/LVandadiumVµg/L
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4Tl
Result182<144<1<1<5<0.00537<0.0584<1<1<1<124<0.2
421-Well 3
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4Tl
Result239<144<1<1<5<0.00571<0.0557<1<1<1<117<0.2
421-Well 4
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result143634594<1<1<1<0.001152<0.0588162<1<1<183<0.1<0.23.45
ABMW-01S
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result6453.41810<1<1<1<0.00124100<0.057845.18<1<1<1<0.1<0.2<0.21.28
ABMW-02S
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result522<1<5<1<1<1<0.0012680<0.051051.37<1<1<14.5<1<0.2<0.3
AW-01B ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result35<116<1<1<1<0.0011320<0.052041.4<1<1<12.9<0.1<0.2<0.3
AW-02B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result32<110<1<1<1<0.0016290<0.0513<1<1<1<140.439<0.20.427
AW-03B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result7<112<1<1<1<0.00141<0.0522<1<1<1<15.4<0.1<0.2<0.3
AW-04B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result45<125<1<1<1<0.001281<0.05268.54<1<1<18.70.173<0.2<0.3
AW-05B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result890<132<1<1<1<0.00171<0.0517<1<1<1<114<0.1<0.2<0.3
AW-06B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result276<125<1<11.65<0.0014450<0.0529<1<1<1<1160.527<0.20.335
AW-08B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result1420<118<1<1<1<0.001225<0.0518<1<1<1<118<0.1<0.2<0.3
AW-09B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result1130<16<1<1<1<0.00193<0.05<5<1<1<1<114<0.1<0.2<0.3
MW-07A
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result590<122<1<1<1<0.00115<0.059<1<1<1<117<0.1<0.2<0.3
MW-07B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result9023.630<1<1<1<0.0013690<0.05769.6<1<1<117<0.1<0.23.88
MW-15
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result1231.4920<1<1<1<0.001113<0.0593<1<1<122<0.1<0.20.316
MW-16
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4Tl
Result92.6273<1<1<5<0.005914<0.05386112<1<1<11400.458
MW-19
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result391.1255<1<1<1<0.001747<0.051076.53<1<1<1450.19<0.239.6
MW-20
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4Tl
Result24<19<1<1<5<0.005<10<0.05<51.5<1<1<14.8<0.2
MW-22B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4TlV
Result14<140<1<1<5<0.005<10<0.057126<1<14.259.8<0.20.3
MW-23B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4TlV
Result7<147<1<1<5<0.005<10<0.053597<1<1<128<0.20.555
MW-24B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4TlV
Result267<141<1<1<5<0.00521<0.0555<1<1<127.162<0.20.3
MW-27B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4Tl
Result23<128<1<1<5<0.00510<0.0510<1<1<1<110<0.2
MW-28B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result203<135<1<1<1<0.0011180<0.0573<1<1<1<18<0.1<0.20.378
MW-31B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4TlV
Result703.0839<1<1<5<0.0059580<0.05254<1<1<1<17.2<0.20.3
MW-37B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result769<178<1<1<1<0.00130<0.0514<1<1<1<145<0.1<0.2<0.3
SMW-01B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result84<161<1<12.29<0.00128800<0.054131.01<1<1<13.20.473<0.21.42
SMW-02B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result25<153<1<1<1<0.0011310<0.0591<1<1<1<138<0.1<0.2<0.3
SMW-03B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result86<117<1<1<1<0.0017590<0.05852.66<1<1<16.60.652<0.2<0.3
SMW-04B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result421.4736<1<1<1<0.0019910<0.05139<1<1<1<1490.399<0.20.81
SMW-05B
ConstituentAlAsBaBeCdCrCuFeHg (CVAFS)MnMoPbSbSeSO4SulfideTlV
Result73<148<1<1<1<0.00122<0.0530<1<1<1<142<0.1<0.2<0.3
SMW-06B
Se rvice L ayer Cre dits: NC One Ma p, NCCenter for Geo graphic Info rma tio n a ndAnalysis, NC 911 Board
PRJ-I-140 SR-1347
S R -1 3 8 5
SR-1430
RMP-5815
U
S-421
SR-1394
SR-2836
R M P -5 8 2 1
S R -2 8 3 8
S
R-2
1
6
9
U
S-17
S R -2 7 7 9
S R -2 1 4 5
P R J -I -1 4 0
SR-2000
I -1 4 0
I -1 4 0
R M P -5 8 1 4
S R -1 4 3 1
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
P:\DU KE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-50-ASSESSMENT MONITORING CONSTITUENT MAP-LOWER SURFICIAL AQUIFER_V07302015.MXD
LEGEND
MONITORING WELL
PIEZOMETER
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGESS SUTTON PLANT SITEBOUNDARY 148 River S treet, Su ite 220Greenville, SC 29601864-421-9999www.syn terraco rp .com DATE: 08/01/201 5CHECKED BY: J. MEAD OWSDRAWN BY: T. KING
PR OJECT MANAGER: P. WAL DREP
400 0 400 800 1,200 1,600 2,000
(IN FEET)
GRAPHIC SCALE
L. V. SUT TON ENE RGY COM P LE X801 SU TTON ST EA M P LA NT RDWILMINGTON, NORT H CAROL INA
FIGURE 10-50CCR RULE ASSESSMENT MONITORING CONSTITUENT MAPLOWER SURFICIAL AQUIFER
DATE: 08/01/201 5
NOT ES:1 AP RIL 17, 2014 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM WS P
2 2013 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/)
3 PARCEL B OUNDA RY WA S OB TAINED FROM THE NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 4 DRAW ING HA S BE EN SE T W ITH A PROJE CTION O F NO RTH CA ROLINA S TAT E PLANE COORDINATE SYS TEM FIPS 3200 (NA D83).
Consti tue nt A bbre vi ati on Uni tsAluminumAlµg/LAntimonySbµg/LArsenicAsµg/LBariumBaµg/LBerylliumBeµg/LCadmiumCdµg/LChromiumCrµg/LCopperCumg/LIronFeµg/LLeadPbµg/LManganeseMnµg/LMercuryHgµg/LMolybdenumMoµg/LSeleniumSeµg/LSulfateSO4mg/LSulfideSulfidemg/LThalliumTlµg/LVandadiumVµg/L
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result2317065<1<1<1<0.0011270150117<1<1<191<0.2<0.2<0.3
ABMW-02D
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result472<1141<1<1<1<0.001470179<1<1<12.632<0.5<0.2<0.3
AW-01C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result117<155<1<1<1<0.001761057<1<1<1<132.43<0.2<0.3
AW-02C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result221.5496<1<1<1<0.001113001830<1<1<1<11402.29<0.20.75
AW-03C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result38<137<1<1<1<0.0013990787<1<1<1<11203.89<0.20.518
AW-04C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result256<136<1<1<1<0.00112821<1<1<1<123<0.1<0.2<0.3
AW-05C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result339<140<1<1<1<0.0016123<1<1<1<121<0.1<0.2<0.3
AW-08C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result199<1118<1<1<1<0.001102289<1<1<1<199<0.1<0.2<0.3
AW-09C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4Tl
Result7<168<1<1<5<0.005128059<1<1<1<110<0.2
MW-04B
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4Tl
Result6<127<1<1<5<0.005<10441<1<1<1<114<0.2
MW-05C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4TlV
Result154<175<1<1<5<0.005166368<1<1<1<1830.4050.573
MW-07C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4Tl
Result289<182<1<1<5<0.0054830<1<1<1<112<0.2
MW-11
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4TlV
Result22<129<1<1<5<0.005569069115.2<1<1<1130<0.20.3
MW-12
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result5<141<1<1<1<0.00185940<1<1<1<185<0.1<0.2<0.3
MW-15D
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result106<140<1<1<1<0.0011020311<1<1<1<1120<0.1<0.22.09
MW-16D
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result102.2551<1<1<1<0.00186413114<1<1<166<0.1<0.2<0.3
MW-20D
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4Tl
Result1353.866<1<1<5<0.0055110430191<1<1<1140<0.2
MW-21C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4Tl
Result<5<195<1<1<5<0.005141732169<1<1<11600.398
MW-22C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4TlV
Result22<136<1<1<5<0.00588309396<1<1<1690.210.323
MW-23C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4TlV
Result313.4239<1<1<5<0.00541801120<1<1<1<1150<0.20.543
MW-24C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4Tl
Result37<151<1<1<5<0.005<1086.23<1<1<110<0.2
MW-28C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4TlV
Result29<155<1<1<5<0.00528501680<1<1<1<1160<0.20.3
MW-31C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4Tl
Result171<127<1<1<5<0.0053030<1<1<1<116<0.2
MW-32C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4Tl
Result136<121<1<1<5<0.0052030<1<1<1<112<0.2
MW-33C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4TlV
Result746<18<1<1<5<0.005336<1<1<1<19.8<0.21.22
MW-37C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result99<134<1<1<1<0.0014250807<1<1<1<11401.87<0.20.402
SMW-01C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result142<137<1<1<1<0.0015370539<1<1<1<149<0.1<0.2<0.3
SMW-02C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result163<186<1<1<1<0.0011510584<1<1<1<1930.177<0.2<0.3
SMW-03C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result2602.5636<1<1<1<0.00196601322.69<1<1<1160.147<0.20.803
SMW-04C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result121<179<1<1<1<0.001175130<1<1<1<153<0.1<0.2<0.3
SMW-05C
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result632.7953<1<1<1<0.0011320273<1<1<1<1402.95<0.2<0.3
SMW-06C
Se rvice L ayer Cre dits: NC One Ma p, NCCenter for Geo graphic Info rma tio n a ndAnalysis, NC 911 Board
PRJ-I-140 SR-1347
S R -1 3 8 5
SR-1430
RMP-5815
U
S-421
SR-1394
SR-2836
R M P -5 8 2 1
S R -2 8 3 8
S
R-2
1
6
9
U
S-17
S R -2 7 7 9
S R -2 1 4 5
P R J -I -1 4 0
SR-2000
I -1 4 0
I -1 4 0
R M P -5 8 1 4
S R -1 4 3 1
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
P:\DU KE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-51-ASSESSMENT MONITORING CONSTITUENT MAP-UPPER PEE DEE WELLS_V07302015.MXD
LEGEND
MONITORING WELL
PIEZOMETER
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGESS SUTTON PLANT SITEBOUNDARY
148 River S treet, Su ite 220Greenville, SC 29601864-421-9999www.syn terraco rp .com DATE: 08/01/201 5CHECKED BY: J. MEAD OWSDRAWN BY: T. KING
PR OJECT MANAGER: P. WAL DREP
400 0 400 800 1,200 1,600 2,000
(IN FEET)
GRAPHIC SCALE
L. V. SUT TON ENE RGY COM P LE X801 SU TTON ST EA M P LA NT RDWILMINGTON, NORT H CAROL INA
FIGURE 10-51CCR RULEASSESSMENT MONITORING CONSTITUENT MAPUPPER PEE DEE WELLS
DATE: 08/01/201 5
NOT ES:1 AP RIL 17, 2014 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM WS P
2 2013 AE RIA L O RTHOPHOTOGRA PHY OBTAINED FROM NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/)
3 PARCEL B OUNDA RY WA S OB TAINED FROM THE NC CE NTER FOR GEOG RA PHIC INFORM ATION AND A NALYS IS, AT (http://s er vices.nc onemap.gov/) 4 DRAW ING HA S BE EN SE T W ITH A PROJE CTION O F NO RTH CA ROLINA S TAT E PLANE COORDINATE SYS TEM FIPS 3200 (NA D83).
Consti tue nt A bbre vi ati on Uni tsAluminumAlµg/LAntimonySbµg/LArsenicAsµg/LBariumBaµg/LBerylliumBeµg/LCadmiumCdµg/LChromiumCrµg/LCopperCumg/LIronFeµg/LLeadPbµg/LManganeseMnµg/LMercuryHgµg/LMolybdenumMoµg/LSeleniumSeµg/LSulfateSO4mg/LSulfideSulfidemg/LThalliumTlµg/LVandadiumVµg/L
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result521.0317<1<1<1<0.0014758211.2<1<1<11.62.9<0.20.642
ABM W-01D
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result104<112<1<1<1<0.001438593.15<1<1<135<0.1<0.2<0.3
AW-02D
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result1491.369<1<1<1<0.0012983850.7<1<1<124<0.2<0.2<0.3
AW-05D
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result431.5716<1<1<1<0.0011021818.1<1<1<115<0.1<0.2<0.3
AW-06D
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result136<1<5<1<1<1<0.001220148.53<1<1<15.72.09<0.20.992
AW-07D
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result46<17<1<1<1<0.001194408.23<1<1<153<0.5<0.2<0.3
AW-09D
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result91<155<1<1<1<0.001347532.38<1<1<125<0.1<0.20.397
PZ -10D
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result2213.7615<1<1<1<0.00130037110<1<1<1263.24<0.21.61
SMW-06D
Se rvice L ayer Cre dits: NC One Ma p, NCCenter for Geo graphic Info rma tio n a ndAnalysis, NC 911 Board
PRJ-I-140 SR-1347
S R -1 3 8 5
SR-1430
RMP-5815
U
S-421
SR-1394
SR-2836
R M P -5 8 2 1
S R -2 8 3 8
S
R-2
1
6
9
U
S-17
S R -2 7 7 9
S R -2 1 4 5
P R J -I -1 4 0
SR-2000
I -1 4 0
I -1 4 0
R M P -5 8 1 4
S R -1 4 3 1
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
P:\DU KE ENERGY PROGRESS.1026\00 GIS BASE DATA\SUTTON\MAP_DOCS\DRAFT_CSA_V07152015\FIGURE 10-52-ASSESSMENT MONITORING CONSTITUENT MAP-LOWER PEE DEE WELLS_V07302015.MXD
LEGEND
MONITORING WELL
PIEZOMETER
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE
DUKE ENERGY PROGESS SUTTON PLANT SITEBOUNDARY
148 River S treet, Su ite 220Greenville, SC 29601864-421-9999www.syn terraco rp .com DATE: 08/01/201 5CHECKED BY: J. MEAD OWSDRAWN BY: T. KING
PR OJECT MANAGER: P. WAL DREP
400 0 400 800 1,200 1,600 2,000
(IN FEET)
GRAPHIC SCALE
L. V. SUT TON ENE RGY COM P LE X801 SU TTON ST EA M P LA NT RDWILMINGTON, NORT H CAROL INA
FIGURE 10-52CCR RULE ASSESSMENT MONITORING CONSTITUENT MAPLOWER PEE DEE WELLS
DATE: 08/01/201 5
NOTES:1 APRIL 17, 2014 AERIAL ORTHOPHOTOGRAPHY OBTAINED FROM WSP
2 2013 AERIAL ORTHOPHOTOGRAPHY OBTAINED FROM NC CENTER FOR GEOGRAPHIC INFORMATION AND ANALYSIS, AT (http://services.nconemap.gov/)
3 PARCEL BOUNDARY WAS OBTAINED FROM THE NC CENTER FOR GEOGRAPHIC INFORMATION AND ANALYSIS, AT (http://services.nconemap.gov/) 4 DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83).
Consti tue nt A bbre vi ati on Uni tsAluminumAlµg/LAntimonySbµg/LArsenicAsµg/LBariumBaµg/LBerylliumBeµg/LCadmiumCdµg/LChromiumCrµg/LCopperCumg/LIronFeµg/LLeadPbµg/LManganeseMnµg/LMercuryHgµg/LMolybdenumMoµg/LSeleniumSeµg/LSulfateSO4mg/LSulfideSulfidemg/LThalliumTlµg/LVandadiumVµg/L
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result971.378<1<1<1<0.001276921.3<1<1<1120<0.1<0.2<0.3
AW-05E
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result577<18<1<114.7<0.001704246.63<1<1<1120<0.2<0.21.77
AW-06E
ConstituentAlAsBaBeCdCrCuFeMnMoPbSbSeSO4SulfideTlV
Result41<1<5<1<1<1<0.00148515.6<1<1<1110<0.1<0.20.993
MW-23E
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
www.synterracorp.com
DRAWN BY: J. GILMER
PROJECT MANAGER: P. WALDREP
LAYOUT:
DATE: JUNE 2015
FIGURE 10-53
PIPER DIAGRAM – ASH PORE WATER
L.V. SUTTON ENERGY COMPLEX
801 SUTTON STEAM PLANT ROAD
WILMINGTON, NORTH CAROLINA 28401
P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\Stats Figures\Piper Diagrams
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
www.synterracorp.com
DRAWN BY: J. GILMER
PROJECT MANAGER: P. WALDREP
LAYOUT:
DATE: JUNE 2015
FIGURE 10-54
PIPER DIAGRAM – PEE DEE
L.V. SUTTON ENERGY COMPLEX
801 SUTTON STEAM PLANT ROAD
WILMINGTON, NORTH CAROLINA 28401
P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\Stats Figures\Piper Diagrams
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
www.synterracorp.com
DRAWN BY: J. GILMER
PROJECT MANAGER: P. WALDREP
LAYOUT:
DATE: JUNE 2015
FIGURE 10-55
PIPER DIAGRAM – SURFICIAL AQUIFER
(SHALLOW)
L.V. SUTTON ENERGY COMPLEX
801 SUTTON STEAM PLANT ROAD
WILMINGTON, NORTH CAROLINA 28401
P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\Stats Figures\Piper Diagrams
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
www.synterracorp.com
DRAWN BY: J. GILMER
PROJECT MANAGER: P. WALDREP
LAYOUT:
DATE: JUNE 2015
FIGURE 10-56
PIPER DIAGRAM – SURFICIAL AQUIFER
(INTERMEDIATE)
L.V. SUTTON ENERGY COMPLEX
801 SUTTON STEAM PLANT ROAD
WILMINGTON, NORTH CAROLINA 28401
P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\Stats Figures\Piper Diagrams
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
www.synterracorp.com
DRAWN BY: J. GILMER
PROJECT MANAGER: P. WALDREP
LAYOUT:
DATE: JUNE 2015
FIGURE 10-57
PIPER DIAGRAM – SURFICIAL AQUIFER
(DEEP)
L.V. SUTTON ENERGY COMPLEX
801 SUTTON STEAM PLANT ROAD
WILMINGTON, NORTH CAROLINA 28401
P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\Stats Figures\Piper Diagrams
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
www.synterracorp.com
DRAWN BY: J. GILMER
PROJECT MANAGER: P. WALDREP
LAYOUT:
DATE: JUNE 2015
FIGURE 10-58
PIPER DIAGRAM – SURFACE WATER
L.V. SUTTON ENERGY COMPLEX
801 SUTTON STEAM PLANT ROAD
WILMINGTON, NORTH CAROLINA 28401
P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\Stats Figures\Piper Diagrams
15 NCAC 02L Standard = 10 ug/L
Ar
s
e
n
i
c
(
µ
g
/
L
)
Ba
r
i
u
m
(
µ
g
/
L
)
Bo
r
o
n
(
µ
g
/
L
)
15 NCAC 02L Standard = 700 ug/L
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
www.synterracorp.com
DRAWN BY: J. GILMER
PROJECT MANAGER: P. WALDREP
LAYOUT:
DATE: JUNE 2015
P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW
Assessment Plan\1.11 CSA Reporting\FIGURES\Stats
Figures\Boxplots
FIGURE 10-59
COMPLIANCE WELL BOX AND WHISKER PLOTS
ARSENIC, BARIUM, BORON
L.V. SUTTON ENERGY COMPLEX
801 SUTTON STEAM PLANT ROAD
WILMINGTON, NORTH CAROLINA 28401
Note: 15 NCAC 02L Standard = 700 µg/L
15 NCAC 02L Standard = 300 ug/L
Ir
o
n
(
µ
g
/
L
)
15 NCAC 02L
Standard = 50 ug/L
Ma
n
g
a
n
e
s
e
(
µ
g
/
L
)
15 NCAC 02L Standard = 250 mg/L
Ch
l
o
r
i
d
e
(
m
g
/
L
)
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
www.synterracorp.com
DRAWN BY: J. GILMER
PROJECT MANAGER: P. WALDREP
LAYOUT:
DATE: JUNE 2015
P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW
Assessment Plan\1.11 CSA Reporting\FIGURES\Stats
Figures\Boxplots
FIGURE 10-60
COMPLIANCE WELL BOX AND WHISKER PLOTS
CHLORIDE, IRON, MANGANESE
L.V. SUTTON ENERGY COMPLEX
801 SUTTON STEAM PLANT ROAD
WILMINGTON, NORTH CAROLINA 28401
15 NCAC 02L Standard = 250 mg/L Su
l
f
a
t
e
(
m
g
/
L
)
15 NCAC 02L Standard = 20 ug/L Se
l
e
n
i
u
m
(
µ
g
/
L
)
Ni
t
r
a
t
e
(
µ
g
/
L
)
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
www.synterracorp.com
DRAWN BY: J. GILMER
PROJECT MANAGER: P. WALDREP
LAYOUT:
DATE: JUNE 2015
P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW
Assessment Plan\1.11 CSA Reporting\FIGURES\Stats
Figures\Boxplots
FIGURE 10-61
COMPLIANCE WELL BOX AND WHISKER PLOTS
NITRATE, SELENIUM, SULFATE
L.V. SUTTON ENERGY COMPLEX
801 SUTTON STEAM PLANT ROAD
WILMINGTON, NORTH CAROLINA 28401
Note: 15 NCAC 02L Standard = 10 µg/L
Zi
n
c
(
µ
g
/
L
)
15 NCAC 02L Standard = 0.2 ug/L
Th
a
l
l
i
u
m
(
µ
g
/
L
)
15 NCAC 02L Standard = 500 mg/L
To
t
a
l
D
i
s
s
o
l
v
e
d
S
o
l
i
d
s
(
m
g
/
L
)
1.5e+003
2e+003
1e+003
500
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
www.synterracorp.com
DRAWN BY: J. GILMER
PROJECT MANAGER: P. WALDREP
LAYOUT:
DATE: JUNE 2015
P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW
Assessment Plan\1.11 CSA Reporting\FIGURES\Stats
Figures\Boxplots
FIGURE 10-62
COMPLIANCE WELL BOX AND WHISKER PLOTS
TOTAL DISSOLVED SOLIDS, THALLIUM, ZINC
L.V. SUTTON ENERGY COMPLEX
801 SUTTON STEAM PLANT ROAD
WILMINGTON, NORTH CAROLINA 28401
Note: 15 NCAC 02L Standard = 1000 µg/L
Tu
r
b
i
d
i
t
y
(
N
T
U
)
pH
(
S
.
U
.
)
Di
s
s
o
l
v
e
d
O
x
y
g
e
n
(
µ
g
/
L
)
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
www.synterracorp.com
DRAWN BY: J. GILMER
PROJECT MANAGER: P. WALDREP
LAYOUT:
DATE: JUNE 2015
P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW
Assessment Plan\1.11 CSA Reporting\FIGURES\Stats
Figures\Boxplots
FIGURE 10-63
COMPLIANCE WELL BOX AND WHISKER PLOTS
DISSOLVED OXYGEN, pH, TURBIDITY
L.V. SUTTON ENERGY COMPLEX
801 SUTTON STEAM PLANT ROAD
WILMINGTON, NORTH CAROLINA 28401
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
1 0
1 0
10
1 0 0
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-24B< 1 (2.91)
AW-08B< 1 (< 1)
MW-07B< 1 (< 1)
MW-23B< 1 (< 1)
MW-27B< 1 (< 1)
AW-01B< 1 (< 1)
AW-02B< 1 (< 1)
AW-05B< 1 (< 1)
AW-06B< 1 (< 1)
421-Well 3< 1 (NS)
421-Well 4< 1 (NS)
SMW-06B< 1 (< 1)
ABMW-01S634 (654)
ABMW-02S53.4 (54.6)
AW-09B< 1 (< 1)
SMW-02B< 1 (1.04)
SMW-03B< 1 (< 1)
MW-31B< 1 (< 1)
AW-04B< 1 (< 1)
SMW-01B< 1 (< 1)
SMW-04B< 1 (< 1)
SMW-05B1.47 (1.34)
AW-03B< 1 (< 1)
MW-1523.6 (20.5)
MW-161.49 (1.59)
MW-201.12 (1)
MW-37B3.08 (< 1)
MW-07A< 1 (< 1)
MW-192.62 (NS)
MW-22B< 1 (NS)
MW-28B< 1 (NS)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR ARSENIC IS 10 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-5JUNE 2015 ISOCONCENTRATION MAPARSENIC IN UPPER SURFICIAL W EL LSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(10)(10)
1010
DISSOLVED ARSENIC CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL ARSENIC CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
700
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-24B47 (40)
AW-08B25 (25)
MW-07B22 (22)
MW-23B40 (38)
MW-27B41 (39)
AW-01B< 5 (< 5)
AW-02B16 (15)
AW-05B25 (21)
AW-06B32 (30)
421-Well 344 (NS)
421-Well 444 (NS)
SMW-06B48 (43)
ABMW-01S594 (585)
ABMW-02S1810 (1840)AW-09B18 (16)
SMW-02B61 (59)
SMW-03B53 (52)
MW-31B35 (36)
AW-04B12 (11)
SMW-01B78 (74)
SMW-04B17 (16)
SMW-05B36 (36)
AW-03B10 (9)
MW-1530 (31)
MW-1620 (20)
MW-2055 (59)
MW-37B39 (8)
MW-07A6 (6)
MW-1973 (NS)
MW-22B9 (NS)
MW-28B28 (NS)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR BARIUM IS 700 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-6JUNE 2015 ISOCONCENTRATION MAPBARIUM IN UPPER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(700)(700)
700700
DISSOLVED BARIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL BARIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
700
700
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-24B409 (1080)
AW-08B< 50 (< 50)
MW-07B< 50 (< 50)
MW-23B145 (144)
MW-27B198 (193)
AW-01B< 50 (< 50)
AW-02B< 50 (< 50)
AW-05B< 50 (< 50)
AW-06B< 50 (< 50)
421-Well 373 (NS)
421-Well 454 (NS)
SMW-06B60 (59)
ABMW-01S3940 (3950)
ABMW-02S234 (237)
AW-09B< 50 (< 50)
SMW-02B< 50 (< 50)
SMW-03B50 (52)
MW-31B< 50 (54)
AW-04B< 50 (< 50)
SMW-01B100 (99)
SMW-04B< 50 (< 50)
SMW-05B< 50 (< 50)
AW-03B< 50 (< 50)
MW-1554 (64)
MW-1690 (98)
MW-2052 (65)
MW-37B< 50 (< 50)
MW-07A< 50 (< 50)
MW-192080 (NS)
MW-22B< 50 (NS)
MW-28B< 50 (NS)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR BORON IS 700 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-7JUNE 2015 ISOCONCENTRATION MAPBORON IN UPPER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(700)(700)
700700
DISSOLVED BORON CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL BORON CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
1 1
1
1
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-24B< 1 (14)
AW-08B2.53 (2.55)
MW-07B< 1 (< 1)
MW-23B< 1 (< 1)
MW-27B1.95 (1.79)
AW-01B1.44 (1.24)
AW-02B< 1 (< 1)
AW-05B< 1 (< 1)
AW-06B< 1 (< 1)
421-Well 3< 1 (NS)
421-Well 4< 1 (NS)
SMW-06B< 1 (< 1)
ABMW-01S< 1 (< 1)
ABMW-02S< 1 (< 1)
AW-09B< 1 (< 1)
SMW-02B< 1 (< 1)
SMW-03B< 1 (< 1)
MW-31B< 1 (< 1)
AW-04B< 1 (< 1)
SMW-01B< 1 (< 1)
SMW-04B< 1 (< 1)
SMW-05B< 1 (< 1)
AW-03B< 1 (< 1)
MW-15< 1 (< 1)
MW-16< 1 (< 1)
MW-20< 1 (< 1)
MW-37B2.52 (< 1)
MW-07A< 1 (< 1)
MW-195.27 (NS)
MW-22B< 1 (NS)
MW-28B< 1 (NS)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) FOR COBALT IS 1 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-8JUNE 2015 ISOCONCENTRATION MAPCOBALT IN UPPER SURFICIAL W EL LSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(1.0)(1.0)
11
DISSOLVED COBALT CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL COBALT CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
3
0
0
300
300
3 0 0
3 0 0
3 0 0
300
300
3
0
0
0
3000
3 0 0 0
3 0 0 0
30 0 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-24B< 10 (2830)
AW-08B4450 (4160)
MW-07B15 (< 10)
MW-23B< 10 (< 10)
MW-27B21 (< 10)
AW-01B2680 (2160)
AW-02B1320 (1630)
AW-05B281 (33)
AW-06B71 (< 10)
421-Well 337 (NS)
421-Well 471 (NS)
SMW-06B22 (16)
ABMW-01S152 (94)
ABMW-02S24100 (24700)
AW-09B225 (39)
SMW-02B28800 (27900)
SMW-03B1310 (1320)
MW-31B1180 (649)
AW-04B41 (< 10)
SMW-01B30 (14)
SMW-04B7590 (7470)
SMW-05B9910 (11400)
AW-03B6290 (6600)
MW-153690 (3230)
MW-16113 (95)
MW-20747 (607)
MW-37B9580 (22)
MW-07A93 (< 10)
MW-19914 (NS)
MW-22B< 10 (NS)
MW-28B10 (NS)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR IRON IS 300 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-9JUNE 2015 ISOCONCENTRATION MAPIRON IN UPPER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(300)(300)
300300
DISSOLVED IRON CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL IRON CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
5 0
50
50
5 0
5 0
50
5 0
5 0 0
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-24B35 (868)
AW-08B29 (28)
MW-07B9 (7)
MW-23B7 (< 5)
MW-27B55 (54)
AW-01B105 (89)
AW-02B204 (202)
AW-05B26 (17)
AW-06B17 (17)
421-Well 384 (NS)
421-Well 457 (NS)
SMW-06B30 (30)
ABMW-01S88 (88)
ABMW-02S784 (812)
AW-09B18 (18)
SMW-02B413 (412)
SMW-03B91 (92)
MW-31B73 (68)
AW-04B22 (23)
SMW-01B14 (13)
SMW-04B85 (83)
SMW-05B139 (148)
AW-03B13 (15)
MW-1576 (79)
MW-169 (10)
MW-20107 (114)
MW-37B254 (8)
MW-07A< 5 (< 5)
MW-19386 (NS)
MW-22B< 5 (NS)
MW-28B10 (NS)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR MANGANESE IS 50 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-10JUNE 2015 ISOCONCENTRATION MAPMANGANESE IN UPPER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(50)(50)
5050
DISSOLVED MANGANESE CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL MANGANESE CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
8.5
6.5
6 .5
6
.
5
6.5
6.5
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-24B6.6
AW-08B5.1
MW-07B4.3
MW-23B6.3
MW-27B4.7
AW-01B5.8
AW-02B6.1
AW-05B8.5
AW-06B4.8
421-Well3 5.7
421-Well4 5.3
SMW-06B5.66
ABMW-01S8.97
ABMW-02S7.48
AW-09B4.6
SMW-02B6.4
SMW-03B5.5
MW-31B6
AW-04B6.16
SMW-01B4.6
SMW-04B5.7
SMW-05B5.7
AW-03B5.8
MW-156.8
MW-165.9
MW-207
MW-37B4.3
MW-07A4.1
MW-196.4
MW-22B5.71
MW-28B6.3
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L RANGE FOR pH IS 6.5 TO 8.5S.U..
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIGURE 10-11JUNE 2015 ISOCONCENTRATION MAPpH IN UPPER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(8.5)(8.5)
8.58.5
DISSOLVED pH CONCENTRATION (S.U.)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL pH CONCENTRATION1 (S.U.)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
0.2
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-24B< 0.2 (< 0.2)
AW-08B< 0.2 (0.258)
MW-07B< 0.2 (< 0.2)
MW-23B< 0.2 (< 0.2)
MW-27B< 0.2 (0.291)
AW-01B< 0.2 (< 0.2)
AW-02B< 0.2 (< 0.2)
AW-05B< 0.2 (< 0.2)
AW-06B< 0.2 (< 0.2)
421-Well 3< 0.2 (NS)
421-Well 4< 0.2 (NS)
SMW-06B< 0.2 (< 0.2)
ABMW-01S< 0.2 (< 0.2)
ABMW-02S< 0.2 (< 0.2)
AW-09B< 0.2 (0.272)
SMW-02B< 0.2 (< 0.2)
SMW-03B< 0.2 (< 0.2)
MW-31B< 0.2 (< 0.2)
AW-04B< 0.2 (< 0.2)
SMW-01B< 0.2 (< 0.2)
SMW-04B< 0.2 (< 0.2)
SMW-05B< 0.2 (< 0.2)
AW-03B< 0.2 (< 0.2)
MW-15< 0.2 (< 0.2)MW-16< 0.2 (< 0.2)MW-20< 0.2 (< 0.2)
MW-37B< 0.2 (< 0.2)
MW-07A< 0.2 (< 0.2)
MW-190.458 (NS)
MW-22B< 0.2 (NS)
MW-28B< 0.2 (NS)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) THALLIUM IS 0.2 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-12JUNE 2015 ISOCONCENTRATION MAPTHALLIUM IN UPPER SURF ICIAL W ELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(0.2)(0.2)
0.20.2
DISSOLVED THALLIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL THALLIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
500
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-24B140
AW-08B26
MW-07B< 25
MW-23B55
MW-27B110
AW-01B44
AW-02B< 25
AW-05B50
AW-06B< 25
421-Well3 66
421-Well4 45
SMW-06B83
ABMW-01S680
ABMW-02S330
AW-09B< 25
SMW-02B140
SMW-03B250
MW-31B40
AW-04B< 25
SMW-01B57
SMW-04B42
SMW-05B150
AW-03B29
MW-15250
MW-1684
MW-20220
MW-37B< 25
MW-07A< 25
MW-19380
MW-22B< 25
MW-28B40
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR TOTAL DISSOLVEDSOLIDS IS 500 mg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-13JUNE 2015 ISOCONCENTRATION MAPTOTAL DISSO LVED SOL IDS IN UPPER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
500500
LEGEND
TOTAL DISSOLVED SOLIDS CONCENTRATION1 (mg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
0 .3
0.3
0 .3
0 .3
0 .3
0 .3
3
3
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-24B0.555 (0.318)
AW-08B0.335 (0.346)
MW-07B< 0.3 (< 0.3)
MW-23B< 0.3 (< 0.3)
MW-27B< 0.3 (< 0.3)
AW-01B< 0.3 (< 0.3)
AW-02B< 0.3 (< 0.3)
AW-05B< 0.3 (< 0.3)
AW-06B< 0.3 (< 0.3)
SMW-06B< 0.3 (< 0.3)
ABMW-01S3.45 (2.87)
ABMW-02S1.28 (1.46)
AW-09B< 0.3 (< 0.3)
SMW-02B1.42 (1.61)
SMW-03B< 0.3 (< 0.3)
MW-31B0.378 (< 0.3)
AW-04B< 0.3 (< 0.3)
SMW-01B< 0.3 (< 0.3)
SMW-04B< 0.3 (< 0.3)
SMW-05B0.81 (0.77)
AW-03B0.427 (0.421)
MW-153.88 (2.19)
MW-160.316 (< 0.3)
MW-2039.6 (26)
MW-37B< 0.3 (< 0.3)
MW-07A< 0.3 (< 0.3)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) FOR VANADIUM IS 0.3 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-14JUNE 2015 ISOCONCENTRATION MAPVANADIUM IN UPPER SURFICIAL W ELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(0.3)(0.3)
0.30.3
DISSOLVED VANADIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL VANADIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
10
10
1
0
1
0
1 0
100
100
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-12< 1 (< 1)
MW-23C< 1 (< 1)
MW-24C3.42 (< 1)
MW-31C< 1 (< 1)
MW-07C< 1 (< 1)
AW-01C< 1 (< 1)
AW-02C< 1 (< 1)
AW-05C< 1 (< 1)
MW-32C< 1 (NS)
MW-33C< 1 (NS)ABMW-02D170 (167)
AW-09C< 1 (< 1)
SMW-02C< 1 (< 1)
SMW-03C< 1 (< 1)
SMW-06C2.79 (2.55)
AW-04C< 1 (< 1)
SMW-01C< 1 (< 1)
SMW-04C2.56 (2.09)
SMW-05C< 1 (< 1)
AW-03C1.54 (1.54)
MW-15D< 1 (< 1)
MW-16D< 1 (< 1)MW-20D2.25 (1.8)
AW-08C< 1 (< 1)
MW-37C< 1 (2.56)
MW-11< 1 (NS)
MW-21C53.8 (NS)
MW-22C< 1 (NS)
MW-28C< 1 (NS)
MW-04B< 1 (NS)
MW-05C< 1 (NS)
ABMW-01S634 (654)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR ARSENIC IS 10 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-15JUNE 2015 ISOCONCENTRATION MAPARSENIC IN LOWER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(10)(10)
1010
DISSOLVED ARSENIC CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL ARSENIC CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-1229 (30)
MW-23C36 (35)
MW-24C39 (46)
MW-31C55 (57)
MW-07C75 (76)
AW-01C141 (136)
AW-02C55 (49)
AW-05C36 (32)
MW-32C27 (NS)
MW-33C21 (NS)ABMW-02D65 (65)
AW-09C118 (104)
SMW-02C37 (35)
SMW-03C86 (84)
SMW-06C53 (51)
AW-04C37 (39)
SMW-01C34 (35)
SMW-04C36 (32)
SMW-05C79 (76)
AW-03C96 (98)
MW-15D41 (42)
MW-16D40 (41)
MW-20D51 (49)
AW-08C40 (37)
MW-37C8 (39)
MW-1182 (NS)
MW-21C66 (NS)
MW-22C95 (NS)
MW-28C51 (NS)
MW-04B68 (NS)
MW-05C27 (NS)
ABMW-01S594 (585)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR BARIUM IS 700 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-16JUNE 2015 ISOCONCENTRATION MAPBARIUM IN LOWER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(700)(700)
700700
DISSOLVED BARIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL BARIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
7 0 0
7 0 0
7 0 0
2 0 0 0
1 0 0 0
1 0 0 0
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-121470 (1490)
MW-23C2050 (1980)
MW-24C1040 (415)
MW-31C1180 (1190)
MW-07C560 (571)
AW-01C98 (111)
AW-02C< 50 (< 50)
AW-05C69 (65)
MW-32C115 (NS)
MW-33C< 50 (NS)ABMW-02D600 (604)
AW-09C554 (566)
SMW-02C337 (329)
SMW-03C417 (418)
SMW-06C197 (199)
AW-04C1450 (1440)
SMW-01C776 (791)
SMW-04C85 (79)
SMW-05C362 (365)
AW-03C1370 (1430)
MW-15D560 (555)
MW-16D680 (733)
MW-20D305 (313)
AW-08C< 50 (< 50)
MW-37C< 50 (< 50)
MW-11< 50 (NS)
MW-21C2120 (NS)
MW-22C2560 (NS)
MW-28C< 50 (NS)
MW-04B< 50 (NS)
MW-05C< 50 (NS)
ABMW-01S3940 (3950)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR BORON IS 700 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-17JUNE 2015 ISOCONCENTRATION MAPBORON IN LOWER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(700)(700)
700700
DISSOLVED BORON CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL BORON CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
1
1
1
1
1
1
1FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-121.26 (1.21)
MW-23C5.19 (3.79)
MW-24C18.6 (< 1)
MW-31C< 1 (< 1)
MW-07C< 1 (< 1)
AW-01C< 1 (< 1)
AW-02C< 1 (< 1)
AW-05C< 1 (< 1)
MW-32C< 1 (NS)
MW-33C< 1 (NS)ABMW-02D< 1 (< 1)
AW-09C1.13 (1.18)
SMW-02C3.37 (2.85)
SMW-03C9.21 (9.95)
SMW-06C3.65 (3.69)
AW-04C< 1 (< 1)
SMW-01C< 1 (< 1)
SMW-04C< 1 (< 1)
SMW-05C2.6 (2.44)AW-03C6.91 (6.35)
MW-15D13.5 (10.9)
MW-16D5.22 (5.18)
MW-20D< 1 (< 1)
AW-08C1.19 (1.07)
MW-37C< 1 (2.35)
MW-11< 1 (NS)
MW-21C10.6 (NS)
MW-22C4.77 (NS)
MW-28C< 1 (NS)
MW-04B< 1 (NS)
MW-05C1.62 (NS)
ABMW-01S< 1 (< 1)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) FOR COBALT IS 1 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-18JUNE 2015 ISOCONCENTRATION MAPCOBALT IN LOWER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(1)(1)
11
DISSOLVED COBALT CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL COBALT CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
300
3 0 0
300
3
0
0
3 0 0
300
300
300
3000
3 0 0 0
3000
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-125690 (5660)
MW-23C88 (31)
MW-24C4180 (< 10)
MW-31C2850 (2700)
MW-07C166 (< 10)
AW-01C470 (67)
AW-02C7610 (6840)
AW-05C128 (< 10)
MW-32C30 (NS)MW-33C20 (NS)
ABMW-02D1270 (1230)
AW-09C102 (< 10)
SMW-02C5370 (5310)
SMW-03C1510 (1490)
SMW-06C1320 (1310)
AW-04C3990 (4420)
SMW-01C4250 (4210)
SMW-04C9660 (8860)
SMW-05C175 (78)
AW-03C11300 (11700)
MW-15D85 (21)
MW-16D1020 (517)MW-20D864 (324)
AW-08C61 (61)
MW-37C33 (8550)
MW-1148 (NS)
MW-21C5110 (NS)
MW-22C141 (NS)
MW-28C< 10 (NS)
MW-04B1280 (NS)
MW-05C< 10 (NS)
ABMW-01S152 (94)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR IRON IS 300 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-19JUNE 2015 ISOCONCENTRATION MAPIRON IN LOWER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(300)(300)
300300
DISSOLVED IRON CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL IRON CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
50
50
5 0
50
50
50
50
1000
500500
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-12691 (677)
MW-23C309 (280)
MW-24C1120 (37)
MW-31C1680 (1750)
MW-07C368 (343)
AW-01C179 (171)
AW-02C57 (54)
AW-05C21 (20)
MW-32C30 (NS)
MW-33C30 (NS)ABMW-02D150 (150)
AW-09C289 (304)
SMW-02C539 (539)
SMW-03C584 (591)
SMW-06C273 (276)
AW-04C787 (797)
SMW-01C807 (810)
SMW-04C132 (124)
SMW-05C130 (131)
AW-03C1830 (1940)
MW-15D940 (811)
MW-16D311 (345)
MW-20D131 (115)
AW-08C23 (22)
MW-37C6 (249)
MW-1130 (NS)
MW-21C430 (NS)
MW-22C732 (NS)
MW-28C8 (NS)
MW-04B59 (NS)
MW-05C441 (NS)
ABMW-01S88 (88)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR MANGANESE IS 50 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-20JUNE 2015 ISOCONCENTRATION MAPMANGANESE IN LOW ER SURFICIAL W ELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(50)(50)
5050
DISSOLVED MANGANESE CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL MANGANESE CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
8 .5
6 .5
6 .5
6 .5
6.5
6.5
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-128.5
MW-23C6.61
MW-24C5.5
MW-31C5.2
MW-07C5
AW-01C4.8
AW-02C5.9
AW-05C4.7
MW-32C4.97
MW-33C4.6ABMW-02D8.16
AW-09C5.1
SMW-02C5.7
SMW-03C4.9
SMW-06C5
AW-04C6.2
SMW-01C5.5
SMW-04C6.6
SMW-05C4.9
AW-03C5.9
MW-15D6.4
MW-16D5.4
MW-20D7
AW-08C4.4
MW-37C5.7
MW-114.5
MW-21C6.5
MW-22C6.43
MW-28C5.62
MW-04B6.8
MW-05C5.5
ABMW-01S8.97
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L RANGE FOR pH IS 6.5 TO 8.5S.U..
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-21JUNE 2015 ISOCONCENTRATION MAPpH IN LOWER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(8.5)(8.5)
8.58.5
DISSOLVED pH CONCENTRATION (S.U.)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL pH CONCENTRATION1 (S.U.)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
0 .2
0.2
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-12< 0.2 (< 0.2)MW-23C0.21 (< 0.2)
MW-24C< 0.2 (< 0.2)
MW-31C< 0.2 (< 0.2)
MW-07C0.405 (< 0.2)
AW-01C< 0.2 (< 0.2)
AW-02C< 0.2 (< 0.2)
AW-05C< 0.2 (< 0.2)
MW-32C< 0.2 (NS)
MW-33C< 0.2 (NS)ABMW-02D< 0.2 (< 0.2)
AW-09C< 0.2 (< 0.2)
SMW-02C< 0.2 (< 0.2)
SMW-03C< 0.2 (< 0.2)
SMW-06C< 0.2 (< 0.2)
AW-04C< 0.2 (< 0.2)
SMW-01C< 0.2 (< 0.2)
SMW-04C< 0.2 (< 0.2)
SMW-05C< 0.2 (0.26)
AW-03C< 0.2 (< 0.2)
MW-15D< 0.2 (< 0.2)
MW-16D< 0.2 (< 0.2)
MW-20D< 0.2 (< 0.2)
AW-08C< 0.2 (< 0.2)
MW-37C< 0.2 (< 0.2)
MW-11< 0.2 (NS)
MW-21C< 0.2 (NS)
MW-22C0.398 (NS)
MW-28C< 0.2 (NS)
MW-04B< 0.2 (NS)
MW-05C< 0.2 (NS)
ABMW-01S< 0.2 (< 0.2)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) THALLIUM IS 0.2 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-22JUNE 2015 ISOCONCENTRATION MAPTHALLIUM IN LOWER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(0.2)(0.2)
0.20.2
DISSOLVED THALLIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL THALLIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
5 0 0
FORMER ASHDISPOSAL AREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-12410
MW-23C280
MW-24C500
MW-31C540
MW-07C200
AW-01C84
AW-02C38
AW-05C40
MW-32C31
MW-33C30ABMW-02D300
AW-09C190
SMW-02C130
SMW-03C190
SMW-06C110
AW-04C310
SMW-01C340
SMW-04C110
SMW-05C120
AW-03C510
MW-15D430
MW-16D350
MW-20D340
AW-08C30
MW-37C81
MW-11< 25
MW-21C420
MW-22C440
MW-28C26
MW-04B210
MW-05C69
ABMW-01S680
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR TOTAL DISSOLVEDSOLIDS IS 500 mg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-23JUNE 2015 ISOCONCENTRATION MAPTOTAL DISSOLVED SOLIDS IN LO WER SURFICIAL W EL LSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
500500
LEGEND
TOTAL DISSOLVED SOLIDS CONCENTRATION1 (mg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
0.3
0 .3
0 .3
0 .3
0 .3
3
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
MW-12< 0.3 (< 0.3)
MW-23C0.323 (< 0.3)
MW-24C0.543 (0.366)
MW-07C0.573 (< 0.3)
AW-01C< 0.3 (< 0.3)
AW-02C< 0.3 (< 0.3)
AW-05C< 0.3 (< 0.3)
ABMW-02D< 0.3 (0.504)
AW-09C< 0.3 (< 0.3)
SMW-02C< 0.3 (< 0.3)
SMW-03C< 0.3 (0.424)
SMW-06C< 0.3 (< 0.3)
MW-31C< 0.3 (0.316)
AW-04C0.518 (0.394)
SMW-01C0.402 (< 0.3)
SMW-04C0.803 (0.328)
SMW-05C< 0.3 (< 0.3)
AW-03C0.75 (0.596)
MW-15D< 0.3 (< 0.3)
MW-16D2.09 (0.534)
MW-20D< 0.3 (< 0.3)
AW-08C< 0.3 (< 0.3)
MW-37C1.22 (0.795)
ABMW-01S3.45 (2.87)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) FOR VANADIUM IS 0.3 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-24JUNE 2015 ISOCONCENTRATION MAPVANADIUM IN LOWER SURFICIAL WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(0.3)(0.3)
0.30.3
DISSOLVED VANADIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL VANADIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-02D< 1 (< 1)
AW-06D1.57 (2.14)
SMW-06D3.76 (3.82)
AW-05D1.36 (1.32)
AW-09D< 1 (< 1)
AW-07D< 1 (< 1)
PZ-10D< 1 (< 1)
ABMW-01D1.03 (< 1)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR ARSENIC IS 10 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-25JUNE 2015 ISOCONCENTRATION MAPARSENIC IN UPPER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(10)(10)
1010
DISSOLVED ARSENIC CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL ARSENIC CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-02D12 (11)
AW-06D16 (15)
SMW-06D15 (14)
AW-05D9 (8)
AW-09D7 (8)
AW-07D< 5 (< 5)
PZ-10D55 (53)
ABMW-01D17 (16)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR BARIUM IS 700 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-26JUNE 2015 ISOCONCENTRATION MAPBARIUM IN UPPER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(700)(700)
700700
DISSOLVED BARIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL BARIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
700
7 0 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-02D666 (652)
AW-06D980 (934)
SMW-06D990 (987)
AW-05D306 (301)
AW-09D581 (590)
AW-07D815 (804)
PZ-10D368 (363)
ABMW-01D167 (176)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR BORON IS 700 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-27JUNE 2015 ISOCONCENTRATION MAPBORON IN UPPER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(700)(700)
700700
DISSOLVED BORON CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL BORON CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-02D< 1 (< 1)
AW-06D< 1 (< 1)
SMW-06D< 1 (< 1)
AW-05D< 1 (< 1)
AW-09D< 1 (< 1)
AW-07D< 1 (< 1)
PZ-10D< 1 (< 1)
ABMW-01D< 1 (< 1)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) COBALT IS 1 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-28JUNE 2015 ISOCONCENTRATION MAPCOBALT IN UPPER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(1)(1)
11
DISSOLVED COBALT CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL COBALT CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
3 0 0
3 0 0
3 0 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-02D438 (174)
AW-06D102 (13)
SMW-06D300 (58)
AW-05D298 (27)
AW-09D194 (62)
AW-07D220 (33)
PZ-10D347 (244)
ABMW-01D475 (42)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR IRON IS 300 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-29JUNE 2015 ISOCONCENTRATION MAPIRON IN UPPER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(300)(300)
300300
DISSOLVED IRON CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL IRON CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
50
5 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-02D59 (56)
AW-06D18 (16)
SMW-06D37 (31)
AW-05D38 (37)
AW-09D40 (39)
AW-07D14 (13)
PZ-10D53 (52)
ABMW-01D82 (79)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR MANGANESE IS 50 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-30JUNE 2015 ISOCONCENTRATION MAPMANGANESE IN UPPER PEE DEE W ELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(50)(50)
5050
DISSOLVED MANGANESE CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL MANGANESE CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
8.5
8.5
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-02D8
AW-06D8.2
SMW-06D9.8
AW-05D8.4
AW-09D8.2
AW-07D9.97
PZ-10D7.7
ABMW-01D7.8
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L RANGE FOR pH IS 6.5 TO 8.5S.U..
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-31JUNE 2015 ISOCONCENTRATION MAPpH IN UPPER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(8.5)(8.5)
8.58.5
DISSOLVED pH CONCENTRATION (S.U.)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL pH CONCENTRATION1 (S.U.)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-02D< 0.2 (< 0.2)
AW-06D< 0.2 (< 0.2)
SMW-06D< 0.2 (< 0.2)
AW-05D< 0.2 (< 0.2)
AW-09D< 0.2 (< 0.2)
AW-07D< 0.2 (< 0.2)
PZ-10D< 0.2 (< 0.2)
ABMW-01D< 0.2 (< 0.2)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) THALLIUM IS 0.2 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-32JUNE 2015 ISOCONCENTRATION MAPTHALIUM IN UPPER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(0.2)(0.2)
0.20.2
DISSOLVED THALIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL THALIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
500
5 0 0
5 0 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-02D510
AW-06D720
SMW-06D670
AW-05D330
AW-09D630
AW-07D510
PZ-10D380
ABMW-01D350
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR TOTAL DISSOLVEDSOLIDS IS 500 mg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-33JUNE 2015 ISOCONCENTRATION MAPTOTAL DISSOLVED SOLIDS IN UPPER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
500500
LEGEND
TOTAL DISSOLVED SOLIDS CONCENTRATION1 (mg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
0 .3
0.3
0
.
3
0
.
3
0.9
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-02D< 0.3 (< 0.3)
AW-06D< 0.3 (0.38)
SMW-06D1.61 (1.19)
AW-05D< 0.3 (< 0.3)
AW-09D< 0.3 (< 0.3)
AW-07D0.992 (0.626)
PZ-10D0.397 (< 0.3)
ABMW-01D0.642 (0.38)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) FOR VANADIUM IS 0.3 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-34JUNE 2015 ISOCONCENTRATION MAPVANADIUM IN UPPER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(0.3)(0.3)
0.30.3
DISSOLVED VANADIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL VANADIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-05E1.37 (1.24)
MW-23E< 1 (< 1)
AW-06E< 1 (< 1)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR ARSENIC IS 10 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-35JUNE 2015 ISOCONCENTRATION MAPARSENIC IN LOWER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(10)(10)
1010
DISSOLVED ARSENIC CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL ARSENIC CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-05E8 (9)
MW-23E< 5 (< 5)
AW-06E8 (5)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR BARIUM IS 700 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-36JUNE 2015 ISOCONCENTRATION MAPBARIUM IN LO WER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(700)(700)
700700
DISSOLVED BARIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL BARIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
700
7 0 0
2000
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-05E1950 (1920)
MW-23E2500 (2420)
AW-06E2470 (2490)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR BORON IS 700 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-37JUNE 2015 ISOCONCENTRATION MAPBORON IN LOWER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(700)(700)
700700
DISSOLVED BORON CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL BORON CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-05E< 1 (< 1)
MW-23E< 1 (< 1)
AW-06E< 1 (< 1)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) COBALT IS 1 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-38JUNE 2015 ISOCONCENTRATION MAPCOBALT IN LOWER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(1)(1)
11
DISSOLVED COBALT CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL COBALT CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-05E276 (66)
MW-23E48 (< 10)
AW-06E704 (< 10)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR IRON IS 300 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-39JUNE 2015 ISOCONCENTRATION MAPIRON IN L OWER PEE DEE WELL SL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(300)(300)
300300
DISSOLVED IRON CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL IRON CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-05E9 (7)
MW-23E5 (< 5)
AW-06E24 (16)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR MANGANESE IS 50 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEMFIPS 3200 (NAD83/2011).
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-40JUNE 2015 ISOCONCENTRATION MAPMANGANESE IN LOW ER PEE DEE W EL LSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(50)(50)
5050
DISSOLVED MANGANESE CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL MANGANESE CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
8 .5
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-05E8.7
MW-23E10
AW-06E8.1
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L RANGE FOR pH IS 6.5 TO 8.5S.U..
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-41JUNE 2015 ISOCONCENTRATION MAPpH IN LOWER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(8.5)(8.5)
8.58.5
DISSOLVED pH CONCENTRATION (S.U.)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL pH CONCENTRATION1 (S.U.)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-05E< 0.2 (< 0.2)
MW-23E< 0.2 (< 0.2)
AW-06E< 0.2 (< 0.2)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) THALLIUM IS 0.2 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-42JUNE 2015 ISOCONCENTRATION MAPTHALLIUM IN LOWER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(0.2)(0.2)
0.20.2
DISSOLVED THALLIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL THALLIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
500
5 0 0
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-05E1500
MW-23E1500
AW-06E1500
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE NORTH CAROLINA 2L FOR TOTAL DISSOLVEDSOLIDS IS 500 mg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-43JUNE 2015 ISOCONCENTRATION MAPTOTAL DISSOLVED SOLIDS IN LOWER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
500500
LEGEND
TOTAL DISSOLVED SOLIDS CONCENTRATION1 (mg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA 2L CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)
C A P E F E A R RIVER
U
S-421
S
R-2
1
6
9
P R J -I -1 4 0
SR-1394
S R -2 7 7 9
S R -2 1 4 5
PRJ-I-140
P R J -I -1 4 0
0.3
FORMER ASHDISPOSALAREA
1984 ASHBASIN(LINED)
NEW ASHBASIN AREA(LINED)
1971 ASHBASIN
AW-05E< 0.3 (< 0.3)
MW-23E0.993 (1.16)
AW-06E1.77 (0.711)
COOLINGPOND
COOLINGPOND
COOLINGPOND
COOLINGPOND
CAPE FEARRIVER
DRAINAGECHANNEL
COOLINGPOND
COOLINGPOND
COOLINGPOND
GRAPHIC SCALE
500 0 500 1,000 1,500
(IN FEET)
NOTES:1 CONCENTRATIONS ARE FROM THE JUNE 2015SAMPLING EVENT.
2 THE INTERIM MAXIMUM ALLOWABLE CONCENTRATION(IMAC) FOR VANADIUM IS 0.3 μg/L.
3 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL17, 2014. IT WAS OBTAINED FROM WSP.
4 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY ISDATED 2012. IT WAS OBTAINED FROM THE NC CENTERFOR GEOGRAPHIC INFORMATION AND ANALYSIS.(http://services.nconemap.gov/)
5 PARCEL BOUNDARY WAS OBTAINEDFROM THE NCCENTER FOR GEOGRAPHIC INFORMATION ANDANALYSIS. (http://services.nconemap.gov/)
6 DRAWING HAS BEEN SET WITH A PROJECTION OFNORTH CAROLINA STATE PLANE COORDINATE SYSTEM
P:\D uke E nergy P rogress.1026\00 GIS B AS E DATA \Sutton\Map_Docs\D raft_CS A_v07152015\Figure 10-5 to 10-44 - Isoconcentration Maps_v20150801.mxd
PROJECT MANAGER: P. WALDREP
DRAWN BY: T. KING
DATE: 07/31/2015
DATE: 07/31/2015
CHECKED BY: J. MEADOWS
FIG URE 10-44JUNE 2015 ISOCONCENTRATION MAPVANADIUM IN LOWER PEE DEE WELLSL. V. SUTTON ENERGY COMPLEX801 SUTTON STEAM PLANT RDWILMINGTON, NORTH CAROLINA
148 RIVER STREET, SUITE 220GREENVILLE, SC 29601864-421-9999www.synterracorp.com
ASH BASIN BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT SITE BOUNDARY
(0.3)(0.3)
0.30.3
DISSOLVED VANADIUM CONCENTRATION (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
LEGEND
TOTAL VANADIUM CONCENTRATION1 (μg/L)BOLD VALUES INDICATE AN EXCEEDANCE2.
ISOCONCENTRATION CONTOUR (DASHED WHERE ESTIMATED)
NORTH CAROLINA IMAC CONTOUR1 (DASHED WHERE ESTIMATED)(HASH MARKS INDICATE DIRECTION OF LOWER CONCENTRATIONS)