Loading...
HomeMy WebLinkAboutNC0001422_Figure H-9 T v. C - MW-24B, MW-27B, MW-28B_20150805148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: J. GILMER PROJECT MANAGER: P. WALDREP LAYOUT: DATE: JUNE 2015 P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\Stats Figures\Boxplots FIGURE H-9 TIME VERSUS CONCENTRATION AND ORP MW-24B, MW-27B, MW-28B L.V. SUTTON ENERGY COMPLEX 801 SUTTON STEAM PLANT ROAD WILMINGTON, NORTH CAROLINA 28401 -50 0 50 100 150 200 250 300 1 10 100 1000 10000 100000 1000000 10/3/2011 7/29/2012 5/25/2013 3/21/2014 1/15/2015 Ox i d a t i o n -Re d u c t i o n Po t e n t i a l ( m V ) Co n c e n t r a t i o n ( µ g / L ) Sampling Date Oxidation-Reduction Potential Iron Manganese Sulfate TDS 0 50 100 150 200 250 300 350 400 1 10 100 1000 10000 100000 1000000 10/3/2011 7/29/2012 5/25/2013 3/21/2014 1/15/2015 Ox i d a t i o n -Re d u c t i o n Po t e n t i a l ( m V ) Co n c e n t r a t i o n ( µ g / L ) Sampling Date Oxidation-Reduction Potential Iron Manganese Sulfate TDS 0 50 100 150 200 250 300 1 10 100 1000 10000 100000 1000000 10/3/2011 7/29/2012 5/25/2013 3/21/2014 1/15/2015 Ox i d a t i o n -Re d u c t i o n Po t e n t i a l ( m V ) Co n c e n t r a t i o n ( µ g / L ) Sampling Date Oxidation-Reduction Potential Iron Manganese Sulfate TDS MW-24B MW-27B MW-28B