Loading...
HomeMy WebLinkAboutNC0001422_Figure H-6 T v. C - Sulfate_20150805148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: J. GILMER PROJECT MANAGER: P. WALDREP LAYOUT: DATE: JUNE 2015 P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\Stats Figures\Boxplots FIGURE H-6 TIME VERSUS CONCENTRATION – COMPARISON BETWEEN COMPLIANCE AND BACKGROUND WELLS SULFATE L.V. SUTTON ENERGY COMPLEX 801 SUTTON STEAM PLANT ROAD WILMINGTON, NORTH CAROLINA 28401 1 10 100 1000 10/4/2011 7/30/2012 5/26/2013 3/22/2014 1/16/2015 Su l f a t e ( m g / L ) Sampling Date 15 NCAC 02L Standard MW-5C MW-7C MW-21C MW-22C MW-23C MW-24C MW-28C MW-31C 1 10 100 1000 9/29/2011 7/25/2012 5/21/2013 3/17/2014 1/11/2015 Su l f a t e ( m g / L ) Sampling Date 15 NCAC 02L Standard MW-4B MW-22B MW-23B MW-24B MW-27B MW-28B 1 10 100 1000 5/31/2012 2/5/2013 10/13/2013 6/20/2014 2/25/2015 Su l f a t e ( m g / L ) Sampling Date 15 NCAC 02L Standard MW-11 MW-12 MW-19 (Background) (Background)