HomeMy WebLinkAboutNC0001422_Figure H-2 T v. C - Boron_20150805148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
www.synterracorp.com
DRAWN BY: J. GILMER
PROJECT MANAGER: P. WALDREP
LAYOUT:
DATE: JUNE 2015
P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW
Assessment Plan\1.11 CSA Reporting\FIGURES\Stats
Figures\Boxplots
FIGURE H-2
TIME VERSUS CONCENTRATION – COMPARISON
BETWEEN COMPLIANCE AND BACKGROUND WELLS
BORON
L.V. SUTTON ENERGY COMPLEX
801 SUTTON STEAM PLANT ROAD
WILMINGTON, NORTH CAROLINA 28401
0
500
1000
1500
2000
2500
3000
3500
4000
10/3/2011 7/29/2012 5/25/2013 3/21/2014 1/15/2015
Bo
r
o
n
(
µ
g
/
L
)
Sampling Date
15 NCAC 02L Standard
MW-5C
MW-7C
MW-21C
MW-22C
MW-23C
MW-24C
MW-28C
MW-31C
0
200
400
600
800
1000
1200
1400
1600
1800
2000
10/4/2011 7/30/2012 5/26/2013 3/22/2014 1/16/2015
Bo
r
o
n
(
µ
g
/
L
)
Sampling Date
15 NCAC 02L Standard
MW-4B
MW-22B
MW-23B
MW-24B
MW-27B
MW-28B
0
500
1000
1500
2000
2500
3/2/2012 12/27/2012 10/23/2013 8/19/2014 6/15/2015
Bo
r
o
n
(
µ
g
/
L
)
Sampling Date
15 NCAC 02L Standard
MW-11
MW-12
MW-19
(Background)
(Background)