Loading...
HomeMy WebLinkAboutNC0001422_Figure H-1 T v. C - Barium_201508051 10 100 1000 9/28/2012 6/5/2013 2/10/2014 10/18/2014 6/25/2015 Ba r i u m ( µ g / L ) Sampling Date 15 NCAC 02L Standard MW-5C MW-7C MW-21C MW-22C MW-23C MW-24C MW-28C MW-31C 1 10 100 1000 10/4/2011 6/10/2012 2/15/2013 10/23/2013 6/30/2014 3/7/2015 Ba r i u m ( µ g / L ) Sampling Date 15 NCAC 02L Standard MW-4B MW-22B MW-23B MW-24B MW-27B MW-28B 1 10 100 1000 3/2/2012 12/27/2012 10/23/2013 8/19/2014 6/15/2015 Ba r i u m ( µ g / L ) Sampling Date 15 NCAC 02L Standard MW-11 MW-12 MW-19 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: J. GILMER PROJECT MANAGER: P. WALDREP LAYOUT: DATE: JUNE 2015 P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\Stats Figures\Boxplots FIGURE H-1 TIME VERSUS CONCENTRATION – COMPARISON BETWEEN COMPLIANCE AND BACKGROUND WELLS BARIUM L.V. SUTTON ENERGY COMPLEX 801 SUTTON STEAM PLANT ROAD WILMINGTON, NORTH CAROLINA 28401 (Background) (Background)