Loading...
HomeMy WebLinkAboutNC0001422_Apx D-3 Equipment Blank (Dissolved) Anaytical Results_20150805APPENDIX D-3 2015 EQUIPMENT BLANK ANALYTICAL RESULTS (DISSOLVED) L.V. SUTTON ENERGY COMPLEX DUKE ENERGY PROGRESS, INC., WILMINGTON, NC P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\Tables\Report Tables\Appendix D-3 Equipment Blank (Dissolved) Anaytical Results Page 1 of 2 Aluminum Antimony Arsenic Barium Beryllium Boron Cadmium Chromium Cobalt Copper Iron Lead ug/l ug/l ug/l ug/l ug/l ug/l ug/l ug/l ug/l mg/l ug/l ug/l Sample ID Sample Collection Date Filter Blank 02/03/2015 <5 <1 <1 <5 <1 <50 <1 <1 <1 <0.001 <10 <1 Filter Blank 02/05/2015 <5 <1 <1 <5 <1 <50 <1 <1 <1 <0.001 <10 <1 Filter Blank 03/24/2015 <5 <1 <1 <5 <1 <50 <1 <1 <1 <0.001 <10 <1 Filter Blank 03/25/2015 <5 <1 <1 <5 <1 <50 <1 <1 <1 <0.001 <10 <1 Filter Blank 03/26/2015 <5 <1 <1 <5 <1 <50 <1 <1 <1 <0.001 <10 <1 Filter Blank 03/27/2015 <5 <1 <1 <5 <1 <50 <1 <1 <1 <0.001 <10 <1 Filter Blank 04/27/2015 <5 <1 <1 <5 <1 <50 <1 <1 <1 <0.001 <10 <1 Filter Blank 04/28/2015 <5 <1 <1 <5 <1 <50 <1 <1 <1 <0.001 <10 <1 Filter Blank 04/29/2015 <5 <1 <1 <5 <1 <50 <1 <1 <1 <0.001 <10 <1 Filter Blank 05/18/2015 <5 <1 <1 <5 <1 <50 <1 <1 <1 <0.001 <10 <1 Filter Blank 05/19/2015 <5 <1 <1 <5 <1 <50 <1 <1 <1 <0.001 <10 <1 Filter Blank 05/26/2015 <5 <1 <1 <5 <1 <50 <1 <1 <1 <0.001 <10 <1 Filter Blank 06/03/2015 <5 <1 <1 <5 <1 <50 <1 <1 <1 <0.001 <10 <1 Filter Blank 06/04/2015 <5 <1 <1 <5 <1 <50 <1 <1 <1 <0.001 <10 <1 Filter Blank 06/05/2015 <5 <1 <1 <5 <1 <50 <1 <1 <1 0.00209 <10 <1 Filter Blank 06/10/2015 <5 <1 <1 <5 <1 <50 <1 <1 <1 0.00546 <10 <1 Filter Blank 06/11/2015 <5 <1 <1 <5 <1 <50 <1 <1 <1 <0.001 <10 <1 Filter Blank 06/17/2015 <5 <1 <1 <5 <1 <50 <1 <1 <1 <0.001 <10 <1 Notes: mg/l = milligrams per liter ug/l = microgram per liter NE = Not established < = concentration not detected at or above the reporting limit. Reporting Units Analytical Result Analytical Parameter APPENDIX D-3 2015 EQUIPMENT BLANK ANALYTICAL RESULTS (DISSOLVED) L.V. SUTTON ENERGY COMPLEX DUKE ENERGY PROGRESS, INC., WILMINGTON, NC P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\Tables\Report Tables\Appendix D-3 Equipment Blank (Dissolved) Anaytical Results Page 2 of 2 Manganese Mercury Molybdenum Nickel Selenium Strontium Thallium Vanadium Zinc ug/l ug/l ug/l ug/l ug/l mg/l ug/l ug/l mg/l <5 <0.05 <1 <1 <1 <0.005 <0.2 <0.3 <0.005 <5 <0.05 <1 <1 <1 <0.005 <0.2 <0.3 <0.005 <5 <0.05 <1 <1 <1 <0.005 <0.2 <0.3 <0.005 <5 <0.05 <1 <1 <1 <0.005 <0.2 <0.3 <0.005 <5 <0.05 <1 <1 <1 <0.005 <0.2 <0.3 <0.005 <5 <0.05 <1 <1 <1 <0.005 <0.2 <0.3 <0.005 <5 <0.05 <1 <1 <1 <0.005 <0.2 <0.3 <0.005 <5 <0.05 <1 <1 <1 <0.005 <0.2 <0.3 <0.005 <5 <0.05 <1 <1 <1 <0.005 <0.2 <0.3 0.013 <5 <0.05 <1 <1 <1 <0.005 <0.2 <0.3 <0.005 <5 <0.05 <1 <1 <1 <0.005 <0.2 <0.3 0.005 <5 <0.05 <1 <1 <1 <0.005 <0.2 <0.3 0.006 <5 <0.05 <1 <1 <1 <0.005 <0.2 <0.3 <0.005 <5 <0.05 <1 <1 <1 <0.005 <0.2 <0.3 <0.005 <5 <0.05 <1 <1 <1 <0.005 <0.2 <0.3 <0.005 <5 <0.05 <1 <1 <1 <0.005 <0.2 <0.3 0.005 <5 <0.05 <1 <1 <1 <0.005 <0.2 <0.3 <0.005 <5 <0.05 <1 <1 <1 <0.005 <0.2 <0.3 <0.005 Prepared by: BER/KLS Checked by: SRW ts