HomeMy WebLinkAboutNC0001422_FIGURE B-1 SUTTON DRINKING WATER SUPPLY_20150805INVISTA 1
INVISTA 2
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W W W W W W W W W
IN
T
E
R
S
T
A
T
E
1
4
0
(
U
S
H
I
G
H
W
A
Y
1
7
)
N
C
H
I
G
H
W
A
Y
4
2
1
R
A
I
L
R
O
A
D
FORMER FLEMINGTON
LANDFILL SUPERFUND
SITE CLOSED IN-PLACE
MW-4B
0H2
H2
INVISTA 3
EDR
B=B9,B10
EDR 16
EDR 1
EDR 2
EDR 4
EDR 6
EDR 7
EDR C12
EDR 13
EDR C14
EDR 17
EDR 19
INVISTA 4
INVISTA 5
INVISTA 6
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
G
EDR 3
PE-SW2
PE-SW4
PE-SW3
PE-SW5 PE-SW6A
PE-SW6B
PE-SW6D
PE-SW6E
EDR 11
EDR 5
NC WILDLIFE
LAKE ACCESS
OLD ASH
BASIN AREA
NEW ASH
BASIN AREA
FORMER ASH
DISPOSAL AREA
FORMER ASH
DISPOSAL AREA
CA
N
A
L
C
A
N
A
L
AST CONCRETE
PAD
CAPE FEAR RIVER
SUTTON LAK
E
R
D
RAILROAD
SUT
T
O
N
L
A
K
E
R
D
SOLAR
FARM
SUTTON STEA
M
P
L
A
N
T
R
D
TRA
N
S
C
O
M
C
T
ROYMAC
D
R
F
R
E
D
R
I
C
K
S
O
N
R
D
C
A
N
A
L
ACCESS ROAD
NHC-SW4
NHC-SW3
NHC-SW2
(NOT IN USE)
MET
R
O
C
I
R
F
R
E
D
R
I
C
K
S
O
N
R
D
N
C
H
I
G
H
W
A
Y
4
2
1
R
A
I
L
R
O
A
D
R
A
I
L
R
O
A
D
NHC-SW1
(ABANDONED)
S.T. WOOTEN
CFPUA
MW
-
3
3
C
MW-32C
MW-27B
MW-31C
MW-24CMW-24B
MW-23CMW-23B
MW-22CMW-22B
MW-19
MW-21C
MW-28B
MW-28C
MW-7C
MW-11
MW-12
FLEMINGTON
TANK
PRW-2
PRW-3
PRW-7
PRW-4
PRW-5
PRW-6
DW-4
DW-5
DW-6
DW-7 DW-8
DW-9
DW-10
DW-11
DW
-
1
2
D
W
-
1
3
DW-15
(PRW-1)
DW-16
DW-14
S18
2014-11-06
2014-11-06H. FRANK
J. CHASTAIN
PROJECT MANAGER:
LAYOUT NAME:
DRAWN BY:
CHECKED BY:
KATHY WEBB
DATE:
DATE:
FIGURE B1
DRINKING WATER WELL AND
RECEPTOR SURVEY
UPDATED JULY 2015
8/
2
/
2
0
1
5
3
:
0
2
P
M
P:
\
D
u
k
e
E
n
e
r
g
y
P
r
o
g
r
e
s
s
.
1
0
2
6
\
1
0
8
.
S
u
t
t
o
n
A
s
h
B
a
s
i
n
G
W
A
s
s
e
s
s
m
e
n
t
P
l
a
n
\
1
.
1
1
C
S
A
R
e
p
o
r
t
i
n
g
\
F
I
G
U
R
E
S
\
S
U
T
T
O
N
-
F
I
G
U
R
E
B
-
1
D
R
I
N
K
I
N
G
W
A
T
E
R
S
U
P
P
L
Y
.
d
w
g
FIG 1 (D WATER SUPPLY WELL & REC SURVEY)
1600
GRAPHIC SCALE
(IN FEET)
0 800400800
www.synterracorp.com
148 River Street, Suite 220
Greenville, South Carolina 29601
864-421-9999
L.V. SUTTON ENERGY COMPLEX
801 SUTTON STEAM PLANT RD
WILMINGTON, NORTH CAROLINA
POTENTIAL AREA OF INTEREST
(APPROXIMATE )
LEGEND
BACKGROUND MONITORING WELL (SURVEYED)
COMPLINACE MONITORING WELL (SURVEYED)
500 ft COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS SUTTON PLANT
WASTE BOUNDARY
HALF MILE SURVEY BOUNDARY
MW-27B
GENERALIZED GROUNDWATER FLOW
DIRECTION
x SUPPORTED BY GROUNDWATER ELEVATION DATA
OR TOPOGRAPHIC DATA
PRW-1
DW-1
POSSIBLE WATER SUPPLY WELL
REPORTED/OBSERVED WATER SUPPLY WELL
EDR 3 EDR REPORTED SUPPLY WELL (APPROXIMATE)
PARCEL LINE (NEW HANOVER CO GIS )
MW-4B
NEW HANOVER COUNTY WATERLINE
(APPROXIMATE )W W
DUKE ENERGY PROGRESS PRODUCTION
WELL (APPROXIMATE)PE-SW2
NHC-SW4 CFPUA PRODUCTION WELL (APPROXIMATE )
0H2 INVISTA REPORTED PRODUCTION WELL
LOCATION
DUKE ENERGY PROGRESS
PRODUCTION WELL (SURVEYED)PE-SW2
MONITORING WELL (SURVEYED)MW-32C
2007 LiDAR CONTOUR MAJOR
2007 LiDAR CONTOUR MINOR
20
DW-1 WATER SUPPLY WELL OR SPRING REPORTED
BY PROPERTY OWNER
COOLING
POND
COOLING
POND
COOLING
POND
APPROXIMATE ROUTE OF
THE NEW WILMINGTON
BYPASS (I-140)
N
C
H
I
G
H
W
A
Y
4
2
1
FLE
M
M
I
N
G
S
T
F
L
E
M
M
I
N
G
D
R
SAM
P
S
O
N
S
T
CLINTON ST
HALES LN
R
A
I
L
R
O
A
D
SAMPSON ST
INVISTA
MW-5C
PROPOSED WATERLINE
RIVER CROSSING TIE-IN
PROPOSED WATERLINE
RIVER CROSSING
DW-1
DW-2
DW-3
SOURCES:
1.2014 AERIAL PHOTOGRAPH WAS OBTAINED FROM WSP FLOWN ON
APRIL 17, 2014
2.2013 AERIAL PHOTOGRAPH WAS OBTAINED FROM THE NRCS GEOSPATIAL DATA
GATEWAY AT http://datagateway.nrcs.usda.gov/
3.DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE
PLANE COORDINATE SYSTEM FIPS 3200 (NAD 83).
4.PARCEL DATA WAS OBTAINED FROM THE NORTH CAROLINA STATE LIBRARIES AT
http://www.lib.ncsu.edu/gis/counties.html FOR NEW HANOVER COUNTY.
5.2ft CONTOUR INTERVALS FROM NCDOT LIDAR DATED 2007
https://connect.ncdot.gov/resources/gis/pages/cont-elev_v2.aspx
6.WELL LOCATIONS AND MEASURING POINTS WERE BASED ON A SURVEY BY
JAMES L. HAINES & ASSOCIATES FOR ISH, INC. DATED DECEMBER 23, 2008.
ISH DRAWING IS TITLED "POTENTIAL LOCATIONS FOR PROPOSED GEOPROBE
AND WELL INSTALLATIONS", DATED FEBRUARY 25, 2009 WITH A CAD FILE NAME
FIGURE 22.DWG
7.NEW WELL LOCATIONS AND MEASURING POINTS WERE BASED ON A TABLE BY
PARAMOUNTE ENGINEERING, WILMINGTON NC DATED 2012-03-05 SUPPLIED
BY PROGRESS ENERGY. HORIZONTAL DATUM IS NAD83(NSRS2007) AND THE
VERTICAL DATUM IS NGVD29.
8.THE PROPERTY BOUNDARY FOR THE L.V. SUTTON STEAM ELECTRIC PLANT WAS
BASED ON A COMPOSITE MAP PREPARED BY DAVIS-MARTIN-POWELL & ASSOC.,
INC. THE DRAWINGS ARE DATED JUNE, 1995 WITH REVISION NOTE FOR MARCH
4, 2004. FILE NAME IS L-D-9022-7.DWG. HORIZONTAL DATUM IS NAD83 AND
THE VERTICAL DATUM IS NGV 29.
9.THE LOCATION OF THE FORMER ASH DISPOSAL AREAS WAS BASED ON A FIGURE
2-2 PREPARED BY BLASLAND, BOUCK & LEE, INC. THE FIGURE IS TITLED
"HORIZONTAL EXTENT OF THE ASH WITHIN THE FORMER DISPOSAL AREA".
NOTE:
1.CONTOUR LINES ARE USED FOR REPRESENTATIVE PURPOSES ONLY AND ARE
NOT TO BE USED FOR DESIGN OR CONSTRUCTION PURPOSES.
2.DISPLAYED WATER SUPPLY WELL OR SPRING LOCATIONS ARE
APPROXIMATE.
S18 WATER SUPPLY WELL SAMPLED AT OWNER'S
REQUEST