Loading...
HomeMy WebLinkAboutNC0001422_FIGURE B-1 SUTTON DRINKING WATER SUPPLY_20150805INVISTA 1 INVISTA 2 W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W IN T E R S T A T E 1 4 0 ( U S H I G H W A Y 1 7 ) N C H I G H W A Y 4 2 1 R A I L R O A D FORMER FLEMINGTON LANDFILL SUPERFUND SITE CLOSED IN-PLACE MW-4B 0H2 H2 INVISTA 3 EDR B=B9,B10 EDR 16 EDR 1 EDR 2 EDR 4 EDR 6 EDR 7 EDR C12 EDR 13 EDR C14 EDR 17 EDR 19 INVISTA 4 INVISTA 5 INVISTA 6 W W W W W W W W W W W W W W W W W W G EDR 3 PE-SW2 PE-SW4 PE-SW3 PE-SW5 PE-SW6A PE-SW6B PE-SW6D PE-SW6E EDR 11 EDR 5 NC WILDLIFE LAKE ACCESS OLD ASH BASIN AREA NEW ASH BASIN AREA FORMER ASH DISPOSAL AREA FORMER ASH DISPOSAL AREA CA N A L C A N A L AST CONCRETE PAD CAPE FEAR RIVER SUTTON LAK E R D RAILROAD SUT T O N L A K E R D SOLAR FARM SUTTON STEA M P L A N T R D TRA N S C O M C T ROYMAC D R F R E D R I C K S O N R D C A N A L ACCESS ROAD NHC-SW4 NHC-SW3 NHC-SW2 (NOT IN USE) MET R O C I R F R E D R I C K S O N R D N C H I G H W A Y 4 2 1 R A I L R O A D R A I L R O A D NHC-SW1 (ABANDONED) S.T. WOOTEN CFPUA MW - 3 3 C MW-32C MW-27B MW-31C MW-24CMW-24B MW-23CMW-23B MW-22CMW-22B MW-19 MW-21C MW-28B MW-28C MW-7C MW-11 MW-12 FLEMINGTON TANK PRW-2 PRW-3 PRW-7 PRW-4 PRW-5 PRW-6 DW-4 DW-5 DW-6 DW-7 DW-8 DW-9 DW-10 DW-11 DW - 1 2 D W - 1 3 DW-15 (PRW-1) DW-16 DW-14 S18 2014-11-06 2014-11-06H. FRANK J. CHASTAIN PROJECT MANAGER: LAYOUT NAME: DRAWN BY: CHECKED BY: KATHY WEBB DATE: DATE: FIGURE B1 DRINKING WATER WELL AND RECEPTOR SURVEY UPDATED JULY 2015 8/ 2 / 2 0 1 5 3 : 0 2 P M P: \ D u k e E n e r g y P r o g r e s s . 1 0 2 6 \ 1 0 8 . S u t t o n A s h B a s i n G W A s s e s s m e n t P l a n \ 1 . 1 1 C S A R e p o r t i n g \ F I G U R E S \ S U T T O N - F I G U R E B - 1 D R I N K I N G W A T E R S U P P L Y . d w g FIG 1 (D WATER SUPPLY WELL & REC SURVEY) 1600 GRAPHIC SCALE (IN FEET) 0 800400800 www.synterracorp.com 148 River Street, Suite 220 Greenville, South Carolina 29601 864-421-9999 L.V. SUTTON ENERGY COMPLEX 801 SUTTON STEAM PLANT RD WILMINGTON, NORTH CAROLINA POTENTIAL AREA OF INTEREST (APPROXIMATE ) LEGEND BACKGROUND MONITORING WELL (SURVEYED) COMPLINACE MONITORING WELL (SURVEYED) 500 ft COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT WASTE BOUNDARY HALF MILE SURVEY BOUNDARY MW-27B GENERALIZED GROUNDWATER FLOW DIRECTION x SUPPORTED BY GROUNDWATER ELEVATION DATA OR TOPOGRAPHIC DATA PRW-1 DW-1 POSSIBLE WATER SUPPLY WELL REPORTED/OBSERVED WATER SUPPLY WELL EDR 3 EDR REPORTED SUPPLY WELL (APPROXIMATE) PARCEL LINE (NEW HANOVER CO GIS ) MW-4B NEW HANOVER COUNTY WATERLINE (APPROXIMATE )W W DUKE ENERGY PROGRESS PRODUCTION WELL (APPROXIMATE)PE-SW2 NHC-SW4 CFPUA PRODUCTION WELL (APPROXIMATE ) 0H2 INVISTA REPORTED PRODUCTION WELL LOCATION DUKE ENERGY PROGRESS PRODUCTION WELL (SURVEYED)PE-SW2 MONITORING WELL (SURVEYED)MW-32C 2007 LiDAR CONTOUR MAJOR 2007 LiDAR CONTOUR MINOR 20 DW-1 WATER SUPPLY WELL OR SPRING REPORTED BY PROPERTY OWNER COOLING POND COOLING POND COOLING POND APPROXIMATE ROUTE OF THE NEW WILMINGTON BYPASS (I-140) N C H I G H W A Y 4 2 1 FLE M M I N G S T F L E M M I N G D R SAM P S O N S T CLINTON ST HALES LN R A I L R O A D SAMPSON ST INVISTA MW-5C PROPOSED WATERLINE RIVER CROSSING TIE-IN PROPOSED WATERLINE RIVER CROSSING DW-1 DW-2 DW-3 SOURCES: 1.2014 AERIAL PHOTOGRAPH WAS OBTAINED FROM WSP FLOWN ON APRIL 17, 2014 2.2013 AERIAL PHOTOGRAPH WAS OBTAINED FROM THE NRCS GEOSPATIAL DATA GATEWAY AT http://datagateway.nrcs.usda.gov/ 3.DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD 83). 4.PARCEL DATA WAS OBTAINED FROM THE NORTH CAROLINA STATE LIBRARIES AT http://www.lib.ncsu.edu/gis/counties.html FOR NEW HANOVER COUNTY. 5.2ft CONTOUR INTERVALS FROM NCDOT LIDAR DATED 2007 https://connect.ncdot.gov/resources/gis/pages/cont-elev_v2.aspx 6.WELL LOCATIONS AND MEASURING POINTS WERE BASED ON A SURVEY BY JAMES L. HAINES & ASSOCIATES FOR ISH, INC. DATED DECEMBER 23, 2008. ISH DRAWING IS TITLED "POTENTIAL LOCATIONS FOR PROPOSED GEOPROBE AND WELL INSTALLATIONS", DATED FEBRUARY 25, 2009 WITH A CAD FILE NAME FIGURE 22.DWG 7.NEW WELL LOCATIONS AND MEASURING POINTS WERE BASED ON A TABLE BY PARAMOUNTE ENGINEERING, WILMINGTON NC DATED 2012-03-05 SUPPLIED BY PROGRESS ENERGY. HORIZONTAL DATUM IS NAD83(NSRS2007) AND THE VERTICAL DATUM IS NGVD29. 8.THE PROPERTY BOUNDARY FOR THE L.V. SUTTON STEAM ELECTRIC PLANT WAS BASED ON A COMPOSITE MAP PREPARED BY DAVIS-MARTIN-POWELL & ASSOC., INC. THE DRAWINGS ARE DATED JUNE, 1995 WITH REVISION NOTE FOR MARCH 4, 2004. FILE NAME IS L-D-9022-7.DWG. HORIZONTAL DATUM IS NAD83 AND THE VERTICAL DATUM IS NGV 29. 9.THE LOCATION OF THE FORMER ASH DISPOSAL AREAS WAS BASED ON A FIGURE 2-2 PREPARED BY BLASLAND, BOUCK & LEE, INC. THE FIGURE IS TITLED "HORIZONTAL EXTENT OF THE ASH WITHIN THE FORMER DISPOSAL AREA". NOTE: 1.CONTOUR LINES ARE USED FOR REPRESENTATIVE PURPOSES ONLY AND ARE NOT TO BE USED FOR DESIGN OR CONSTRUCTION PURPOSES. 2.DISPLAYED WATER SUPPLY WELL OR SPRING LOCATIONS ARE APPROXIMATE. S18 WATER SUPPLY WELL SAMPLED AT OWNER'S REQUEST