Loading...
HomeMy WebLinkAboutNC0000396_Offsite Assessment Boring Logs_20150823PROJECT: Asheville Steam Plant WELL / BORING NO: AMW-1 B PROJECT NO: 1026.02.23 STARTED: 6/16/14 COMPLETED: 6/24/14 DRILLING COMPANY: Geologic Exploration NORTHING: 641961.05 EASTING: 944768.25 DRILLING METHOD: DPT/Rock Core/Air Rotary/Air Hammer ELEVATION 2080.53 ft MSL M.P. ELEV: 2083.58 ft MSL BOREHOLE DIAMETER: 6"/10" IN WATER: 40.78 ft TOC TOTAL DEPTH: 64.0 ft BGS NOTES: 2" PVC Slotted Screen and Risers LOGGED BY: T. Plating CHECKED BY: K. Webb a U o DESCRIPTION a O oi p z o f a WELL WW < U) Q W— m O n CONSTRUCTION U U U SM SAND, silty, fill material, dark reddish brown, some 50 gravel, moist. 5 SILT, sandy, light brown, elastic, sand lenses and MH weathered material throughout, dark gray/black organic 50 -6" I.D. PVC Surface layer @ 10' bgs, woody debris. Casing, set at 30' bgs. 10 SAND, silty, light brown, some coarse sand from 10' to ML 12' bgs, some gravel, interbedded sands, beginning to 80 reflect relict structure, wet at 10' bgs, less moist at 12-15' bgs. 15 Cement Grout SILT, sandy, light gray with red mottling, highly ML weathered saprolite, dry at 16' bgs, becoming more i moist to 20' bgs. 20 CH CLAY, brown. light gray with red to brown mottling, highly _ CHCLAY, SM weathered sa rolite SAND, light gray with red to brown mottling, highly 250z weathered saprolite, increased oxidation, poorly grade sand with some silt. RK DPT Refusal at 23' bgs. " MGN: Mica -Gneiss, gray. i 30 —4" Borehole - MGN: Mica -Gneiss, hard, fine to medium grained, closely spaced fractures, quartz, muscovite, biotite, RK plagioclase, mica gneiss / augen gneiss with abundant 94 35 pyrite, horizontal to shallow dipping fractures, notable fresh fractures at 30'6", 314", and 32' bgs._ Cement Grout RK MGN: Mica -Gneiss, hard, fine to medium grained, i closely spaced fractures, quartz, muscovite, biotite, &.1-20- plagioclase, mica gneiss / augen gneiss with abundant 40pyrite, horizontal to shallow dipping fractures, quartz I bearing vein encountered. RK MGN: Mica -Gneiss, hard, fine to medium grained, 95 = closely spaced fractures, quartz, muscovite, biotite, Bentonite 45 plagioclase, mica gneiss / augen gneiss with abundant -" pyrite, horizontal to shallow dipping fractures, notable _ fresh fractures at 44'5" bgs, possible fractures at 41'6" —and 38'7" bgs. 2" I.D. PVC Risers MGN: Mica -Gneiss, hard, fine to medium grained, 50 _ " closely spaced fractures, quartz, muscovite, biotite, plagioclase, mica gneiss / augen gneiss with abundant RK pyrite, horizontal to shallow dipping fractures, notable 100 fractures close spaced between 47'-49' and 49'-51' bgs, closely spaced at 49' bgs, and moderately closely Sand Filter Pack 55—very - spaced between 51'-57' bgs. --------------------------- MGN: Mica -Gneiss, hard, fine to medium grained, closely spaced fractures, quartz, muscovite, biotite, 78 2" I.D. Slotted PVC 60— plagioclase, mica gneiss / augen gneiss with abundant Screen RK pyrite, horizontal to shallow dipping fractures, no " fractures from 57'-61'1" bgs, clay rich fault gouge, 2" thick, very dark gray, moderately plastic, and saturated -" at 61'1" bgs. 65 CLIENT: Duke Energy Progress SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Arden, NC PhoTerra n864-679-3711 Fax: PAGE 1 OF 1 PROJECT: Asheville Steam Plant WELL / BORING NO: AMW-2A PROJECT NO: 1026.02.23 STARTED: 6/26/14 COMPLETED: 6/26/14 DRILLING COMPANY: Geologic Exploration NORTHING: 642100.64 EASTING: 945131.56 DRILLING METHOD: Air Rotary ELEVATION 2104.95 ft MSL M.P. ELEV: 2107.93 ft MSL BOREHOLE DIAMETER: 6" IN WATER: 22.45 ft TOC TOTAL DEPTH: 30.0 ft BGS NOTES: 2" PVC Slotted Screen and Risers LOGGED BY: T. Plating CHECKED BY: K. Webb a U o a O ,—o p z o f WELL WW < DESCRIPTION Q W `� m O a n CONSTRUCTION U U) U U 5 Cement Grout 10 2" I.D. PVC Risers i Bentonite 15 Air hammer to 30' bgs, transition zone well, see well log for AMW-2B for lithology description. 20 Sand Filter Pack 25 2" I.D. Slotted PVC Screen 30 CLIENT: Duke Energy Progress SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Arden, NC PhoTerra n864-679-3711 Fax: PAGE 1 OF 1 a PROJECT: Asheville Steam Plant PROJECT NO: 1026.02.23 DRILLING COMPANY: Geologic Exploration DRILLING METHOD: DPT/Rock Core/Air Rotary/Air Hammer BOREHOLE DIAMETER: 6"/10" IN NOTES: Open borehole U d aU U W <O U)DESCRIPTION CD WELL / BORING NO: AMW_2B STARTED: 6/24/14 COMPLETED: 6/26/14 NORTHING: 642095.04 EASTING: 945124.96 ELEVATION 2104.09 ft MSL M.P. ELEV: 2107.45 ft MSL WATER: 89.50 ft TOC TOTAL DEPTH: 94.0 ft BGS LOGGED BY: T. Plating CHECKED BY: K. Webb 45 _''_ -' O O z 97 WELL a n CONSTRUCTION0a SM SAND, silty, gravel present throughout, fill material, brownish red with orange mottling, moist. 5 — —————————————————— — — — — —— SAND, silty, gravel present throughout, sand and SM gravel decreasing with depth, fill material, brownish red with orange mottling, moist. 10 RK SAPROLITE, red/orange, completely weathered, parent material. 15 — ------------------------ SAPROLITE, red/orange, completely weathered, RK parent material, saturated at 18' bgs, gray below 18' = bgs. 20 DPT Refusal at 20' bgs. 25 Air hammer to set surface casing, very weathered RK oxidation apparent, light gray at 27' bgs, dark gray at 28' bgs. 30 70 35 40 _ - _ - T _ _ RK MGN: Mica -Gneiss, hard, fine grained, closely spaced fractures, shallow dipping fractures, smooth and open fractures, mica gneiss, pyrite with epidote present, slight weathered fracture with very close joints at 36.5' bgs, some pyrite present in fracture at 36.5' bgs, dry. 89 45 _''_ -' RK MGN: Mica -Gneiss, hard, fine grained, no notable fractures or weathered zones, quartz veins, abundant pyrite, dry. 97 6" I.D. PVC Surface Casing, set at 34.' bgs. Cement Grout CLIENT: Duke Energy Progress SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Arden, NC Phoe: 864-421-999 s mTerra Faxn864-679-3711 PAGE 1 OF 2 a PROJECT: Asheville Steam Plant PROJECT NO: 1026.02.23 DRILLING COMPANY: Geologic Exploration DRILLING METHOD: DPT/Rock Core/Air Rotary/Air Hammer BOREHOLE DIAMETER: 6"/10" IN NOTES: Open borehole U d aU U W <O U)DESCRIPTION (D WELL / BORING NO: AMW_2B STARTED: 6/24/14 COMPLETED: 6/26/14 NORTHING: 642095.04 EASTING: 945124.96 ELEVATION 2104.09 ft MSL M.P. ELEV: 2107.45 ft MSL WATER: 89.50 ft TOC TOTAL DEPTH: 94.0 ft BGS LOGGED BY: T. Plating CHECKED BY: K. Webb completely weathered, muscovite grains visible due to 0 z preferential weathering, dry. Video logging confirmed 7)0,,i weeping fractures at 54.8' and 57.8' bgs. O o f WELL w �- m0 o Q CONSTRUCTION � U RK_L---------------------- 55 - MGN: Mica -Gneiss, hard, fine grained, shallow dipping -" fractures, notable fracture at 53.5'-54' bgs, severely RK weathered zone with iron staining present, feldspar _ completely weathered, muscovite grains visible due to 80 - preferential weathering, dry. Video logging confirmed -' weeping fractures at 54.8' and 57.8' bgs. 60 ` 65 70 75 85 90 95 100 6" Open Borehole CLIENT: Duke Energy Progress SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Arden, NC Phos)mTerra Fax: n864-679-3711 PAGE 2 OF 2 - Air hammer to 94.55' bgs, cuttings similar to above _ (MGN: Mica -Gneiss), dry. Video logging revealed RK weathered area, weeping at 82' bgs, and fracrured _ zone, tight fractures shallow dipping and closely 80 :- spaced with no apparent flow at 86'-88' bgs. 85 90 95 100 6" Open Borehole CLIENT: Duke Energy Progress SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Arden, NC Phos)mTerra Fax: n864-679-3711 PAGE 2 OF 2 PROJECT: Asheville Steam Plant WELL / BORING NO: AMW-3A PROJECT NO: 1026.02.23 STARTED: 7/7/14 COMPLETED: 7/7/14 DRILLING COMPANY: Geologic Exploration NORTHING: 641987.41 EASTING: 948032.19 DRILLING METHOD: Mud Rotary ELEVATION 2169.87 ft MSL M.P. ELEV: 2173.37 ft MSL BOREHOLE DIAMETER: 5.875" IN WATER: 9.20 ft TOC TOTAL DEPTH: 72.0 ft BGS NOTES: 2" PVC Slotted Screen and Risers LOGGED BY: K. Webb CHECKED BY: T. Plating a U o a 0,—o p z o f WELL wo < � DESCRIPTION Q w `� m O o- n CONSTRUCTION U U U 5- 10- 101520 15- 20- - Cement Grout 25- 30— 2" I.D. PVC Risers -2" 35 See lithology for well AMW-3B, rock ledges encountered at 38', 41', and 45' bgs, hard rock encountered at 72' bgs (4,000 lbs. of down pressure). 40- 04550Bentonite 45- 50— Bentonite 55- 56065 60- 65— —Sand Filter Pack 2" 1. D. Slotted PVC Screen 70 CLIENT: Duke Energy Progress SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Arden, NC s mTerra Faxn8864-679-3711 PAGE 1 OF 1 PROJECT: Asheville Steam Plant WELL / BORING NO: AMW-3B PROJECT NO: 1026.02.23 STARTED: 6/30/14 COMPLETED: 7/7/14 DRILLING COMPANY: Geologic Exploration NORTHING: 641985.98 EASTING: 948035.66 DRILLING METHOD: DPT/HSA/Mud Rotary/Rock Core/Air Hammer ELEVATION 2173.00 ft MSL M.P. ELEV: 2173.00 ft MSL BOREHOLE DIAMETER: 6/12"/6/7.875" IN WATER: 7.92 ft TOC TOTAL DEPTH: 98.0 ft BGS NOTES: 2" PVC Slotted Screen and Risers LOGGED BY: A. Yonkofski CHECKED BY: K. Webb a U a a o ,—o p z o f WELL WW < U) DESCRIPTION Q W `� m 0 a n CONSTRUCTION U U U ML SILT, ORGANIC, brown. — —————————————————— — — — — —— .`., 100 /4 ML SILT, light tan with some orange mottling, moist 5 CL CLAY, gray, saturated. 80 SW SAND, gray, well graded, fine to coarse grained sand SC with some gravel and clay. CL CLAY, gray with orange mottling, grading into saprolite 10 44 at 12' bgs. — ------------------------.`., 50 15 6" I.D. PVC Surface Casing, set to 80' bgs. 50 SAPROLITE, orange, grading downwards to brown with 20 - orange and black mottling, relict structure readily RK apparent, more gray with depth, gray/brown to brown/red foliation, cave in prevented further use of Direct Push Technology, switched to Hollow Stem 60 Augers. 25 Cement Grout 60 30 35 SC SAND, silty, clayey, brown/tan, some small gravel, fine SM grained sand, few fines, cohesive, low plasticity, micaceous, wet. 40 2" 1. D. PVC Risers _ RK Weathered rock, no sample return. Auger refusal. 45 MH SILT, brown, trace amount of clay and fine grained sand, micaceous, cohesive, high plasticity, moist/wet. CLIENT: Duke Energy Progress SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Arden, NC PhosynTerra n864-679-3711 Fax: PAGE 1 OF 2 a PROJECT: Asheville Steam Plant PROJECT NO: 1026.02.23 DRILLING COMPANY: Geologic Exploration DRILLING METHOD: DPT/HSA/Mud Rotary/Rock Core/Air BOREHOLE DIAMETER: 6/12"/6/7.875" IN NOTES: 2" PVC Slotted Screen and Risers U aU W <O U)DESCRIPTION CD 61%1 WELL / BORING NO: AMW_3B STARTED: 6/30/14 COMPLETED: 7/7/14 NORTHING: 641985.98 EASTING: 948035.66 ELEVATION 2173.00 ft MSL M.P. ELEV: 2173.00 ft MSL WATER: 7.92 ft TOC TOTAL DEPTH: 98.0 ft BGS LOGGED BY: A. Yonkofski CHECKED BY: K. Webb a- O z O o f WELL Q W m �0 o Q CONSTRUCTION U Q� U 60 ] MH SILT, brown, trace amount of clay and fine grained sand, micaceous, cohesive, high plasticity, moist/wet. (continued) 65 2" I.D. PVC Risers 70 Weathered rock encountered at 74' bgs. VA1. 80—Bedrock encountered at 78' bgs, roller cone refusal at 81.5' bgs. RK ROCK, coarse grained quartz rich and coarse grained mica rich rock, core consistent with garnet mica schist maooed in the area and on the around surface. 85 � I , I— Bentonite 90 � Air rotary to final well depth of 98' bgs. 95 —Sand Filter Pack 2" I.D. Slotted PVC Screen CLIENT: Duke Energy Progress SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Arden, NC PhoTerra Fax: n864-679-3711 PAGE 2 OF 2 PROJECT: Asheville Steam Plant WELL / BORING NO: APZ-30 PROJECT NO: 1026.02.23 STARTED: 6/17/14 COMPLETED: 6/20/14 DRILLING COMPANY: Geologic Exploration NORTHING: 642200.8 EASTING: 944983.63 DRILLING METHOD: DPT/Rock Core/Air Rotary/Air Hammer ELEVATION 2100.31 ft MSL M.P. ELEV: 2103.50 ft MSL BOREHOLE DIAMETER: 6'710" IN WATER: (Dry) ft TOC TOTAL DEPTH: 218.0 ft BGS NOTES: Open borehole LOGGED BY: T. Plating CHECKED BY: K. Webb a U o_ O 0 DESCRIPTION a O- 0 O z o f a WELL wo < Q `� m 0 n CONSTRUCTION U U U RK SAPROLITE, red with orange mottling, highly weathered. 6" I.D. PVC Surface 5 _ RK ___________ ____________ SAPROLITE, light gray, highly weathered micaceous Casing, set at 20' bgs. RK zone, moist but not saturated throughout. o _ _ _ _ _ / _ SAPROLITE, light gray, highly weathered, less fine (clay) material with depth, medium to coarse sand, relict rock structure. 10 Cement Grout DPT refusal at 8' bgs. - RK MGN: Mica -Gneiss, light gray to gray, oxidation present _ on fractured surface. 15 - MGN: Mica -Gneiss, hard, gray, fine to medium grained, closely spaced fracture, quartz, plagioclase, muscovite, - RK pyrite mineralization, shallow dipping fractures along 73 20 -' foliation, notable fresh fractures at approximately 15', -" 16'2", and 16'8" bgs. 25 MGN: Mica -Gneiss, hard, fine to medium grained, -X closely spaced fractures, quartz, plagioclase, RK muscovite, mica gneiss / augen gneiss with pyrite 100 - mineralization, shallow dipping fractures along foliation, = notable fresh fractures at approximately 23'8", 242", 30 and 25' bgs. MGN: Mica -Gneiss, hard, fine to medium grained, 35 - closely spaced fractures, quartz, plagioclase, - muscovite, mica gneiss / augen gneiss with pyrite - RK mineralization and weathered garnet, shallow dipping 98 _ fractures along foliation, notable fresh to slightly 40 weathered fractures at approximately 33', 33'6", 37', _ and 38'4" bgs. 45 - MGN: Mica -Gneiss, hard, fine to medium grained, closely spaced fractures, quartz, plagioclase, - RK muscovite, mica gneiss / augen gneiss with pyrite 94 _ mineralization and weathered garnet, shallow dipping 50 fractures along foliation, no notable fractures. " 55 MGN: Mica -Gneiss, gray, darkening with depth, fine to - - medium grained, closely spaced fractures, mica gneiss -' RK / augen gneiss with pyrite mineralization, shallow 96 - dipping fractures along foliation, notable fracture zones = between 53'-54' and 55'-58' bgs, very slight weathering, 60 softest zone/quickest coring rate. 65 - RK MGN: Mica -Gneiss, gray, darkening with depth, dry fractures at 87'-89' bgs. 70 CLIENT: Duke Energy Progress SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Arden, NC Phos n864-679-3711 mTerra Fax: PAGE 1 OF 3 a PROJECT: Asheville Steam Plant PROJECT NO: 1026.02.23 WELL / BORING NO: APZ-30 STARTED: 6/17/14 COMPLETED: 6/20/14 DRILLING COMPANY: Geologic Exploration NORTHING: 642200.8 EASTING: 944983.63 DRILLING METHOD: DPT/Rock Core/Air Rotary/Air Hammer ELEVATION 2100.31 ft MSL M.P. ELEV: 2103.50 ft MSL BOREHOLE DIAMETER: 6'710" IN WATER: (Dry) ft TOC TOTAL DEPTH: 218.0 ft BGS NOTES: Open borehole LOGGED BY: T. Plating CHECKED BY: K. Webb a U o- 0 0- 0 0 z o f WELL W Q DESCRIPTION w -- _j Z) o Q CONSTRUCTION p � W M 80 85 90 95 MGN: Mica -Gneiss, gray, darkening with depth, dry RK fractures at 87'-89' bgs. (continued) 100 105 110 115 6" Open Borehole 120 125 130 MGN: Mica -Gneiss, cuttings become dark gray at RK 121.5' bgs, rough drilling at 128' bgs, cuttings appear to have very slight weathering at 128' bgs. 135 140 145 MGN: Mica -Gneiss, rough drilling at 142' bgs, cuttings RK very fine dust and show slight weathering at 149'-154' bgs. CLIENT: Duke Energy Progress SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Arden, NC synTerra Faxn864-679-3711 PAGE 2 OF 3 PROJECT: Asheville Steam Plant PROJECT NO: 1026.02.23 DRILLING COMPANY: Geologic Exploration DRILLING METHOD: DPT/Rock Core/Air Rotary/Air Hammer BOREHOLE DIAMETER: 6"/10" IN NOTES: Open borehole U d aU U W <O U)DESCRIPTION 0 WELL / BORING NO: APZ_30 STARTED: 6/17/14 COMPLETED: 6/20/14 NORTHING: 642200.8 EASTING: 944983.63 ELEVATION 2100.31 ft MSL M.P. ELEV: 2103.50 ft MSL WATER: (Dry) ft TOC TOTAL DEPTH: 218.0 ft BGS LOGGED BY: T. Plating CHECKED BY: K. Webb -n O z 7m(0 O o f WELL w �- m0 o Q CONSTRUCTION U MGN: Mica -Gneiss, rough drilling at 142' bgs, cuttings RK very fine dust and show slight weathering at 149'-154' 155 bgs. (continued) 160 165 170 175 180 185-jj RK MGN: Mica -Gneiss, larger and darker cuttings at 169'-174' bgs, cuttings very slightly weathered at 174'-179' bgs. 190 195 a 200 F ai J 205 z 'a c� LU 210 J J_ i W S U) � 215 W 0 0 CE 9 220 RK I MGN: Mica -Gneiss, dust return at 214' bgs. z CLIENT: Duke Energy Progress 54 18 River Street, Suite 220 PROJECT LOCATION: Arden, NC ¢ s]mTerra Phone: 864-421-9999 0 Fax: 864-679-3711 PAGE 3 OF 3