Loading...
HomeMy WebLinkAboutNC0000396_Table H-2 Summary of Interwell Prediction Limit Results_20150823TABLE H-2. SUMMARY OF INTERWELL PREDICTION LIMIT RESULTS Asheville Steam Electric Plant NOTES. a y cm —1y �s Only.—W— detected above the PQL,n mmPl— wellsduring the April 2015 —,toeven were analyzed. Pred, a,on I, m, t—p-- type ,s based on the percentage of —d-1,end d-,, b,1 m of the dataset (Table 1) PQL A-ac[ical q,an —0' 1,— * Data se[ does not o,.,, any nond-1, None Req,, red Percentage of nondeteclsgreeter then 50 percentend l—th- 90 percent cr dataset,s nm+iormall y d,-b—d Replace wi th 1/2 PQL Percentage of nondetec5 less then or q-1 to 50 percentand the data d—b,00n,s normal or l a�namal or percentage of nondetecls,s greater th- or equal to 90 percent (ND) _d,"-1, mit fs nmpara 7" c mm -- was the NQL for a nondetect —Res,lt exceeds the pred, ction I, m, t P:\Duke Energy Progress. 1026\102. Asheville Ash Basin GW Assessment Plan\1.11 CSA Reporting\Appendices\Appendix H\Table H-2 Summary of Interwell Prediction Limit Results 1 of 1 ® ��® ®aims ® ®® ®® ® ®® ® ® ® ®®® ® ®® ®®®��® ®® ® ®® ® Repla- mth 1/2 PQL NOTES. a y cm —1y �s Only.—W— detected above the PQL,n mmPl— wellsduring the April 2015 —,toeven were analyzed. Pred, a,on I, m, t—p-- type ,s based on the percentage of —d-1,end d-,, b,1 m of the dataset (Table 1) PQL A-ac[ical q,an —0' 1,— * Data se[ does not o,.,, any nond-1, None Req,, red Percentage of nondeteclsgreeter then 50 percentend l—th- 90 percent cr dataset,s nm+iormall y d,-b—d Replace wi th 1/2 PQL Percentage of nondetec5 less then or q-1 to 50 percentand the data d—b,00n,s normal or l a�namal or percentage of nondetecls,s greater th- or equal to 90 percent (ND) _d,"-1, mit fs nmpara 7" c mm -- was the NQL for a nondetect —Res,lt exceeds the pred, ction I, m, t P:\Duke Energy Progress. 1026\102. Asheville Ash Basin GW Assessment Plan\1.11 CSA Reporting\Appendices\Appendix H\Table H-2 Summary of Interwell Prediction Limit Results 1 of 1