HomeMy WebLinkAboutNC0000396_Table H-2 Summary of Interwell Prediction Limit Results_20150823TABLE H-2. SUMMARY OF INTERWELL PREDICTION LIMIT RESULTS
Asheville Steam Electric Plant
NOTES. a y cm —1y �s
Only.—W— detected above the PQL,n mmPl— wellsduring the April 2015 —,toeven were analyzed.
Pred, a,on I, m, t—p-- type ,s based on the percentage of —d-1,end d-,, b,1 m of the dataset (Table 1)
PQL A-ac[ical q,an —0' 1,—
* Data se[ does not o,.,, any nond-1,
None Req,, red Percentage of nondeteclsgreeter then 50 percentend l—th- 90 percent cr dataset,s nm+iormall y d,-b—d
Replace wi th 1/2 PQL Percentage of nondetec5 less then or q-1 to 50 percentand the data d—b,00n,s normal or l a�namal or percentage of nondetecls,s greater th- or equal to 90 percent
(ND) _d,"-1, mit fs nmpara 7" c mm -- was the NQL for a nondetect
—Res,lt exceeds the pred, ction I, m, t
P:\Duke Energy Progress. 1026\102. Asheville Ash Basin GW Assessment Plan\1.11 CSA Reporting\Appendices\Appendix
H\Table H-2 Summary of Interwell Prediction Limit Results 1 of 1
®
��®
®aims
®
®®
®®
®
®®
®
®
®
®®®
®
®®
®®®��®
®®
®
®®
®
Repla- mth 1/2 PQL
NOTES. a y cm —1y �s
Only.—W— detected above the PQL,n mmPl— wellsduring the April 2015 —,toeven were analyzed.
Pred, a,on I, m, t—p-- type ,s based on the percentage of —d-1,end d-,, b,1 m of the dataset (Table 1)
PQL A-ac[ical q,an —0' 1,—
* Data se[ does not o,.,, any nond-1,
None Req,, red Percentage of nondeteclsgreeter then 50 percentend l—th- 90 percent cr dataset,s nm+iormall y d,-b—d
Replace wi th 1/2 PQL Percentage of nondetec5 less then or q-1 to 50 percentand the data d—b,00n,s normal or l a�namal or percentage of nondetecls,s greater th- or equal to 90 percent
(ND) _d,"-1, mit fs nmpara 7" c mm -- was the NQL for a nondetect
—Res,lt exceeds the pred, ction I, m, t
P:\Duke Energy Progress. 1026\102. Asheville Ash Basin GW Assessment Plan\1.11 CSA Reporting\Appendices\Appendix
H\Table H-2 Summary of Interwell Prediction Limit Results 1 of 1