Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NC0000396_Figure H-9 - Time v. Concentration - Sulfate, Thallium (1982)_20150823
700 0.5 Samp ing Date 15 NCAC 0 L Standard fCB-1 CB -1 ND (BG) — — 15 NCAC 0 L Standard 600 =L CCB- —O CB- ND E 0.3 O CB -3R O CB -313 ND --Ell —❑-- CB -1 ND (BG) '— O CB -4 O CB -4 ND t 0. — — — — —— 500 --C6-2 —O— CB- ND CB -4B ND 0.1 aj 400 GW -1 ND O C6-4 —O CB -313 ND 4-0 O CB -3R O CB -4 ND 300 N — b— — — — — — — — — —— O CB -46 O CB 4B ND 00 0 00 0 O O GW -1 O GW -1 ND 100 Q -G4 88 8 0 �- 0 ❑ 1100 coo 0077t: 11/17/ 010 1 / / 011 1/ 5/ 013 3/1/ 014 4/5/ 015 0.5 Samp ing Date 15 NCAC 0 L Standard 0 11/17/ 010 9/ / 01 7/ 9/ 014 Samp ing Date Notes: CB -1 installed 7/13/10, CB- : 7/14/10, CB -3R: 10/8/1 , CB -4: 7/13/10, CB -4B: 8/17/10, GW -1: 8/6/07; BG = Background well FIGURE H-9 148 RIVER STREET, SUITE 220 TIME VERSUS CONCENTRATION — COMPARISON GREENVILLE, SOUTH CAROLINA 29601 10 PHONE 864-421-9999 BETWEEN COMPLIANCE AND BACKGROUND WELLS www.synterracorp.com SULFATE, THALLIUM �/ ■M■■■����� DRAWN BY: J. GILMER DATE: J NE 2015 s ■ er■ M PROJECTMANAGER:J. MAHAN LAYOUT: ASHEVILLE STEAM ELECTRIC PLANT T P:\Duke Energy Progress.1 026\1 02. Asheville Ash Basin 200 CPSL DRIVE GW Assessment Plan\1.11 GSA ARDEN, NORTH CAROLINA 28704 Reporting\figures\StatiStatistics\Time-Series\1982 Ash Basin fCB-1 CB -1 ND (BG) 13,11)0.4 =L CCB- —O CB- ND E 0.3 O CB -3R O CB -313 ND 3 '— O CB -4 O CB -4 ND t 0. — — — — —— ❑ 8 ❑ ❑ O CB4B O CB -4B ND 0.1 O GW -1 O GW -1 ND 0 11/17/ 010 9/ / 01 7/ 9/ 014 Samp ing Date Notes: CB -1 installed 7/13/10, CB- : 7/14/10, CB -3R: 10/8/1 , CB -4: 7/13/10, CB -4B: 8/17/10, GW -1: 8/6/07; BG = Background well FIGURE H-9 148 RIVER STREET, SUITE 220 TIME VERSUS CONCENTRATION — COMPARISON GREENVILLE, SOUTH CAROLINA 29601 10 PHONE 864-421-9999 BETWEEN COMPLIANCE AND BACKGROUND WELLS www.synterracorp.com SULFATE, THALLIUM �/ ■M■■■����� DRAWN BY: J. GILMER DATE: J NE 2015 s ■ er■ M PROJECTMANAGER:J. MAHAN LAYOUT: ASHEVILLE STEAM ELECTRIC PLANT T P:\Duke Energy Progress.1 026\1 02. Asheville Ash Basin 200 CPSL DRIVE GW Assessment Plan\1.11 GSA ARDEN, NORTH CAROLINA 28704 Reporting\figures\StatiStatistics\Time-Series\1982 Ash Basin