HomeMy WebLinkAboutNC0000396_Figure H-8 - Time v. Concentration - Manganese, Mercury, Selenium (1982)_20150823A
E 5 NCAC 02L Standard
O O O O O O 0 0 O 0 O 0--4---0
000 o p p—CB 1 � CB- ND (BG)
O O O B g h Q R e e o L7 U f— CB -2 --<>— CB -2 N D
= 00 O O O l� 0 C7 O O C13-4 O CB -3R ND
dA
O CB -3R O CB -4 ND
f=C
0 00 O CB -4B O CB -4B ND
O G)N'-1 0 GW- ND
/ 7/20 0 2/22/20 /25/20 3 3/ /20 4
Samp ing Date
0)
J
o\uo 0.8
L 0.6
3
v 0.4
0.2 ❑
30
0 0--
0 %-..* 0
0
/ 7/20 0 2/22/20
O
Cl 0-0-0-0 ❑ ❑
4/5/20 5
/25/20 3 3/ /20 4 4/5/20 5
Samp ing Date
— � 5 NCAC 02L Standard
f CB -1
B ❑ to ❑ ❑ 0 ❑ O O O
CB- ND (BG)
f CB -2
CB -2 ND
O CB -3R
O
CB -3R ND
O CB -4
O
CB -4 ND
O CB4B
O
CB -4B ND
O GW -1
O
GW- ND
25 5 NCAC 02L Standard
—j 0 'CB -1 --C]-- CB- ND (BG)
20 – – – – – – – – – – – – – – – – – -.
O CB -2 --0— CB -2 ND
E 5 O CB -3R O CB -313 ND
0
0
B ❑ to ❑ ❑ 0 ❑ O O O
O CB -4 O CB4ND
0 0
0
cn
5
O CB41 O CB -4B ND
O GW -1 �� GW- ND
0
/
7/20 0 2/22/20 /25/20 3 3/ /20 4 4/5/20 5
Samp ing Date
Notes:
CB-
installed 7/ 3/ 0, CB -2: 7/ 4/ 0, CB -3R: 0/8/ 2, CB -4: 7/ 3/ 0, CB -4B: 8/ 7/ 0, GW- : 8/6/07; BG = Background well
FIGURE H-8
148 RIVER STREET, SUITE 220
-
TIME VERSUS CONCENTRATION — COMPARISON
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
BETWEEN COMPLIANCE AND BACKGROUND WELLS
www.synterracorp.com
MANGANESE, MERCURY, SELENIUM
DRAWN BY: J. GILMER DATE: J NE 2015
PROJECTMANAGER:J. MAHAN
�/
s
■■■�����
T
er■
LAYOUT:
ASHEVILLE STEAM ELECTRIC PLANT
P:\Duke Energy Progress.1 026\1 02. Asheville Ash Basin
■M
■ M
200 CPSL DRIVE
GW Assessment Plan\1.11 GSA
Reporting\figures\StatiStatistics\Time-Series\1982 Ash Basin
ARDEN, NORTH CAROLINA 28704