Loading...
HomeMy WebLinkAboutNC0000396_Figure H-8 - Time v. Concentration - Manganese, Mercury, Selenium (1982)_20150823A E 5 NCAC 02L Standard O O O O O O 0 0 O 0 O 0--4---0 000 o p p—CB 1 � CB- ND (BG) O O O B g h Q R e e o L7 U f— CB -2 --<>— CB -2 N D = 00 O O O l� 0 C7 O O C13-4 O CB -3R ND dA O CB -3R O CB -4 ND f=C 0 00 O CB -4B O CB -4B ND O G)N'-1 0 GW- ND / 7/20 0 2/22/20 /25/20 3 3/ /20 4 Samp ing Date 0) J o\uo 0.8 L 0.6 3 v 0.4 0.2 ❑ 30 0 0-- 0 %-..* 0 0 / 7/20 0 2/22/20 O Cl 0-0-0-0 ❑ ❑ 4/5/20 5 /25/20 3 3/ /20 4 4/5/20 5 Samp ing Date — � 5 NCAC 02L Standard f CB -1 B ❑ to ❑ ❑ 0 ❑ O O O CB- ND (BG) f CB -2 CB -2 ND O CB -3R O CB -3R ND O CB -4 O CB -4 ND O CB4B O CB -4B ND O GW -1 O GW- ND 25 5 NCAC 02L Standard —j 0 'CB -1 --C]-- CB- ND (BG) 20 – – – – – – – – – – – – – – – – – -. O CB -2 --0— CB -2 ND E 5 O CB -3R O CB -313 ND 0 0 B ❑ to ❑ ❑ 0 ❑ O O O O CB -4 O CB4ND 0 0 0 cn 5 O CB41 O CB -4B ND O GW -1 �� GW- ND 0 / 7/20 0 2/22/20 /25/20 3 3/ /20 4 4/5/20 5 Samp ing Date Notes: CB- installed 7/ 3/ 0, CB -2: 7/ 4/ 0, CB -3R: 0/8/ 2, CB -4: 7/ 3/ 0, CB -4B: 8/ 7/ 0, GW- : 8/6/07; BG = Background well FIGURE H-8 148 RIVER STREET, SUITE 220 - TIME VERSUS CONCENTRATION — COMPARISON GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 BETWEEN COMPLIANCE AND BACKGROUND WELLS www.synterracorp.com MANGANESE, MERCURY, SELENIUM DRAWN BY: J. GILMER DATE: J NE 2015 PROJECTMANAGER:J. MAHAN �/ s ■■■����� T er■ LAYOUT: ASHEVILLE STEAM ELECTRIC PLANT P:\Duke Energy Progress.1 026\1 02. Asheville Ash Basin ■M ■ M 200 CPSL DRIVE GW Assessment Plan\1.11 GSA Reporting\figures\StatiStatistics\Time-Series\1982 Ash Basin ARDEN, NORTH CAROLINA 28704