Loading...
HomeMy WebLinkAboutNC0000396_Figure H-7 - Time v. Concentration - Chloride, Chromium, Iron (1982)_20150823/ 011 1/ 5/ 013 3/1/ 014 4/5/ 015 Sampling Date — — 15 NCAC 0 L Standard 51 - 80 - --<D— CB- ND 70 =L 60 E 56 -- — — — — — — — — — — — — — — — — — — - — — 15 NCAC 0 L Standard s 1 8 u 10 O 0 - ^ 11/17/ 010 1 / f CB -1 --ED--- C13-1 ND (BG) CCB 2 CB- ND 34 16 O CB -4 O CB -3R ND g❑ / O` O 0 0 O u ® �J O CB -3R O CB -4 ND G t 4 O (� O CB -413 O CB -413 ND u O G)N-1 O GW -1 ND 1 - - 11/17/ 010 1 / / 011 1/ 5/ 013 3/1/ 014 4/5/ 015 Sampling Date / 011 1/ 5/ 013 3/1/ 014 4/5/ 015 Sampling Date — — 15 NCAC 0 L Standard 90 --0— C13-1 ND (BG) 80 - --<D— CB- ND 70 =L 60 E 50 3 .p 40 O GW -1 ND 30 s 0 u 10 O 0 - 11/17/ 010 1 / / 011 1/ 5/ 013 3/1/ 014 4/5/ 015 Sampling Date — — 15 NCAC 0 L Standard f C13-1 --0— C13-1 ND (BG) f C13-2 --<D— CB- ND —p CB -3R O C13 -3R ND O CB -4 O C13-4 ND O CB413 O C13-413 ND O GW -1 O GW -1 ND 100000 O — — 15NCAC 0 L Standard 10000 O O O O fCB-1 —a— CB -1 ND (BG) CCB -2 --0— CB- ND bb 1000O =- O 0 .O O O O O C13-4 O C13 -3R ND G 100 B� O 8 O� O -CB-3R O CB -4 ND �' O O O o 10 O O O CB -413 O C13-412; ND O GW -1 O GW -1 ND 11/17/ 010 1 / / 011 1/ 5/ 013 3/1/ 014 4/5/ 015 Sampling Date Notes: C13-1 installed 7/13/10, CB- : 7/14/10, CB -3R: 10/8/1 , CB -4: 7/13/10, C13-413: 8/17/10, GW -1: 8/6/07; BG = Background well FIGURE H-7 148 RIVER STREET, SUITE 220 TIME VERSUS CONCENTRATION — COMPARISON GREENVILLE, SOUTH CAROLINA 29601 ,tip PHONE 864-421-9999 BETWEEN COMPLIANCE AND BACKGROUND WELLS www.synterracorp.com CHLORIDE, CHROMIUM, IRON DRAWN BY: J. GILMER DATE: JUNE 2015 synTerra PROJECT MANAGER J MAHAN LAYOUT: ASHEVILLE STEAM ELECTRIC PLANT [P\Duke Energy Progress.1026\102. Asheville Ash Basin 200 CP&L DRIVE GW Assessment Plan\1.11 CSA ARDEN, NORTH CAROLINA 28704 Reporting\figures\Statistics\Time-Series\1982 Ash Basin