Loading...
HomeMy WebLinkAboutNC0000396_Figure H-6 - Time v. Concentration - Arsenic, Barium, Boron (1982)_20150823I 800 f CB -1 700 — 10 — — — — — — — — — — — — - — — — - — — 15 NCAC 0 L Standard J E 400 fCB-1 C13-1 ND (BG) \ 8 00 C 100 ac � �.- 800 � O CCB -2 CB- ND v 6- O CB -3R O C13 -3R ND ® O N O O O O O CB -4 O C13-4 ND 4 Q a o 8� 00 oa a o 0 -0-c-3-0- Q O O C13-413 O C13 -4B ND Sampling Date ®� O GW -1 O GW -1 ND ®0 148 RIVER STREET, SUITE 220 0 4-- TIME VERSUS CONCENTRATION - COMPARISON ,tip GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 11/17/ 010 1 / / 011 1/ 5/ 013 3/1/ 014 4/5/ 015 www.synterracorp.com ARSENIC, BARIUM, BORON Sampling Date 1 / / 011 1/ 5/ 013 3/1/ 014 4/5/ 015 Sampling Date — — 15 NCAC 0 800 f CB -1 700 — CCB -2 600 \ CB -3R ND =L 500 E 400 •z 300 m 00 C 100 ac � �.- 800 0� 11/17/ 010 1 / / 011 1/ 5/ 013 3/1/ 014 4/5/ 015 Sampling Date — — 15 NCAC 0 L Standard f CB -1 CB -1 ND (BG) CCB -2 CB- ND O C13-311 CB -3R ND O C13-4 O CB -4 ND O C13-46 O CB -4B ND O GW -1 GW -1 ND 1400 — — 15 NCAC 0 L Standard 1 00 .-. fCB 1 C13-1 ND (BG) —j 1000 CCB -2 �— CB- ND � �.- 800 �--------- — — O C13-4 —O� C13 -3R ND 0 600 O 0 CB -3R O C13-4 ND G 00 400 O O O O O O O O CB -413 O C13 -4B ND 00 O GW -1 —O— GW -1 ND Q a o 8� 00 oa a o 0 -0-c-3-0- _a 11/17/ 010 1 / / 011 1/ 5/ 013 3/1/ 014 4/5/ 015 Sampling Date Notes: CB -1 installed 7/13/10, CB- : 7/14/10, CB -3R: 10/8/1 , CB -4: 7/13/10, C13-413: 8/17/10, GW -1: 8/6/07; BG = Background well FIGURE H-6 148 RIVER STREET, SUITE 220 TIME VERSUS CONCENTRATION - COMPARISON ,tip GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 BETWEEN COMPLIANCE AND BACKGROUND WELLS www.synterracorp.com ARSENIC, BARIUM, BORON DRAWN BY: J. GILMER DATE: JUNE 2015 PROJECT MANAGER J MAHAN synTerra[P\Duke LAYOUT: ASHEVILLE STEAM ELECTRIC PLANT Energy Progress.1026\102. Asheville Ash Basin 200 CP&L DRIVE GW Assessment Plan\1.11 CSA Reporting\figures\Statistics\Time-Series\1982 Ash Basin ARDEN, NORTH CAROLINA 28704