Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NC0000396_Figure H-5 - Time v. Concentration - TDS, pH (1964)_20150823
1IM1111 01111I11 800 O NO O E 600 0 �0 N----------0----0'----- 11— 400 O 0 0 00 O O a..' °0 00 _ _ 0 0 — — 15 NCAC 0 L Standard --III-- CB -9 —0— CB -9 ND (BG) —401 --0— CB -5 ND 0 O CB -6 O CB -6 ND --9— CB -7 --0— CB -7 ND _ fCB-8 —0— CB -8 ND 0 — 11/18/ 010 1/13/ 01 3/10/ 013 5/5/ 014 7/1/ 015 Sampling Date 8 - 7 — — 15 NCAC 0 L Standard 6 - -— f C13-9 ICB-9 ND (BG) 5 0 CCB-5—O—'CB-5 ND CL 4 O CB -6 —0-- ICB-6 ND 3 O CB -7 —C— ICB-7 ND O CB -8 O CB -8 ND 1 0 11/18/ 010 1/13/ 01 3/10/ 013 5/5/ 014 7/1/ 015 Sampling Date Notes: CB -9 installed 10/8/1 ; CB -5, CB -6, CB -7 installed 7/1 /10; CB -8 installed 8/17/10; ND = Non detect, BG = Background well FIGURE H-5 148 RIVER STREET, SUITE 220 TIME VERSUS CONCENTRATION — COMPARISON GREENVILLE, SOUTH CAROLINA 29601 ,tip PHONE 864-421-9999 BETWEEN COMPLIANCE AND BACKGROUND WELLS www.synterracorp.com TOTAL DISSOLVED SOLIDS, pH DRAWN BY: J. GILMER DATE: JUNE 2015 PROJECT MANAGER J MAHAN synTerra LAYOUT: ASHEVILLE STEAM ELECTRIC PLANT Energy Progress.1026\102. Asheville Ash Basin 200 CP&L DRIVE [P\Duke GW Assessment Plan\1.11 CSA ARDEN, NORTH CAROLINA 28704 Reporting\figures\Statistics\Time-Series\1964 Ash Basin