HomeMy WebLinkAboutNC0000396_Figure H-18 - Time v. Concentration - ORP and Turbidity - CB-7_20150823O O O O
100000 O O O
0
2 10000
c
1000
c
c100 O
u 10 0
1
0
0
0
FIGURE H-18
0
o
O 0 300
TIME VERSUS CONCENTRATION
50
ac,
1 00
0
50
PHONE 864-421-9999
0
0
o°°
c
CB -7
�
DRAWN BY. J. GILMER DATE. JUNE 2015
PROJECT MANAGER: J. MAHAN
0o
0
0
0
0
0 o g
11/18/ 010 9/14/ 011 7/10/ 01 5/6/ 013 3/ / 014
Sampling Date
OTurbidity 0 °Iron O Manganese O Sulfate O TDS
O O O 0 O O
100000 O O O O 0
J ® O
2L 10000
c
1000
c
100 Q
o
10 O� u
O a �
1
1
00
O 0
1
11/18/ 010 9/14/ 011 7/10/ 01 5/6/ 013 3/ / 014
Sampling Date
OORP —1110—Iron O Manganese O Sulfate O TDS
❑•
r 8
07
I06
F _
5
z
4
3 -4
O 71
1
0
1 / 7/ 014
0
E
350
FIGURE H-18
O
148 RIVER STREET, SUITE 220
O 0 300
TIME VERSUS CONCENTRATION
50
ac,
1 00
a°
1 / 7/ 014
x
100 O
150
Q
FIGURE H-18
100
148 RIVER STREET, SUITE 220
TIME VERSUS CONCENTRATION
GREENVILLE, SOUTH CAROLINA 29601
50
PHONE 864-421-9999
TURBIDITY AND ORP
0
c
CB -7
1 / 7/ 014
x
100 O
FIGURE H-18
148 RIVER STREET, SUITE 220
TIME VERSUS CONCENTRATION
GREENVILLE, SOUTH CAROLINA 29601
,tip
PHONE 864-421-9999
TURBIDITY AND ORP
w .s nterracor .Dorn
CB -7
DRAWN BY. J. GILMER DATE. JUNE 2015
PROJECT MANAGER: J. MAHAN
synTP:\Duke
er�
LAYour_
ASHEVILLE STEAM ELECTRIC PLANT
Energy Progress 1026\102 Asheville Ash Basin
200 CP&L DRIVE
GW Assessment Plan\1.11 CSA
ARDEN, NORTH CAROLINA 28704
Reporting\figures\Statistics\Time-Series\Field Parameters