Loading...
HomeMy WebLinkAboutNC0000396_Figure H-18 - Time v. Concentration - ORP and Turbidity - CB-7_20150823O O O O 100000 O O O 0 2 10000 c 1000 c c100 O u 10 0 1 0 0 0 FIGURE H-18 0 o O 0 300 TIME VERSUS CONCENTRATION 50 ac, 1 00 0 50 PHONE 864-421-9999 0 0 o°° c CB -7 � DRAWN BY. J. GILMER DATE. JUNE 2015 PROJECT MANAGER: J. MAHAN 0o 0 0 0 0 0 o g 11/18/ 010 9/14/ 011 7/10/ 01 5/6/ 013 3/ / 014 Sampling Date OTurbidity 0 °Iron O Manganese O Sulfate O TDS O O O 0 O O 100000 O O O O 0 J ® O 2L 10000 c 1000 c 100 Q o 10 O� u O a � 1 1 00 O 0 1 11/18/ 010 9/14/ 011 7/10/ 01 5/6/ 013 3/ / 014 Sampling Date OORP —1110—Iron O Manganese O Sulfate O TDS ❑• r 8 07 I06 F _ 5 z 4 3 -4 O 71 1 0 1 / 7/ 014 0 E 350 FIGURE H-18 O 148 RIVER STREET, SUITE 220 O 0 300 TIME VERSUS CONCENTRATION 50 ac, 1 00 a° 1 / 7/ 014 x 100 O 150 Q FIGURE H-18 100 148 RIVER STREET, SUITE 220 TIME VERSUS CONCENTRATION GREENVILLE, SOUTH CAROLINA 29601 50 PHONE 864-421-9999 TURBIDITY AND ORP 0 c CB -7 1 / 7/ 014 x 100 O FIGURE H-18 148 RIVER STREET, SUITE 220 TIME VERSUS CONCENTRATION GREENVILLE, SOUTH CAROLINA 29601 ,tip PHONE 864-421-9999 TURBIDITY AND ORP w .s nterracor .Dorn CB -7 DRAWN BY. J. GILMER DATE. JUNE 2015 PROJECT MANAGER: J. MAHAN synTP:\Duke er� LAYour_ ASHEVILLE STEAM ELECTRIC PLANT Energy Progress 1026\102 Asheville Ash Basin 200 CP&L DRIVE GW Assessment Plan\1.11 CSA ARDEN, NORTH CAROLINA 28704 Reporting\figures\Statistics\Time-Series\Field Parameters