HomeMy WebLinkAboutNC0000396_Figure H-13 - Time v. Concentration - ORP and Turbidity - CB-3R_201508231 F1 H
F1 I
11/14/ 01 7/ / 013 3/ 9/ 014
100000 8
J
2 10000
C
c�
1000
100
c
0
U
10
1 —
11/14/ 01
0
60
8
50
40
z
30
0
10
0
1 /4/ 014
Sampling Date
Turbidity , O -Iron O Manganese O Sulfate O TDS
0
8
8
8 8
O
8
100000
GREENVILLE, SOUTH CAROLINA 29601
0
J
PHONE 864-421-9999
TURBIDITY AND ORP
w .s nterracor .corn
10000
DRAWN BY. J. GILMER DATE. JUNE 2015
r-
PROJECT MANAGER: J. MAHAN
synTP:\Duke
er�
1000
/00001
ASHEVILLE STEAM ELECTRIC PLANT
Energy Progress 1026\102 Asheville Ash Basin
200 CP&L DRIVE
O
O
O
ARDEN, NORTH CAROLINA 28704
Reporting\figures\Statistics\Time-Series\Field Parameters
O
100
c
0
U
10
1 F1 H
F1 I
11/14/ 01 7/ / 013 3/ 9/ 014
100000 8
J
2 10000
C
c�
1000
100
c
0
U
10
1 —
11/14/ 01
0
60
8
50
40
z
30
0
10
0
1 /4/ 014
Sampling Date
Turbidity , O -Iron O Manganese O Sulfate O TDS
0
0
o�
o
TIME VERSUS CONCENTRATION
GREENVILLE, SOUTH CAROLINA 29601
i
0
0
350
8 300 E
50
00 +°J+
0
150
0
100 u
50 v
0
-50
I x
-100 O
7/ / 013 3/ 9/ 014 1 /4/ 014
Sampling Date
OORP tlron O Manganese O Sulfate O TDS
FIGURE H-13
148 RIVER STREET, SUITE 220
TIME VERSUS CONCENTRATION
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
TURBIDITY AND ORP
w .s nterracor .corn
CB -3R
DRAWN BY. J. GILMER DATE. JUNE 2015
PROJECT MANAGER: J. MAHAN
synTP:\Duke
er�
LAYour_
ASHEVILLE STEAM ELECTRIC PLANT
Energy Progress 1026\102 Asheville Ash Basin
200 CP&L DRIVE
GW Assessment Plan\1.11 CSA
ARDEN, NORTH CAROLINA 28704
Reporting\figures\Statistics\Time-Series\Field Parameters