Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NC0000396_Figure H-1 - Time v. Concentration - Arsenic, Barium, Boron (1964)_20150823
1 .-. — — 15 NCAC 0 L Standard J 148 RIVER STREET, SUITE 220 700 — — 1310 8 — — — — — — — — — — f CB -9 --C)--- CCB -9 ND (BG) 600 www.synterracorp.com ARSENIC, BARIUM, BORON DRAWN BY: J. GILMER DATE: JUNE 2015 —40--CB-5--O---,CB-5 ND 6 f CB -9 .a L 500 ---0—CB-6 —D— CB -6 ND � 4 200 CP&L DRIVE [P\Duke GW Assessment Plan\1.11 CSA Reporting\figures\Statistics\Time-Series\1964 Ash Basin ARDEN, NORTH CAROLINA 28704 f CB -7 --O--- CCB -7 ND Q --C— ICB-5 ND E 400 —*—CB-8 —<�— CB -8 ND 0 11/17/ 010 T 1/ 5/ 013 3/1/ 014 Sampling Date J 4/5/ 015 800 FIGURE H-1 148 RIVER STREET, SUITE 220 700 — — — — — — — — — — — — — — — — — — - — — 15 NCAC 0 L Standard 600 www.synterracorp.com ARSENIC, BARIUM, BORON DRAWN BY: J. GILMER DATE: JUNE 2015 PROJECT MANAGER J MAHAN f CB -9 —[D--CB-9 ND (BG) L 500 Energy Progress.1026\102. Asheville Ash Basin 200 CP&L DRIVE [P\Duke GW Assessment Plan\1.11 CSA Reporting\figures\Statistics\Time-Series\1964 Ash Basin ARDEN, NORTH CAROLINA 28704 --40--CB-5 --C— ICB-5 ND E 400 O CB -6 --O-- ICB-6 ND •� 300 00 O O CB -7 O —O—ICB-7 ND 00 O O O O O O 00 O O CB -8 —O—ICB 8 ND 100 0 11/18/ 010 1/13/ 01 3/10/ 013 5/5/ 014 7/1/ 015 Sampling Date 1400 -' 1 00 J 1000 - tw :L 800 - - — — — — — — — — — — — — — — — — — — r 0 600 - m 400 -� 00 0 0 0 O O O O O O 00 0 11/18/ 010 1/13/ 01 3/10/ 013 5/5/ 014 Sampling Date — — 15 NCAC 0 L Standard f C13-9 --E]--- CB -9 ND (BG) f CB -5 CB -5 ND O C13-6 0—,CB-6 ND O C13-7 0—CCB-7 ND O C13-8 0—CB-8 ND O O 7/1/ 015 Notes: CB -9 installed 10/8/1 ; CB -5, CB -6, CB -7 installed 7/1 /10; CB -8 installed 8/17/10; ND = Non detect, BG = Background well FIGURE H-1 148 RIVER STREET, SUITE 220 TIME VERSUS CONCENTRATION — COMPARISON ,tip GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 BETWEEN COMPLIANCE AND BACKGROUND WELLS www.synterracorp.com ARSENIC, BARIUM, BORON DRAWN BY: J. GILMER DATE: JUNE 2015 PROJECT MANAGER J MAHAN synTerra LAYOUT: ASHEVILLE STEAM ELECTRIC PLANT Energy Progress.1026\102. Asheville Ash Basin 200 CP&L DRIVE [P\Duke GW Assessment Plan\1.11 CSA Reporting\figures\Statistics\Time-Series\1964 Ash Basin ARDEN, NORTH CAROLINA 28704