Loading...
HomeMy WebLinkAboutNC0000396_Horizontal Velocity Calcs_20150823Duke - Asheville MSL - Feet Above Mean Sea Level Depth measurements in feet MW -13D to MW -15D DISTANCE CHANGE IN LEVEL GRADIENT 1,380 96.68 0.07006 HORIZONTAL GRADIENT (i): 0.0701 Average Groundwater Velocity (V)* Phase I *Based on the Darcy Equation where velocity equals (K x i) / n Hydraulic Conductivity valups (units of ft/lav) from Tahlp 6-9 MW -13D Water Well ID Elevation Slug Out MSL MW -13D 2123.86 MW -15D 1 2027.18 MSL - Feet Above Mean Sea Level Depth measurements in feet MW -13D to MW -15D DISTANCE CHANGE IN LEVEL GRADIENT 1,380 96.68 0.07006 HORIZONTAL GRADIENT (i): 0.0701 Average Groundwater Velocity (V)* Phase I *Based on the Darcy Equation where velocity equals (K x i) / n Hydraulic Conductivity valups (units of ft/lav) from Tahlp 6-9 MW -13D Slug In Test 2 3.16E-02 1.08E-01 Slug Out Test 1 1.79E-01 Test 2 2.26E-01 MW -15D Slug Out Test 1 2.80E-01 3.39E-01 Test 2 3.93E-01 Test 3 3.55E-01 Hydraulic Conductivity (K) 0.1918 foot/day (Geometric Mean of K for MW -13D and MW -15D) Average Horizontal Gradient (i) 0.0701 foot/foot Porosity (n) 45.45 percent Velocity = 0.02956 foot/day 10.7884 foot/year Monitoring Event: ASSUMPTIONS: 1. K of 0.1918 ft/day based on in-situ slug and packer tests 2. Porosity is based on average value of saprolitic soils as determined by BLE (Appendix F). Prepared by: TCP Date: Checked: HJF Date: 7/30/2015 June 2015 S:\Prof\Duke Energy Progress. 1 026\1 02. Asheville Ash Basin GW Assessment Plan\1.11 CSA Reporting\tables\GW Grad ie nts\Backup Hydraulic Velocities\MW-13D to MW -15D Duke - Asheville MSL - Feet Above Mean Sea Level Depth measurements in feet C13-91311 to MW-12BR DISTANCE CHANGE IN LEVEL GRADIENT 780 18.48 0.02369 HORIZONTAL GRADIENT (i): 0.0237 Average Groundwater Velocity (V)* Phase I *Based on the Darcy Equation where velocity equals (K x i) / n Hydraulic Conductivity values (units of ft/day) from Table 6-8 Water Well ID Elevation Slug -Out Test 2 2.14E+00 MSL CB-9BR 2132.61 MW-12BR 1 2114.13 MSL - Feet Above Mean Sea Level Depth measurements in feet C13-91311 to MW-12BR DISTANCE CHANGE IN LEVEL GRADIENT 780 18.48 0.02369 HORIZONTAL GRADIENT (i): 0.0237 Average Groundwater Velocity (V)* Phase I *Based on the Darcy Equation where velocity equals (K x i) / n Hydraulic Conductivity values (units of ft/day) from Table 6-8 Monitoring Event: Hydraulic Conductivity (K) 1.6326 foot/day (Geometric Mean of K for CB-9BR and MW-12BR) Average Horizontal Gradient (i) 0.0237 foot/foot Porosity (n) 34 percent Velocity = 0.11377 foot/day 41.53 foot/year to ASSUMPTIONS: 1. K of 1.6326 ft/day based on in-situ slug and packer tests 2. Porosity based on values from Morris and Johnson 1967 crystalline rocks. based on geologic conditions at the site. Prepared by: TCP Date: Checked: HJF Date: 7/30/2015 June 2015 Range from 34% to 57%. 34% used S:\Proj\Duke Energy Progress. 1 026\1 02. Asheville Ash Basin GW Assessment Plan\1.11 CSA Reporting\tables\GW Gradients\Backup Hydraulic Velocities\CB-9BR to MW-12BR Test 1 1.88E+00 CB-09BR Slug -Out Test 2 2.14E+00 2.09E+00 Test 3 2.27E+00 MW-12BR PK -SI Test 1 1.49E+00 1.13E+00 PK -SO Test 1 8.50E-01 Monitoring Event: Hydraulic Conductivity (K) 1.6326 foot/day (Geometric Mean of K for CB-9BR and MW-12BR) Average Horizontal Gradient (i) 0.0237 foot/foot Porosity (n) 34 percent Velocity = 0.11377 foot/day 41.53 foot/year to ASSUMPTIONS: 1. K of 1.6326 ft/day based on in-situ slug and packer tests 2. Porosity based on values from Morris and Johnson 1967 crystalline rocks. based on geologic conditions at the site. Prepared by: TCP Date: Checked: HJF Date: 7/30/2015 June 2015 Range from 34% to 57%. 34% used S:\Proj\Duke Energy Progress. 1 026\1 02. Asheville Ash Basin GW Assessment Plan\1.11 CSA Reporting\tables\GW Gradients\Backup Hydraulic Velocities\CB-9BR to MW-12BR Duke - Asheville MSL - Feet Above Mean Sea Level Depth measurements in feet CB-9SL to MW -9S DISTANCE CHANGE IN LEVEL GRADIENT 1,095 29.49 0.02693 HORIZONTAL GRADIENT (i): 0.0269 Average Groundwater Velocity (V)* Phase I *Based on the Darcy Equation where velocity equals (K x i) / n Hvdraulic Conductivitv values (units of ft/dav) from Table 6-8 Water Well ID Elevation Test 2 2.36E-01 MSL CB-9SL 2145.47 MW -9S 1 2115.98 MSL - Feet Above Mean Sea Level Depth measurements in feet CB-9SL to MW -9S DISTANCE CHANGE IN LEVEL GRADIENT 1,095 29.49 0.02693 HORIZONTAL GRADIENT (i): 0.0269 Average Groundwater Velocity (V)* Phase I *Based on the Darcy Equation where velocity equals (K x i) / n Hvdraulic Conductivitv values (units of ft/dav) from Table 6-8 Hydraulic Conductivity (K) 0.2395 foot/day (Geometric Mean of K for CB-09SL) Average Horizontal Gradient (i) 0.0269 foot/foot Porosity (n) 45 percent Velocity = 0.01433 foot/day 5.23 foot/year Monitoring Event: ASSUMPTIONS: 1. K of 0.2395 ft/day based on in-situ slug and packer tests 2. Porosity is based on average value of saprolitic soils as determined by BLE (Appendix F). Prepared by: TCP Date: Checked: HJF Date: 7/30/2015 June 2015 S:\Proj\Duke Energy Progress. 1026\102. Asheville Ash Basin GW Assessment Plan\1.11 CSA Reporting\tables\GW Gradients\Backup Hydraulic Velocities\CB-9SL to MW-9SL Slug In Test 1 3.35E-01 Test 2 2.36E-01 CB-09SL 2,40E-01 Slug Out Test 1 2.03E-01 Test 2 2.05E-01 Hydraulic Conductivity (K) 0.2395 foot/day (Geometric Mean of K for CB-09SL) Average Horizontal Gradient (i) 0.0269 foot/foot Porosity (n) 45 percent Velocity = 0.01433 foot/day 5.23 foot/year Monitoring Event: ASSUMPTIONS: 1. K of 0.2395 ft/day based on in-situ slug and packer tests 2. Porosity is based on average value of saprolitic soils as determined by BLE (Appendix F). Prepared by: TCP Date: Checked: HJF Date: 7/30/2015 June 2015 S:\Proj\Duke Energy Progress. 1026\102. Asheville Ash Basin GW Assessment Plan\1.11 CSA Reporting\tables\GW Gradients\Backup Hydraulic Velocities\CB-9SL to MW-9SL Duke - Asheville MSL - Feet Above Mean Sea Level Depth measurements in feet MW -31311 to MW-22BR DISTANCE CHANGE IN LEVEL GRADIENT 1,065 47.67 0.04476 HORIZONTAL GRADIENT (i): 0.0448 Average Groundwater Velocity (V)* Phase I *Based on the Darcy Equation where velocity equals (K x i) / n Hvdraulic Conductivitv values (units of ft/dav) from Table 6-8 MW-22BR Water Well ID Elevation Test 2 7.92E+00 MSL MW-3BR 2082.09 MW-22BR 1 2034.42 MSL - Feet Above Mean Sea Level Depth measurements in feet MW -31311 to MW-22BR DISTANCE CHANGE IN LEVEL GRADIENT 1,065 47.67 0.04476 HORIZONTAL GRADIENT (i): 0.0448 Average Groundwater Velocity (V)* Phase I *Based on the Darcy Equation where velocity equals (K x i) / n Hvdraulic Conductivitv values (units of ft/dav) from Table 6-8 MW-22BR Slug -Out Test 1 8.35E+00 7.70E+00 Test 2 7.92E+00 Test 3 6.92E+00 Hydraulic Conductivity (K) 7.7043 foot/day (Geometric Mean of K for MW-22BR) Average Horizontal Gradient (i) 0.0448 foot/foot Porosity (n) 34 percent Velocity = 1.01 foot/day 370.21 foot/year Monitoring Event: June 2015 ASSUMPTIONS: 1. K of 7.7043 ft/day based on in-situ slug and packer tests 2. Porosity based on values from Morris and Johnson 1967 crystalline rocks. Range from 34% to 57%. 34% used based on geologic conditions at the site. Prepared by: TCP Date: Checked: HJF Date: 7/30/2015 S:\Prof\Duke Energy Progress. 1 026\1 02. Asheville Ash Basin GW Assessment Plan\1.11 CSA Reporting\tables\GW Gradients\Backup Hydraulic Velocities\MW-3BR to MW-22BR Duke - Asheville MSL - Feet Above Mean Sea Level Depth measurements in feet MW -313 to MW -21D DISTANCE CHANGE IN LEVEL GRADIENT 1,050 60.74 0.05785 HORIZONTAL GRADIENT (i): 0.0578 Average Groundwater Velocity (V)* Phase I *Based on the Darcy Equation where velocity equals (K x i) / n Hydraulic Conductivity values (units of ft/day) from Table 6-8 MW -21D I Slug Out I Test 1 1 6.59E-02 I 6.59E-02 Monitoring Event: June 2015 Hydraulic Conductivity (K) 0.0659 foot/day (Geometric Mean of K for MW -21D) Average Horizontal Gradient (i) 0.0578 foot/foot Porosity (n) 45.45 percent Velocity = 0.00838 foot/day 3.0604 foot/year to ASSUMPTIONS: 1. K of 0.0659 ft/day based on in-situ slug and packer tests 2. Porosity is based on average value of saprolitic soils as determined by BLE (Appendix F). Prepared by: TCP Date: Checked: HJF Date: 7/30/2015 S:\Prof\Duke Energy Progress. 1 026\1 02. Asheville Ash Basin GW Assessment Plan\1.11 CSA Reporting\tables\GW Gradients\Backup Hydraulic Velocities\MW-3D to MW -21 D Water Well ID Elevation MSL MW -3D 2102.20 MW -21D 1 2041.46 MSL - Feet Above Mean Sea Level Depth measurements in feet MW -313 to MW -21D DISTANCE CHANGE IN LEVEL GRADIENT 1,050 60.74 0.05785 HORIZONTAL GRADIENT (i): 0.0578 Average Groundwater Velocity (V)* Phase I *Based on the Darcy Equation where velocity equals (K x i) / n Hydraulic Conductivity values (units of ft/day) from Table 6-8 MW -21D I Slug Out I Test 1 1 6.59E-02 I 6.59E-02 Monitoring Event: June 2015 Hydraulic Conductivity (K) 0.0659 foot/day (Geometric Mean of K for MW -21D) Average Horizontal Gradient (i) 0.0578 foot/foot Porosity (n) 45.45 percent Velocity = 0.00838 foot/day 3.0604 foot/year to ASSUMPTIONS: 1. K of 0.0659 ft/day based on in-situ slug and packer tests 2. Porosity is based on average value of saprolitic soils as determined by BLE (Appendix F). Prepared by: TCP Date: Checked: HJF Date: 7/30/2015 S:\Prof\Duke Energy Progress. 1 026\1 02. Asheville Ash Basin GW Assessment Plan\1.11 CSA Reporting\tables\GW Gradients\Backup Hydraulic Velocities\MW-3D to MW -21 D Duke - Asheville Water Well ID Elevation MSL MW-9BR 1 2113.51 MW-16BR 1 2026.74 MSL - Feet Above Mean Sea Level Depth measurements in feet MW -91311 to MW-16BR DISTANCE CHANGE IN LEVEL GRADIENT 810 86.77 0.10712 HORIZONTAL GRADIENT (i): 0.1071 Average Groundwater Velocity (V)* Phase I *Based on the Darcy Equation where velocity equals (K x i) / n Hvdraulic Conductivitv values (units of ft/dav) from Table 6-8 MW-09BR Slug Out Test 1 8.38E-02 Test 2 8.06E-02 8,22E-02 MW-16BR PK -SI Test 1 3.23E+01 2,84E+01 PK -SI Test 2 1.54E+01 PK -SO Test 1 3.72E+01 PK -SO I Test 2 1 3.50E+01 Hydraulic Conductivity (K) 4.0452 foot/day (Geometric Mean of K for MW-9BR and MW-16BR) Hydraulic Conductivity (K) 28.4000 foot/day Average Horizontal Gradient (i) 0.1071 foot/foot Porosity (n) 34 percent Velocity = 8.94796 foot/day 3266 foot/year Monitoring Event: June 2015 ASSUMPTIONS: 1. K of 4.0452 ft/day based on in-situ slug and packer tests 2. Porosity based on values from Morris and Johnson 1967 crystalline rocks. Range from 34% to 57%. 34% used based on geologic conditions at the site. Prepared by: TCP Date: Checked: HJF Date: 7/30/2015 S:\Prof\Duke Energy Progress. 1026\102. Asheville Ash Basin GW Assessment Plan\1.11 CSA Reporting\tables\GW Gradients\Backup Hydraulic Velocities\MW-9BR to MW- 16BR Duke - Asheville MSL - Feet Above Mean Sea Level Depth measurements in feet MW -9S to MW -16A DISTANCE CHANGE IN LEVEL GRADIENT 810 88.99 0.10986 HORIZONTAL GRADIENT (i): 0.1099 Average Groundwater Velocity (V)* Phase I *Based on the Darcy Equation where velocity equals (K x i) / n Hydraulic Conductivity values (units of ft/day) from Table 6-8 MW -16A Water Well ID Elevation Test 2 1.93E+01 MSL MW -95 2115.98 MW -16A 1 2026.99 MSL - Feet Above Mean Sea Level Depth measurements in feet MW -9S to MW -16A DISTANCE CHANGE IN LEVEL GRADIENT 810 88.99 0.10986 HORIZONTAL GRADIENT (i): 0.1099 Average Groundwater Velocity (V)* Phase I *Based on the Darcy Equation where velocity equals (K x i) / n Hydraulic Conductivity values (units of ft/day) from Table 6-8 MW -16A Slug In Test 1 1.65E+01 1.81E+01 Test 2 1.93E+01 Test 3 2.38E+01 Test 5 2.57E+01 Test 7 2.50E+01 Slug Out Test 1 9.87E+00 Test 2 1.44E+01 Test 4 2.01E+01 Test 5 1.82E+01 Test 6 1.69E+01 Test 7 1.59E+01 Monitoring Event: June 2015 Hydraulic Conductivity (K) 18.09 foot/day (Geometric Mean of K for MW -16A) Average Horizontal Gradient (i) 0.1099 foot/foot Porosity (n) 46.4 percent Velocity = 4.28 foot/day 1563.80 foot/year to ASSUMPTIONS: 1. K of 18.0946 ft/day based on in-situ slug and packer tests 2. Porosity is based on value of alluvial soils as determined by BLE (Appendix F). Prepared by: TCP Date: Checked: HJF Date: 7/30/2015 S:\Prof\Duke Energy Progress. 1 026\1 02. Asheville Ash Basin GW Assessment Plan\1.11 CSA Reporting\tables\GW Gradients\Backup Hydraulic Velocities\MW-9S to MW -16A Duke - Asheville MSL - Feet Above Mean Sea Level Depth measurements in feet MW-12BR to MW -91311 DISTANCE CHANGE IN LEVEL GRADIENT 330 0.62 0.00188 HORIZONTAL GRADIENT (i): 0.0019 Average Groundwater Velocity (V)* Phase I *Based on the Darcy Equation where velocity equals (K x i) / n Hvdraulic Conductivitv values (units of ft/dav) from Table 6-8 MW-09BR Water Well ID Elevation Test 2 8.06E-02 MSL MW-12BR 2114.13 MW-9BR 1 2113.51 MSL - Feet Above Mean Sea Level Depth measurements in feet MW-12BR to MW -91311 DISTANCE CHANGE IN LEVEL GRADIENT 330 0.62 0.00188 HORIZONTAL GRADIENT (i): 0.0019 Average Groundwater Velocity (V)* Phase I *Based on the Darcy Equation where velocity equals (K x i) / n Hvdraulic Conductivitv values (units of ft/dav) from Table 6-8 MW-09BR Slug Out Test 1 8.38E-02 8.22E-02 Test 2 8.06E-02 MW-12BR PK -SI Test 1 1.49E+00 1.13E+00 PK -SO Test 1 8.50E-01 Monitoring Event: Hydraulic Conductivity (K) 0.3042 foot/day (Geometric Mean of K for MW-9BR and MW-12BR) Average Horizontal Gradient (i) 0.0019 foot/foot Porosity (n) 34 percent Velocity = 0.00168 foot/day 0.6135 foot/year to ASSUMPTIONS: 1. K of 0.3042 ft/day based on in-situ slug and packer tests 2. Porosity based on values from Morris and Johnson 1967 crystalline rocks based on geologic conditions at the site. Prepared by: TCP Date: Checked: HJF Date: 7/30/2015 June 2015 Range from 34% to 57%. 34% used S:\Proj\Duke Energy Progress. 1 026\1 02. Asheville Ash Basin GW Assessment Plan\1.11 CSA Reporting\tables\GW Gradients\Backup Hydraulic Velocities\MW- 12BR to MW-9BR