Loading...
HomeMy WebLinkAboutNC0000396_072215DENRLTR_20150823NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor July 22, 2015 Mr, John Elnitsky Vice President Duke Energy P.O Box 1321, DEC 22C Charlotte, NC 28201-1007 RE: As -Built Instrumentation Revision Request Asheville 1982 Ash Pond Dam Buncombe County BUNCO -089 Dear Mr. Elnitsky: Donald van der Vaart Secretary This concerns the subject high hazard dam recently modified pursuant to issuance of an Approval to Install Instrumentation on March 24, 2015 as required by the Dam Safety Law of 1967. Record Drawings and the engineer's certification were received on May 11, 2015. The dam was certified by Mr. David D. Wilson, PE. An inspection of this dam was made by Land (duality Section staff of the Asheville Regional Office on June 12, 2015. Prior to issuance of an approval of the modifications, additional information or revision is requested for the following items and corrected as -built drawings must be submitted: 1. A) On Page 3 of the engineer's report, it states that the wells were placed "approximately 10 feet" apart, however, field observations found that the wells were spaced approximately 6 feet apart. B) One borehole location was submitted on the as -built drawings to represent all of the wells that were installed. C) The as -built drawings were not sealed by a Professional Engineer. Please revise the engineer's report accordingly, submit an as -built drawing that indicates the locations of all wells, and have a Professional Engineer seal the as -built drawings. 2. On Page 4 of the Engineer's Report, it states that several different geotechnical observations were made including the flow discharging from the toe drains during the Division of Energy, Mineral, and Land Resources Energy Section • Geological Survey Section - Land Quality Section 1612 Mail Service Center, Raleigh, North Carolina 27699-1612 , 919-707-9200 / FAX: 919-715-8801 512 North Salisbury Street, Raleigh, North Carolina 27604 - Internet: http•//Portal.ncdenr.org/web/Irl An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper Mr. John Elnitsky Asheville 1982 Ash Pond Dam As -Built Instrumentation Revision Request BUNCO -089 July 22, 2015 Page 2 of 2 installation of the wells, however those have not been submitted. Please submit geotechnical field observations including observed flow discharging from the toe drains and photographic documentation of the dam conditions. It would greatly aid further application review if a response to each of the above comments were made in a cover letter submitted with two sets of the revised drawings. You should contact Ms. Melissa Ding, PE, Assistant Regional Engineer in the Asheville Regional Office when the above listed items have been addressed. You may contact the Asheville Regional Office at (828) 296- 4500 or a member of the Dam Safety Program in the Raleigh Central Office by telephone at (919) 707-9220 for assistance concerning this platter. Sincerely, r _ Brian Shane Cook, PE, LSIT Assistant State Dam Safety Engineer Land Quality Section BSC cc: Mr. David D. Filson, PE, Design Engineer Ms. Melissa King, PE, Land (duality Assistant Regional Engineer Mr. Jeff Poupart, Division of Water Resources Mr. Randy Hart, Duke Energy Filename: BUNCO-089-20150722—As-Built Rev Req_Asheville 1982 Ash Pond Dam