HomeMy WebLinkAboutNC0000396_072215DENRLTR_20150823NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
July 22, 2015
Mr, John Elnitsky
Vice President
Duke Energy
P.O Box 1321, DEC 22C
Charlotte, NC 28201-1007
RE: As -Built Instrumentation Revision Request
Asheville 1982 Ash Pond Dam
Buncombe County
BUNCO -089
Dear Mr. Elnitsky:
Donald van der Vaart
Secretary
This concerns the subject high hazard dam recently modified pursuant to issuance of an
Approval to Install Instrumentation on March 24, 2015 as required by the Dam Safety Law of
1967. Record Drawings and the engineer's certification were received on May 11, 2015. The
dam was certified by Mr. David D. Wilson, PE. An inspection of this dam was made by Land
(duality Section staff of the Asheville Regional Office on June 12, 2015. Prior to issuance of an
approval of the modifications, additional information or revision is requested for the following
items and corrected as -built drawings must be submitted:
1. A) On Page 3 of the engineer's report, it states that the wells were placed "approximately
10 feet" apart, however, field observations found that the wells were spaced
approximately 6 feet apart. B) One borehole location was submitted on the as -built
drawings to represent all of the wells that were installed. C) The as -built drawings were
not sealed by a Professional Engineer. Please revise the engineer's report accordingly,
submit an as -built drawing that indicates the locations of all wells, and have a
Professional Engineer seal the as -built drawings.
2. On Page 4 of the Engineer's Report, it states that several different geotechnical
observations were made including the flow discharging from the toe drains during the
Division of Energy, Mineral, and Land Resources
Energy Section • Geological Survey Section - Land Quality Section
1612 Mail Service Center, Raleigh, North Carolina 27699-1612 , 919-707-9200 / FAX: 919-715-8801
512 North Salisbury Street, Raleigh, North Carolina 27604 - Internet: http•//Portal.ncdenr.org/web/Irl
An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper
Mr. John Elnitsky Asheville 1982 Ash Pond Dam
As -Built Instrumentation Revision Request BUNCO -089
July 22, 2015
Page 2 of 2
installation of the wells, however those have not been submitted. Please submit
geotechnical field observations including observed flow discharging from the toe drains
and photographic documentation of the dam conditions.
It would greatly aid further application review if a response to each of the above comments were
made in a cover letter submitted with two sets of the revised drawings. You should contact Ms.
Melissa Ding, PE, Assistant Regional Engineer in the Asheville Regional Office when the above
listed items have been addressed. You may contact the Asheville Regional Office at (828) 296-
4500 or a member of the Dam Safety Program in the Raleigh Central Office by telephone at
(919) 707-9220 for assistance concerning this platter.
Sincerely, r _
Brian Shane Cook, PE, LSIT
Assistant State Dam Safety Engineer
Land Quality Section
BSC
cc: Mr. David D. Filson, PE, Design Engineer
Ms. Melissa King, PE, Land (duality Assistant Regional Engineer
Mr. Jeff Poupart, Division of Water Resources
Mr. Randy Hart, Duke Energy
Filename: BUNCO-089-20150722—As-Built Rev Req_Asheville 1982 Ash Pond Dam