Loading...
HomeMy WebLinkAboutNCG020167 DMR SW NI Øoicicastie® Industrial Minerals January 4,2017 Department of Environment and Natural Resources EU E� Division of Water Quality 1! Central Files JAN 9 2017 1617 Mail Service Center Raleigh,NC 27699-1617 CENTRAL FILES Re: APAC-Atlantic,Inc.—Fletcher Quarry �wR SECTION 269 Fanning Bridge Road Fletcher,NC 28732 Certificate of Coverage ,GOA.11i67 Dear Sirs: Attached is the annual 2016 stormwater discharge monitoring report for APAC-Atlantic,Inc.—Fletcher Quarry. Table 1 summarizes the stormwater discharge quality parameters. Also attached are the supporting analytical and sampling documentation. The samples were collected on March 6,2016, during a`Representative Storm Event' from the outfall of the detention pond that collects stormwater from roads and aggregate stone storage areas at the facility. The total precipitation during the storm event was 0.82 inches. Based on an impervious drainage area of 273,840 square feet,the maximum total flow through the SDO-001 detention pond is 0.140 MG. The stormwater discharge complies with the turbidity and total suspended solids benchmarks. The stormwater pond has been re-configured so that it rarely discharges. The overflow discharge line was raised several inches. Consequently,the pond did not discharge during the second semi-annual period from June to December 2016. Please contact Dan March of Pisgah Environmental Services at 828-768-3335 or via e-mail at Pisgah- air(a,vt.edu if you have questions or comments concerning this report. Sincerely, APAC-Atlantic,Inc. e fatrick Owen Plant Manager Attachments: Discharge Monitoring Report j Analytical Report Sampling Chain-of-Custody 639 Fanning Bridge Road • P.O. Box 218 • Fletcher, NC 28732 (828)684-6701 • (828) 684-5153 fax d Table 1. APAC-Atlantic,Inc.—First Semi-Annual Discharge Monitoring Summary—March 6,2016. Results Benchmark Discharge Characteristics Units March 5,2015' Limit Settleable Solids mg/L <0.1 0.1 Total Suspended Solids mg/L 5.9 100 pH pH 8.3 >6.0;<9.0 Turbidity NTU 6.4 50 Total Rainfall Inches 0.83 N/A Event Duration minutes 360 N/A Total Flow MG 0.140 N/A 1 Pace Analytical Laboratories report. APAC-Atlantic—Stormwater Discharge Monitoring ''3 ANNUAL SUMMARY DMR - STORMWATER SEND TO CENTRAL OFFICE * I STORMWATER DISCHARGE OUTFALLS (SDO) GENERAL PERMIT NO. NCG020000 *Report ALL STORMWATER Monitoring Data on this form(including No Flow and No Discharge and Permit Limit Violations)by 111.4RCH 1 of each year. CERTIFICATE OF COVERAGE NO.NCG020167 SAMPLE COLLECTION YEAR: 2016 FACILITY NAME: APAC-Atlantic,Inc COUNTY Henderson PERSON COLLECTING SAMPLES PHONE NO.L828)684-6701 CERTIFIED LABORATORYPace Analytical Lab# 040 ADD TO LISTSERVE?YES N NO❑ EMAIL: Lab# Part A:Stormwater Monitoring Requirements Date Sample In Tier 2 #of Months in Outfall Collected Monthly Total Suspended Total Event Tier 2 Total Flow Turbidity Settleable No, (mo/dd/yr OR Monitoring? SamplingZ (MG) Solids Rainfall Duration (NTU) Solids(m1/1)NO FLOW)1 (y/n) (mg/I) (in) (minutes) - - - - - 1003'4 See Footnote3'5 0.13 SDO-1 March 6,2016 No N/A 0.140 5.9 6.4 <0.1 0.83 360 SDO-1 Jan-June No N/A N/A N/A N/A N/A N/A N/A NO FLOW During Second Semi Annual Period - JAN 172017 ----NT' R.A.L r: E s C WR SF(`,i M 'If"NO FLOW"or"NO DISCHARGE,Enter"NO FLOW"or"NO DISCHARGE"for each outfall here and the Date Range. 2 Per NCG02: Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range 3 If a value is in excess of the benchmark,or outside the benchmark range(for pH),you must implement the Tier 1 or Tier 2 responses in the General Permit. 4 TSS benchmark values are 100 mg/1 except in ORW,HWQ,trout,and PNA waters where they are 50 mg/l. 5 The discharge shall not cause an instantaneous measurement of the turbidity of the receiving water to exceed: 10 NTU for freshwater streams,lakes,and reservoirs designated as trout waters;25 NTU for all lakes and reservoirs,and all salt waters;50 NTU for all other streams and surface waters.Turbidity may be monitored at the SDO. Alternatively,the permittee may choose to monitor turbidity in the receiving water,directly upstream and downstream of the SDO. Permit Date: 1/1/2010-12/31/2014 Last Revised 02-02-11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using>55 gal of new motor oil/month on average Outfall Date Sample In Tier 2 #of Months New Motor Total Flow TPH using method Total Suspended pH Total Event No. Collected Monthly in Tier 2 Oil Usage (MG) 1664A SGT-HEM Solids (Standard Rainfall Duration (mo/dd/yr OR Monitoring? Sampling2 (gal/month) (mg/I) (mg/I) Units) (in) (minutes) NO FLOW) (Y/n) - - 153 1003'4 6-93 HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL(INCLUDING VEHICLE MAINTENANCE)? YES ❑NO El HAVE YOU CONTACTED THE REGION? YES ❑NO❑ WHO AT THE REGION HAVE YOU SPOKEN WITH? MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY(INCLUDING ALL"NO FLOW","NO DISCHARGE" & LIMIT VIOLATIONS)BY MARCH 1 OF EACH YEAR TO: Division of Water Quality Attn:DWQ Central Files 1617 Mail Service Center Raleigh,North Carolina 27699-1617 (919)807-6300 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate, and co lete. I am aware that there are significant penalties for submitting false information,including the possibility of fines and imprisonment for knowing violati ' 9Nk, _ egp2_ (Signature of Permittee) ( ate Permit Date: 1/1/2010-12/31/2014 Last Revised 02-02-11 Page 2 of 2