HomeMy WebLinkAboutNCG030229 DMR SW (19) I
1 Semi-annual Stormwater Discharge Monitoring Report
i for North Carolina Division-of Water Quality General Permit No. NCG030000
Date submitted 1/20/2017
h
1 '> { =r- SAMPLE COLLECTION YEAR 2016
CERTIFICATE OF,COVERAGE,NO NCGO229 �� :
FACILITY NAME _Eaton Corporation—Transmission Division', SAMPLE PERIOD ❑Jan-June ❑July-Dec
COUNTY Cleveland 1 ,i
PERSON COLLECTING SAMP ES •Gia, RECEIVEiTO CLASS ❑ORW ❑HQW ['Trout ❑PNA
LABORATORY SII Lab Cert.# ii; JAN 31 2017 X Zero-flow ❑Water Supply EISA '
Comments on sample collect ❑Other
ion or analysis: CENTRAL FILES
I ` DWR SECTION PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 9
I
Part A: Stormwater Benchmarks and Monitoring Results
;, , X No discharge this period?2
iDate Sa p 24-hour rainfall pH, Non-Polar O&G/ Total Toxic
Outfall No. Collected' amount, Total Suspended Solids Standard units Copper Lead Zinc Total Petroleum Organics
: (mo/dd/yr) Inches Hydrocarbons
Benchmarks=__> _ - 100 mg/L or 50 mg/L4 6.0—9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L
II '
1 Monthly sampling(instead;of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
For sampling pleriods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here.
1The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
n See General Permit,Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals,or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelihes for the facility subject to the requirement to'sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture us'e the definition as found in 40 CFR 469.12;for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
11
i
j I
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page1of3
u'
„Facilities that incorporate a'solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
'Permit. For those facilities electing to employ the TTO monitoring waiver,the discharger shall sign the following certification statement:
1 II j
"Based qupon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I;certify that toIthe best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
• stormw'ater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan.”
Name(Print name)
1
ITitle(Print title)
(Signature) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non-detect, ND, or other similar non-numerical
' format. When results are below the applicable limits,they mut be reported in the format, "<XX mg/L",where XX is the numerical value of the detection
limit, reporting,limit, etc. in;mg/L.
Note: If you report a sample value in excess of the benchmark you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
'Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging> 55 gal of new oil per month.
ft ! •
n No discharge this period?2
Date Sample 24-hour rainfall
Outfall No.
Collected) amount, Non-polar O&G/TPH by p.
s Total Suspended Solids pH
i (mo/dd/yr) Inches EPA 1664(SGT-HEM)
Benchmarkc ,=> - - 15 mg/L 100 mg/L or 50 mg/L* 6.0—9.0 SU
'Footnotes from Part A also'apply to this Part B
,I*See General Permit text,Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
' • ' % .Ili;;',
'Permit Date: 1141/2012-10/311/2017 SWU-245, last revised 10/25/2012
I 1 Page 2 of 3
f
I
I
M t ,,tI, ,
Note: If you report a sample value in excess of the benchmark,;you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
.
,FOR PART A ANDIPART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: CHAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES X NO❑
IF YES,HAVE YOU COi�ITACTED THE DWQ REGIONAL OFFICE?II,' YES X NO❑
REGIONAL OFFICE CONTACT NAME: Ryan Kormanik ih,„
Mail an original and one copy of this DMR, including all"No Discharge"reports, within 30 days of receipt of the lab results(or at end of monitoring period
in the case of"No Discharge"reports)to:
Division of WaterlQuality 1 1.1
Attn: DWQ Central Files I — I;,r
1617 Mail ServiceII Center i, 'I:,
'Raleigh, North Carolina 27699-1617
1
•YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"i'l certify, under penalty of law,'that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel. roperly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate, and complete. I
am aware that there are significant penalties for submitting false information,including the possibility of fines and imprisonment for knowing violations."
�� D/ �
(Signature of Perirnittee) (Ode)
1
-G11�
.
i
r ,
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page3of3
II