Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCG030130 DMR SW (23)
ENGINEERING, D INC. January 16, 2017 Mr. Ryan Pennington JAN 3 o 2017 *SHIELD Gastonia Components and Logistics Daimler Trucks North America, LLC CEh1TRAL SIL S 1400 Tulip Drive DWR SECTION Gastonia,NC 28052 Subject: Monthly Sampling—December 2016 NPDES General Permit No.NCG030000-CoC No' NG'G03`Ol 't Daimler Trucks, Gastonia Components and Logistics,LLC 1400 Tulip Drive Gastonia,North Carolina Shield Project No. 1140099-02 Dear Mr.Pennington: Shield Engineering, Inc. (Shield) successfully collected monthly stormwater samples and completed the qualitative assessment for Stormwater Discharge Outfall (SDO) #001 at the Gastonia facility for the month of December. The Qualitative Monitonng Report for SDO #001 and a partially completed Discharge Monitoring Report form are attached to this cover letter. In addition, the analytical results for the stormwater sample collected during the qualifying storm event on December 6 2016 are attached to this cover letter. Results from the December 6th sampling event show an exceedance of the following } parameters at or above the corresponding benchmarks: SDO#00 (10/07/16)—Copper—0.0121 in g/I,()3enchmark 0,007 mg/L) Daimler's Gastonia facility remains in Tier Three of the NPDES General Permit No.NCG030000 at SDO #001 for Copper and Tier 2 for pH at SDO #001. Shield will continue to perform monthly sampling at SDO#001 per Tier Two requirements until instructed to halt by either Daimler or the State. Shield greatly appreciates the opportunity to provide environmental services to Daimler Trucks, of North America. If you have any questions in reference to this document or require further information, please feel free to contact either of the undersigned at(704)394-6913. Respectfully, SHIELD ENGINEERING,INC i t - 1 t�1r-- / T, - — 6 Melina '.Gr- ne - M. k Boland,P.E. { Senio gineer . Prizcipal Engineer Attachments: Stormwater DMR,Qualitative Monitoring Report form,Analytical Results 4301 Taggart Creek Road Telephone 704 394.6913 www.shieldengzneering corn Charlotte,NC 28208 Fax 704.394.6968 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 1/15/17 CERTIFICATE OF COVERAGE NO. NCG030-1301 SAMPLE COLLECTION YEAR 2016 FACILITY NAME Daimler Trucks—Gastonia Components&Logistics SAMPLE PERIOD ❑Jan-June fl July-Dec PERSON COLLECTING SAMPLES Danny Hefner, Shield Engineering or ►/ Month! December LABORATORY: Pace Analytical Lab Cert.# 12 DISCHARGING TO CLASS ['ORW ['HC W ['Trout ❑PNA Comments on sample collection or analysis: Benchmark exceedance ere-Bow ['Water Supply ©SA for Copper at SDO#001 '0Other p ND PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 -* Part A:Stormwater Benchmarks and Monitoring Results �N\ a zo�� LES CENTRAL f I m ®No discharge this period?2 0WR SECT a�! Date Sample 24-hour rainfall pH, Non-Polar O&G/ Total Toxic Outfall No. Collected) amount, Total Suspended Solids Standard units Copper Lead Zinc Total Petroleum 5 _ (mo/dd/yr) Inches 3 Hydrocarbons Organics Benchmarks===> _ - 100 mg/L or 50 mg/L° 6.0—9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L SDO4001 . %6 'OM 20 7 7.2 0.0121 <0.005 0.0282 <5.0 <0.4873 ' Monthly sampling(instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. `See General Permit,Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample(for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12;for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date:11/1/2012-10/31/2017SWU-245, last revised 10/25/2012 _ _ _ Page 1 of 3 , Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify,and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver,the discharger shall sign the following certification statement: - "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief,no dumping of concentrated toxic organics into the storrnwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." AA Lt,k."_s Name(Print name) - 91OWTC4. N1,h` . Title Print title) u._s_.......... I/t /7 i - (Signatur .- . (Date) _ Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL,<PQL, Non-detect, ND,or other similar non-numerical format. When results are below the applicable limits,they must be reported in the format, "<XX mg/L",where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark,you must implement Tier 1, Tier 2,or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging> 55 gal of new oil per month. n No discharge this period?2 Outfall No. Date Sample 24,hour rainfall - Collected' amount, Non-polar O&G/TPH by (mo/dd/yr) Inches3 EPA 1664(SGT-HEM} Total Suspended Solids pH Benchmarks===> -' - - - 15 mg/L - 100 mg/L or 50 mg/L* 6.0—9.0 SU i — Footnotes from Part A also apply to this Part B - - *See General Permit text,Table 5,identifying the especially sensitive receiving water classifications where the more protective benchmark applies. - Permit Date:=11/1/2012-10/31/2017 - _ ., - - '- - - SWU-245,-last"revised 10/25/2012 - - ` — - _ ,rc�55K • — �lre Note: If you report a sample value in excess of the benchmark,you must implement Tier 1, Tier 2,or Tier 3 responses. See General Permit text. FOR PART.AAND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑NO❑ IF YES,HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑NO❑ REGIONAL OFFICE CONTACT NAME: Mail an original and=one copy of this DMR,includingall"No Discharge reports,within 30 days s of receipt of the lab results,(or at end of monitoring period in the case of"No Discharge"reports)to: - - Division of Water Quality - - - - Attn:DWQ Central Files _ - , 1617 Mail Service Center % Raleigh, North Carolina 27699-1617 - YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware at t ere e significant penalties for submitting false information,including the possibility of fines and imprisonment for knowing violations." //Z-2.1/ 7 . (Signature of Pe ittee) (Date) - - -Permit Date:_11/1/2012-10/31/2017 _ --_ -- -- _ - - -- ' - --- - _ - SWU-245, lastrevised 10/25/2012-:; - - w , ull" - :` �e3rof�3: y� _� - ^ .---F,,"-4.1:.:','I'±',.—:',4` _ dry, it _ - _ O:=' - aa .f _ '-, , : _ . i ...._.� .. ... .- �- ':',_;11::-::-'q''''' :-...1'-...i, --''''j':, .. .- _ _ - ,_ ,7-:'. - --_ . .. . �- _ -ate ,. - . '7- -. _ _ ,.. - __