Loading...
HomeMy WebLinkAboutNC0027332_Owner Name Change_20160919N� Tennessee Valley Authority, 1101 Market Street, BR 4A, Chattanooga, Tennessee 37402-2801 September 14, 2016 RECEI fED1N(J"DENWR SEP 19 2016 Division of Water Resources Water Quality Water Quality Permitting Section R errr,it€ins Section 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Dear Maddam or Sir: TENNESSEE VALLEY AUTHORITY - CHATUGE HYDRO (CTH), FONTANA HYDRO (FNH), AND HIWASSEE HYDRO (HIH) - NPDES PERMIT NAME CHANGE REQUESTS,, Enclosed are completed name change request forms for the following facilities. Facility NPDES Permit No. Chatuge Hydro (CTH) NCO027332 Fontana Hydro (FNH) NCO027341 Hiwassee Hydro (HIH) NC0027359 If you have any questions regarding this matter, please contact Mike Stiefel at (423) 751-6844 in Chattanooga, Tennessee or by email at mbstiefel(D-tva.clov. Sincerely, r.'! f4 Terry . Cheek Senior Manager Water Permits, Compliance, and Monitoring Pat McCrory Governor F15%REuEiVEDINCDE� DDR _ !' NCDENR SEP 19 2016 Water Quality North Carolina Department of Environment and Natural Resources.rrnitting Section Division of Water Resources Donald R. van der Vaart WATER QUALITY PERMITTING SECTION Secretary PERMIT NAME/OWNERSHIP CHANGE REQUEST This form is for ownership changes or name changes of NPDES wastewater permits. • "Permittee" references the existing permit holder • "Applicant" references the entity applying for the ownership/name change. I. NPDES Permit No. (for which the change is requested): NCO 0 2 73 3 2 or Certificate of Coverage #: N C G 5 II. Existing Permittee Information: a. Permit issued to (company name): b. Person legally responsible for permit: c. Facility name: d. Facility's physical address: Tennessee Valley Authority -TVA Cynthia M Anderson First MI Last Senior Manager, Water and Waste Compliance Title 1101 Market Street, BR 4A Permit Holder Mailing Address Chattanooga TN 37402 - City - State Zip (423) 751-4876 (423) 751-7011 Phone Fax Chatuge Hydro Plant Chatuge Dam Road) Address Hayesville NC 28904 City State Zip e. Facility contact person: TVA (423) 751-7965 First / MI / Last Phone III. Applicant Information: a. Request for change is a result of: If other please explain: b. Permit issued to (company name): c. Person legally responsible for permit: ❑ Change in ownership of the facility ® Name change of the facility or owner Tennessee Valley Authority -TVA James R Dalrymple First MI Last Senior Vice President, Power Operations Title 1101 Market Street, LP 3K Permit Holder Mailing Address Chattanooga TN 37402 - City State Zip (423) 751-4096 jrdalrymple(a tva.gov Phone E-mail Address Page 1 of 2 Revised 7/0112014 d. Facility name: Chatuge Hydro Plant e. Facility's physical address: Chatuge Dam Road Address Hayesville NC 28904 City State Zip f. Facility contact person: Stephen C Williams First MI Last Environmental Scientist Title (423) 876-4176 SCWILLIAMS(&tva.gov Phone E-mail Address IV. Will the permitted facility continue to conduct the same commercial/industrial activities conducted prior to this ownership or name change? ® Yes ❑ No (please explain) If applicable, the applicant shall submit a major permit modification request to DWR. A major modification shall be defined as one that increases the volume, increases the pollutant load, results in a significant relocation of the discharge point, or results in a change in the characteristics of the waste generated. V. Required Items: THIS APPLICATION WILL BE RETURNED UNPROCESSED IF ITEMS ARE INCOMPLETE OR MISSING: 1. This completed application is required for both name change and/or ownership change requests. 2. Legal documentation of the transfer of ownership (such as relevant pages of a contract deed, or a bill of sale) is required for an ownership change request. Articles of incorporation are not sufficient for an ownership change. Applicable regulations: 40 CFR 122.41, 40 CFR 122.61 and 15A NCAC 02H .0114 ..................................................................................................................... The certifications below must be completed and signed by both the permit holder prior to the change (Permittee), and the new applicant in the case of an ownership change request. For a name change request, the signed Applicant's Certification is sufficient. PERMITTEE CERTIFICATION (Permit holder prior to ownership change): I, , attest that this application for a name/ownership change has been reviewed and is accurate and complete to the best of my knowledge. I understand that if all regdired parts of this application are not completed and that if all required supporting information is not included, this application package will be returned as incomplete. Signature APPLICANT CERTIFICATION Date I, James R. Dalrymple, attest that this application for a name/ownership change has been reviewed and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that i required supporting mf ation is not included, this application package will be returned as incomplete. I 1(f 61 Signa a V Date PLEASE SEND THE COMPLETE APPLICATION PACKAGE TO: Division of Water Resources Water Quality Permitting Section 1617 Mail Service Center Raleigh, North Carolina 27699-1617 NPDES PERMIT NAME/OWNERSHIP CHANGE REQUEST Page 2 of 2 Revised 7/01/2014 d. Facility name: Chatuge Hydro Plant e. Facility's physical address: Chatuge Dam Road Address Hayesville NC 28904 City State Zip f. Facility contact person: Stephen C Williams First MI Last Environmental Scientist Title (423) 876-4176 SCWILLIAMS@atva.gov Phone E-mail Address IV. Will the permitted facility continue to conduct the same commercial/industrial activities conducted prior to this ownership or name change? ® Yes ❑ No (please explain) If applicable, the applicant shall submit a major permit modification request to DWR. A major modification shall be defined as one that increases the volume, increases the pollutant load, results in a significant relocation of the discharge point, or results in a change in the characteristics of the waste generated. V. Required Items: THIS APPLICATION WILL BE RETURNED UNPROCESSED IF ITEMS ARE INCOMPLETE OR MISSING: This completed application is required for both name change and/or ownership change requests. Legal documentation of the transfer of ownership (such as relevant pages of a contract deed, or a bill of sale) is required for an ownership change request. Articles of incorporation are not sufficient for an ownership change. Applicable regulations: 40 CFR 122.41, 40 CFR 122.61 and 15A NCAC 02H .0114 .................................................,.................................................................... The certifications below must be completed and signed by both the permit holder prior to the change (Permittee), and the new applicant in the case of an ownership change request. For a name change request, the signed Applicant's Certification is sufficient. PERMITTEE CERTIFICATION (Permit holder prior to ownership change): I, , attest that this application for a name/ownership change has been reviewed and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information is not included, this application package will be returned as incomplete. Signature APPLICANT CERTIFICATION Date I, James R. Dalrymple, attest that this application for a name/ownership change has been reviewed and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that i required supporting mf ation is not included, this application package will be returned as incomplete. 61 Signatige V Date PLEASE SEND THE COMPLETE APPLICATION PACKAGE TO: Division of Water Resources Water Quality Permitting Section 1617 Mail Service Center Raleigh, North Carolina 27699-1617 NPDES PERMIT NAME/OWNERSHIP CHANGE REQUEST Page 2 of 2 Revised 7101/2014