Loading...
HomeMy WebLinkAbout20080809 Ver 1_Other Agency Comments_20080702 U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action ID: 200801581 TIP No: B-4080 State Project No: 8.2430901 GENERAL PERMIT (REGIONAL AND NATIONWIDE) Applicant: North Carolina Department of Transportation Address: Gregory J. Thorpe, Ph.D. Environmental Management Director Project Development and Environmental Analysis 1598 Mail Service Center Raleigh, North Carolina 27699-1598 Telephone Number: (910) 733-3141 v County" >1 bus 0?o VERIFIC,k%' c? Size and Location of project (waterway, road name/number, town, etc.): 125 linear feet of 40 feet wide three- span bridge, over the Pine Log Branch, including 520 linear feet of approach fills and on SR 1437 in Columbus County, North Carolina. Description of Activity: To replace bridge # 148, a 37 linear feet by 24 feet wide two-span bridge with 125 linear feet by 36 feet wide, three-span bridge on existing alignmentand widening of 520 feet of bridge approach, impacting 0.09 acre of wetlands. Traffic will be detoured on existing roadways during construction. Applicable Law: X Section 404 (Clean Water Act, 33 U.S.C. 1344) Section 10 (River and Harbor Act of 1899) Authorization: 23 Nationwide Permit Number Regional General Permit Number Your work is authorized by this Regional General (RGP) or Nationwide (NWP) Permit provided it is accomplished in strict accordance with the attached conditions and your submitted plans. If your activity is subject to Section 404(if Section 404 block above is checked), before beginning work you must also receive a Section 401 water quality certification from the N.C. Division of Environmental Management, telephone (919) 7331786 Please read and carefully comply with the attached conditions of the RGP or NWP. Any violation of the conditions of the RGP or NWP referenced above may subject the permittee to a stop work order, a restoration order, and/or appropriate legal action. This Department of the Army RGP or NWP verification does not relieve the permittee of the responsibility to obtain any other required Federal, State, or local approvals/permits. The permittee may need to contact appropriate State and local agencies before beginning work. This verification and will remain valid until the expiration date identified below unless the nationwide authorization is modified, reissued or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all modifications. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer canply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under-contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completedwithin twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the authorization. Action ID: 200801581 TIP No: B-4080 State Project No: 8.2430901 County: Columbus GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION If there are any questions regarding this authorization or any of the conditions of the RGP or NWP, please contact the Corps Regulatory Official specified below. Date 30 June 2008 Expiration Date of Verification 30 June 201 Corps Regulatory Official Richard K. Spencer Telephone No. (910) 251-4172 CF: Brian Wrenn, NCDWQ Ken Averitte, NCDWQ, Fayetteville Office Megan Willis, NCDOT, PDEA Jim Rerko, NCDOT Div 6 2 Action ID: 200801581 TIP No: B-4080 State Project No: 8.2430901 County: Columbus GENERAL PERMIT SPECIAL CONDITIONS 1. Bridge demolition and removal will be accomplished in accordance with "Best Management Practices For Construction and Maintenance Activities, Section 4.6" dated August 2003 and a copy will be provided to the contractor prior to the pre-construction conference. 2. No bridge demolition debris will be intentionally allowed to enter the waterway or wetlands. 3. Sediment and erosion control measures shall be in place prior to any demolition or land clearing activities. 4. Staging areas or the stockpiling of construction material shall not be located in any wetlands. 5. All temporary fill is to be placed on filter fabric and removed from the waterway in its entirety upon completion of the construction. 6. All construction spoil material shall be disposed of on an upland area and shall not be placed in any waterway or wetland. 3 : IJ GOLUAABLJS-COUN LL sj, tt , A_ \ J -1? 1 ? t A , J . 1 _. f_ 1h1FTf At?1P'1. .IKAI:3- Af^•T'C r+Q. '?.c.?.?.. ...a.?.:...?o O 'U W O H GRAPHIC SCALES DESIGN DATA ADT 2008 = 4,135 ?0 25 P 50 tQ0 ADT 2028 = 6,917 917 PLANS DHV - 10 % D 60 % SOS ss 4 so lqo T = 7 % PROFILE (F10RI20MAL.) V 60 MPH O tp 5 Q 70 7Q ' TTST 4% DUAL 3% V FUNC. - UAN RB PROfIIE IVER71CAL1 CLASS C OLLECTOR ng -Y rolect B-4080 = 0.118 Miles Length Stmdure TIP Project B-4080 = 0.024 Miles Total Length TIP ProjectB-4080 - 0.142 Miles RNGROM Rte, N_ Ceab.IlRe ....r o a?cnom RIGHT OP WAY __ Lonna . ht p NOV 16.2007 "'4PC°?O°?• ROADWAY DRSIGN ENGNRER fN.V. IL1TR: Jodr L. Cole OV 18.2008 ""?T °"'a^'m• L ?w?NS DIVISION OPORTHGR 19=AYS STAI R OA N0a. PROJECT LENGTH v aw.a ?? ry w'. d, `? - E-.R4 th Roc OIR MneN CrpAro,0.• GROUPS=A 5M FMbalN_ M., sap. 3u TIP P - - _ t3 % I Y.? ?' PAVI All Ni 1110MI M I AT10NSHIP nmecr urewice ra. EtlIET Np, 8-4080 4 + ./ D I ?' a I 110 r n rrrE do fD ?Ary ?fdi NYGeNRM'Y d 4 ? / ?? "? ?.? (P?EA??R1?x LE!??$?.w,(sel??` PRELEMIN Rr PLANS m ?t f / / {l ?J „/ 4YIi4Nf1 MnIN i4l •irlp?E J Q Cl mE N) T,, b77 8 in ~ Q Qs !' I D '' wvvnltrl NI l RD NY'RDKH S " ' / ? SITE 1 i aA,:.«.>u r srAn;.am Y ! ! / ? ? ' f "I ' 'e ! / ! f ? f+?Y,Mays y M = .go'Er. a = a ?u\ yv ! = ? ' d , , E - - - mws nosr. i f ? I y E ----- 1 Y sn ??Im no ? 7333'007-E ^ N 74 /4'27.4'E -L- -----r- - -- ? _•ronc. . ?[y ! E E l . '.? _ _ ? E Tfll E rui _ _ ____? , .. , i Is r o Y . ,eui. I = .. .. ;0; .. I ! ! ! ! sY YN _ f?.iteOY,N aut i=i s ! _ = 1 I _dI a e ?'# \ .. I y .. k'<e = ! =?lY? ! ! fTfp4' IIbM ACT Q LY = _ \ ? 1 I DENOTE HAND: \ ? Oi i FENTRE55 iLE /y, $ ?? o 'ti: Ma \ ' Go45 \ ' R CLEARING ° j T?R!' ?A i/ I kRO4D \ ..GNRET R. Q DENOTES FILL IN w' WETLAND B 80 ELEV. J2 cor N 20B4K164 O E 5J/00 B I EL£V.61 3 B STA6t18 62DM IG1? N l56 E 208 837411 BL STA25 36 1092 LEFT NOT :BENCH OUf5/0E ARK 80 OF PROJ BI ARE CT UM? COATED . E 0 IS IST.RO EXC [[ F/ VA F1 BEGIN GRAD B-40 0 END G -L- 5 D. /1'51 -00 -L- S ADE .19+ -4080 .00 ELEV. 60.74 ELEV. 59.03 PI - 12 7363 PI = 14 5000 PI= 6 EL = 501X) BO' PI EL 18+20 = 5905' VC = I OS=-I MPH VC - K = OS ' 1 3 0 MPH K 05 237 80 MP elasTla GROUND SED OS NPH 70 60 E7 - - f+ 3945% f-X161 % WSfIN ro EE f- FRIDGE veo 6i6T/. PROPOSE GRADE NG GIl P ujM 7 7`r - T An ST CTURE HYDRA L/C DA A u 0 ? I I 'J•MIN. .0267 EX/57.G AOE OES/GN FREOUEb .Y = 25 YRS I I DESIGN BASf HW E ISCHARG TION = 585 /60O FT CF5 PAY fft" w BASE ELEVA ION - 593 FT MEMO ND OVERT( PING Dl HARGE = 2000 CF5 AREA To u } _ OVERT nVFR PING FR OUENCY= 200 5qR TRS ERUYA RTR rAr 1 0 1 1 1 2 T 7 T A ,n , A _ l.1 Ni HHIMI RELATIONSHIP -t NQ C i 8-4080 q a1 a D y EO ? qQ{ '.,N.IA I ,?eT 12?.?7A N. GLI ? mvuuua EwnwAr o®cw?? ewwu . ?•? s a n ? 7YPE 111-77 ad Q ? -N Parmit Drwh" PRELIMIN RY PLANS . ' ? NILAFEi FAIro X N:l of yl 1YrE e n h ` ? I SITE 1 ll, (AX ' NIMII • NI fNU /PP/roMX 5 } 4 F I 1 , I . b N 73 N 74'/4'27. T - - ?- _ - .. oft : E F ve 11 ? „ , n? 'r d s s : , ' \\ ' + y RR r nut = a : o : 03 = ' NUE 0 © ' a \ EC LEA o ; e d I A AFE rARO , 4 I DE OTE Fl M hp? F L I WE LAN B 80 V. BJ2 'ot N I' m E 209 5Jf00 B / ECEV.6/ 3 B STA6+18 50 62.01' IGHT N /56 E 208 B3741I BL STA25 36 /09 LEFT NOT : BENCH ARK BO 81 ME OCATEO OUTSIDE OF PROD CT LIMfT . E IST RD S F/LL 0 . EXC VATS BEGIN GRAD B-40 0 END G ADE -4080 -L- S o. 11+5( .00 -L- 5 . 19 + DO- - - - ELEV.- 60.74 LEV. 59.03 P Pl = I2 73b3 Pl = 14 SOHO f - K EL = 50.00 BO' PI EL /8+20 - 59.0 5' VC = I VC = K = 3 K 237 S= K = 1 OS = 0 MPH OS = 80 NP eASDN rwrnwD rro ED E = 6 O MPH DS = MPH EASEIN wo PEDPO DIIADE NG G0. --- -_ Z7 -- - -- - (t 39457 1-X16/ % TO M /- EWNED 51677 STR CTURE HYDRA LIC DA A • - 7T 035?57 m !-)0.94 % !- .9450 . f- A2 67 EXIST.G AOE 50 \ I y,µN DESIGN FREOUE 25 YRS P I I DESIGN HIY f TION 585 FT PAY1 BASE ISCHARG E -1 f600 CF5 BASE ELEVa , ION 593 FT EssnNG No OVERT PING DI HARGE = 2000 CF5 AIIEA,o Y OVERT PING FR -EN CY= 200 YRS E VA I'M PAY 1 0 1 1 1 2 1 3 1 4 1 5 1 S n ,o -.4 In