Loading...
HomeMy WebLinkAboutNCG030246 DMR SW (21) St t 828-901-6695 CORNING 1NV SrEHS eve treet Hickory ring and Coordinator Technology Center f 828-901-5665 PO Box 489 steve street@corning coin Hickory,NC 28603 www corning corn June 1st, 2016 North Carolina Department of Environmental Quality Division of Energy, Mineral, and Land Resources Attn: DWQ Central Files 1617 Mail Service Center Raleigh,North Carolina 27699-1617 Dear Sir/Madam: Please find enclosed an original and one(1) copy of the Stormwater Discharge Monitoring Report for Corning Optical Communications, LLC—Hickory Manufacturing and Technology Center(HMTC) located in Hickory, Catawba County,North Carolina. The stormwater samples were collected on 4/12/2016 for all permitted outfalls and represent the monthly sample as specified in the Tier II requirements of HMTC's stormwater permit. The results are mixed and reflect HMTC to be outside the benchmark value for the following parameters: • Copper—Stormwater Outfall 1, 2, and 3 • Zinc—Stormwater Outfall 1,2, and 3 Additional attachments include the Laboratory Analytical Report, Chain-of-Custody, and Qualitative Monitoring Report. Please contact me if you have any questions at 828-901-6695. Sincerely, \• Stephen L Street Senior Environmental,Health and Safety Coordinator attachments ©2016 Corning Incorporated.An Rights Reserved. Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 �y Date submitted: 06/01/2016 CERTIFICATE OF COVERAGE NO. NCG030000 11' 6`' `= 'r `' SAMPLE COLLECTION YEAR:2016 FACILITY NAME: Hickory Manufacturing and Technology Center SAMPLE PERIOD ❑Jan-June ❑July-Dec COUNTY:Catawba or lil Monthlyi—Apr PERSON COLLECTING SAMPLES:Steve Street DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY:Water Tech Labs Lab Cert.#50 ❑Zero-flow ['Water Supply OSA Comments on sample collection or analysis:The amount of pollen in RECEIVED ❑Other the discharge at SDO#2 was much higher than the other outfalls. JUN1 07 2016 There was a noticeable visual difference in the amount of pollen PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 resulting in a TSS value that exceeded the benchmark parameter. CENTRAL FILES DWR SECTION Part A: Stormwater Benchmarks and Monitoring Results ❑ No discharge this period?2 Date Sample 24-hour rainfall pHA Non-Polar O&G/ Total Toxic Outfall No. 1 Total Suspended Solids Copper Lead ' Zinc Total Petroleum s Collected amount, - Standard units Organics (mo/dd/yr): Inches , - Hydrocarbons Benchmarks===> _ - 100 mg/L or 50 mg/L4 6.0—9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 1 4/12/16 .12" 10.7 mg/I 7.13 .010 mg/I <.003 mg/I .189 mg/I <5.6 mg/I N/A 2 4/12/16 .12" 20 mg/I 7.22 .011 mg/I .004 mg/I .501 mg/I <5.6 mg/I N/A 3 4/12/16 .12" 19.5 mg/I 7.22 .008 mg/I .003 mg/I .448 mg/I <5.6 mg/I N/A 5 4/12/16 .12" 10 mg/I 7.59 <.002 mg/I <.003 mg/I .060 mg/I <5.6 mg/I N/A 1 Monthly sampling(instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit,Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations,manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample(for metal finishing use the definition as found in 40 CFR 433.11;for semiconductor manufacture use the definition as found in 40 CFR 469.12;for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). ©2016 Corning Incorporated.All Rights Reserved. Permit Date:11/1/2012-10/31/2017 SWU-245,last revised 10/25/2012 Page 1 of 3 , Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify,and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver,the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO),I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." N/A Name(Print name) N/A Title(Print title) N/A (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL,<PQL, Non-detect, ND,or other similar non-numerical format. When results are below the applicable limits,they must be reported in the format,"<XX me/L",where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark,you must implement Tier 1, Tier 2,or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results:only for facilities averaging>55 gal of new oil per month. ❑ No discharge this period?2 Date Sample 24-hour rainfall ' Outfall No. Collected amount, a Non-polar O&G/TPH by Total Suspended Solids pH (mo/dd/yr) Inches EPA 1664(SGT-HEM) Benchmarks===> -, 15 mg/L ' 100 mg/L or 50 mg/L* 6.0-9.0 SU, N/A N/A N/A N/A N/A N/A ©2016 Corning Incorporated.All Rights Reserved. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Footnotes from Part A also apply to this Part B *See General Permit text,Table 5,identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Note: If you report a sample value in excess of the benchmark,you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES X NOD IF YES,HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YESX_ NO❑ REGIONAL OFFICE CONTACT NAME: Several discussions and correspondence held with Mr.Samar Bou-Ghazale with the Mooresville regional office. Mail an original and one copy of this DMR, including all"No Discharge"reports, within 30 days of receipt of the lab results(or at end of monitoring period in the case of"No Discharge"reports)to: Division of Water Quality Attn:DWQ Central Files 1617 Mail Service Center Raleigh,North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware that there are significant penalties for submitting false information,including the possibility of finesfand imprisonment for knowing violations." . __.,,,----1...< ---, 4 /// //fid/ 6 (Signature of Permittee) (Date) ©2016 Corning Incorporated.All Rights Reserved. Permit Date:11/1/2012-10/31/2017 SWU-245,last revised 10/25/2012 Page 3 of 3