Loading...
HomeMy WebLinkAboutNCG200463 DMR SW (8) Keywell Metals Aerospace and Specialty Steel Recycling -t3 December 16, 2016 Storm Water Permitting Unit ➢,�"�sn Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality 111, Attention: Bradley Bennett 0 1612 Mail Service Center Raleigh, NC 27699-1612 Re: Storm Water Discharge Monitoring Report—Tiered Monitoring Keywell Metals, L.L.C. 2826 Top Hill Road, Monroe, NC 28110 Certificate of Coverage Number NCG200463 Dear Sir/Madam: Keywell Metals, L.L.C. located at 2826 Top Hill Road, Monroe, Union County, North Carolina in accordance with National Pollution Discharge Elimination System (NPDES)General Permit,with Certificate of Coverage No. NCG200463, is submitting two copies of our November 2016 Discharge Monitoring Report (DMR). There was either no flow or unsafe conditions in which to collect a sample during the month of November. Keywell Metals will continue to conduct tiered monitoring during the month of December 2016. If you have any questions or concerns, please feel free to contact me at (704) 234-8614, or our environmental consultant, Rob Duffy of Antea Group at(704)324-7035. Sincerely, Dan Buwalda Keywell Metals, L.L.C. Director of Aerospace Operations Attachment Semi-annual Stormwater Discharge Monitoring Report (DMR) br for North Carolina DEMLR General Permit No. NCG200000—Scrap Metal Recycling c , , n�� :LL ii j Date submitted December 15, 2016 f"t". P 2 2016 CERTIFICATE OF COVERAGE NO. NCG2O 0 4 6 3 SAMPLE COLLECTION YEAR 2016 y ;� ,n r FACILITY NAME Keywell Metals, LLC Top Hill Road Facility SAMPLE PERIOD ❑Jan-June ❑July-Des ` �� •l.l t COUNTY Union or X❑ Monthly1 November f month)'y'-I 'IP��r PERSON COLLECTING SAMPLES Jerry Plowman DISCHARGING TO CLASS ❑oRW ❑HQW ❑Trout ❑PNA LABORATORY Pace Analytical Lab Cert.# 40 ❑Zero-flow ❑Water Supply EISA Comments on sample collection or analysis: ❑Saltwater ❑X Other N; CSW PLEASE REMEMBER TO SIGN ON THE REVERSE - Part A:Stormwater Benchmarks and Monitoring Results I X1 No discharge this period?2 Outfall No. Date Sampe 24-hour rainfall Non-polar oil&grease Collected' amount, Total Suspended Chemical Oxygen EPA Method 1664 Copper, Lead, Zinc, (mo/dd/yr) Inches3 Solids Demand (SGT-HEM) Total Total Total Benchmarks==> _ - 100 mg/L or 0.010 mg/L or 0.075 mg/L or 0.126 mg/L or 50 mg/L4 120 mg/L 15 mg/L 0.005 mg/L5 0.210 mg/L5 0.090 mg/L5 1 Monthly sampling(instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit text,Table 3 or Table 4, identifying protected receiving water classifications where the more protective TSS benchmark applies. 5 Stormwater discharges into receiving waters classified as saltwater are subject to the second listed benchmark. Note: Results must be reported in numerical format. For example,do not report Below Detection Limit, BDL,<PQL, Non-detect, ND,or other similar non- numerical format. When results are below the applicable limits,they must be reported in the format,"<XX mg/L",where XX is the numerical value of the detection limit, reporting limit, quantitation limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit. Permit Date•02/02/2015-12/31/2019 SWU-256,last revised 1/28/2015 Page 1 of 2 Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging> 55 gal of new oil per month. NA No discharge this period?2 Date Sample 24-hour rainfall Outfall No. 1 Collected amount, Non-polar O&G by EPA (mo/dd/yr) Inches3 1664(SGT-HEM) Total Suspended Solids Benchmarks=__> - - 15 mg/L 100 mg/L or 50 mg/L4 Footnotes from Part A also apply to this Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit. FOR PART A AND PART B MONITORING RESULTS: • A SINGLE BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑X NO❑ IF YES,HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE AS REQUIRED BY THE PERMIT? YES X❑ NO❑ REGIONAL OFFICE CONTACT NAME Mail an original and one copy of this DMR,including all"No Discharge"reports, within 30 days of receipt of the lab results(or at end of monitoring period in the case of"No Discharge"reports)to: Division of Water Resources Attn DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware that there are significant penalties for submitting false information,including the possibility of fines and imprisonment for knowing violations." 7-1-- ( lk------e _.,_ cip /CD)IC(/),‘ (Signature of Permittee) — (Date) Permit Date.02/02/2015-12/31/2019 SWU-256,last revised 1/28/2015 Page 2 of 2