HomeMy WebLinkAbout20160418 Ver 2_More Info Received_20170202STREAM PROTECTION NOTES: 1. ALL WORK IN OR ADJACENT TO STREAM WATERS SHALL BE CONDUCTED SO THAT THE FLOWING STREAM DOES NOT COME IN CONTACT WITH THE DISTURBED AREA, I.E. IN THE DRY". (PER WATER QUALITY CERTIFICATION NO. 3890, CONDITION #6) (SEE ''PHASING PLAN" ON SHEET 5 FOR ADDITIONAL INFORMATION) 2. NO CONSTRUCTION ACTIVITIES THAT INVOLVE DISTURBANCE OF THE STREAM MAY TAKE PLACE DURING TROUT SPAWNING SEASON (JAN. 1 - APRIL 15). 3. SEE EROSION CONTROL PLANS 8 SHEET 4 REGARDING PHASING OF THE WORK SPECIFIC TO PROTECTING THE EXISTING STREAM. PROJECT NOTES: 1. PROPERTY OWNER INFORMATION: HIGH MOUNTAIN HOLDINGS 2. DEVELOPER INFORMATION: THE BROADWAY GROUP LLC 216 WESTSIDE SQUARE HUNTSVILLE, ALABAMA 35801 PHONE: 256-533-7287 3. PROPERTY INFORMATION: DEED BOOK 442 PAGE 260 4. GOVERNING MUNICIPALITY: TRANSYLVANIA COUNTY, NC -U.S. ARMY CORPS OF ENGINEERS -NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ) CONSTRUCTION PLANS FOR PROPOSED RETAIL STORE PREPARED FOR THE BROADWAY GROUP LLC U.S HIGHWAY 276 — BRFVARn. NC DUNN'S ROCK TOWNSHIP - TRANSYLVANIA COUNTY VICINITY MAP INDEX TO DRAWINGS: SHT. NO. SHT. NAME COVER COVER SHEET 1 NOTES 2 DEMOLITION 3 LAYOUT 4 GRADING (PHASE I & 11) 5 GRADING (PHASE 111) 6-8 EROSION CONTROL (PHASE 1-111) 9 STORM 10 STORM CROSS-SECTIONS 11-13 DETAILS 14 LANDSCAPE PLAN 1 PROJECT NO.: 16-137 I Lu LLIU Lu ~ (n Z O cu Q J 0 L0 Lu Q OJ cf) LLJ> QN � U(n z Q Q .0 N E N u N CD Z Lu + (_9 0 3 a N LU U) woo > Lo. 19 01 a LU M Q o w Z v J O Lo N z Lu U J U W m O Cly J } z 0 U J a Q z W0 J �zz Q�Q LL (n ZW Q> Q 0 Lu a u) a V) Z WIZ OO�1_1�o a cu ua0 u w 0 0 w U)U) > Z azz a� �01111111/ 1�► CARO ��oQ;'��ss�o�•�ti-9�' SEAL 0365 _ r d � ,GIN • . • �V`� [fill REVISIONS: DRAWN BY: BBAILEY FIELD DATE: 01.01.2016 OFFICE DATE: 08.17.2016 CHECKED BY: JCARGILE PLOT DATE: 23.01.2017 NO SCALE SHEET COVER OF 14 PROJECT NO.: 16-137 I STREAM PROTECTION NOTES: 1. ALL WORK IN OR ADJACENT TO STREAM WATERS SHALL BE CONDUCTED SO THAT THE FLOWING STREAM DOES NOT COME IN CONTACT WITH THE DISTURBED AREA, I.E. "IN THE DRY". (PER WATER QUALITY CERTIFICATION NO. 3890, CONDITION #6) (SEE "PHASING PLAN" ON SHEET 5 FOR ADDITIONAL INFORMATION) 2. NO CONSTRUCTION ACTIVITIES THAT INVOLVE DISTURBANCE OF THE STREAM MAY TAKE PLACE DURING TROUT SPAWNING SEASON (JAN. 1 - APRIL 15). 3. SEE EROSION CONTROL PLANS 6 SHEET 4 REGARDING PHASING OF THE WORK SPECIFIC TO PROTECTING THE EXISTING STREAM. GENERAL NOTES 1. THE CONTRACTOR IS RESPONSIBLE FOR MAKING APPLICATION, AND PAYING FOR ALL NECESSARY PERMITS. 2. THE CONTRACTOR SHALL PREVENT THE DESTRUCTION OF ALL SURVEY MONUMENTS, BENCH MARKS, PROPERTY CORNERS AND ALL OTHER SURVEY POINTS. WHERE THE REMOVAL OF SUCH POINTS IS NECESSARY FOR THE ACCOMPLISHMENT OF THE WORK, THE CONTRACTOR IS TO INFORM THE ENGINEER IN WRITING, PRIOR TO THE DISTURBANCE OF ANY POINT, AND IS NOT TO DISTURB THE POINT UNTIL WRITTEN PERMISSION TO DO SO HAS BEEN GRANTED BY THE ENGINEER. 3. ALL EXISTING TREES AND SHRUBS OUTSIDE OF THE LIMITS OF WORK SHALL BE PROTECTED DURING CONSTRUCTION, AND ARE NOT TO BE DAMAGED IN ANY MANNER. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ANY DAMAGE TO EXISTING STREETS AND OTHER STRUCTURES WHICH IS CAUSED BY CONSTRUCTION ACTIVITIES. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL AND PROPER DISPOSAL OF ALL BOULDERS, DEBRIS, EXCESS CONSTRUCTION MATERIALS, MATERIAL GENERATED FROM THE DEMOLITION OF EXISTING STRUCTURES AND FACILITIES, AND TRASH. 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR HAVING EXISTING UTILITIES LOCATED PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. THE ENGINEER/SURVEYOR ASSUME NO RESPONSIBILITY AS TO THE ACCURACY OR COMPLETENESS OF THE EXISTING UTILITIES SHOWN ON THE PLANS. 7. UNLESS INDICATED OTHERWISE ON THE PLANS, ALL STORM DRAINAGE PIPES SHALL BE REINFORCED CONCRETE CLASS III (ASTM C-76). COMPACTED GRANULAR MATERIAL FOR BEDDING SHALL BE REQUIRED WHERE UNSUITABLE GROUND WATER OR OTHER CONDITIONS PREVENT THE CONTRACTOR FROM OBTAINING A PROPERLY SHAPED TRENCH BOTTOM. 8. ALL PAVEMENT CUTS SHALL BE REPAIRED WITH MATERIAL IN KIND TO THAT REMOVED. 9. UNLESS INDICATED OTHERWISE ON THE PLANS, ALL RIP RAP SHALL BE IN ACCORDANCE WITH SECTION 6.15, NCDEQ EROSION 6 SEDIMENT CONTROL PLANNING 6 DESIGN MANUAL. 10. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS OF THE JOB SITE, INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. 11. THE CONTRACTOR SHALL PROVIDE ADEQUATE TRAFFIC CONTROL DEVICES AND SAFETY MEASURES FOR CONSTRUCTION WORK WITHIN PUBLIC RIGHT-OF-WAYS AND OTHER AREAS WHICH REQUIRE ITS' USE IN ACCORDANCE WITH THE FEDERAL HIGHWAY ADMINISTRATION MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS (M.U.T.C.D.) LATEST EDITION. 12. THE DUTY OF THE ENGINEER TO CONDUCT CONSTRUCTION REVIEW OF THE CONTRACTOR'S PERFORMANCE DOES NOT INCLUDE REVIEW OF THE CONTRACTOR'S SAFETY MEASURES IN, ON, OR NEAR THE CONSTRUCTION SITE. 13. SIDEWALK RAMPS ARE TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) SPECIFICATIONS. PAVEMENT CONSTRUCTION GENERAL NOTES: 1. NCDOT 2006, SHALL MEAN NORTH CAROLINA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION, 2006 EDITION. 2. CRUSHED AGGREGATE BASE COURSE PLANT MIXED SHALL BE PLACED IN ACCORDANCE WITH SECTION 520, NCDOT 2006. ALL MATERIALS SHALL BE INACCORDANCE WITH SECTION 1010. 100% COMPACTION REQ'D. 3. PORTLAND CEMENT CONCRETE PAVEMENT SHALL BE PLACED IN ACCORDANCE3 WITH SECTION 700, NCDOT 2006. 4. BITUMINOUS CONCRETE BINDER LAYER SHALL BE PLACED IN ACCORDANCE WITH SECTION 610, 1-19.00, NCDOT 2006. 5. BITUMINOUS CONCRETE WEARING SURFACE LAYER SHALL BE PLACED IN ACCORDANCE WITH SECTION 610, S -9.5C, NCDOT 2006. 6. THE SITE SHALL BE CLEARED AND ALL UNSUITABLE MATERIAL REMOVED PRIOR TO PLACING AND COMPACTING EMBANKMENTS. 7. ALL SUBGRADES SHALL BE CLEARED AND GRUBBED, SCARIFIED TO A DETH OF 8", AND THEN RECOMPACTED TO 100% OF THE MAXIMUM DRY DENSITY, PLUS OR MINUS 2% OF OPTIMUM MOISTURE (ASTM -D6798). 8. IN ROCK EXCAVATION A MINIMUM OF 1 FOOT OF SOIL SHALL BE PLACED OVER ROCK PRIOR TO PLACEMENT OF BASE MATERIAL. 9. PAVEMENT MARKING PAINT SHALL BE ALKYD -RESIN TYPE, READY -MIXED, COMPLYING WITH FS TT -P-115, TYPE I, AASHTO M-248, TYPE N, OR LATEX WATER -BASE EMULSION, READY -MIXED, COMPLYING WITH FS TT -P-1952. APPLY PVMT. MARKING PAINT WITH MECHANICAL EQUIPMENT, PER THE MFR'S RECOMMENDATIONS TO PRODUCE PVMT. MARKINGS OF DIMENSIONS INDICATED ON THE PLANS WITH UNIFORM, STRAIGHT EDGES, AND A MINIMUM WET FILM THICKNESS OF 15 mils (0.4 mm). REINFORCED CONCRETE NOTES 1. ALL CONCRETE SHALL BE AIR ENTRAINED 3000 PSI MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS, (CLASS "A."), UNLESS NOTED OTHERWISE ON THE PLANS. 2. ALL CONSTRUCTION JOINTS SHALL BE CONSTRUCTED WITH CONTINUOUS SHEAR KEYS IN ACCORDANCE WITH THE SHEAR KEY DETAIL ON THE PLANS. 3. ALL REINFORCING STEEL SHALL BE GRADE 60 DEFORMED BARS, AND SHALL CONFORM TO STM A615, FOR BILLET STEEL. 4. LAP SPLICES AND BAR EMBEDMENTS SHALL BE IN ACCORDANCE WITH THE TABLE ON THE PLANS. 5. CONCRETE AIR CONTENT AND SLUMP SHALL BE IN ACCORDANCE WITH THE TABLE ON THE PLANS. 6. ALL REINFORCING BARS SHALL BE SHOP BENT IN ACCORDANCE WITH THE TABLE ON THE PLANS. HEATING OF REINFORCING BARS TO BEND THEM, OR STRAIGHTEN THEM WILL NOT BE ALLOWED. 7. ALL WELDED WIRE FABRIC SHALL CONFORM TO ASTM A185. SMOOTH FABRIC WITH AN ASTM YIELD STRENGTH OF 65.000 PSI. SEEDING NOTES: 1. THE CONTRACTOR IS REQUIRED TO FURNISH ALL MATERIALS, EQUIPMENT AND LABOR NECESSARY FOR THE SEEDING OF ALL DISTURBED AREAS, AND OTHER AREAS SPECIFIED ON THE GRADING PLANS. ALL SPECIFIED SURFACE AREAS SHALL BE SEEDED IN ACCORDANCE WITH THE FOLLOWING SPECIFICATIONS. 2. TOPSOIL SHALL BE STRIPPED AND STOCK PILED DURING CONSTRUCTION. A MINIMUM OF 6 INCHES OF CONDITIONED AND AMENDED TOPSOIL SHALL BE RESPREAD OVER ALL AREAS SPECIFIED FOR SEEDING. GRADING SHALL CONFORM WITH THE GRADING PLAN. 3. SEEDING SHALL BE AS FOLLOWS: (A)"REBEL" OR "FALCON" FESCUE SEED ('TIL APRIL 15TH) WITH 95% GERMINATION. APPLICATION RATE SHALL BE 8 LBS. PER 1,000 SQUARE FEET. (B)BERMUDA SEED (FROM APRIL 15TH TO AUGUST 15TH) WITH 95% GERMINATION. APPLICATION RATE SHALL BE 3 LBS. PER 1,000 SQUARE FEET. 4. SOIL AMENDMENT SHALL BE RECOMMENDED USING LIME OR SULFUR TO ACHIEVE A SOIL PH OF 5.5 TO 6.5. 5. "2-4-D ROUNDUP" OR EQUIVALENT POST -EMERGENT HERBICIDE SHALL BE REQUIRED TO KILL EXISTING WEEDS PRIOR TO SEEDING. "TREFLAN," "DACTAL" OR EQUIVALENT PRE -EMERGENT HERBICIDE SHALL BE REQUIRED FOR ALL SEEDED AREAS TO PREVENT WEED GERMINATION. 6. PROTECTION OF SEEDED AREAS ON STEEP SLOPES SHALL BE PROVIDED USING A "SUPER DUTY EXCELSIOR EROSION CONTROL BLANKET" AS MANUFACTURED BY "PPS PACKAGING COMPANY," P.O. BOX 56 FOWLER, CA, 93625, OR APPROVED EQUIVALENT WHERE INDICATED ON THE GRADING PLAN. APPLICATION OF "EXCELSIOR" BLANKET SHALL COMPLY WITH THE MANUFACTURER'S RECOMMENDATIONS. WHERE INDICATED ON THE PLANS, APPLY BLANKET TO THE SLOPE AFTER PROPER PREPARATION AND SEEDING OF THE GROUND. EARTHWORK GENERAL NOTES: 1. THE SITE TOPOGRAPHY AND OTHER TOPOGRAPHIC DATA SHOWN ON THE PLANS OR INCLUDED IN THE SPECIFICATIONS ARE FOR THE INFORMATION OF THE CONTRACTOR. THE CONTRACTOR SHALL MAKE SUCH ADDITIONAL INVESTIGATIONS AS REQUIRED TO ACQUAINT HIMSELF ADEQUATELY WITH THE SITE, INCLUDING SUBSURFACE SOIL CONDITIONS, FOR PREPARATION OF HIS BID, AND FOR THE SUCCESSFUL EXECUTION. 2. UNLESS INDICATED OTHERWISE ON THE PLANS, ALL PROPOSED CONTOURS AND ALL PROPOSED SPOT ELEVATIONS SHOWN ARE FINISHED GRADE. 3. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE PROTECTION OF HIS WORK. SUCH GRADING AS IS REQUIRED FOR THIS PURPOSE SHALL BE THE CONTRACTOR'S RESPONSIBILITY AND SHALL BE PERFORMED AT NO ADDITIONAL COST TO THE OWNER. THE OWNER MAY DIRECT THE CONTRACTOR TO PERFORM SUCH GRADING AND DRAINAGE AS IS NECESSARY TO PREVENT SURFACE RUNOFF FROM DAMAGING THE WORK. 4. THE CONTRACTOR SHALL BE REQUIRED TO INSTALL SILT FENCES, CHECK DAMS, AND OTHER EROSION 6 SEDIMENT CONTROL MEASURES TO PREVENT LOOSE DIRT AND SEDIMENT FROM WASHING ONTO STREETS AND ADJACENT PROPERTY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE MAINTENANCE OF EROSION 6 SEDIMENT CONTROL MEASURES UNTIL FINAL INSPECTION BY THE LOCAL GOVERNING AGENCY. S. ALL EARTH FILL SHALL BE COMPACTED TO 95% OF THE MAXIMUM DRY DENSITY, PLUS OR MINUS 2% OF OPTIMUM MOISTURE (ASTM -D6798), EXCEPT FOR EARTH FILLS UNDER ROADS WHICH ARE TO COMPLY WITH THE PAVING SPECIFICATIONS. 6. ALL EARTH FILL SHALL BE PLACED IN UNIFORM LAYERS OR LIFTS NOT EXCEEDING 6" IN COMPACTED THICKNESS, UNLESS INDICATED OTHERWISE ON THE PLANS. 7. ALL EARTH FILL SHALL BE PLACED IN ACCORDANCE WITH NCDOT 2006 STANDARDS. ALL EARTH FILL UNDER BUILDINGS SHALL ALSO MEET THE REQUIREMENTS OF THE ARCHITECT'S PLANS AND SPECIFICATIONS. 8. IF A GEOTECHNICAL REPORT HAS BEEN PREPARED FOR THE SITE, THE CONTRACTOR SHALL BE RESPONSIBLE FOR FOLLOWING THE SITE PREPARATION RECOMMENDATIONS SPECIFIED WITHIN THIS DOCUMENT, UNLESS MORE STRINGENT REQUIREMENTS ARE GIVEN ON THE PLANS OR WITHIN THE PROJECT SPECIFICATIONS. 9. ALL DISTURBED AREAS ARE TO BE PERMANENTLY STABILIZED WITH SOD. EROSION AND SEDIMENT CONTROL PLAN CONSTRUCTION SEQUENCE - PHASE I: 1. INSTALL CONSTRUCTION ENTRANCES WITH CRUSHED AGGREGATE BASE COURSE AT ALL LOCATIONS WHERE CONSTRUCTION TRAFFIC WILL BE ENTERING AND EXITING THE SITE. CONSTRUCTION ENTRANCES USED FOR REMOVAL OF ONSITE MATERIALS SHALL EXTEND TO THE LOADING AREA, BUT IN NO CASE SHALL ANY CONSTRUCTION ENTRANCE BE LESS THAN 50 FEET IN LENGTH OR 6" IN DEPTH. WIDTH SHALL NOT BE LESS THAN 15 FEET. 2. INSTALL SILT FENCES AROUND TOE OF PROPOSED SLOPES (SEE SHEET 6). 3. ESTABLISH TOPSOIL STOCKPILE. (SEE SHEET 6) 4. INSTALL SILT FENCES AROUND STOCKPILE AND COVER STOCKPILES. 5. BEGIN SITE CLEARING AND GRUBBING OPERATIONS. AS NEEDED FOR PHASE 1 IMPROVEMENTS. 6. COMPLETE GRADING 6 WORK ASSOCIATED WITH WALL CONSTRUCTION. 7. PHASE I STORM IMPROVEMENTS ASSOCIATED W/ STREAM DISTURBANCES (SHEET 4) 8. DISTURBED AREA WHERE CONSTRUCTION WILL CEASE FOR MORE THAN 14 DAYS WILL BE STABILIZED WITH EROSION CONTROLS. EROSION AND SEDIMENT CONTROL PLAN CONSTRUCTION SEQUENCE - PHASE II: L FOLLOWING GRADING ASSOCIATED WITH PHASE II STREAM DISTURBANCE INSTALL CONTROL BLANKET OVER ENTIRE DISTURBED AREA 2. INSTALL HARDWARE CLOTH 6 GRAVEL INLET PROTECTION AS SHOWN ON SHEET 7 FOLLOWING CONSTRUCTION OF INLET DURING STREAM DISTURBANCE PHASE II. EROSION AND SEDIMENT CONTROL PLAN CONSTRUCTION SEQUENCE - PHASE II: 1. REMOVE SPOILS 6 STOCKPILE 2. INSTALL DOUBLE ROW SILT FENCE ALONG RIGHT OF WAY 3. INSTALL STRAW WATTLES AROUND EXISTING INLETS 4. INSTALL CHECK DAMS ALONG EAST PROPERTY LINE 5. INSTALL PHASE III STORM (SEE SHEET 4) 6 INSTALL ASSOCIATED EROSION CONTROL (WATTLES) 6. REMOVE PHASE 1 6 II SILT FENCING. 7. INSTALL TEMPORARY SANITARY FACILITIES AND DUMPSTERS 8. INSTALL UTILITIES STORM SEWER, SANITARY SEWERS AND WATER SERVICES. 9. CONSTRUCT TEMPORARY CONCRETE WASHOUT AREA. 10. CONSTRUCT STAGING AND MATERIALS STORAGE AREA. 11. INSTALL TEMPORARY SANITARY FACILITIES AND DUMPSTERS. 12. INSTALL UTILITIES, STORM SEWER, SANITARY SEWERS AND WATER SERVICES. 13. BEGIN CONSTRUCTION OF BUILDING FOUNDATION AND STRUCTURE. 14. INSTALL GUTTERS, CURBS, AND PREPARE PAVEMENT SUBGRADE. 15. PARKING LOT PAVED, EXTERIOR BUILDING CONSTRUCTED. 16. REMOVE TEMPORARY CONCRETE WASHOUT AREA. 17. IMPLEMENT WINTER STABILIZATION PROCEDURES IF NECESSARY. 18. FINALIZE PAVEMENT ACTIVITIES. 19. FINALIZE GRADING ACTIVITIES. 20. REMOVE ALL TEMPORARY CONTROL BMP'S AND STABILIZE AREAS DISTURBED BY THEIR REMOVAL WITH EROSION CONTROLS. 21. PREPARE FINAL SOD AND LANDSCAPING. 22. MONITOR STABILIZED AREAS UNTIL FINAL STABILIZATION IS REACHED. 1 PROJECT NO.: 16-137 I w U w (n z ~ = O cu o a J Lo a 0 Q N v w U cq (D z6 w + U)U) 0 3 cu TN w Lu ~ECJ uyi a) Lo a N w m cf) w z_ Q _j o Lo z w O U J U w Q�0 Z J O J a Q z W0 Q �Z)-z 0 Q Q Q Woo<� Z Q � I a Q O W m m n (I wZ W i z 0 Pl% o ZV aLLQU O>� N V O Lu ~�/ W=3, 0 cn Z O Z�a2 auaW� la o %%%' ► CARO ��♦i %�pQ;••�ss�p•.�'�'�'• ? • • SEAL 0365 r r ••GIN•.• � w. CP��`. REVISIONS: DRAWN BY: BBAILEY FIELD DATE: 01.01.2016 OFFICE DATE: 08.17.2016 CHECKED BY: JCARGILE PLOT DATE: 23.01.2017 NO SCALE SHEET 1 OF 14 PROJECT NO.: 16-137 I STREAM PROTECTION NOTES: 1. ALL WORK IN OR ADJACENT TO STREAM WATERS SHALL BE CONDUCTED SO THAT THE FLOWING STREAM DOES NOT COME IN CONTACT WITH THE DISTURBED AREA, I.E. "IN THE DRY". (PER WATER QUALITY CERTIFICATION NO. 3890, CONDITION 96) (SEE PHASING PLAN ON SHEET 5 FOR ADDITIONAL INFORMATION) 2. NO CONSTRUCTION ACTIVITIES THAT INVOLVE DISTURBANCE OF THE STREAM MAY TAKE PLACE DURING TROUT SPAWNING SEASON (JAN. 1 - APRIL 15). 3. SEE EROSION CONTROL PLANS 6 SHEET 4 REGARDING PHASING OF THE WORK SPECIFIC TO PROTECTING THE EXISTING STREAM. //// -11 iII, r l l r l l l 11\ I1 IIII IIII /r / / 1 = I I I I ►IIIIIIIII/ 7////// I( sj / / I✓/ II III IIIIIIII \ I //////// //// / / N � I 7/ / // / / / / _ Q cel rn w r,i t /� �// // ✓ �s �Ilr i 11111 11 l l I I \` 11/1 lll/llll/ l l l /l /l /l / 1 / l l /// /j k N (D /l�l�llll/llll% ///IIIA (� 7/10/1 1 11 1 cn NJ 1 I I I 11 a' l 11111111 ` I\ N llll/lllj N 1 �11 I �11 1111111111 I J s 11111111 1111/// /l I I III 1 1 1 1 1 1 1 1 111 I IIIIIIII ( s. 1111/ 1111111 III III I I (J� ISI I II,� 1 1 1__—_ "// o%/I Io I I III I IIII 1 1 1 1 1 1 1 Cn 111�1111o,1 ( �//��//' IIII; I I 111 I I eco I ISI I I ISI I 11u La /� I I I I ' 1 11 \ /'//// 111;'1 I I I I N 1 I I I I I I I 1 I N 111� �•I/j 111111111 1 1 1 1 1 1 III I I I I I I I I I I Q 1111 11111 111—� �IIIIIIIIIII1111 I I I I I I IIII IIIIIIIIII C.4 0) 4� 11 111 1 1 _ VIII IIII I I I I I 1 1 1 1 1 1 1 1 II iw CO \ I 1 11 \ \ — — — — I �I 11 �I I I I I I I I I I III 1 1 1 NEW SEPTIC SYSTEM tiWgS lei 11 1111 1 1 I I I I I� I� 1 1 to I I IIII I a? �S111 INI III^ I I IIII IIII TO UTILIZE EXISTING n; \ /l I 1 111111 1 �, \ 11111111111111 111 I I I I ( I I I I I I I I I I FIELD LINES 1 1 11 \ _ _ 'III III III I I IIIIIIII (SEE SHEET 3) \� /l �,4 111111( 1 —�� II 111111 IIIIIII1111�111(III \ I / l 1111111 REMOVE\\\\\\\\\\ 1 1 1 1 1 1 1 1 1 1 1 1 I\\ 1 1 1 1 1 1 1 EXISTING PIPE \\\\\\\ \\\\\ I 1 I I I I \ \ \ \IIIIIIII r \\ \\\\\ \\\\ \\ \ \ \ \ I IIII II Wl �,4 \\ / 1 ❑ l \ 1111 I \ � � � � ' � '� � ` �� \\�\� ��\ ���\���\�`\�\\\\\\\\\\\\\ \ \ \ I I I IIIIIIIII rnr — I -- — \\�� �\ / 1 1111 I DEMO EXISTING / �\\�\\ \\\\\\\\\\\\\\ III I I I III I c„ PAVEMENT o 00 SAW -CUT EX. EDGE OF PVMT. 1 1, �com�� ANN / RELOCATE EXISTING POLE & I N-1 CONNECTING LINES (SEE SHEET 3) I I ti \\ °� \\ � I I I / I\\1111\1111\1111\III11111111111I\\N�\\\\\\\\��, LJ // I CN �� �� \ IIIIIIIjjIl111111111111i111111 O1\ \\\\\\\\\ \ o / N DEMO EXISTING I \III 111\ \ \\ \ \ \\ BUILDING \ vv I A 1IIIIIIjllll1111\I111\I\11111\\ \\VAS '�\ \ oo� o/�-- / \ � \ \ \ 111111111IIIIIIIIIIIII\\� ��, - -�REMOVE EX. AV 2744 SIGNS \ \\ \� \\ , \ \ \ \ RELOCATE EX. WELL ' I \\ (SEE SHEET 3) , \\ I ON" \ \ I \ I \ \ I d/, \ � I \ ® I co 01 �\ Ic 1 (y) 1i �o I oy� \ \ 4 \ \ ( I I v 1 Lu U Lu ~ Lu (n z O cu T Q J o 00 w d U O cn w Q N Q Z Q �� Q � 3 z Lu U Z cD cf) oN 3 TN � LU 0 a� '^ U) w o� L co �N `t' za 0LU Q o Lu Z O J Ln Z Lu U J U w cynO F cn } O J J Q Z j WO Q _ju )_z Z 0 Q < ry cn p ZW Q j ' a QOw m a W (I Z 7: WIZ 00��0 Z V am cuO�oLL ~ ° O W O = 3<__ 2 cn Z 2:Z W Ow �? aVaaDo CARO `������j► SEAL • • 0365 � .•GIN•.• `�� M. CP�``. Mill it REVISIONS: DRAWN BY: BBAILEY FIELD DATE: 01.01.2016 OFFICE DATE: 08.17.2016 CHECKED BY: JCARGILE PLOT DATE: 23.01.2017 J 0 0 20' 40' SHEET 2 OF 14 PROJECT NO.: 16-137 I STREAM PROTECTION NOTES: 1. ALL WORK IN OR ADJ WATERS SHALL BE COf THE FLOWING STREAM CONTACT WITH THE DI` "IN THE DRY". (PER WA7 CERTIFICATION NO. 38c, (SEE "PHASING PLAN" C ADDITIONAL INFORMAT 2. NO CONSTRUCTION / INVOLVE DISTURBANCE MAY TAKE PLACE DURIr SPAWNING SEASON (J) 3. SEE EROSION CONTP 4 REGARDING PHASING SPECIFIC TO PROTECTIf STREAM. ARTHWORK QUANTITIES UT = 1,206 CYD LL = 1,671 CYD ET FILL = 466 CYD OTAL DISTURBED AREA = 38,306 SQ. FT. (0.88 AC) OTE: EARTHWORK QUANTITIES REPRESENT NADJUSTED VOLUMES BASED ON EXISTING 6 :�OPOSED SURFACE MODELS. EXISTING STORM PIPE DEMO EXISTING ASPHALT EXISTING AREA TO REMAIN aAREAINLET Lu ABBREVIATIONS LEGEND U Lu ~ (n z BC BACK OF CURB _ Q O F J o Lo Lu Uw 0 Q N �i CONCRETE MONUMENT, FOUND BW BOTTOM OF WALL ZQ g a CONC. CONCRETE o� 0 cu T CONCRETE MONUMENT, SET 00 LU D EL., ELEV. ELEVATION O PROPERTY CORNER, FOUND F EP EDGE OF PAVEMENT co Q) �N 0 PROPERTY CORNER, SET cjj z ESM'T EASEMENT L0 Q U EX. EXISTING x— FENCE U w F.F.E. FINISHED FLOOR ELEVATION FG FINISHED GRADE CONCRETE N J F.S.L. FRONT SETBACK LINE } C) z no DIRECTION OF FLOW H -WALL HEAD WALL O J HP HIGH POINT 0HT OVERHEAD TELEPHONE LINE Q Z WO j Q I.E. INVERT ELEVATION 0HE- OVERHEAD ELECTRIC LINE N uI 0 INV. INVERT ILL Wo UGE UNDERGROUND ELECTRIC LINE LO ZW JB JUNCTION BOX I QOwa LF LINEAR FEET UGT UNDERGROUND TELEPHONE LINE (AT&T) a(InW LOC. LOCATION O EXISTING SANITARY SEWER MANHOLE 7: i MAX. MAXIMUM (U aV 0LLQ S EXISTING SANITARY SEWER LINE M.B.L. MINUMUM BUILDING LINE W3° Q O Z M.H. MANHOLE OS PROPOSED SANITARY SEWER MANHOLE �r Ua m J . o _j MIN. MINIMUM S PROPOSED SANITARY SEWER LINE CARO N.I.C. NOT IN CONTRACT ' SEAL 0365 -0- EXISTING UTILITY POLE OTI OPEN THROAT INLET filM PVMT. PAVEMENT A EXISTING LIGHT POLE REQ'D REQUIRED W EXISTING WATER LINE DRAWN BY: BBAILEY REQ'TS REQUIREMENTS OFFICE DATE: 08.17.2016 R.S.L. REAR SETBACK LINE C4 EXISTING WATER VALVE PLOT DATE: 23.01.2017 R.O.W. RIGHT-OF-WAY M EXISTING FIRE HYDRANT I�Y7 S.S. SANITARY SEWER 0 20' 40' W PROPOSED WATER LINE SHEET S.S.L. SIDE SETBACK LINE OF 14 STR STRUCTURE 04 PROPOSED WATER VALVE TEMP. TEMPORARY ;YD PROPOSED FIRE HYDRANT TOC TOP OF CURB G EXISTING GAS LINE TOW TOP OF WALL TYP TYPICAL G PROPOSED GAS LINE U & D UTILITY AND DRAINAGE U.N.O. UNLESS NOTED OTHERWISE 610 EXISTING INDEX CONTOURS STR STRUCTURE — — EXISTING INTER CONTOURS WQU WATER QUALITY UNIT XEG 661.2 EXISTING SPOT ELEVATION 610 PROPOSED INDEX CONTOURS 611— PROPOSED INTER CONTOURS ITE AREA DETAILS X FG 662.50 PROPOSED SPOT ELEVATION TANDARD ASPHALT/CONC. PVMT = 4,634 SQ. FT. TREE LINE EAVY DUTY ASPHALT/CONC. PVMT = 9,600 SQ. FT. CDOT PAVEMENT = 1,338 SQ. FT. EXISTING TREES ONCRETE SIDEWALK = 1,285 SQ. FT. UMPSTER/DELIVERY AREA CONCRETE = 1,054 SQ. FT. -TAINING WALL APPROXIMATELY = 2,628 SQ. FT. x TEMPORARY SILT FENCE TEMPORARY STONE CHECK DAM TEMPORARY STRAW WATTLE ARTHWORK QUANTITIES UT = 1,206 CYD LL = 1,671 CYD ET FILL = 466 CYD OTAL DISTURBED AREA = 38,306 SQ. FT. (0.88 AC) OTE: EARTHWORK QUANTITIES REPRESENT NADJUSTED VOLUMES BASED ON EXISTING 6 :�OPOSED SURFACE MODELS. EXISTING STORM PIPE DEMO EXISTING ASPHALT EXISTING AREA TO REMAIN aAREAINLET PROJECT NO.: 16-137 I Lu U Lu ~ (n z _ Q O F J o Lo Lu Uw 0 Q N �i Y ZQ g a U Z Lu u(7 + Z � o� 0 cu T � LU D a� U) > COO, co Q) �N Z_ a LU m Q cf) o Lu Z J O L0 z Lu U J U w Q�O J } z O J J Q Z WO j Q �Zz 0 Q -< ILL Wo Q ZW Q ; I QOwa mmU a(InW Z 7: i Z 00�N0 (U aV 0LLQ U LL= r O W3° O Z Qa 2 z I..L Ua m J . o _j (ID NN X41, CARO ? • ' SEAL 0365 _ IM. CP��`. filM REVISIONS: DRAWN BY: BBAILEY FIELD DATE: 01.01.2016 OFFICE DATE: 08.17.2016 CHECKED BY: JCARGILE PLOT DATE: 23.01.2017 J� V I�Y7 0 20' 40' SHEET 3 OF 14 PROJECT NO.: 16-137 I STREAM PROTECTION NOTES: 1. ALL WORK IN OR ADJACENT TO STREAM WATERS SHALL BE CONDUCTED SO THAT THE FLOWING STREAM DOES NOT COME IN CONTACT WITH THE DISTURBED AREA, I.E. "IN THE DRY". (PER WATER QUALITY CERTIFICATION NO. 3890, CONDITION #6) (SEE PHASING PLAN ON SHEET 5 FOR ADDITIONAL INFORMATION) 2. NO CONSTRUCTION ACTIVITIES THAT INVOLVE DISTURBANCE OF THE STREAM MAY TAKE PLACE DURING TROUT SPAWNING SEASON (JAN. 1 - APRIL 15). 3. SEE EROSION CONTROL PLANS 6 SHEET 4 REGARDING PHASING OF THE WORK SPECIFIC TO PROTECTING THE EXISTING STREAM. NOTE: ONLY THE INFORMATION SHOWN ON THIS SHEET MAY BE CONSTRUCTED DURING TROUT SPAWNING SEASON (JAN. 1 - APRIL 15) TO AVOID STREAM DISTURBANCE STREAM DISTURBANCE SCHEDULE CALENDAR DAYS 1 5-11 3-4 ACTIVITY MOBILIZE PHASE I: PIPE & STRUCTURE INSTALLATION PHASE II: PIPE & STRUCTURE INSTALLATION PHASE III: FILL REMAINING STREAM NOTE: PHASE II S PHASE III WORK IS TO BE PERFORMED ONLY WHEN THERE IS NO RAIN FORECASTED WITHIN 5 DAYS OF COMMENCEMENT OF THE WORK 6 THERE IS NO VISIBLE EVIDENCE OF FLOW IN THE STREAM. ALL WORK SHALL BE COMPLETED & STABILIZED 24 HOURS MIN. PRIOR TO FORECASTED RAIN. (PER 15A NCAC 04B.0105) / �S \ y�r \ 2�6 ,II III IIIA III I (IIII VII I VII I 11111 III`1 I 1 \ 1 I l \ 111 \M11 \ 111111 \ 1111111 IIIIIIII \llllllll� �IIIIIIIIIM Illlllllll� 'I II II II II II 11 II II II I it 11111111111111 111111111111 l y� l I 1111 1 I �I��I I I J P FRo�PNo� IIIII�I � 1 0 I \ \ \ �— 4595 0l/l jll �I� �III1N\\\ \\ /FsTRB2JB I I II�INI��I� I1 NOTE: INSTALL ALL PIPE 6 STRUCTURE B2 TO OUTSIDE LIMITS OF \ /// 19 LF RCP - STREAM (HIGHLIGHTED PORTION) (SEE SHEET 7 FOR FURTHER DETAILS) 1 /// III 1111 l /� - Illlllll l / x X1111111 �1/l / x I 11 1 �`/ ///p 75 LF RCP / / l I� I I / 1 /lI / l/ i 0 0 �8� DOUBLE ROW SILT 111 FENCE ALONG wl \ xIIII TOP OF BANK (\ \ 7:T: \` \ E I W/l PHASE I STR Bl H -WALL \ PHASE II NOTES: I 1I 1 I \ _ 1. INSTALL ALL REMAINING PIPES 6 LF RCP I1 I I I 110 I 6 STRUCTURES (HIGHLIGHTED _ 1 — 0' r 1 I' E:Z =° INSTALL REMAINING PIPE, PORTION) (SEE SHEET 7 FOR 45•g5 l l �1'll'� H -WALL &GRADE IN CONNECTION FURTHER DETAILS) \ ' I �� 111 TO STREAM, "BERM OFF" FLOW TO 2. SPREAD STRAW OVER ENTIRE \ I REMAINING CHANNEL DISTURBED AREA AT HEADWALL 2�1�21 - 6 INSTALL COIR MATTING = 3 (HEAVY DUTY BIODEGRADABLE u + Z c6 cou 3 700 GRAM) OVER STRAW. w INSTALL S STAKE MATTING AS / I IIII PROVIDED IN " SMALL-SCALEi a �� Lo �j I SOLUTIONS TO ERODING 0 co E Lo STREAM BANKS" AS PUBLISHED BY NC AST STATE UNIVERSITY / I� 111 \ ^ 18 COOPERATIVE EXTENSION. (SEE \ x — — 111111 1111/l LANDSCAPE PLAN FOR / ` / PLANTING REO'TS) J O l 11111 \kk //11111 l = 11111 j/ "1►\�\� \ / d l III 1 r 10 LF RCP —STR B3OTI I J --- r I �k I� PHASE II (ALSO NOTED AS PHASE II GRAD CONSTRUCT WITH PHASE III GRADING (SEE SHEET 5) ` NOTE: PHASE II S PHASE III /) WORK IS TO BE PERFORMED ONLY WHEN THERE IS NO RAIN FORECASTED WITHIN 5 DAYS OF COMMENCEMENT OF THE WORK SII II I I I I I I I ( S THERE IS NO VISIBLE EVIDENCE I IIIIIIII \ \ OF FLOW IN THE STREAM. ALL \ 1 I (IIIIIIII I \ _ WORK SHALL BE COMPLETED S (IIII Io' I STABILIZED 24 HOURS MIN. \ \ PRIOR TO FORECASTED RAIN. I I ICU (PER 15A NCAC 04B.0105) hj A— lll-- II 11 111111 — I 1/6 I ll l 1\ I ll ^/71/ Ir 111 FILL REMAINING STREAM r I I (SEE GRADING PLAN I (THIS SHEET)) l \ 11111 � l \ IIII ( \ III 1 l l _1111 I \ III 11 l J W/ l / PHASE III STREAM DISTURBANCE PHASING PLAN 1 PROJECT NO.: 16-137 w a D F__ � E:Z =° o Q 0 Lu Q O cr) Q N U W N .c Q Q � = 3 z wco u + Z c6 cou 3 w aN cd �' 0 W > a �� Lo 0 co E Lo w< mC/i o w Z J O o Lo Z Lu U U w 10�O J } z 0U J J IL Q z W0 Q U i z LL Q Q Z W Q j Q0 — W a�mmU) Qz�: W i O z m co _O a V o (u >- v z LL W3° Q U O= z W o = 0 V aDo N CAR 0 SEAL -. 0365 ; r r � � •GINS.• v� M. CPQ`. �111l11�� REVISIONS: DRAWN BY: BBAILEY FIELD DATE: 01.01.2016 OFFICE DATE: 08.17.2016 CHECKED BY: JCARGILE PLOT DATE: 23.01.2017 I�Y7 0 20' 40' SHEET 4 OF 14 PROJECT NO.: 16-137 STREAM PROTECTION NOTES: 1. ALL WORK IN OR ADJACENT TO STREAM WATERS SHALL BE CONDUCTED SO THAT THE FLOWING STREAM DOES NOT COME IN CONTACT WITH THE DISTURBED AREA, I.E. IN THE DRY". (PER WATER QUALITY CERTIFICATION NO. 3890, CONDITION #6) (SEE "PHASING PLAN" ON SHEET 5 FOR ADDITIONAL INFORMATION) 2. NO CONSTRUCTION ACTIVITIES THAT INVOLVE DISTURBANCE OF THE STREAM MAY TAKE PLACE DURING TROUT SPAWNING SEASON (JAN. 1 - APRIL 15). 3. SEE EROSION CONTROL PLANS 6 SHEET 4 REGARDING PHASING OF THE WORK SPECIFIC TO PROTECTING THE EXISTING STREAM. BUFFER DISTURBANCE: LENGTH = 140' WIDTH = 25' III 111 III I VIII VII I VII I VII I 111`1 1111 l � 111 � 1111, � 111111 � 1111111 X1111111 �1 III 11 II II 11 � I 1 I I 111 II 1111 II II \ II II I M1 11111111111111 111111111111 1111111111111 55 1111111111 19 11111111111 i 11111111111 +1111111111111 11111111111111 X11111111111111 \\\\\\\\\\11111 14.73 744.66 , 744.35 . 1 PROJECT NO.: 16-137 w a D F-- � Z � =° o Q J 0 n 0 <-1 N U U)>_ Lu �u >cu C .L, o Q Q �= �w 3 (D w U + Z W C6 3 0 3 oi a U) N � j D 0 w > a �� �Lo z �M W m Q0 w Z J o o Z Lu U J U W 0�O J } z OU J J a Q z W0 a J U z � Q ZQj W ._. Q O w a = W Lu Go QZ wI N Z � to O _O a V � o v z LLQ W3° U O= In W Z fx a w.D = z O 0 V aDo CAROo ��•�`0 R %, SEAL -. 0365 ; r r � •GINS.• v� �1�111111 REVISIONS: DRAWN BY: BBAILEY FIELD DATE: 01.01.2016 OFFICE DATE: 08.17.2016 CHECKED BY: JCARGILE PLOT DATE: 23.01.2017 I�Y7 0 20' 40' SHEET 5 OF 14 PROJECT NO.: 16-137 STREAM PROTECTION NOTES: 1. ALL WORK IN OR ADJACENT TO STREAM WATERS SHALL BE CONDUCTED SO THAT THE FLOWING STREAM DOES NOT COME IN CONTACT WITH THE DISTURBED AREA, I.E. IN THE DRY". (PER WATER QUALITY CERTIFICATION NO. 3890, CONDITION #6) (SEE PHASING PLAN ON SHEET 5 FOR ADDITIONAL INFORMATION) 2. NO CONSTRUCTION ACTIVITIES THAT INVOLVE DISTURBANCE OF THE STREAM MAY TAKE PLACE DURING TROUT SPAWNING SEASON (JAN. 1 - APRIL 15). 3. SEE EROSION CONTROL PLANS 6 SHEET 4 REGARDING PHASING OF THE WORK SPECIFIC TO PROTECTING THE EXISTING STREAM. PROTECTION OF STREAM TEMPERATURE: USGS PROVIDES A LIST OF CONSTRUCTION ACTIVITIES THAT CAN AFFECT THE TEMPERATURE OF DOWNSTREAM WATERS ((https://water.usgs.gov/edu/temperature.htm1) THESE ACTIVITIES INCLUDE: • IMPERVIOUS AREAS • SEASONAL CHANGES IN LAKES S RESERVOIRS • DAMS 6 IMPOUNDMENTS • POWER PLANTS THE PROPOSED IMPERVIOUS AREAS WILL NOT DISCHARGE DIRECTLY INTO THE EXISTING STREAM 6 WILL BE DIRECTED TO THE EXISTING STORM SEWER ALONG U.S. HWY 276. THE REMAINING ACTIVITIES ARE UNRELATED TO THIS DEVELOPMENT. BASED ON THE ABOVE, NO ADVERSE EFFECTS ON TEMPERATURE CHANGE AS A RESULT OF THIS DEVELOPMENT ARE ANTICIPATED AND THE PROPOSED ACTIVITIES WILL BE IN COMPLIANCE WITH THE REQUIREMENTS OF 15A NCAC 04B.0125. l l l J I I �I 11111111111111 \— 1111/lll l l l l l 1 /l / /l // / l// l / / �I 1111I1111111111i\ 71/1//1111/l //// I� =11 �111111111111� I I 71 \ ,�/ �I I1/ I\) SII 1 1111jIII�IV II 1 71/ll�1111111%/ll I 1 1 _1 I 11111111 I 1�� 11/11 11111111/ 1 1// 1 / 1 1 1 III I I �I I I '111 1 I I I I I I I I I` � N� 111111111111111 / l/ 1 1 I I I I S l l l l l l l I III I I -111 7 1 1 1 1 1 11111 1( �`� 111 /11111111111 // l l 1 I I I I 1 I I I 1 1 1 1 I _�\� II I 1111111111111 1 1 ---1111/lllllll/ll I I I I I I I I I I 1 1 1 1 1 1 1 1 I I �l I 11 :I I I I I I I I I I lllllllllllll I I I III 1 1 1 1 1 1 1 1 I I I 11111 11 0 1 /1//11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 �1 I l� I IIII 111 11 \ I 11111// 1j11111111 I I I I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 �5.g5 o I I I �I 11 \ 1 ` /.IIII 1111111111 1 1 1 1 1 1 1 I I I i 1 1 1 1 1 1 1 1 1 1 1 1 1 1 \ _1111 NI 1111 II ��—� IIII 111111 III I I I I 1 1 IIII I IIIIIIII I `` I 111111 11/ 1 INl l l l l l l l l l l 1111 I I I I I I I I I I I 1 1 1 1 1 1 1 _ _ o IIII II IIII I 111111`°111111 I I I I I I 1 1 245 11 % I l 111 I 111 1 ���\ I I Cu) I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 I I I 1 \ l/ II 111111 1��\ I IIII, I IIII III I I I I I I I I \ 11 111111��I 11 I I 11111 112 LF SILT FENCE (DOUBLE ROW). /1/ 1111111 \ 1 111111 80 LF SILT FENCE (DOUBLE ROW): SLOPE = 5-10%: \ i 1 I I I 1 II SLOPE = 33% (MAX.):/1111 / I — — 1I`�\` ' 900 SF < 1,500 SF -- OK III 1 I 2,760 SF < 5,000 --> OK / � � � i 1 1 I 1 1 SLOPE = 10% (MAX.): IIII 1 1 TEMPORARY SEEDING 2,180 SF < 5,000 SF --> OK I I I I I 1 SOLID HATCHED AREA /, 11111 \ '� //1�v`o�46 \\ \\ \\\\\\\\\\1 I \ \ \ \ \ I 1 I 1 11 (FOR DETAILS S SPECS, SEE \\\\\ \\\\ \ EROSION S SEDIMENT CONTROL r G S SIGN MANUAL, PLANNING DESIGN S-, \\ \ 1 11 1 1 11 111 1 1 SECTION 6.10) \ / d \ 11 1111 I 1\ \ \ \III El I 1 I I 1 II \ I I 1 I I I I I 1 1 II -y\\ \\\ \\� \\�\�\�\\ 11►111 I 111111111 I I I 1111 II \��\��\�\\\ 11 1 I I I I 1 11 1111111111 III \ \\\\00\\\ \\ o \ \\ \ 0 \\ \ \ W i \ \ o i I 1111111111111111\ \\\\\\\��� �;-- / 62 LF SILT FENCE (DOUBLE ROW): I \ \ 1 111111111111 \ \ 1\ \ SLOPE = 2-5% I \ \ I e 11111111111111\ \ \ \ \\ 4,534 SF < 7,500 --> OK r v1 \ \ \ \ I 111111111111111\\ \\` 1\1111\Illjlllll\ \11111111\ I Av �v 121 LF SILT FENCE. \\ \9M SLOPE \ \ SLOPE = 2-5%: \\ \ \ i \ 3,760 SF < 7,500 --> OK oy \\ \ \\\\\ \\\\\\\\\ TEMPORARY CONSTRUCTION ENTRANCE/EXIT:- 12' (MIN.) X 50', 6" THICK 2-3" WASHED STONE (SEE DETAILS) °tip ----------- \ PROPOSED - — — — — \ \ ----- k \STOCKPILE AREA I \ \ �C)o � Q � r,- I N _Tj C-) N � � I N � c� Q0 v J FOLLOWING GRADING 6 WALL CONSTRUCTION. INSTALL REQUIRED BASE TO ESTABLISH STAGING 8 MATERIALS STORAGE AREA. -297 LF SILT FENCE (DOUBLE ROW): SLOPE = 5-10%: 2,701 SF < 5,000 --> OK EROSION CONTROL LEGEND: X SILT FENCE TEMPORARY GRAVEL CONSTRUCTION ENTRANCE EROSION CONTROL NOTES: 1. HATCHED AREAS REPRESENT DRAINAGE AREAS TO EACH BMP. 2. CAPACITIES FOR EROSION AND SEDIMENT CONTROL MEASURES DOCUMENTED PER THE NC DEQ "EROSION 6 SEDIMENT CONTROL PLANNING 6 DESIGN MANUAL" IN ACCORDANCE WITH THE REQUIREMENTS OF 15A NCAC 0413.0105-0106, .0106, AND .0108. 1 PROJECT NO.: 16-137 I w ch D Lu U w ~ cn z IE a O J m 0 Lo Q_ � <_j N U W -- o g Q w '>') .�) c:� z Lu U3 + 03 f) N LU 0 w a °Lo coo �N z � h LU mcri Q 0 Lu z c� J 0 O Lo z Lu U J U W 0�O J } D J O J jz Q W® Q _J U> > w -ZZ O Q Q 2 001 a Z Q j a QW Ow O a V) m m U) wIz �z o 0 -' cu O LL wQv Z� O O w�0 W �/ Q 2 =z cn OZLLa w u CLa� c,ARo _ • �` • SEAL - 03659 � GIN . • � ��� Al. GP�`�• REVISIONS: DRAWN BY: BBAILEY FIELD DATE: 01.01.2016 OFFICE DATE: 08.17.2016 CHECKED BY: JCARGILE PLOT DATE: 23.01.2017 1�; I�Y7 0 20' 40' SHEET 6 OF 14 PROJECT NO.: 16-137 I STREAM PROTECTION NOTES: 1. ALL WORK IN OR ADJACENT TO STREAM WATERS SHALL BE CONDUCTED SO THAT THE FLOWING STREAM DOES NOT COME IN CONTACT WITH THE DISTURBED AREA, I.E. "IN THE DRY". (PER WATER QUALITY CERTIFICATION NO. 3890, CONDITION #6) (SEE ''PHASING PLAN" ON SHEET 5 FOR ADDITIONAL INFORMATION) 2. NO CONSTRUCTION ACTIVITIES THAT INVOLVE DISTURBANCE OF THE STREAM MAY TAKE PLACE DURING TROUT SPAWNING SEASON (JAN. 1 - APRIL 15). 3. SEE EROSION CONTROL PLANS 6 SHEET 4 REGARDING PHASING OF THE WORK SPECIFIC TO PROTECTING THE EXISTING STREAM. 05 X \ 2745 7/ l/ �� � � / / I✓/ _11 -1111 1111111 \ \ ��� ��— /////1✓ -II 1111111 /III II I �� �/ /� ///I X11 � -III IIII \ 11//IIII///l/ 1111 111 11/ 11 11 l / INSTALL CONTROL BLANKET / I1 OVER ENTIRE DISTURBED AREA r l l l l \ FOLLOWING GRADING. (SEE I 1 1 1 =111 LANDSCAPE PLANS FOR PLANTING ////l /Illlllll l l l l l l l/ I I I I I I I I I I I I I I 111 VEGETATION REQUIREMENTS) IIII /lllllllll l l l l l 1 1 III I I I I I I I l 11 1 1 - IIIIIIII ( �s 11111 II/1111111 / I I I I I I I I I I I I 1 1 1 1 1 _ �5•g5 l/ I I� I I I I 11 \I i.11ll l I/I / I I I I I I I I I I I I I I ..IIIII I I I I I I I I \ �' " _III jIIIj1 I\ /\�--\ �III11111111�1�1 I I I I I I I I I.I I I I I I I I I -, I 11 ��----�I II II°1111111111 I I I I I I IIIII I I I I I I I l IIII I ��� I I I IIII I I III III I / \\ HARDWARE CLOTH & GRAVEL—,\, INLET PROTECTION: DISTURBED AREA = 0.12 AC (MAX.) < 1.0 AC --> OK 111 I Illlljl 1\^� IIIIIIII'1111111111II�IIIIIlllj111111111 // I I I I I1� 1� �, \ IIIIIIII 1111111111 I I I I IIIIIIII 1 1 1 1 1 1 1 1' // ��� x I IIII -- \� I 1111111111111 I I I I IIII 1 1 1 1 1 1 1 1 1 1 1 1 - /ll � -11 1111 --_\� 1 111111 I I III 1 I I I I I I // 1111111 2� IF1 I Ly \\\\\ \\\\ \ w x \ \ �\\\\\ N \ 11 1 I \\ l\ \ �� �` \ �\ 2745 _ r \\\\\\\\\\ �� I I I \ / x ��� I\1111\III 111\111111111111111\\ i I \I { �� III II 1111111111111111111\\ 11111111111111111\\\ c 1 � I I ` — � IIIIIII IIIIIII \\I1111i11 \\ \� I I ►\ X 1 1 1 1 I III 11111 1 1 1\ I ,— \ \ I IIIIIIII�II 1111111\\\11\11\1\\ �� \ \ I �� \ ►III II 111\ 11\\\ 11\1\\\ I \ \ \ MAINTAIN PHASE I IIIIIIII 111 \111 \ 1111 111 \ I o\ \ \ ` \ \ SILT FENCES IIIIIII 1 \111 \111 j 11\\M\ \111; 1111\\\ 0&, \ III IIII III I IIII I 11111 11111 (IIII 111`1 I I \ 11 l \ 111 \ 1111, \ 111111 \ 1111111 IIIIIIII \IIIIIIIII 111111111 1111111111 /IIIIIIIII II /IIIIIIIIIIII /IIIIIIIIIIII 1111111111111 1111111111111 1111111111111 11111111111111 IIIIIIIIIIIIII 11111111111111 111111111111111 \\\\\\\\\\11111 \\\\\\\\ C_ CD Q EROSION CONTROL LEGEND: x SILT FENCE HARDWARE CLOTH & GRAVEL INLET PROTECTION TEMPORARY GRAVEL CONSTRUCTION ENTRANCE NOTE: PHASE II & PHASE III WORK IS TO BE PERFORMED ONLY WHEN THERE IS NO RAIN FORECASTED WITHIN 5 DAYS OF COMMENCEMENT OF THE WORK & THERE IS NO VISIBLE EVIDENCE OF FLOW IN THE STREAM. ALL WORK SHALL BE COMPLETED & STABILIZED 24 HOURS MIN. PRIOR TO FORECASTED RAIN. (PER 15A NCAC 0413 .0105) 1 PROJECT NO.: 16-137 I w LuU W ~ (n z a D a O J m 0 co m w Q O c J Q N U w ul � o g Q�FD w c:� =Lo z W U + z L of 03 m N w U' 0 w > a ° Lo . , o0i �Lo z w m Q � o Z J O Ln z w U U W 0�O J } J 0U J jz Q WO Q � � J wm >-zz ao� QLL 2tn�p�� (I Z Q j a QW Ow 1E O a � m m U) W I z O ZoO~� cu ao�� O V V LL Q U ZjX Q 111.— O w�0 2 �/ Q C� cn O ZLLa=z w u a� CL willill/l/ N CAR0'�i'� 0.1 •-ESS/p' _ • �` • SEAL 03659 � GIN . • � ��� Al. 111111111 GP�`�• REVISIONS: DRAWN BY: BBAILEY FIELD DATE: 01.01.2016 OFFICE DATE: 08.17.2016 CHECKED BY: JCARGILE PLOT DATE: 23.01.2017 ��N 0 20' 40' SHEET 7 OF 14 PROJECT NO.: 16-137 I STREAM PROTECTION NOTES: 1. ALL WORK IN OR ADJACENT TO STREAM WATERS SHALL BE CONDUCTED SO THAT THE FLOWING STREAM DOES NOT COME IN CONTACT WITH THE DISTURBED AREA, I.E. IN THE DRY". (PER WATER QUALITY CERTIFICATION NO. 3890, CONDITION #6) (SEE "PHASING PLAN" ON SHEET 5 FOR ADDITIONAL INFORMATION) 2. NO CONSTRUCTION ACTIVITIES THAT INVOLVE DISTURBANCE OF THE STREAM MAY TAKE PLACE DURING TROUT SPAWNING SEASON (JAN. 1 - APRIL 15). 3. SEE EROSION CONTROL PLANS S SHEET 4 REGARDING PHASING OF THE WORK SPECIFIC TO PROTECTING THE EXISTING STREAM. fes O n� X CHECK DAMS. DISTURBED AREA = 0.08 AC < 0.5 AC --> OK HEIGHT =1' (SEE DETAIL) ELEV. DROP BETWEEN DAMS = I'--> OK CHECK DAM. \ DISTURBED AREA = 0.07 AC < 0.5 AC --> OK HEIGHT = 1' (SEE DETAIL) ELEV. DROP BETWEEN DAMS = I'— OK HARDWARE CLOTH 6 GRAVEL i INLET PROTECTION: 1 DISTURBED AREA = 0.03 AC (MAX.) < 1.0 AC --> OK i �Q o- 1 o� n / I / Qti,✓l / I 125 LF SILT FENCE (DOUBLE ROW). I I SLOPE = 33% (MAX.): 1,450 SF < 1,500 SF --> OK \ \ I 1 n-1 SLOPE = 2% (MAX.): 2,755 SF < 5,000 SF --> OK % \ � c /r 7j% //// II �I11111111111� II I 1///////1/// /// / 41/ I I I ,�/ r I II 1/ I\1 �,I 1 Illliljlil� II 7////�1111111%lll I I 1 1 III III ` N IIII 111111 / l / 1 1 1 1 1 1 1 1 1 '\ � I III I I I A � 1 � 1111//ll/11111 l l I I I I I I I I I I I I I I I I I I I I 11 l -IIIIIIIII �_— ///// /IIII I I .III `I I I I I III h' /I I 1 \ / I I IIII I I IIII I I I L0///I I I I I I I I I I I I I I I I III 1 1 1 1 1 1 1 1 1 I I 1 1 1 \ 2 �I 1 11 �„IIIIIIIIII I I II II VIII III \ � 2���11j III 1 1 1 I �INIIII (IIIIIIIII I I I I I I I I III I I I I I I I IIII "o 0, l I I I I I III 1 1 1 1 1 1 1 1 1 11111`11 z�, llllllll �_—\I� � I jlllllll I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 �\lIIIII III I I 11 I I II I II 0 . I I `` \\\\� 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 II l \ l l IIII I 'lI1 1 1l � o \ \ III \ \ \ I IIIIIIIIIIII wl l 1111 11 �'� \\�\� J_ \ I I IIIIIIII I \\\\\\\\\ \ \\ ��— �� I I I �___�� IIIIIII lIIIII►11111111111\\ \\\\\\\���-� I I I ` 111 II 111111111111111111\\ \\\\\\�� �� I ► ► \ IIIIIII 11111111111111111\\ \\\\\\���� \ I \ \ 111111 II 111111111111\1111\ \\\\\ \ \ I \ \ ►III 111111 11111\\ \\ \` �—_ \\ l \ \ 111►1111 1111111j1111111\\ \ \ \\ \ IIIIIII 11 \\\Q\\w\1wo \\ vv v \ �v \\ 1111A �1 111111\11jj1\1A1A\ \� � 1 _ _ \\ \\\ \\ \ \\\\\\ \I \1\11\\IIlj�111\\ \A\' �\\11111111111\\ 0 STORAGE & MATERIAL STORAGE AREA EROSION CONTROL LEGEND: x SILT FENCE CHECK DAM HARDWARE CLOTH & GRAVEL INLET PROTECTION TEMPORARY GRAVEL CONSTRUCTION ENTRANCE HARDWARE CLOTH & GRAVEL (AT ALL STORM INLETS): OVERALL DRAINAGE BASIN = 0.88 AC < 1.0 AC --> OK HECK DAMS (3): \ \ \ 6 \ 194 LF SILT FENCE (DOUBLE ROW) SLOPE = 2-5% (AVG.): \ DISTURBED AREA = 23,970 SF FENCE CAPACITY: 7,500 SF PER 100 LF (SINGLE ROW) --> 14,550 SF PER 194 LF (SINGLE ROW) --> 14,500 SF x 2 = 29,100 SF (DOUBLE ROW) 29,100 SF > 23,970 SF --> OK I \ \ \\ o I I\ \ \ I \9 \ \ DRAINAGE AREA = 0.05 AC < 0.5 AC --> OK HEIGHT = 2' (SEE DETAIL) ELEV. DROP BETWEEN DAMS = 2'--> OK I oyF I I \ I TEMP CONCRETE WASHOUT AREA 1 PROJECT NO.: 16-137 I w a D Lu U W ~ cn z T Q O J m co Lu QQ O w N U Z Q n � g w U3 :3 Lr) Z w + � 0cf)3 LU �N a a0 U) w > C, . , coo cum O W Q z J O O Lo Z w U U w m 0 J J 0U J az Q W0 ^ a U w� �z—iz QLL aoQ 2W pQ� a 0 41 w oaU)mmn � 0 Wiz Z _ ��O N O Vam 0�zVLL Q U Z � O O W = Q C7 cn O ZLLa=z W�11w Z a� CAR0 /1/' ��'L-��' �- o ;' �-f,ss�o' _ • �` • SEAL - 03659 � GIN . • � ��� M. GP�`�• REVISIONS: DRAWN BY: BBAILEY FIELD DATE: 01.01.2016 OFFICE DATE: 08.17.2016 CHECKED BY: JCARGILE PLOT DATE: 23.01.2017 7 0 20' 40' SHEET 8 OF 14 PROJECT NO.: 16-137 I STREAM PROTECTION NOTES: 1. ALL WORK IN OR ADJACENT TO STREAM WATERS SHALL BE CONDUCTED SO THAT THE FLOWING STREAM DOES NOT COME IN CONTACT WITH THE DISTURBED AREA, I.E. "IN THE DRY". (PER WATER QUALITY CERTIFICATION NO. 3890, CONDITION #6) (SEE "PHASING PLAN" ON SHEET 5 FOR ADDITIONAL INFORMATION) 2. NO CONSTRUCTION ACTIVITIES THAT INVOLVE DISTURBANCE OF THE STREAM MAY TAKE PLACE DURING TROUT SPAWNING SEASON (JAN. 1 - APRIL 15). 3. SEE EROSION CONTROL PLANS 6 SHEET 4 REGARDING PHASING OF THE WORK SPECIFIC TO PROTECTING THE EXISTING STREAM. TOP SLAB ACCESS FILTRATION BAY SEE FRAME AND (4'-5") (3'-7") COVER DETAIL ALTERNATE PIPE F LOCATION (TYP) I ° _°/ , ° I I I ` " Ia OUTLET 4 INLET -- -- io FLOW -77 OUTLET INLET BAY STORMFILTER BAY CARTRIDGE 6" CONCRETE WALL WIDTH 12'-0" MAY VARY REGIONALLY PLAN VIEW VAULT STYLE: INLET BAY - OUTLET BAY CONTRACTOR TO GROUT TO FINISHED GRADE GRADE RING/RISERS INLET PIPE PERMANENT POOL ELEV. FLOW SPREADER & BAFFLE WALL (TYP OF 2) ENERGY DISSIPATOR STORMFILTER DESIGN NOTES STORMFILTER TREATMENTCAPACITY IS A FUNCTION OF THE CARTRIDGE SELECTION AND THE NUMBER OF CARTRIDGES. THE STANDARD VAULT STYLE IS SHOWN WITH THE MAXIMUM NUMBER OF CARTRIDGES (11), VAULT STYLE OPTIONS INCLUDE, OUTLET BAY (11), FULL HEIGHT BAFFLE WALL (12). STORMFILTER 6X12 PEAK HYDRAULIC CAPACITY IS 1.6 CFS. IF THE SITE CONDITIONS EXCEED 1.6 CFS AN UPSTREAM BYPASS STRUCTURE IS REQUIRED. CARTRIDGE SELECTION CARTRIDGE HEIGHT 27" 18" LOW DROP RECOMMENDED HYDRAULIC DROP (H) 3.05' 2.3' 1.8' SPECIFIC FLOW RATE (gpm/sf) 2 gpm/ft' 11 gpm/ft2 2 gpm/ftp 11 gpm/ft2 2 gpm/ft2 1 gpm/ft2 CARTRIDGE FLOW RATE (gpm) 22.5 11.25 15 7.5 10 5 FRAME AND COVER (DIAMETER VARIES) N.T.S. SITE SPECIFIC DATA REQUIREMENTS STRUCTUREID WATER QUALITY FLOW RATE (cfs) PEAK FLOW RATE (cfs) RETURN PERIOD OF PEAK FLOW (yrs) # OF CARTRIDGES REQUIRED CARTRIDGE FLOW RATE MEDIA TYPE (CSF, PERLITE, ZPG, GAC, PHS) 6' TYPICAL PIPE DATA: I.E. MATERIAL DIAMETER INLET PIPE #1 INLET PIPE #2 OUTLET PIPE FOR SITE SPECIFIC DRAWINGS WITH DETAILED VAULT DIMENSIONS AND WEIGHTS, PLEASE CONTACT YOUR CONTECH ENGINEERED SOLUTIONS UPSTREAM RIM ELEVATION DOWNSTREAM RIM ELEVATION LLC REPRESENTATIVE. www.ContechES.com ANTI -FLOTATION BALLAST WIDTH HEIGHT STORMFILTER WATER QUALITY STRUCTURE SHALL BE IN ACCORDANCE WITH ALL DESIGN DATA AND INFORMATION CONTAINED IN THIS NOTES/SPECIAL REQUIREMENTS: 1. PER ENGINEER OF RECORD STEP ILL GENERAL NOTES INSIDE VAULT HEIGHT 1. CONTECH TO PROVIDE ALL MATERIALS UNLESS NOTED OTHERWISE. 6' TYPICAL 2. DIMENSIONS MARKED WITH () ARE REFERENCE DIMENSIONS. ACTUAL DIMENSIONS MAY VARY. cu 0 LO 3. FOR SITE SPECIFIC DRAWINGS WITH DETAILED VAULT DIMENSIONS AND WEIGHTS, PLEASE CONTACT YOUR CONTECH ENGINEERED SOLUTIONS O Q N LLC REPRESENTATIVE. www.ContechES.com U 4. STORMFILTER WATER QUALITY STRUCTURE SHALL BE IN ACCORDANCE WITH ALL DESIGN DATA AND INFORMATION CONTAINED IN THIS HYDRAULIC DROP o gw DRAWING. (H) INLET INV. 5. STRUCTURE SHALL MEET AASHTO HS20 LOAD RATING, ASSUMING EARTH COVER OF 0'- 5' AND GROUNDWATER ELEVATION AT, OR BELOW, THE --- TO OUTLET INV. oN 3 CU OUTLET PIPE INVERT ELEVATION. ENGINEER OF RECORD TO CONFIRM ACTUAL GROUNDWATER ELEVATION. CASTINGS SHALL MEET AASHTO LU 0 M306 AND BE CAST WITH THE CONTECH LOGO. -- j 6. FILTER CARTRIDGES SHALL BE MEDIA -FILLED, PASSIVE, SIPHON ACTUATED, RADIAL FLOW, AND SELF CLEANING. RADIAL MEDIA DEPTH SHALL c L EL BE 7 -INCHES. FILTER MEDIA CONTACT TIME SHALL BE AT LEAST 39 SECONDS. STORMFILTER 7. SPECIFIC FLOW RATE IS EQUAL TO THE FILTER TREATMENT CAPACITY (gpm) DIVIDED BY THE FILTER CONTACT SURFACE AREA (sq ft). CARTRIDGE m Q O INSTALLATION NOTES FLOW KIT OUTLET PIPE 1. ANY SUB -BASE, BACKFILL DEPTH, AND/OR ANTI -FLOTATION PROVISIONS ARE SITE-SPECIFIC DESIGN CONSIDERATIONS AND SHALL BE U SPECIFIED BY ENGINEER OF RECORD. J 2. CONTRACTOR TO PROVIDE EQUIPMENT WITH SUFFICIENT LIFTING AND REACH CAPACITY TO LIFT AND SET THE STORMFILTER VAULT (LIFTING U CLUTCHES PROVIDED). SECTION A -A 3. CONTRACTOR TO INSTALL JOINT SEALANT BETWEEN ALL VAULT SECTIONS AND ASSEMBLE VAULT. 4. CONTRACTOR TO PROVIDE, INSTALL, AND GROUT PIPES. MATCH OUTLET PIPE INVERT WITH OUTLET BAY FLOOR. 5. CONTRACTOR TO TAKE APPROPRIATE MEASURES TO PROTECT CARTRIDGES FROM CONSTRUCTION -RELATED EROSION RUNOFF. The st'rmw ter nna"aye- Art, s StormFilter CONTECH STORMFILTER DETAIL NOT TO SCALE III IlltO IIIA; III I Illjl III II111 1 1 1 1 11�1I l � 111 � 1111, � 111111 \ 1111111 X1111111 \�11111111� �111111111M 11111111111111111111 �1 11111111111111 111111111111 1111111111111 1111111111111 11111111111111 11111111111111 11111111111111 11111111111111 11111111111111 \\\\\\\\\\11111 \ \\ \\ \ \ � 1 1 PROJECT NO.: 16-137 I ILL LLI u Lu ~ to z IE Q O J cu 0 LO Q O Q N U LU >_ ° Q >c 1 o gw Q c� :3 LO Z } Lu U oN 3 CU LU 0 j a cu V) ; c L EL � w m Q O Lu z cD J O O LO z w U J U w m O J } z J �U J o. Q z W0 Q� J i O Qo� z z LL Z Q> QW Ow n- a U) Z W I z o0~`DO (U a0>-�z V LL W3 Q U ° O = < L (_7 U) Oza` U0. cn a D Q CARO���i' <'y'�' ESS�O SEAL 03659 _ r d � � GIN•.• �,� AM. �rrrll��� CP�`� REVISIONS: DRAWN BY: BBAILEY FIELD DATE: 01.01.2016 OFFICE DATE: 08.17.2016 CHECKED BY: JCARGILE PLOT DATE: 23.01.2017 0 20' 40' SHEET 9 OF 14 PROJECT NO.: 16-137 I STREAM PROTECTION NOTES: 1. ALL WORK IN OR ADJACENT TO STREAM WATERS SHALL BE CONDUCTED SO THAT THE FLOWING STREAM DOES NOT COME IN CONTACT WITH THE DISTURBED AREA, I.E. "IN THE DRY". (PER WATER QUALITY CERTIFICATION NO. 3890, CONDITION #6) (SEE PHASING PLAN ON SHEET 5 FOR ADDITIONAL INFORMATION) 2. NO CONSTRUCTION ACTIVITIES THAT INVOLVE DISTURBANCE OF THE STREAM MAY TAKE PLACE DURING TROUT SPAWNING SEASON (JAN. 1 - APRIL 15). 3. SEE EROSION CONTROL PLANS S SHEET 4 REGARDING PHASING OF THE WORK SPECIFIC TO PROTECTING THE EXISTING STREAM. PROPOSED GRADE (TYP.) EX. GRADE (TYP.) 2740 \ 2740 Ff B3 OTI EX. STREAM 2730 it -20 2750 2740 2730 -20 C@7 0+60 2730 20 40 2750 2740 0 1+16.83 2750 • 2740 TREAM 2730 20 40 u� cu EX. STREAM Bl H -WALL -20 -20 0 20 -00 2750 2740 2730 2750 2740 2730 -20 0+20 2750 2740 2730 i] 0+88.'70 2750 2740 X. STREAM 2730 20 40 B2 JB — m EX. -20 0 20 SECTION VIEW VERTICAL SCALE: 1" = 5' 2750 2740 STREAM 2730 2750 2740 2730 2750 2740 2730 0+40 I o cu EX. -20 0 20 1+02.76 2750 2740 STREAM 2730 N EX. STREAf 2750 2740 M 2730 20 40 60 2745 2740 2735 2733 PLAN VIEW EX. STREAM BANK \III\I EX. STREAM I I I \ IALIGNMENT\- 1\ �II 1= Illjjljllll/ II 1 �---- 1 _II �I11111111` I �N /, a I� YI 111111�1�11 I �_---�/lllllli 1 1 1 1 1 11' I I, I I I IN I 0 1 I ISI I I� 11 Bl H -WALL I 1 1` _ I `i1 I I to I I I TOP= 2741.54 I.E. IN= 2737.75 dU1 I I I I ( 1 —I \� J III 1111111 �� -I 11111 \I (IIII IIII llll 7///// /11110\\ ` IIII If l ` jll /I- 1111 j I I I I I I I I I I \ I \ 1 w cn Z =O o co I J Q O `cr I � � o gD w .� c V) U 2750 2740 0 1+16.83 2750 • 2740 TREAM 2730 20 40 u� cu EX. STREAM Bl H -WALL -20 -20 0 20 -00 2750 2740 2730 2750 2740 2730 -20 0+20 2750 2740 2730 i] 0+88.'70 2750 2740 X. STREAM 2730 20 40 B2 JB — m EX. -20 0 20 SECTION VIEW VERTICAL SCALE: 1" = 5' 2750 2740 STREAM 2730 2750 2740 2730 2750 2740 2730 0+40 I o cu EX. -20 0 20 1+02.76 2750 2740 STREAM 2730 N EX. STREAf 2750 2740 M 2730 20 40 60 2745 2740 2735 2733 PLAN VIEW EX. STREAM BANK \III\I EX. STREAM I I I \ IALIGNMENT\- 1\ �II 1= Illjjljllll/ II 1 �---- 1 _II �I11111111` I �N /, a I� YI 111111�1�11 I �_---�/lllllli 1 1 1 1 1 11' I I, I I I IN I 0 1 I ISI I I� 11 Bl H -WALL I 1 1` _ I `i1 I I to I I I TOP= 2741.54 I.E. IN= 2737.75 dU1 I I I I ( 1 —I \� J III 1111111 �� -I 11111 \I (IIII IIII llll 7///// /11110\\ ` IIII If l ` jll /I- 1111 j I I I I I I I I I I \ I \ 1 -0+35 0+00 PROFILE VIEW 1+00 2745 _L 11.54 2737.75 2740 2735 2733 1+35 Lu w cn Z =O o co I J Q O Q N I w > � o gD w .� c V) U C61 cu 3 C7 z z O w Lu �N w a o ECD, ° "' J B2 JB cu w Q — w Z TOP= 2744.33 – Z w - B1 H -WA J > I.E. IN- 2736.98 U TOP= 27 / I.E. OUT= 2736.88 I.E. OUT= B3 OTI 0 F 30,. RCP TOP= 2740.73 — 2`� I.E. IN= 2735.77 — — — z J 85 LF 30" RCP 1.30% �U J IL Q z W� Q 4_1 �Zz o a Z 3p o to co m Co m N Q N d Rl (ill N N N N n -0+35 0+00 PROFILE VIEW 1+00 2745 _L 11.54 2737.75 2740 2735 2733 1+35 Lu w cn Z =O o co a J Q O Q N U U) w > � o gD w .� c V) U C61 cu 3 C7 z z O w Lu �N w a o ECD, ° "' z °m cu w Q U) o w Z J O Z w U J > U 0 z J �U J IL Q z W� Q �Zz o a Z 3p o to oZ a>� V QW Ow w a�mm n to Z w I z tnpO1N.o cu �uo>� a. Q V LLQ u � W 3 U ° 0 = O Z�a2Z V) ua � o a D. CARO ��y-y►�' ;.off ' EsSro' SEAL 03659 s � •GIN•.• v` REVISIONS: DRAWN BY: BBAILEY FIELD DATE: 01.01.2016 OFFICE DATE: 08.17.2016 CHECKED BY: JCARGILE PLOT DATE: 23.01.2017 0 20' 40' .11111 SHEET 10 OF 14 PROJECT NO.: 16-137 STREAM PROTECTION NOTES: 1. ALL WORK IN OR ADJACENT TO STREAM WATERS SHALL BE CONDUCTED SO THAT THE FLOWING STREAM DOES NOT COME IN CONTACT WITH THE DISTURBED AREA, I.E. "IN THE DRY". (PER WATER QUALITY CERTIFICATION NO. 3890, CONDITION #6) (SEE "PHASING PLAN" ON SHEET 5 FOR ADDITIONAL INFORMATION) 2. NO CONSTRUCTION ACTIVITIES THAT INVOLVE DISTURBANCE OF THE STREAM MAY TAKE PLACE DURING TROUT SPAWNING SEASON (JAN. 1 - APRIL 15). 3. SEE EROSION CONTROL PLANS (S SHEET 4 REGARDING PHASING OF THE WORK SPECIFIC TO PROTECTING THE EXISTING STREAM. O168 LBS./S.Y. (1-1/2") HOT BITUMINOUS CONCRETE WEARING COURSE, NCDOT 2012 SPECIFICATIONS. O168 LBS./S.Y. (1-1/2") HOT BITUMINOUS CONCRETE 1 2 3 4 BINDER COURSE, NCDOT 2012 SPECIFICATIONS. O0.10 GAL./S.Y. EMULSIFIED ASPHALT OR 0.07 GAL./S.Y. 3 TACK COAT. ALL MATERIALS ARE TO BE IN ACCORDANCE TOP 6" OF SUBGRADE IS TO BE COMPACTED TO WITH THE NCDOT 2012 SPECIFICATIONS. 100% PROCTOR DENSITY. BELOW TOP 6" IS TO 6" LAYER OF DENSE GRADED LIMESTONE BASE COURSE BE COMPACTED TO 95% PROCTOR DENSITY AS O NCDOT 2012 SPECIFICATIONS. ALL MATERIALS SHALL BE DETERMINED BY AASHTO T-99 COMPACTION IN ACCORDANCE WITH SECTION 1010. 100% COMPACTION REO'D. TEST. SEE PAVEMENT NOTES FOR ADDITIONAL INFORMATION. STANDARD PAVEMENT SECTION NOT TO SCALE 1 2 3 4 TOP 6" OF SUBGRADE IS TO BE COMPACTED TO 100% PROCTOR DENSITY. BELOW TOP 6" IS TO BE COMPACTED TO 95% PROCTOR DENSITY AS DETERMINED BY AASHTO T-99 COMPACTION TEST. SEE PAVEMENT NOTES FOR ADDITIONAL INFORMATION. 224 LBS./S.Y. (2") HOT BITUMINOUS CONCRETE O1 WEARING COURSE, NCDOT 2012 SPECIFICATIONS. O224 LBS./S.Y. (2") HOT BITUMINOUS CONCRETE BINDER COURSE, NCDOT 2012 SPECIFICATIONS. O0.10 GAL./S.Y. EMULSIFIED ASPHALT OR 0.07 GAL./S.Y. TACK COAT. ALL MATERIALS ARE TO BE IN ACCORDANCE 3 WITH THE NCDOT 2012 SPECIFICATIONS. O8" LAYER OF DENSE GRADED LIMESTONE BASE COURSE NCDOT 2012 SPECIFICATIONS. ALL MATERIALS SHALL BE IN ACCORDANCE WITH SECTION 1010. 100% COMPACTION REO'D. HEAVY DUTY PAVEMENT SECTION NOT TO SCALE 1 2 3 4 TOP 6" OF SUBGRADE IS TO BE COMPACTED TO 100% PROCTOR DENSITY. BELOW TOP 6" IS TO BE COMPACTED TO 95% PROCTOR DENSITY AS DETERMINED BY AASHTO T-99 COMPACTION TEST. SEE PAVEMENT NOTES FOR ADDITIONAL INFORMATION. 0 22 LBS./S.Y. (2") BITUMINOUS CONCRETE SURFACE COURSE, REF. 610, S9.513, NCDOT 2012 STANDARD SPECIFICATIONS. O336 LBS./S.Y. (3") BITUMINOUS CONCRETE INTERMEDIATE COURSE, REF. 610, 1-19.OB, NCDOT 2012 STANDARD SPECIFICATIONS. O0.04 - 0.08 GAL./S.Y. TACK COAT AS REO'D BY SPECS. ALL MATERIALS ARE TO BE IN ACCORDANCE WITH SECTION 605 OF THE NCDOT 2012 SPECIFICATIONS. O4 10" LAYER OF CRUSHED AGGREGATE BASE COURSE PLANT MIXED SHALL BE PLACED IN ACCORDANCE WITH SECTION 520, NCDOT 2012. ALL MATERIALS SHALL BE IN ACCORDANCE WITH SECTION 1010.100% COMPACTION REO'D. NCDOT PAVEMENT SECTION (IN P.O.W. NOT TO SCALE "W SEE PLANS LIGHT BROOM STROKES FINISH (TYP) / 1/4" PER FT. a a 4 -II - 1= SEE DETAIL 9, C1.03 FOR EXPANSION JOINT REO'TS NOTE: CONTRACTION JOINTS SHALL BE SPACED AT "W" (MAX) CENTER TO CENTER, AND SHALL BE FORMED USING PLASTIC OR HARDBOARD PREFORMED STRIPS (1/3 DEPTH OF SLAB) PLACED IN THE SIDEWALK AND CURB AT THE TIME OF CONSTRUCTION, OR BY SAWCUTTING THE SIDEWALK AND CURB TO 1/3 DEPTH WITHIN 12 HOURS AFTER CONSTRUCTION. MATCH LOCATION OF JOINTS IN PAVEMENT WHERE POSSIBLE. 4JOINT SEALING SEE PAVEMENT SECTION �COMPOUND (TYP) FOR REQUIREMENTS. 0 illllll4 1/2" PRE -MOLDED JOINT FILLER REO'D BETWEEN CURB 8 CONC. PVMT. (TYP) CONCRETE SIDEWALK 6 TURN -DOWN CURB DETAIL NOT TO SCALE Y >J i w 0 U) GENERAL NOTES FACE OF CURB 112 LANDING 5'-0" "LANDING" AT GRADE OF GUTTER (NO CURB AT LANDING) w1e]riato] Me] M•la 1.43 FACE OF CURB SIDEWALK RAMP 111311. NOT TO SCALE 1:12 1. THE EXPANSION JOINT IS TO BE REPLACED WHERE THE NEW RAMP OR SIDEWALK JOINS EXISTING PAVEMENT STRUCTURE. 2. EXPANSION JOINT MATERIAL TO BE IN ACCORDANCE WITH ARTICLE 832.01 AND 832.02 OF ALABAMA DEPARTMENT OF TRANSPORTATION SPECIFICATIONS. 3. THE SUBGRADE SHALL BE FREE OF ALL ROOTS AND OTHER UNDESIRABLE MATERIALS WITH THE ROOTS CUT BACK ONE (1) FOOT FROM FACE OF SIDEWALK. 4. RAMPS SHALL HAVE A NON-SKID SURFACE APPLIED BY BRUSHING TRANSVERSELY OR GROOVING. 5. WHERE SIDEWALKS ARE REQUIRED, THIS PLAN SHALL BE USED AT PEDESTRIAN CROSSWALKS FOR SAFE AND CONVENIENT MOVEMENT OF THE HANDICAPPED AND PERSONS USING WHEEL CHAIRS. 6. INSTALL DETECTABLE WARNINGS (TRUNCATED DOMES) FOR A DISTANCE OF 24" FROM THE BACK OF THE CURB FOR THE ENTIRE WIDTH OF THE RAMP OPENING SHOWN. 7. PAVERS SHALL MEET ASTM C 902 CLASS SX, TYPE I, OR C 936, OR C 1272 TYPE R. 8. PAVERS WILL BE LAID ON TOP OF A 4" CONCRETE BASE. SETTING BED AND JOINTS TO BE MORTARED IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS, OR WITH A MAXIMUM 1/2 " THICK BED OF LATEX MODIFIED CEMENT MORTAR. MORTAR JOINTS TO A WIDTH OF 3/8 ". PAVERS SHALL NOT BE DIRECTLY TOUCHING EACH OTHER UNLESS THAY HAVE SPACING BARS. 9. MORTARED JOINTS ARE TO BE FLUSH WITH THE TOP SURFACE AND STRUCK SO AS TO GIVE A SMOOTH SURFACE. PAVERS SHALL BE LAID SUCH THAT JOINTS ARE LEVEL WITH ADJOINING JOINTS SO AS TO PROVIDE A SMOOTH TRANSITION FROM BRICK TO BRICK AND BRICK TO CONCRETE SURFACE. 10. THE SURFACE OF ANY TWO ADJACENT UNITS SHOULD NOT DIFFER BY MORE THAN 1/8 " IN HEIGHT. BRICKS SHALL BE PLACED IN A HERRINGBONE PATTERN WHERE FEASIBLE. IN ALL CASES, THE PATTERN OF THE DOMES IS TO BE MAINTAINED PER ADA REQUIREMENTS. FACE OF ALL BRICK SHALL BE CLEAN OF CEMENT AND PROTECTED SO AS TO AVOID CHIPPING DURING CONSTRUCTION.1LEXPANSION JOINTS SHALL BE PROVIDED IN THE CURB RAMP AS EXTENSIONS OF WALK JOINTS FOR A NEW CONCRETE WALK. A 1/2 " EXPANSION JOINT FILLER SHALL BE PROVIDED AROUND THE EDGE OF RAMPS BUILT IN EXISTING CONCRETE WALKS. LINES SHOWN ON THIS DRAWING INDICATE THE RAMP EDGE AND SLOPE CHANGES AND ARE NOT NECESSARILY JOINT LINES. HICAP RAMP DETAILS NOT TO SCALE COMPOUND (TYP) NOTE: SPACE EXPANSION JOINTS AT 50' MAX., AND AT ALL LOCATIONS WHERE CURB OR SIDEWALK TERMINATES AGAINST A RIGID OBJECT. 1, -E -MOLDED JOINT FILLER REO'D BETWEEN CURB & CONC. PVMT. (TYP) SIDEWALK B CURB EXPANSION JOINT DETAIL NOT TO SCALE HANDICAPPED _0 PARKING ONLY +6 MAXIMUM FINE $300 +51-011 ELEVATION ABOVE FINISHED PVMT. (TYP) H'CAP SIGN DETAIL 18"x18" SIGN WHITE H'CAP SYMBOL BLUE BACKGROUND 1" HIGH WHITE LETTERS (TYP) 18"x8" SIGN BLUE BACKGROUND SET SIGN POST IN CONCRETE (TYP) TO A MINIMUM DEPTH OF 3-0". USE "U -TYPE" FLANGED STEEL SECTIONS FOR FOR SIGN POST (PER ALDOT SPEC'S). FABRICATE SIGN PANELS OF 16 GA. OR .063 ALUMINUM. ACCEPTABLE MANUFACTURERS AND PRODUCTS ARE: 1) WHITACRE-GREER FIREPROOFING COMPANY, 1400 S. MAHONING AVE, ALLIANCE, OH, 44601, ADA PAVER, 4" X 8" X 2-1/4", CLEAR RED (RUSTIC) #30 2) HANOVER ARCHITECTURAL PRODUCTS, 240 BENDER ROAD, HANOVER, PA 17331, DETECTABLE WARNING PAVER, 4" X 8" X 2", RED OR QUARRY RED. 3) PAVESTONE COMPANY, 7322 BONNYSHIRE DRIVE, CHATTANOOGA, TENNESSEE, DETECTABLE WARNING PAVER, 4" X 8" X 2-3/8", RED DESIGN SPECIFICATIONS FOR DETECTABLE (TRUNCATED) WARNINGS THE DETECTABLE WARNING IS DEFINED AS "A STANDARDIZED SURFACE FEATURE BUILT IN OR APPLIED TO THE WALKING SURFACE OR OTHER ELEMENTS TO WARN VISUALLY IMPAIRED PEOPLE OF HAZARDS ON A CIRCULATION PATH". ALL DETECTABLE WARNINGS SHALL BE IN COMPLIANCE WITH THE AMERICANS WITH DISABILITIES ACT OF 1990 ACCESSIBILITY GUIDELINES (ADAAG) AS DETAILED IN 28 CFR PART 36. DETECTABLE WARNINGS SHALL CONSIST OF RAISED TRUNCATED DOMES WITH A: - BOTTOM DIAMETER OF 23 MM (0.9 IN); - TOP DIAMETER OF 10 MM (0.4 IN); - HEIGHT OF 5 MM (0.2 IN); - CENTER -TO -CENTER SPACING OF 60 MM (2.35 IN); - THE COLOR OF THE DETECTABLE WARNING SHOULD CONTRAST VISUALLY WITH ADJOINING SURFACES; EITHER LIGHT ON DARK OR DARK ON LIGHT. THE MATERIAL USED TO PROVIDE CONTRAST SHOULD CONTRAST BY AT LEAST 70 PERCENT. DETECTABLE WARNINGS SHALL BE LAID OUT ON A TRIANGULAR GRID OR A SQUARE GRID (PARALLEL ALIGNMENT). WHEN INSTALLED ON CURB RAMPS, ONLY THE LOWER 610 MM (2 FT) OF THE ENTIRE CURB RAMP WIDTH SHALL BE COVERED (EXCLUDING THE FLARED SIDES) RATHER THAN THE ENTIRE LENGTH OF THE RAMP TO MAXIMIZE THE DETECTABILITY AND TO MINIMIZE THE NEGATIVE IMPACT ON PEOPLE WHO RELY ON WHEELED DEVICES FOR MOBILITY. THE DETECTABLE WARNINGS SHALL BE INSTALLED SUCH THAT THE EDGE NEAREST THE CURB LINE IS 152 MM TO 200 MM (6 IN TO 8 IN) BEHIND THE CURB LINE. 1 PROJECT NO.: 16-137 s w Lu UU) w z ~O mu cu 0 co Q J U)co Lu U) W Q N U V > _-> .� gwD Q a V) z� U o (D z z N }? w W ~ j N . , Lu > a co (D cu � LU OOO N Z Q J o n U Z O U cy W O J '_ I-_ O J J IL Q z uu � Q �>- z z O LL � Qo< v1. 4W0Wa om n a� Z 00�-�0 0®Q u z O L30 =� Qv1.Z � z�n.=z W O�? InV a D o CARO't ��y-�'- ;�o� •' ass%�' SEAL 03658 r Ilq' GP`s REVISIONS: DRAWN BY: BBAILEY FIELD DATE: 01.01.2016 OFFICE DATE: 08.17.2016 CHECKED BY: JCARGILE PLOT DATE: 23.01.2017 NO SCALE SHEET 11 OF 14 PROJECT NO.: 16-137 s STREAM PROTECTION NOTES: 1. ALL WORK IN OR ADJACENT TO STREAM WATERS SHALL BE CONDUCTED SO THAT THE FLOWING STREAM DOES NOT COME IN CONTACT WITH THE DISTURBED AREA, I.E. "IN THE DRY". (PER WATER QUALITY CERTIFICATION NO. 3890, CONDITION #6) (SEE "PHASING PLAN" ON SHEET 5 FOR ADDITIONAL INFORMATION) 2. NO CONSTRUCTION ACTIVITIES THAT INVOLVE DISTURBANCE OF THE STREAM MAY TAKE PLACE DURING TROUT SPAWNING SEASON (JAN. 1 - APRIL 15). 3. SEE EROSION CONTROL PLANS 8 SHEET 4 REGARDING PHASING OF THE WORK SPECIFIC TO PROTECTING THE EXISTING STREAM. 8' max. standard strength fabric with wire fence 6' max. extra strength fabric without wire fence Steel post Wire 18 24 fence 1 Plastic or ire ties Natural ground 8" down & 4" forward along 24" the trench 24" Filter fabric Wire fenc Cross -Section View Filter Steel fabric Backfill trench Natural post and compact ground thoroughly • ••6•• ••: • m •min • • Upsl� m 0mmm••mm• 8„ . m •. • m • min 6660• •• 6 6 6.666 •m 6••66 •. SEDIMENT (SILT) FENCE NOT TO SCALE NOTE: ALL EROSION CONTROL DETAILS ARE TAKEN FROM E SHOULD BE INSTALLED IN ACCORDANCE WITH THE NCDEO EROSION E SEDIMENT CONTROL PLANNING E DESIGN MANUAL (REVISED MAY 2013). 1.5' min. 9" min 12 of NCDOT #5 or #57 washed stone 14K Class B Riprap Filter Cloth _. 4 I-Ilter Cloth Plan View • 1.5' ,v — 2 max. at �t J center i 4' to 6' Cross -Section View L = The distance such that points A and B are of equal elevation Figure 6.83a Space check dams in a channel so that the crest of downstream dam is at elevation of the toe of upstream dam. CHECK DAM NOT TO SCALE MOUND BACKFILL TO ALLOW FOR SETTLEMENT SLOPE AS REQUIRED O MEET OSHA REGULATIONS VT .. \ COMPACTED SOIL IN 12 INCH LAYERS TO 85% STANDARD PROCTOR DENSITY. COMPACT THIS PORTION OF TRENCH WITH HAND HELD MECHANICAL TAMPERS ALDOT NO. 78 STONE OR SELECT BACKFILL FROM EXCAVATION. WORK MATERIAL AROUND PIPE. z STORM SEWER IN NON -TRAFFIC AREAS FINISHED PAVEMENT ° O V A A IN A " ° A o d ° a a ° A A d dd d a 4 4 d d a ASPHALT PAVING • DENSE GRADED BASE MATERIAL AS REQ'D BY STREET SECTION DENSE GRADED BASE ALDOT NO, 78 CRUSHED STONE z P-0" I BELL DIA. I 1'-0" I MIN. T OF PIPE T MIN. METHOD "B" STORM SEWERS IN PROPOSED TRAFFIC AREAS OR WITHIN STREET RIGHTS-OF-WAY STORM SEWER PIPE BEDDING NOT TO SCALE PERMEABLE a GE07M E a FABRIC _= o PLYWOOD PAINTED WHITE LAG SCREWS ;WA RETELETTERSSECTION A -A WAS NOT TO SCALE WOOD POST 0 0 0 C O O O PLAN VIEW NOT TO SCALE TYPE "BELOW GRADE" 0 0 0 0 ST EARTHEN PERMEABLECRL1 GEOTDrRLE FABRIC CONCRETE WASHOUT Lu a SIGN (OR EQUIVALENT) A B J L NCDOT #5 or #57 washed stone NCDOT #5 or #57 washed stone - MDTE� 1. ACTUAL LAYOUT DETERMINED IN THE FIELD. 2 SIGNAGE IDEN71FYING THE CONCRETE WASHOUT AREA SHALL BE INSTALLED WITHIN 5FT.OF THE WASHOUT FACILITY. EROSION CONTROL PLAN LEGEND = I. -ITE WASHOUT CONCRETE WASHOUT NOT TO SCALE NOT TO SCALE PERMEABLE \ J H.`EOIEXBLE FABRIC a VARIABLE PLAN VIEW NOT TO SCALE TYPE "ABOVE GRADE" WITH EATHERN BERMS 4' max--- 3 - 19-guage hardware cloth ------------------------- - (4 mesh openings) T T ' 2' fi =1 16" 2' filtered HARDWARE CLOTH 6 GRAVEL INLET PROTECTION NOT TO SCALE 2-3 " coarse aggregate '•J TEMPORARY CONSTRUCTION ENTRANCE NOT TO SCALE J 1 PROJECT NO.: 16-137 Lu a UU7 w Z ~ O cu 0 Q J L0 a O Q N U cn LLI -u > C) g Q w + z 3 N 3:z `� � L-1 aN w >Lo i� ~ Eco . N LU m Ji LU Z Q J O O U w O U U W M O J } D 0 J J a Q z W0 Q i �- z z 0 Q Q < ZW ; I QWa oma a� Z Wiz �o 0OCU ®QU UaLL (n�O 0 3= ° H z LU O W �? 10 U0.CL D CARO! � 6.00•• � " SEAL 0365 ; •0*90.6• AN. Cp,```�. REVISIONS: DRAWN BY: BBAILEY FIELD DATE: 01.01.2016 OFFICE DATE: 08.17.2016 CHECKED BY: JCARGILE PLOT DATE: 23.01.2017 NO SCALE SHEET 12 OF 14 PROJECT NO.: 16-137 STREAM PROTECTION NOTES: 1. ALL WORK IN OR ADJACENT TO STREAM WATERS SHALL BE CONDUCTED SO THAT THE FLOWING STREAM DOES NOT COME IN CONTACT WITH THE DISTURBED AREA, I.E. "IN THE DRY". (PER WATER QUALITY CERTIFICATION NO. 3890, CONDITION #6) (SEE "PHASING PLAN" ON SHEET 5 FOR ADDITIONAL INFORMATION) 2. NO CONSTRUCTION ACTIVITIES THAT INVOLVE DISTURBANCE OF THE STREAM MAY TAKE PLACE DURING TROUT SPAWNING SEASON (JAN. 1 - APRIL 15). 3. SEE EROSION CONTROL PLANS 6 SHEET 4 REGARDING PHASING OF THE WORK SPECIFIC TO PROTECTING THE EXISTING STREAM. #3 BAR CONT. AROUND OUTSIDE OF BELL (TYP.) .K,_ #3 12" O.C. J'- #3 BARS ® 1, 4'-6" MODEL V-7394 PEDESTRIAN SAFE TRENCH FRAME & GRATE AS MANUFACTURED BY "EAST JORDAN IRON WORKS, INC." (1-800-874-4100) OR APPROVED EQUAL. INSTALL PER MANUFACTURER'S RECOMENDATIONS. �To 4" MIN. 3000 PSI CONCRETE "SAW -CUT" EXISTING SIDEWALK 8 INSTALL 1/2" PRE -MOLDED JOINT FILLER BETWEEN TRENCH DRAIN 6 EXIST. WALK TRENCH GRATE SECTION NOT TO SCALE 2'-6" PIPE I.D. <= _j 0} �v B W 12" I 3-0" L_ END ELEVATION 8'-0" UP VERT. INTO WINGS 8'-6" PLAN 6" #3 BAR CONT. AROUND �OUTSIDE OF BELL (TYP.) 'K'- #3 BARS - ® 12" O.C. #3 BAR I N cn D I i7 I N D 0 I 'H'- #3 BARS ® 10" O.C. _ I #3 BARS ® 12" O.C. v 0- 3'-0" 3'-0" CROSS SECTION CONCRETE HEADWALL DETAIL - 42'' PIPE NOT TO SCALE 2-#4 JARS � (TYP) A I� 18" CONCRETE APRON REQ'D AT THROAT OPENINGS ONLY (SEE CONSTRUCTION PLANS FOR APRON LOCATIONS) MATCH GRADE (TYP) #5's 0 12" O.C. EACH WAY #5's 0 8" O.C. EACH WAY NOTES m 0000 1-002 00 00 / i000 94 BARS 0 4" O.C. EACH WAY B (3MIN.) A PLAN SECTION "A" -"A" 1. ALL CONCRETE SHALL BE CLASS "A" AND SHALL DEVELOP A MINIMUM COMPRESSIVE STRENGTH OF 3000 PSI IN 28 DAYS. 2. REINFORCING SHALL BE INTERMEDIATE GRADE (GRADE 60) DEFORMED BARS AND SHALL CONFORM TO THE REQUIREMENTS OF THE STANDARD SPECIFICATIONS FOR BILLET STEEL CONCRETE REINFORCEMENT BARS, ASTM A-15 AND DEFORMATIONS CONFORMING TO ASTM A-305. 3. STEPS ARE REQUIRED ON ALL INLET BOXES WHEN DIMENSION FROM BOTTOM SLAB FLOW LINE TO TOP OF TOP SLAB IS GREATER THAN 4-0". 4. WHEN BRICK CONSTRUCTION IS USED, WALLS SHALL BE 8" BRICK WHEN H < 5', USE 12" BRICK WHEN H > 5'. WITH 1/2" THICK MORTAR ON BOTH SIDES. CONCRETE APRON REQ'D AT THROAT OPENINGS ONLY (SEE CONSTRUCTION PLANS FOR APRON LOCATIONS) co INLET DIMENSIONS PIPE I.D. A B W 12" 4-4" 3-0" 5'-4" 15" 4'-4" 3'-0" 5'-4" 1811 4-41 3-0"5'-4 21" 4--6"3-21 -00900900 / 5'-6 24" 4-9"3-511 I c n 5'-91 30" 5'-4" 4-0" 6'-4" 36" 5'-10" 4-6" 6'-10" OPEN THROAT INLET NOT TO SCALE Mit #5's 0 6" O.C. a _g Lo SLOPE BOTTOM WITH GROUT AS NEEDED TO DRAIN 1� 00 Lu a Z) Y 'OF HUNTS` 0000000 <<� U QJ / 0000000000 OOo00�00�00 co OOo00 ooloo u 099 0000 -00900900 / 41 — z_ gw:3N I c n a 1 2'-6" 8" co I I CONCRETE APRON REO'D AT THROAT OPENINGS ONLY (SEE CONSTRUCTION PLANS FOR APRON LOCATIONS) z LD w a LU 0 —7tt . W2 = D3 + 2'-0" MAX. W2 = 7-0" MIN. W2 = 3'-6" PLAN 8` W2 MAX. W2 = 7-0" MIN. W3 = 3'-6" #5's 0 12" O.C. #5's 0 ' 15" LAP (TYP) 1 Nlu 00 #6's 0 6" O.C. 2'-6" 96's 0 6" O.C. 95's 0 6" O.C. #6's 0 8" O.C. 5 2-#5's 5 2" CLR. <C #5's 0 12" O.C. l THIS CALCULATED WIDTH IS BASED ON MAXIMUM PIPE SKEW OF 70' NOTE: FOR JUNCTION BOX ONLY, OMIT CONCRETE APRONS AND THROAT OPENINGS. 2'-6"x6" OPENING 8" 18" CONCRETE APRON REQ'D AT THROAT OPENINGS ONLY (SEE CONSTRUCTION PLANS FOR APRON LOCATIONS) •I X Q 2-#5's >- #5's 0 6" O.C. 2" CLR. \�� _"�K (U U D o �Q IL IO O co m lu 95's 0 8" O.C. 2-#5's SECTION A -A NOTES 1. ALL CONCRETE SHALL BE CLASS "A" AND SHALL DEVELOP A MINIMUM COMPRESSIVE STRENGTH OF 3000 PSI IN 28 DAYS. 2. REINFORCING SHALL BE INTERMEDIATE GRADE (GRADE 60) DEFORMED BARS AND SHALL CONFORM TO THE REQUIREMENTS OF THE STANDARD SPECIFICATIONS FOR BILLET STEEL CONCRETE REINFORCEMENT BARS, ASTM A-15 AND DEFORMATIONS CONFORMING TO ASTM A-305. 3. STEPS ARE REQUIRED ON ALL INLET BOXES WHEN DIMENSION FROM BOTTOM SLAB FLOW LINE TO TOP OF TOP SLAB IS GREATER THAN 4-0". JUNCTION BOX/OPEN THROAT INLET DETAIL FOR 27'' TO 60'' PIPES NOT TO SCALE X Q 0 0 PROJECT NO.: 16-137 Lu a Z) t) -U) �z U QJ o co O0- cn Q U U) w > > z_ gw:3N cc .L, y Uof + 0 3 Z z LD w a LU 0 j N a c- U) > o m Lo co Z0Lcoj rx Lu m(10w g o Z J O z w U U 0 J } Z 0 J J d Q z uu0 a �Zz O Q ® Q Z4 > ' a Q 0 W Im n a � Z Liz 0O�o N � il0 V�Qv OLa. Lu - = z H zQ+ � ora uo a� N CARO SEAL 03659 _ r � GIN•.• V � REVISIONS: DRAWN BY: BBAILEY FIELD DATE: 01.01.2016 OFFICE DATE: 08.17.2016 CHECKED BY: JCARGILE PLOT DATE: 23.01.2017 NO SCALE SHEET 13 OF 14 PROJECT NO.: 16-137 STREAM PROTECTION NOTES: 1. ALL WORK IN OR ADJACENT TO STREAM WATERS SHALL BE CONDUCTED SO THAT THE FLOWING STREAM DOES NOT COME If CONTACT WITH THE DISTURBED AREA, I.E. "IN THE DRY". (PER WATER QUALITY CERTIFICATION NO. 3890, CONDITION 96) (SEE "PHASING PLAN" ON SHEET 5 FOR ADDITIONAL INFORMATION) 2. NO CONSTRUCTION ACTIVITIES THAT INVOLVE DISTURBANCE OF THE STREAM MAY TAKE PLACE DURING TROUT SPAWNING SEASON (JAN. 1 - APRIL 15). 3. SEE EROSION CONTROL PLANS 6 SHEET 4 REGARDING PHASING OF THE WORK SPECIFIC TO PROTECTING THE EXISTING STREAM. / w/ / I I �ili 111111111__\ \ — J °/ I J o/ L� I / / 1 /o/ / L J� /°// 7 °/ 1 z1 I I I 'll �IIi1i111111 I \ ///11111111111/ / � I °I I I II 1 1 I III \ I 111 IIII I l/ I I • W_1 11 / I I I I I I I I I I I N� / I I I 111 I I 111 I/ l I I I I � 11 -IIIIIIIIIII II / �� lI /I l 1 / l 11 11 1 11 11 1 / I \I °I I l l % �� 1 _IIIIIIIII I I I _ -------- �/ Ill '�I N -IIIIIIII wlIIII 1 1 \ IIIIIIII I I I 45.95 o 1 /I 111 - I 1 1 1 1 1 1 1 1 1 1\ \ // ///// / 1 1 1 1 1 IIIII I I I 111 'l' lI �I IIjN11111 1 1 \� ////I�� Ill 1111 Ij l � 1 � I J �� - 1 1 1 1 1 1 111 I I � I�11 1 111 11 11 111 11 I I I IN,___ I I 11 11 11 IIII I I --- -- — I I j i 1 1 1N�1 1 1 1 1 1 1 1 1 1 I I I 45 / l I III 1 1 1 1 I I I I I I I I I -1 _ 1111111 1 1 \\ I III III IIIII I I I I If II 11111 1 `---_� I I IIIII IIIIIIIIIIII I I I I IIII 1 1 \ I I III IIII I I 1 /l 11 /I j111111 1 \ z�soji111 111111``` 1 1 1 1 1 1 1 1 I\ \\ \ I 1 1 o 11 /°/ 2745 \ it 11 1 `----�\\�� \\� LLJ cu I \ \ w 70 o / I I I I 01 \ PLANT SCHEDULE TREES SHRUBS OTY BOTANICAL NAME / OOMMON NAME Darya r_ordiformis / Bitternut Hir_kory r,ONT OAL SIZE B $ B 8'611'H7 QTY BOTAN I GAL NAME / GOMMON NAME SIZE I Galycanthus fIoridus / Sweet Shrub 5 gal 1� Ilex vertiGillata / Knterberry 5 gal � Sambur-us nigra / Common E Iderborry 5 gal NOTE: LANDSCAPE PLANT MATERIALS WERE SELECTED FROM THE MOUNTAIN RIPARIAN SPECIES DOCUMENT FOUND AT NC STATE UNIVERSITY STREAM RESTORATION PROGRAM AND THE NCDEO - DIVISION OF WATER RESOURCES - ASHEVILLE REGIONAL OFFICE. NOTE: ONLY THE INFORMATION SHOWN ON THIS SHEET MAY BE CONSTRUCTED DURING TROUT SPAWNING SEASON (JAN. 1 - APRIL 15) TO AVOID STREAM DISTURBANCE NOTE: PHASE II 6 PHASE III WORK IS TO BE PERFORMED ONLY WHEN THERE IS NO RAIN FORECASTED WITHIN 5 DAYS OF COMMENCEMENT OF THE WORK & THERE IS NO VISIBLE EVIDENCE OF FLOW IN THE STREAM. ALL WORK SHALL BE COMPLETED 6 STABILIZED 24 HOURS MIN. PRIOR TO FORECASTED RAIN. (PER 15A NCAC 04B.0105) HT 24'' min. 18" min. 1 PROJECT NO.: 16-137 I w Of D LUU) w UjZ 0 a J 0 L m FU Q O <.N cr)>_ 0 LJ F__ 6 >c V) z gLU _j c� z } LLJ U + Z W 3 0 3 oN 3 N a 0 j a w > �� �Lo 0 co E Lo W mcn Q 0 w z O w J U w Q�O z J O J � jz W0 Q O �z_jz Q -< ry ZW Q> QOwa z aV)mmcn J Z mto� . z a OQ (1! o a Va o�-� Q � �Ow=� 030 V a zWU, zu = z J �a � o � a � `��.1% CARO ` ESSI �`�� ' • �• SEAL — 03659 _ d � � •GIN•.• v� 1w CP �rrri i�t� REVISIONS: DRAWN BY: BBAILEY FIELD DATE: 01.01.2016 OFFICE DATE: 08.17.2016 CHECKED BY: JCARGILE PLOT DATE: 23.01.2017 J�7� KH�7 0 10' 20' SHEET 14 OF 14 PROJECT NO.: 16-137 I