Loading...
HomeMy WebLinkAbout20060331 Ver 1_Meeting Minutes_20080129M0331 May 23, 2003 Subject: Draft Minutes Interagency Hydraulic Design 4C Permit Review Meeting on May 22, 2003, for R2606A, Randolph County. Team Members: Participants: Eric Alsmeyer - USACE (Present) John Frye - NCDOT Structures Cynthia Van Der Wiele - NCDWQ (Present) Mike Penney - NCDOT PDEA Travis Wilson- NCWRC (Absent*) Rachelle Beauregard- NCDOT ONE Gary Jordan - USFWS (Absent) Marshall Clawson - NCDOT Hydraulics Chris Militscher - EPA (Absent) Anne Gamber - NCDOT Hydraulics Brett Feulner - NCDOT ONE (Present) Teresa Bruton - NCDOT Design Services (Absent* *) * Due to the time change, Travis Wilson could not attend. ** Teresa Bruton was not informed of the revised time. Marshall Clawson began the meeting at 3:00 pm. 1. Causeway for Muddy Creek: Eric Alsmeyer questioned if consideration was taken for installing the bent in the northeast quadrant. He believes a causeway may be needed. Action since meeting: Structure Design will use single span bridge therefore no causeway is needed. 2. Culvert Geometry: The permit drawings showed the centerline of the culverts. This caused confusion over the number of barrels. The centerline must be removed. 3. Natural Channel Design: Cynthia Van Der Wiele questioned if mitigation would be allocated for this site. Eric Alsmeyer commented that the other agency representatives would be needed to determine this issue. The meeting was adjourned at 3:30