Loading...
HomeMy WebLinkAboutNC0020451_Compliance Evaluation Inspection_20151013 North Carolina Department of Environmental Quality Pat McCrory Donald R. van der Vaart Governor Secretary October 13, 2015 Mr. Charles Call Town of West Jefferson P.O. Box 490 RECEIVEDIDENR/DWR West Jefferson,NC 28694 T 1 5 2015 Water Quality SUBJECT: Pretreatment Compliance Inspection Permitting Section Town of West Jefferson • NPDES #NC0020451 Ashe County Dear Mr. Call: A Pretreatment Compliance Inspection(PCI) was performed on October 8, 2015 by George Smith of this office. Mr. Charles Call, Water Resources Director was present for the inspection. The purpose of this inspection was to determine the effectiveness of the Town's pretreatment program by reviewing the files, which include, POTW plant performance; industry monitoring data, and adherence to the enforcement response plan (ERP). Background This is a 0.5 MGD permitted facility. The Town has one (1) significant industrial user.- - • POTW Interview There was a monthly average violation for BOD during May 2015. The reason for the violation is unknown. Pretreatment Program Elements Review The Headworks Analysis (HWA) was approved June 20, 2014. The next HWA is due April 1, 2019. The Industrial Waste Survey (IWS) was approved June 23, 2014. The next IWS is due April 1, 2019. The Sewer Use Ordinance (SUO)was last approved on January 10, 2013 The Enforcement Response Plan(ERP) was approved on August 18, 2005. Short Term Monitoring Plan (STMP) is satisfactory and was approved on August 21, 2014. 450 W Hanes Mill Rd,Suite 300,Winston-Salem,NC 27105 Phone:336-776-9800\Internet:www.ncdenr,gov An Equal Opportunity\Affirmative Action Employer—Made in part by recycled paper .J 'C STMP File Review The Short Term Monitoring Plan (STMP) is being conducted at the proper locations and frequencies. The proper detection levels are used and all data is maintained in a spreadsheet. There are no POTW modifications that require a change in the STMP. Industrial User Permit (IUP) File Review The file review for Ashe Cheese (#0003) showed that the monitoring data was kept well organized. Action Items The next Pretreatment Annual Report(PAR) is due on March 1, 2016. Mr. Call implements the pretreatment program in an excellent manner. If you have any questions please contact George Smith or me at(336) 776-9800. Sincerely, .....761116141-1444r-* W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Division of Water Resources,NCDEQ cc: PERS-Unitrt--Monti-Hassan. WSRO Files NORTH CAROLINA DIVISION OF WATER QUALITY PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT BACKGROUND INFORMATION (Complete Prior To PCI; Review Program Info Database Sheet(s)1 1. Control Authority(POTW)Name: ! u w n b F UI/e cr .1-e-.-d e r so n 2. Control Authority Representative(s): C.l,(u,(`.�c -I 3. - Title(s): 1/iC,� % -e5(7ufrC"S e 4. Last Inspection Date: /0-3- VI Inspection Type(Check One): M PCI ❑ Audit 5. Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s)? YES ❑ NO 6. Is POTW under an Order That Includes Pretreatment Conditions? ❑ YESO Order Type,Number, Parameters: :v/4 Are Milestone Dates Being Met? ❑ YES- E-NO PCS CODING Trans Code Main Program Permit Number MM/DD/YY Inspec.Type Inspector Fac.Type NL 1NICI010HLIOI / 1 ,5111 1 /0121 '61 lP1 JSl 1 (DTIA) (TYPI) (INSP) (FACC) 7. Current Number Of Significant Industrial Users(SIUs)? SIUS 8. Current Number Of Categorical Industrial Users(CIUs)? _ O CIUS 9. Number of SIUs Not Inspected By POTW in the Last Calendar Year? U 10.Number of SIUs Not Sampled By POTW in the Last Calendar Year? 0 11.Enter the Higher Number of 9 or 10' O NON 12.Number of SIUs With No IUP, or With an Expired IUP Ci NOCM 13.Number of SIUs in SNC for Either Reporting or Limits Violations During Either of the Last 2 Semi-Annual Periods (Total Number of SIUS in SNC) PSNC 14.Number of SIUs in SNC For Reporting During Either of the Last 2 Semi-Annual Periods o MSNC 15.Number of SIUS In SNC For Limits Violations During Either of the Last 2 Semi-Annual Periods p SNPS 16.Number of SIUs In SNC For Both Reporting and Limits Violations During Either of the Last 2 Semi-annual Periods 1 POTW INTERVIEW 17. Since the Last PCI,has the POTW had any NPDES Limits Violations? aYES ❑ NO If Yes, What are the Parameters and How are these Problems Being Addressed? , !3 c' - LI (°''`".-1 1.,) p}^1'cr'": t1,,C - no i Su• r- I'-.a50 r.;;" violrtcr�A 18. Since the Last PCI,has the POTW had any Problems Related to an Industrial ❑ YES 11.116 Discharge(Interference,Pass-Through,Blockage,Citizens' Complaints,Increased Sludge Production,Etc.)? If Yes,How are these Problems Being Addressed? 19. Which Industries have been in SNC for Limits or Reporting during SNC for Limits: either of the Last 2 Semi-Annual Periods?Not Been Published for SNC for Reporting: Public Notice?(May refer to PAR if Excessive SIUS in SNC) Not Published: 20. Which Industries are on Compliance Schedules or Orders?For all SIUs on an Order,Has a Signed Copy of the Order been sent to the Division? 21. Are Any Permits Or Civil Penalties Currently Under Adjudication?If Yes, Which ❑ YES 11F-NO Ones? LTMP/STMP FILE REVIEW: 22. Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? BUY ES ❑ NO 23. Are Correct Detection Levels being used for all LTMP/STMP Monitoring? ES ❑ NO 24. Is LTMP/STM.P Data Maintained in a Table or Equivalent? EKES ❑ NO Is Table Adequate? [Ll-YIS ❑ NO 25. All LTMP/STMP effluent data reported on Discharge Monitoring Report? [YES ❑ NO DWQ Inspector, please verify yourself! 26. If NO to 23 -26, list violations A! /% 27. Should any Pollutants of Concern be Eliminated from or Added to LTMP/STMP? ❑ YES ❑SIO If yes,which ones?Eliminated: ,ti' /4- Added: N /4 NC DWQ Pretreatment Compliance Inspection(PCI)Form Updated 7/25/07 Page 1 • 28. PRETREATMENT PROGRAM ELEMENTS REVIEW— Please review POTW files, verify POTW has copy of Program Element in their files,complete with supporting documents and copy of PERCS Approval Letter,and dates consistent with Program Info: Program Element Last Submittal Last Approval Date Next Due, Date In file? Date In file If Applicable Headworks Analysis(HWA) ❑ Yes ❑ No 0-Yes❑ No Y /1 /15' Industrial Waste Survey(IWS) ❑ Yes ❑ No O'Yes El No /, /1 c/ Sewer Use Ordinance(SUO) El Yes ❑ No 7i' /!, 0-Yes ❑ No Enforcement Response Plan(ERP) El Yes El No g /i R'Yes El No Long Term Monitoring Plan(LTMP) ❑ Yes El No .. 7,A.t j,/ 0-Yes El No INDUSTRIAL USER PERMIT(IUP)FILE REVIEW(3 IUP FILE REVIEWS OR 1 FILE REVIEW AND 1 IU INSPECTION) 29. User Name 1. m i �'c,t �-i C��lis r, 2. 3. 30. IUP Number 000, 31. Does File Contain Current Permit? [Yes El No El Yes El No El Yes ❑ No 32. Permit Expiration Date 'I 0, 33. Categorical Standard Applied(I.E.40 CFR,Etc.)Or N/A A//14 34. Does File Contain Permit Application Completed Within One Year Prior 0-Ves El No ❑ Yes El. No ❑ Yes ❑ No to Permit Issue Date? 35. Does File Contain an Inspection Completed Within Last Calendar Year? Q-Yes El No El Yes El No El Yes ❑ No 36. a.Does the File Contain a Slug/Spill Control Plan? a. ['Yes EKO a. EYes ❑No a. ❑Yes ❑No b. If No, is One Needed?(See Inspection Form from POTW) b. [Wes ENo b. ['Yes ❑No b. ❑Yes ❑No 37. For 40 CFR 413 and 433 TTO Certification,Does File Contain a Toxic ❑Yes❑Nol NTA ❑Yes❑No❑N/A ❑Yes❑No❑N/A Organic Management Plan(TOMP)? • 38. a.Does File Contain Original Permit Review Letter from the Division? a. ©des❑N�o a. [Pies ❑No a. ['Yes ❑No b.All Issues Resolved? b.❑Yes❑Not�iV/A b❑Yes❑No❑N/A b.❑Yes:No❑N/A 39. During the Most Recent Semi-Annual Period,Did the POTW Complete 04Ies ❑ No El Yes ❑ No ❑Yes El No its Sampling as Required by IUP, including flow? 40. Does File Contain POTW Sampling Chain-Of-Custody Forms? ['Yes El No ❑ Yes ❑ No ❑ Yes ❑ No 41. During the Most Recent Semi-Annual Period,Did the SIU Complete its Wes❑No❑N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A Sampling as Required by IUP,including flow? 41b. During the Most Recent Semi-Annual Period, Did SIU submit all reports Elles❑M❑N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A on time? 42a. For categorical IUs with Combined Wastestream Formula(CWF), does ❑YesENol A ❑Yes❑No❑N/A ❑Yes❑No❑N/A file include process/dilution [lows as Required by [UP? 42b. For categorical IUs with Production based limits,does file include ❑Yes❑Nor /A ❑Yes❑No❑N/A ❑Yes❑No❑N/A production rates and/or flows as Required by IUP? 43a. During the Most Recent Semi-Annual Period,Did the POTW Identify 0-"Yes ❑.No ❑Yes ❑ No ❑ Yes ❑ No All Limits Non-Compliance from Both POTW and SIU Sampling? ;Jcs s 43b. During the Most Recent Semi-Annual Period, Did the POTW Identify ❑YesDNoElN%A ❑Yes❑No❑NIA ❑Yes❑No❑N/A All Reporting Non-Compliance from SIU Sampling? 44. a. Was the POTW Notified by SIU(Within 24 Hours)of All Self- a.❑Yes❑NoEWA a.❑Yes❑No❑N/A a.❑Yes❑No❑N/A Monitoring Violations? b.Did Industry Resample and submit results to POTW Within 30 Days? b❑Yes❑NoO A b❑Yes❑No❑N/A b❑Yes❑No❑N/A c. If applicable, Did POTW resample within 30 days of becoming aware c❑Yes❑NotN%A of SIU limit violations in the POTW's sampling of the SIU? c.❑Yes❑No❑N/A c❑Yes❑No❑N/A 46. During the Most Recent Semi-Annual Period, Was the SIU in SNC? ❑ Yes a'No ❑Yes ❑ No ❑ Yes ❑ No 47. During the Most Recent Semi-Annual Period, Was Enforcement Taken ❑Yes❑NoON/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A as Specified in the POTW's ERP(NOVs, Penalties,dining, etc.)? 48. Does the File Contain Penalty Assessment Notices? ❑Yes❑NoPN/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A 49. Does The File Contain Proof Of Penalty Collection? ElYes0NorROA ❑Yes❑No❑N/A ❑Yes❑No❑N/A 50. a.Does the File Contain Any Current Enforcement Orders? a.❑Yes❑Nottt/A a.❑Yes❑No❑N/A a.❑Yes❑No❑N/A b.Is SIU in Compliance with Order? b❑Yes❑NomN b.❑Yes❑No❑N/A b.oYesoNooN/A 51. Did the POTW Representative Have Difficulty in Obtaining Any of This ❑ Yes 0-No El Yes ❑ No El Yes El No Requested Information For You? NC DWQ Pretreatment Compliance Inspection(PCI)Form Updated 7/25/07 Page 2 FIEF REVIEW COMMENTS: INDUSTRY INSPECTION PCS CODING: Trans.Code Main Program Permit Number MM/DD/YY Inspec.Type Inspector Fac.Type • N l 1 II II °I { I 1 l 1 I 11 I I S 1 1 2 (DTIA) (TYPI)'' (INSP) (FACC) 1. Industry Inspected: 2. Industry Address: '�•, 3. Type of Industry/Product: 4. Industry Contact: ./ Title: Phone: � Fax: 5.Does the POTW Use the Division Model Inspection Form or Equivalent? ❑ YES ❑ NO 6. Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly? Comments: - A. Initial Interview , ❑ YES ❑ NO B. Plant Tour ❑ YES ❑ NO C. Pretreatment Tour ❑ YES ❑ NO D. Sampling Review ❑ YES ❑ NO -E:- Exit Interview ❑ YES ❑ NO Industrial Inspection Comments: OVERALL SUMMARY AND COMMENTS: Comments: Requirements: Recommendations: NOD: ❑ YES NO NOV: ❑ YES QNCR: ❑ YES O POTW Rating: / Satisfactory 17 Marginal• UnSatisfactory • PCI COMPLETED BY: DATE: i•C5 /,7 NC DWQ Pretreatment Compliance Inspection(PCI)Form Updated 7/25/07 Page 3