HomeMy WebLinkAboutNC0020354_Email_20160303 / rii4- f1 : Nun 3/20/6
Belnick, Tom
From: Templeton, Mike
Sent: Thursday, March 03, 2016 9:59 AM
To: Smith, Danny, Wainwright, David; Belnick, Tom
Cc: Gore, Deborah; Pohlig, Ken
Subject: pittsboro
FYI, Ken Pohlig came by this morning to talk about Pittsboro's latest WW plans.The Town submitted an engineering
report to DWI yesterday.They propose to refurbish the existing 0.75 MGD plant, construct a pump station and force
main to the Sanford WWTP-(2-3 MGD?), and construct a 1.75 MGD BNR plant and Haw River outfall further in the future.
o Kim Ni m me r nexratriTartteTternitric nccd-amara-II-a eaia I.
David..&-Ke-n---Doestie-E45'-RetYlr ii apump station&force main o anf'o"rd?7OtWo'n"SerThe last version I
revi •OA9,rckehrrt
1411 ee111/4 k
J4.(2,61L. L.i/ IC?", foldel 1,0404 bigyel ? Jii-e d.,,,,,,ili
j ,), 004j othly rv,a iv k a/44
felle
a °
ij jikt) Ipsev.
, ,c 4„,,3/3/tifolL