Loading...
HomeMy WebLinkAbout20061804 Ver 12_More Info Received - Email_20161216Permit No. fro be provided byDWq II. DESIGN INFORMATION 01t YYA � 9 ♦ NCDENR Drainage area .�( o Impervious area, post -development STORMWATER MANAGEMENT PERMIT APPLICATION FORM %impervious 38.48 % 401 CERTIFICATION APPLICATION FORM 1.0 in WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information, I. PROJECT INFORMATION Project name Woodlands W Flowers Plantation (Pod NE -6) Contact person Kevin Vamell Phone number 252.459.8196 Date 27 -Jun -16 Drainage area number NA II. DESIGN INFORMATION Site Characteristics Drainage area 338,461 rye Impervious area, post -development 130,244 ft2 %impervious 38.48 % Design rainfall depth 1.0 in Storage Volume: Non-SAWaters Minimum volume required Volume provided Storage Volume: SA Waters 1.5' runoff volume Pre -development 1 -yr, 24 -hr runoff Post -development) -yr, 24 -hr mnog Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the lyr 24hr storm peak flow required? 1 -yr, 24 -hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1 -yr, 24 -hr storm Pre -development 1 -yr, 24 -hr peak flow Post -development 1 -yr, 24 -hr peak flow PrelPost 1 -yr, 24 -hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 108 vegetated shelf elevation Bottom of 10ft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp. pool? Elevation of the top of the additional volume 11,197 83 16,4640 OK, volume provided is equal to or In excess of volume required. ft' to 83 to fe Y (Y or N) 2.9 in 0.35 (unitless) 0.58 (unitless) 0.12 in#1r OK 0.23 ft'/sec 0.23 f0/sec 0.00 f/sec 240.80 fmsl 239.50 fmsl 230.00 fmsl 240.00 fmsl 239.00 fmsl Data not needed for calculation option #1, but OK if provided. 237.00 fmsl 235.00 fmsl Data not needed for calculation option #1, but OK if provided. 2.00 It Yes (Y or N) 240.8 fmsl OK Foran SW401-Wet Detention Basin-Rev.9-4118112 Parts I. & II. Design Summary, Page t of 2 Permit No. (to be provided by DWQ) II. DESIGN INFORMATION Surface Areas Area, temporary pool 14,179 f? Area REQUIRED, permanent pool 8,462 fte SAIDA ratio 2.50 (unilless) Area PROVIDED, permanent pool, Ace,,,, 9,999 ft` OK Area, bottom of 1011 vegetated shelf, Aya sns1 5,619 ft` Area, sediment cleanout, lop elevation (bottom of pond), Am d 1,144 11` Volumes Volume, temporary pool 18,852 ft' Insufficient. Volume does not agree with data previously entered. Volume, permanent pool, V._p, 31,192 if Volume, forebay (sum of forebays if more than one forebay) 6,143 rya Forebay % of permanent pool volume 19.7% % OK SAIDA Table Data Design TSS removal 90 % Coastal SAIDA Table Used? N (Y or N) Mountain/Piedmont SAIDA Table Used? Y (Y or N) SAIDA ratio 2.50 (unilless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Y (Y or N) Volume, permanent pool, V. -PW 31,192 ft' Area provided, permanent pool, A ea m 9,999 ft Average depth calculated 3.10 11 OK Average depth used in SAIDA, d.„ (Round to nearest 0.511) 3.0 ft OK Calculation option 2 used? (See Figure 10-2b) N (Y or N) Area provided, permanent pool, Ace,,,, 9,999 ft, Area, bottom of 1 Oft vegetated shelf, A,, y,�g 5,619 ft Area, sediment cleanout, lop elevation (bottom of pond), A 1,144 fte 'Depth' (distance b/w bottom of 1Oft shelf and top of sediment) 2.00 it Average depth calculated ft Average depth used in SAIDA, d,,,, (Round to down to nearest 0.5ft) ft Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 2.00 in Area of orifice (if -non -circular) in' Coefficient of discharge (Cu) 0.60 (unilless) Driving head (Ha) 0.33 It Drawdown through weir? N (Y or N) Weirtype (unilless) Coefficient of discharge (C„.) (unilless) Length of weir (L) it Driving head (H) ft Pre -development 1 -yr, 24 -hr peak flow 0.62 fP/sec Post -development 1 -yr, 24 -hr peak flow 0.59 fP/sec Storage volume discharge rate (through discharge orifice or weir) 0.06 fts/sec Storage volume drawdown time 2.40 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 it OK Length of fiowpalh to width ratio 3 :1 OK Length to width ratio 5.3 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.0 it OK Vegetated filter provided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Captures all runoff at ultimate build -out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: Valve and Drawdown Forth SW401-Wet Detention Basin-Rev.9-4/18112 Parts I. & II. Design Summary, Page 2 of 2 Permit No. (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan - Side slopes, 3:1 or lower, Initials Sheet No. - Pretreatment and treatment areas, and !3W - Cie -c% 1. Plans (1" - 50' or larger) of the entire site showing: '17ZI fgnCe_ - Design at ultimate build -out, - Off-site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROVE, �+✓ FI H - Overnow device, and - Boundaries of drainage easement. 'VAV GE -4S 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, - Vegetation specification for planting shelf, and - Filter strip. 'VV (4-09 3. Section view of the wet detention basin (1" = 20' or larger) showing �w LLS 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wel Detention Basin-Rev.9-4/18/12 Part III. Required Items Checklist, Page 1 of 1 - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. '17ZI fgnCe_ 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for Forebay, to verify volume provided. 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (O&M) agreement. �+✓ FI H 9. A copy of the deed restrictions (if required). �w LLS 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wel Detention Basin-Rev.9-4/18/12 Part III. Required Items Checklist, Page 1 of 1 *A NCDENR Permit Number: (to be provided by DW4) o2ot WATFgO y O < STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM BIORETENTION CELL SUPPLEMENT This form must be filled out, printed and submitted. The Required items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name Woodlands @ Flowers Plantation (NE -6) Contact name Kevin Varnell Phone number 252.459.8196 Date June 27, 2016 Drainage area number 1 Site Characteristics Drainage area 76,666 i(2 Impervious area 51,836 fl2 Percent impervious 67.6% % Design rainfall depth 1.0 inch Peak Flow Calculations Is pre/post control of the 1 -yr, 24 -hr peak flow required? Y (Y or N) 1 -yr, 24 -hr runoff depth 2.89 in 1 -yr, 24 -hr intensity 0.12 in/hr Pre -development 1 -yr, 24 -hr peak flow 0.189 fl'/sec Post -development 1 -yr, 24 -hr peak flow 0.134 ft' /sec Pre/Post 1 -yr, 24 -hr peak control -0.055 ft'/sec Storage Volume: Non-SAWaters Minimum volume required 4,217.0 ft' Volume provided 4,876.0 ft' OK Storage Volume: SA Waters 1.5" runoff volume it, Pre -development l-yr,24-hrrunoff it, Post -development 1 -yr, 24 -hr runoff fl' Minimum volume required 0 it, Volume provided to Cell Dimensions Ponding depth of water 12 inches OK Ponding depth of water 1.00 it Surface area of the top of the bioretention cell 5,351.0 ft2 OK Length: ft Width: ft -or- Radius it Media and Soils Summary Drawdown time, ponded volume 6 hr OK Drawdown time, to 24 inches below surface 18 hr OK Drawdown time, total: 24 hr In-situ soil., Soil permeability 0.10 in/hr Insufficient. Increase infiltration rate or include underdrains. Planting media soil: Soil permeability 3.50 inthr OK Soil composition % Sand (by volume) 86% OK % Fines (by volume) 10% OK % Organic (by volume) 4% OK Total: 100% Phosphorus Index (P -Index) of media 30 (unitless) OK Form SW401-eioretention-Rev.e June 25, 2010 Parts I and 11. Design Summary, Page 1 of 2 Permit Basin Elevations (to be provided by DWQ) Temporary pool elevation 229.00 fmsl Type of bioretention cell (answer "Y" to only one of the two Does volume in excess of the design volume bypass the Y following questions): OK bioretention cell? Is this a grassed cell? Y (Y or N) OK Is this a cell with trees/shrubs? N (Y or N) (Y or N) Planting elevation (top of the mulch or grass sod layer) 228 fmsl Depth of mulch inches What is the length of the vegetated filter? Bottom of the planting media soil 226 fmsl Planting media depth 2 ft (Y or N) Depth of washed sand below planting media soil 0.33 ft Y Are underdrains being installed? Y (Y or N) SA waters)? How many clean out pipes are being installed? 4 Insufficient number of clean out pipes provided. What factor of safety is used for sizing the underdrains? (See p OK BMP Manual Section 12.3.6) Are the vegetated side slopes equal to or less than 3:1? Y Additional distance between the bottom of the planting media and 1 it Is the BMP located in a proposed drainage easement with access the bottom of the cell to account for underdrains (Y or N) OK Bottom of the cell required 224.67 fmsl SHWT elevation 220 fmsl Distance from bottom to SHWT 4.67 ft OK Internal Water Storage Zone (IWS) Does the design Include IWS N (Y or N) Elevation of the top of the upturned elbow fmsl Separation of IWS and Surface 228 ft Planting Plan Number of tree species 0 Number of shrub species Number of herbaceous groundcover species Additional Information Does volume in excess of the design volume bypass the Y (Y or N) OK bioretention cell? Does volume in excess of the design volume flow evenly distributed N (Y or N) Excess volume must pass through filter. through a vegetated filter? What is the length of the vegetated filter? It Does the design use a level spreader to evenly distribute flow? N (Y or N) Show how flow is evenly distributed. Is the BMP located at least 30 feet from surface waters (50 feet if Y (Y or N) OK SA waters)? Is the BMP located at least 100 feel from water supply wells? Y (Y or N) OK Are the vegetated side slopes equal to or less than 3:1? Y (Y or N) OK Is the BMP located in a proposed drainage easement with access Y (Y or N) OK to a public Right of Way (ROM? Inlet velocity (from treatment system) 0.52 fUsec OK Is the area surrounding the cell likely to undergo development in N (Y or N) OK the future? Are the slopes draining to the bioretention cell greater than 20%? N (Y or N) OK Is the drainage area permanently stabilized? Y (Y or N) OK Pretreatment Used (Indicate Type Used with an "X" in the shaded cell) Gravel and grass (8 orches gravel followed by 3-5 ft of grass) Grassed swale OK Forebay X Other Form SW401-8ioretention-Rev.8 June 25, 2010 Parts I and II. Design Summary, Page 2 of 2 Permit No: Ito be assigned by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. L �_ 1. Plans 0" - 50' or larger) of the entire site showing: _Wf - Design at ultimate build -out, - Off-site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Cell dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Recorded drainage easement and public right of way (ROW), -Clean out pipe locations, - Overflow device, and - Boundaries of drainage easement. !Y�V CC —09 2. Plan details (1" = 30' or larger) for the bioretention cell showing (x✓ C4"o$ -7ky Lmo t"lt Z R_ - Cell dimensions - Pretreatment system, - High flow bypass system, - Maintenance access, - Recorded drainage easement and public right of way (ROW), - Design at ultimate build -out, - Off-site drainage (if applicable), - Clean out pipe locations, - Overflow device, and - Boundaries of drainage easement. - Indicate the P -Index between 10 and 30 3. Section view of the bioretention cell 0" = 20' or larger) showing: - Side slopes, 3:1 or lower - Underdrain system (if applicable), and - Bioretention cell layers [ground level and slope, pre-treatment, ponding depth, mulch depth, fill media depth, washed sand, filler fabric (or choking stone if applicable), #57 stone, underdrains (if applicable), SHWT level(s), and overflow structure] 4. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (fmsl). Results of soils tests of both the planting soil and the in situ soil must include: - Soil permeability, - Soil composition (% sand, % fines, % organic), and P -index. 5. A detailed planting plan (1" = 20' or larger) prepared by a qualified individual showing: - A variety of suitable species, - Sizes, spacing and locations of plantings, -Total quantity of each type of plant specified, A planting detail, - The source nursery for the plants, and - Fertilizer and watering requirements to establish vegetation. 6. A construction sequence that shows how the bioretention cell will be protected from sediment until the entire drainage area is stabilized. 7. The supporting calculations (including underdrain calculations, if applicable). 8. A copy of the signed and notarized inspection and maintenance (I&M) agreement. 9. A copy of the deed restriction. Form SW401-Bioretention-Rev.7 Pad III, Page 1 of 1 N D- c 0 n E W 0 T N o O C Z W LU L uS p V QU i L -ET .3Co''' SGP �'_'-.�.-� ' Q. i�IPcS ouZ- 4� 3ta Nw, lECa USS 1C-L)e S.D KYJol-,U 2.4. fl e� f MIN. IP -EQ . MI /o S (o' i (}SE Crams $ P-tD ovz� MI?�pl1'.�,�,/S" IN aEr I i , N --wolt-cs-----Z!-4- 7&r4", - L -4— 7&r4 , - SL,uZ-S.F - - /MQaPkicauS ��?S .'St—c-r = _4fr (off %r _yr, CftLwl,a'is� �FH�E Mr�.��.�wt Pfwtnv,-S-T�� - /M� utauS t,.►/ -nhE_ 12-)CLS77 JCP- Vo(-.0VUA-C --- - 8-7(e c -r ?Qf ZuLDrcZ) B� DMJ4" I_ y� Z!7 CF Voww�E ZFAu (ZEA e V= 3, (a -?o -+E ! .6 -w- 0.45- -*- A , wltia� V = (059c.F 4059 C.F - A C. 3o -r.- ( 4� o.gs�) o. !q_l •4c = A 4_sem ��-(M� utia5s-&�r��ss C�1-�E �crr-��=t�Ecs -BMR - C I. ZZ A -t.---- -- —�� 0.05 —r o.q ��A �__c,,,��..•��'.��-� 0.057-t_OM 4t 7 C�