Loading...
HomeMy WebLinkAboutNCG080177 DMR SW (3) Semi-annual Stormwater Discharge Monitoring Report Y for North Carolina Division of Water Quality General Permit No. NCG080000 Date submitted 07/25/2016 CERTIFICATE OF COVERAGE NO. rrre.71111166 SAMPLE COLLECTION YEAR 2016 FACILITY NAME United Parcel Service-Asheville SAMPLE PERIOD nJan-June n July-Dec COUNTY Buncombe or❑Monthly' (month) PERSON COLLECTING SAMPLES James W.Willard II(INENCO,INC.) DISCHARGING TO CLASS nORW OHQW I—Trout EJPNA LABORATORY Pace Analytical Services,Inc. Lab Cert.# 40,37712,&442 Ns?, c E SVE nZero-flow ElWater Supply EISA LABORATORY INENCO,Inc. Lab Cert.# 5540 SEP 12 2016 Comments on sample collection or analysis: ri Other C CENTRAL FILES PLEASE REMEMBER TO SIGN ON THE REVERSE 9 DDR SECTION Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes no Part A:Vehicle Maintenance Areas Monitoring Requirements(If applicable) ❑No discharge this period?2 Outfall Date 00530 00400 00556 No. Sample Collected, Total Suspended pH, Non-Polar Oil and Grease/TPH EPA New Motor Oil Usage, mo/dd/yr Solids,mg/I Standard units Method 1664(SGT-HEM),mg/L Annual average gal/mo Benchmark - 50 or 100 see permit Within 6.0–9.0 15 - S00-001 05/17/2016 8.9 7.54 0.685 162 500-002 05/17/2016 11.1 7.25 0.815 162 Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals(if applicable) Outfall Date 00556 00530 00400 No. Sample Collected, Non-Polar Oil and Grease/TPH EPA Method Total Suspended Solids pH, mo/dd/yr 1664(SGT-HEM),mg/L mg/I Standard units Permit Limit - 15 50 or 100 see permit Within 6.0–9.0 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised April 11,2013 Page 1 of 2 United Parcel Service-Asheville STORM EVENT CHARACTERISTICS: Date 05/17/2016 (first event sampled) 11 Total Event Precipitation(inches): 0.20 Date (list each additional event sampled this reporting period,and rainfall amount) Total Event Precipitation(inches): Note: If you report a sample value in excess of the benchmark,you must implement Tier 1,Tier 2,or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES n NO n IF YES,HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ri NO IT REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR,including all"No Discharge"reports,within 30 days of receipt of the lab results(or at end of monitoring period in the case of"No Discharge"reports)to: Division of Water Quality Attn:DWQ Central Files 1617 Mail Service Center Raleigh,North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware that there are significant penalties for submitting false information,including the possibility of fines and imprisonment for knowing violations.' (Signature of Per - ,.e) (Dat ) Additional copies of this form may be downloaded at: htto://portal.ncdenr.ore/web/wg/ws/su/npdessw#tab-4 SWU-250 last revised April 11,2013 Page 2 of 2 NON-STORMWATER DISCHARGE EVALUATION UPS Facility Location- N l4- dsk : ((e Inspection Date Inspector. --.4-44e - (AL W (ZD -C (-�-N -c=-Nco) 6 - Ol c Signature of Inspector: 11/ ig c� Storm Water Discharge Outfall Locations Outfall Location ID: -S" 0-001 Outfall Type: Ditch Pipe Outlet Pipe Inlet Pond to Ditch Outlet Pond to Pipe Outlet Catch Basin Curb Inlet Other: 1. Is the outfall free of any non-stormwater discharge? Yes No NA If no,describe: 2. Identify potential sources of any non-stormwater discharges observed or discovered: Alert-e- 3. lert43. Method(s)of evaluation: Visual Dye Test Storm sewer map review Other: Comments: Outfall Location ID: 5d 0—00(9\ Outfall Type: Ditch 6ipe Outlee Pipe Inlet Pond to Ditch Outlet Pond to Pipe Outlet Catch Basin Curb Inlet Other: 1. Is the outfall free of any non-stormwater discharge? Yes No NA If no,describe: 2. Identify potential sources of any non-stormwater discharges observed or discovered: /VD/1..0 3. Method(s)of evaluation: 40100 Dye Test Storm sewer map review Other: Comments: NCG080000 Part II,Sections A.1(e)&A.7(b) SPPP Non-Stormwater Discharge Evaluation—Appendix F Page 1 of 1