HomeMy WebLinkAbout20170131 Ver 1_401 Application_20170117VJA <
0 V4111:� Y
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.4 January 2009
Page 1 of 10
PCN Form — Version 1.4 January 2009
Pre -Construction Notification (PCN) Form
A.
Applicant Information
1.
Processing
1 a.
Type(s) of approval sought from the Corps:
❑X Section 404 Permit ❑ Section 10 Permit
1 b.
Specify Nationwide Permit (NWP) number: NW 13 or General Permit (GP) number:
1c.
Has the NWP or GP number been verified by the Corps?
❑ Yes ❑X No
1 d.
Type(s) of approval sought from the DWQ (check all that apply):
❑X 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑X Riparian Buffer Authorization
1 e.
Is this notification solely for the record
because written approval is not required?
For the record only for DWQ
401 Certification:
❑ Yes X❑ No
For the record only for Corps Permit:
❑ Yes ❑X No
1f.
Is payment into a mitigation bank or in -lieu fee program proposed for
mitigation of impacts? If so, attach the acceptance letter from mitigation bank
or in -lieu fee program.
❑ Yes ❑X No
1 g.
Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h
below.
❑ Yes ❑X No
1 h.
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes ❑X No
2.
Project Information
2a.
Name of project:
7424 Deer Track Drive
2b.
County:
Wake
2c.
Nearest municipality / town:
Raleigh
2d.
Subdivision name:
Hampton Oaks
2e.
NCDOT only, T.I.P. or state project no:
N//A
3.
Owner Information
3a.
Name(s) on Recorded Deed:
Daniel and Rita Passer Richard A. Hohman
3b.
Deed Book and Page No.
DB 002954 PG 00494 DB 006114 PG 00450
3c.
Responsible Party (for LLC if
applicable):
3d.
Street address:
7424 Deer Track Drive 7420 Deer Track Drive
3e.
City, state, zip:
Raleigh, NC 27613 Raleigh, NC 27613
3f.
Telephone no.:
3g.
Fax no.:
3h.
Email address:
Page 1 of 10
PCN Form — Version 1.4 January 2009
4.
Applicant Information (if different from owner)
4a.
Applicant is:
❑ Agent ❑X Other, specify: City of Raleigh
4b.
Name:
Blair Hinkle, PE
4c.
Business name
(if applicable):
City of Raleigh Public Works Department
4d.
Street address:
222 West Hargett Street, PO Box 590
4e.
City, state, zip:
Raleigh, NC 27602
4f.
Telephone no.:
919-996-3940
4g.
Fax no.:
919-996-7638
4h.
Email address:
blair.hinkle@raleighnc.gov
5.
Agent/Consultant Information (if applicable)
5a.
Name:
Becky L. Ward
5b.
Business name
(if applicable):
Ward Consulting Engineers, P.C.
5c.
Street address:
4805 Green Road, Suite 100
5d.
City, state, zip:
Raleigh, NC 27616
5e.
Telephone no.:
919-870-0526
5f.
Fax no.:
919-870-5359
5g.
Email address:
bward@wce-corp.com
Page 2 of 10
B.
Project Information and Prior Project History
1.
Property Identification
1a.
Property identification no. (tax PIN or parcel ID):
0797353600, 0797352499
1 b.
Site coordinates (in decimal degrees):
Latitude: 35.8489
Longitude: -78.6377
1 c.
Property size:
0.98 acres
2.
Surface Waters
2a.
Name of nearest body of water to proposed project:
UT to Big Branch
2b.
Water Quality Classification of nearest receiving water:
C, NSW
2c.
River basin:
Neuse
3.
Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Please see documentation attachment
3b.
List the total estimated acreage of all existing wetlands on the
property: 0
3c.
List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 200
3d. Explain the purpose of the proposed project:
Please see documentation attachment
3e. Describe the overall project in detail, including the type of equipment to be used:
Please see documentation attachment
4.
Jurisdictional Determinations
4a.
Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project including all prior phases) in the past?
❑ Yes ❑X No ❑ Unknown
Comments:
4b.
If the Corps made the jurisdictional determination, what type
of determination was made?
❑ Preliminary ❑ Final
4c.
If yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company:
Other:
4d.
If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5.
Project History
5a.
Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past?
❑ Yes ❑ No ❑X Unknown
5b.
If yes, explain in detail according to "help file" instructions.
6.
Future Project Plans
6a.
Is this a phased project?
❑ Yes ❑X No
6b.
If yes, explain.
Page 3 of 10
PCN Form — Version 1.4 January 2009
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
❑ Wetlands ❑X Streams — tributaries ❑X Buffers ❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
2b.
2c.
2d.
2e.
2f.
Wetland impact
Type of impact
Type of wetland
Forested
Type of jurisdiction
Area of
number
Corps (404,10) or
impact
Permanent (P) or
DWQ (401, other)
(acres)
Temporary T
W1 -
Choose one
Choose one
Yes/No
-
W2 -
Choose one
Choose one
Yes/No
W3 -
Choose one
Choose one
Yes/No
W4 -
Choose one
Choose one
Yes/No
W5 -
Choose one
Choose one
Yes/No
W6 -
Choose one
Choose one
Yes/No
2g. Total Wetland Impacts:
2h. Comments:
N/A
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
3b.
3c.
3d.
3e.
3f.
3g.
Stream impact
Type of impact
Stream name
Perennial (PER) or
Type of
Average
Impact
number
intermittent (INT)?
jurisdiction
stream
length
Permanent (P) or
width
(linear
Temporary (T)
(feet)
feet)
S1 P
Stabilization
UT to Hare Snipe Creek
PER
Corps
12
143
S2 -
Choose one
S3 -
Choose one
-
S4 -
Choose one
-
S5 -
Choose one
-
S6 -
Choose one
-
3h. Total stream and tributary impacts
143
3i. Comments:
S1: The stream impacts include bank stabilization. The banks will be sloped back to a stable slope and a bankfull bench established where possible.
The outside of bends in pool areas will be stabilized with a rock toe to an elevation that is at or below bankfull. The banks will be seeded, matted, and
woody vegetation will be planted for long term stabilization.
Page 4 of 10
PCN Form — Version 1.4 January 2009
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then indivi ually list all open water impacts below.
4a.
Open water
impact number
Permanent (P) or
Temporary T
4b.
Name of waterbody
(if applicable)
4c.
Type of impact
4d.
Waterbody
type
4e.
Area of impact (acres)
01 -
Choose one
Choose
02 -
Choose one
Choose
03 -
Choose one
Choose
04 -
Choose one
Choose
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If pond or lake construction proposed, the complete the chart below.
5a.
Pond ID number
5b.
Proposed use or
purpose of pond
5c.
Wetland Impacts (acres)
5d.
Stream Impacts (feet)
5e.
Upland
(acres)
Flooded
Filled
Excavated
Flooded
Filled
Excavated
P1
Choose one
P2
Choose one
5f. Total:
5g. Comments: N/A
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If any impacts require mitigation, then you MUST fill out Section D of this form.
6a. Project is in which protected basin?
X❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other:
6b.
Buffer Impact
number —
Permanent (P) or
Temporary (T)
6c.
Reason for impact
6d.
Stream name
6e.
Buffer
mitigation
required?
6f.
Zone 1
impact
(square
feet)
6g.
Zone 2
impact
(square
feet
B1 P
Bank Stabilization
UT to Hare Snipe Creek
No
2,700
0
B2 T
Construction Access
UT to Hare Snipe Creek
No
3,700
1,760
B3 -
Yes/No
B4 -
Yes/No
B5 -
Yes/No
B6 -
Yes/No
6h. Total Buffer Impacts:
6,400
1,760
61. Comments: Please see documentation attachment
Page 5 of 10
D.
Impact Justification and Mitigation
1.
Avoidance and Minimization
1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Please see documentation attachment
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Please see documentation attachment
2.
Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a.
Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State?
❑ Yes ❑X No
2b.
If yes, mitigation is required by (check all that apply):
❑ DWQ ❑ Corps
2c.
If yes, which mitigation option will be used for this
project?
❑ Mitigation bank
El Payment to in -lieu fee program
❑ Permittee Responsible Mitigation
3.
Complete if Using a Mitigation Bank
3a.
Name of Mitigation Bank:
3b.
Credits Purchased (attach receipt and letter)
Type: Choose one
Type: Choose one
Type: Choose one
Quantity:
Quantity:
Quantity:
3c. Comments:
4.
Complete if Making a Payment to In -lieu Fee Program
4a.
Approval letter from in -lieu fee program is attached.
❑ Yes
4b.
Stream mitigation requested:
linear feet
4c.
If using stream mitigation, stream temperature:
Choose one
4d. Buffer mitigation requested (DWQ only):
square feet
4e. Riparian wetland mitigation requested:
acres
4f.
Non -riparian wetland mitigation requested:
acres
4g.
Coastal (tidal) wetland mitigation requested:
acres
4h.
Comments:
5.
Complete if Using a Permittee Responsible Mitigation Plan
5a.
If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
PCN Form — Version 1.4 January 2009
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
❑ Yes ❑X No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c.
6d.
6e.
Zone
Reason for impact
Total impact
Multiplier
Required mitigation
(square feet)
(square feet)
Zone 1
3 (2 for Catawba)
Zone 2
1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund).
N/A
6h. Comments:
Page 7 of 10
E.
Stormwater Management and Diffuse Flow Plan (required by DWQ)
1.
Diffuse Flow Plan
1a.
Does the project include or is it adjacent to protected riparian buffers identified
❑X Yes ❑ No
within one of the NC Riparian Buffer Protection Rules?
1 b.
If yes, then is a diffuse flow plan included? If no, explain why.
No
new impervious area is being added
❑ Yes ❑X No
2.
Stormwater Management Plan
2a.
What is the overall percent imperviousness of this project?
0
2b.
Does this project require a Stormwater Management Plan?
❑ Yes ❑X No
2c.
If this project DOES NOT require a Stormwater Management Plan, explain why:
This
project is only to provide long term bank stabilization in an existing stream.
2d.
If this project DOES require a Stormwater Management Plan, then provide a brief, narrative
description of the plan:
2e.
Who will be responsible for the review of the Stormwater Management Plan?
N/A
3.
Certified Local Government Stormwater Review
3a.
In which localgovernment's jurisdiction is thisproject?
City of Raleigh
X❑ Phase II
❑ NSW
3b.
Which of the following locally -implemented stormwater management programs
❑ USMP
apply (check all that apply):
❑ Water Supply Watershed
❑ Other:
3c.
Has the approved Stormwater Management Plan with proof of approval been
❑ Yes X❑ No
attached?
4.
DWQ Stormwater Program Review
❑Coastal counties
❑HQW
4a.
Which of the following state -implemented stormwater management programs apply
❑ORW
(check all that apply):
❑X Session Law 2006-246
❑ Other:
4b.
Has the approved Stormwater Management Plan with proof of approval been
❑ Yes ❑ No
attached?
5.
DWQ 401 Unit Stormwater Review
5a.
Does the Stormwater Management Plan meet the appropriate requirements?
❑ Yes ❑ No
5b.
Have all of the 401 Unit submittal requirements been met?
❑ Yes ❑ No
Page 8 of 10
PCN Form — Version 1.4 January 2009
F.
Supplementary Information
1.
Environmental Documentation (DWQ Requirement)
1 a.
Does the project involve an expenditure of public (federal/state/local) funds or the
Yes ❑ No
use of public (federal/state) land?
1 b.
If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
❑ YesX❑ No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c.
If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
❑ Yes ❑ No
letter.)
Comments:
2.
Violations (DWQ Requirement)
2a.
Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards,
❑Yes ❑X No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b.
Is this an after -the -fact permit application?
❑Yes ❑X No
2c.
If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3.
Cumulative Impacts (DWQ Requirement)
3a.
Will this project (based on past and reasonably anticipated future impacts) result in
❑Yes ❑X No
additional development, which could impact nearby downstream water quality?
3b.
If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4.
Sewage Disposal (DWQ Requirement)
4a.
Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
N/A
Page 9 of 10
PCN Form — Version 1.4 January 2009
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or
ZYes F1 No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act
El Yes ❑X No
impacts?
5c. If yes, indicate the USFWS Field Office you have contacted.
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
Please see documentation attachment
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat?
❑ Yes ❑X No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
The project is located In an urban stream.
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation
El Yes X❑ No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
The NC Historical Preservation Office website (www.hpo.dcr.state.nc.us) was searched and no sites were listed for this property. In addition, no
architectural structures or archaeological artifacts were noted during preliminary surveys at the site.
8. Flood Zone Designation (Corps Requirement)
Be. Will this project occur in a FEMA-designated 100-year floodplain?
❑ Yes ❑X No
8b. If yes, explain how project meets FEMA requirements;
8c. What source(s) did you use to make the floodplain determination?
(Floodmaps.nc.gov)
-Z3 _ (�
Blair Hinkle, PE
Applicant/Agent's Printed Name
Date
Applicant/ ent's Signature
(Agent's signature is valid only if an authorization
letter from the applicant is rovided.
Page 10 of 10
Documentation for Pre -Construction Notification (PCN) Form
7424 Deer Track Drive, City of Raleigh, NC
B. Project Information and Prior Project History
3a. Project Description
The project is located in a fully developed residential neighborhood at 7424 Deer Track Drive.
The watershed contributing to an unnamed tributary of Hare Snipe Creek in the Neuse River
watershed to be repaired is 178 acres. Land use is mostly residential with 4 dwellings per acre, 6
dwellings per acre, apartments, and retail commercial. The project will be limited to stabilization
of the existing stream that bisects the back yard of the residence. The site will be accessed from
the existing driveway and equipment will be limited to the area shown as the limits of
disturbance on the plans.
3b. List the total estimates acreage of all existing wetlands on the property
No wetlands are located and within the limits of disturbance for this project.
3d. Explain the purpose of the project
The existing stream has been incising for a number of years. The incision has caused unstable
stream banks that are actively eroding. The banks have eroded back in some areas exposing roots
from adjacent trees. The purpose of this project is to provide long term stabilization of the stream
through re -shaping of the stream bank, stream toe reinforcement at bends, and re -vegetation of
the stream banks in its current location. Tie-ins to the existing stream dimension and elevation
upstream and downstream of the property will be maintained.
3e. Describe the overall project in detail, includingthe he type of equipment to be used.
The stabilization project will be limited to the stream on property located at 7424 Deer Track and
less than 20 feet of stream length at 7420 Deer Track Drive to tie in the improvements
downstream. The stabilization work will be primarily sloping the stream banks back to an
appropriate slope. The stream has been sized to accommodate bankfull flows and a bench
established to accommodate larger flows within this incised profile. The bankfull bench within
the south east side of the stream will be graded to transition into the existing natural bench at the
downstream tie in. The stream banks will be stabilized with riparian seed, erosion control
matting, and woody vegetation. On the outside of bends in pools, the stream toe will be
stabilized with a rock toe to resist the higher flow stresses anticipated at this location during large
storm events. Existing tree removal was minimized only the trees shown on the construction
plans with exposed roots or in areas of bankfull benching will be removed. The contractor will
work around all other trees to remain. The stream bisects the property and therefore one stream
crossing will be required to move construction equipment to the east side of the stream. The
stream crossing will be bridge mats that will be placed at the top of the banks, no stream
disturbance will occur. The stream has good pattern and a stable profile therefore no work will
be completed in the channel, only work will be completed on the stream banks and within the
stream buffers. The stream buffer in zone one will be impacted for construction access. Work in
zone 2 will be for construction access and stream bank stabilization.
The equipment to be used in the project is earth moving equipment and various other support
apparatuses. Heavy equipment may include hydraulic excavator, compactors, bulldozers,
skidsteer loaders, and dump trucks to load and unload materials. The construction equipment will
enter the site from Deer Track Drive along an existing driveway and will perform all
construction within a defined limit of disturbance. Work will be completed primarily from the
west bank with access to the east bank provided by a bridge mat crossing.
C. Proposed Impacts Inventory
6i- Comment -,-
B 1: Stream bank stabilization with occur along the east and west banks. The area will be re-
graded, matted, and re -vegetated.
B2: Construction equipment will enter from Deer Track Drive. The area will be re -vegetated to
match existing yard or natural area conditions.
D. Impact Justification and Mitigation
la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing
project.
This project is necessary to stabilize the stream channel and to eliminate active erosion of the
stream channel bank. The project has been minimized by limiting the repairs to the stream bank.
No changes in pattern or profile are proposed with this design. The buffer impacts have been
minimized in the wooded area by identifying access areas and the preservation of as many trees
as possible within the forested buffer.
lb. Specifically describe measures taken to avoid or minimize the proposed impacts through
construction techniques.
Bypass pumping of the normal flow for the stream will be maintained while work on the bank
and stream toe is in progress. Bank stabilization, covering the slope with riparian seed and coir
matting, will occur daily upon completion of bank grading. Permanent woody vegetation will be
installed on all stream banks by hand.
F. Supplementary Information
5d. What data sources did you use to determine whether your site would impact Endangered
Species or Designated Critical Habitat?
The site is an existing urban residential area that has been previously impacted by development.
Habitat is not present for Wake County listed vertebrate and invertebrate endangered species
with the exception of Northern Long Eared Bats. Michaux's sumac prefers open areas and is
relatively shade intolerant. The site is forested with other open areas currently being mowed. A
few trees are planned to be removed as a part of the project however it is not anticipated that
these few trees would not be an impact to critical habitat for the Northern Long Eared Bat in
Wake County. This work could be completed prior to or after nesting if required by US Fish and
Wildlife. It is not anticipated that there will be any adverse impacts associated with T/E species
for this project.
_ 1
-95--- EXISTING ► I 7428
%/--
DRIVEWAY
-94--_ CONCRETE
GRASS IIi� I DEER TRA
CK
AREA DRIVE
PROPOSED SPOIL / / �'g2 _ I 120' STORM SEMENT
AREA SPREAD EXCESS l i i --- 7424 I DRAINAGE �` I
ss
EXCAVATED MATERIAL / � I f DEER TRACK 1 m I EXISTING SSMH
/ / DRIVE I 1►>c 1 TOP=93.0 FT.
AND GRADE EVENLY. / / ���\ I 1 8 IN.(N)=85.2 FT.
MAXIMUM DEPTH
SHOULD NOT EXCEED / / I IC) I EXISTING 8" IN.(W)=85.7 T.
6 INCHES // 911"/ I 1 I HEDGE AREA INV OUT.=85.0 FT.\_,C79
`�EXISTING I I cl HOUSEEXISTING FFE=94.14' 1 I n wHEDGE AREA / $9-
ot C-1 SENN ER ss
ss
TOP=87.94NG FT I DECK TORAH -� ♦♦♦♦♦• I ilii It. - *' $„=FZR= �� ss i
8” IN.(N)=80.86 FT. o ♦♦ _ , J i i ss -r ♦�
i r ■.. ■
INV OUT.=80.61 FT. --as- ♦♦ 1 1 ss ss _
•• � ion— _ �_ 11 �
EXPOSED ROOTS TO '■•■ ■■•• n■■■■■■■■.►♦ �o�c �tcm�*��I■♦♦♦♦' _ w o o
REMAIN FILL BEHIND , _ 2 ss ♦♦♦ ill r' Li—��� m N
WITH SOIL _ - ss_ ♦ 1I
APPROXIMATELY 25 FT s� ss� __$a I -I 11 1 EXISTING �♦■■■■-.-_■ ■■son.■
OFSTREAM BANK - �� ■r■���■ �`- _ _ tea -♦I II I GRASS EXISTING FES I
AREA
### ■■ ss ■m r..r■r �.♦♦� 11 I 18 RCP OUT=85.8
�♦S,.!--ss — ss , 1* ■ _ 1 1 I w w
3 PROPOSED ♦♦♦ �1 � zo 0
,VROCK TOE ♦ ♦ �_ / i,1 EXPOSED ROOTS m N
♦♦♦ -"- s REMOVE WITH TREE
.♦♦♦♦ _ �,�\\\ n - li I APPROXIMATELY 15 FT I
—
OO
I _
EXISTING
TOP OF
BANK 4
s�
EXISTING _ -/ �-
,-
STREAM xs _�- ,A
CENTERLINE F�/' it �J X70
00
colli
�' rn v N m `� o o ^ DO .•■ LEGEND
CM,. - Z 2 N ~ PROPOSED 3 ♦♦ BUFFER ZONES
O I ROCK TOE 3
TCE l a��F`��•PROPOSED O
♦ ♦♦
W •♦ o ROCK TOE o o 1 ♦ •■ B1 BUFFER IMPACTS
%♦ O p �a01 �. w •r. •••♦.r■♦ ♦ ••
• ., Oft
- .. ♦10 2 � a `�6t'��cn �anl — d � v ♦♦♦♦♦ .••♦♦♦ ♦♦♦♦ STREAM IMPACTS
00
.■■■ ,, _ Z o of of WOODED AREA I
NN a 0 ♦♦♦
EXISTING �••"♦� x ♦co ♦
FENCE •
SPIT -RAIL ••.••• ♦♦ ..�1..� ■■\■■■■••••-■■r■•■••=.♦♦♦♦`♦ ...♦♦♦ 20 10 0 20 40
• • •
-■0000■■■■• ■■■ PLAN VIEW - SCALE 1"=20'
1■e 1-13-2017 1
DEER TRACK DRIVE
WME
IMPACs MM
e
T ND.
1
a
j
O m
C4
N
a
CIO
?"
�6
Q
x
�
�
U
�
�z
�
_
�
N
1■e 1-13-2017 1
DEER TRACK DRIVE
WME
IMPACs MM
e
T ND.
1
a
�
U
Q
x
�
�
U
�
WQ
Q
�
c7
W
W
�
N
U
1■e 1-13-2017 1
DEER TRACK DRIVE
WME
IMPACs MM
e
T ND.
1
Project Photographs
X50 -
d
v
.i i
! ,
X50 -
d
Project Location, Watershed, and Soils Map
r llr +rte_
I
400 o on the Ga
( � Village r
V AHINTONST ) fi w �o�
`Pines of �, o, /
ickwick� �� Brookhaven '
tillage= �° i` eQ �- o PROJECT AREA A
LATITUDE: 35.5056
Lo�yRD o' o LONGITUDE: 78.3815
, 2 V
2 t z✓ ` KE ARK DR 350
V \JI rll
PE LNCBP-0O'avell Chllppen112LVen �
pRD Square - A- Z o
ERQ o JJ x 73P Six
Fork
iso A\ o W
PASTILLE Brandermill
BASIL DR
VA�1 E c -so m
7-
s
spc+ Lambsh<re Downs mCL
350 — Shelley
J m -.� vim--
a � � \ iLae
PL k
; w I �� $
'"culyn Park
r�e0 T06
BELSX' D�
CV
YORKGATEDR ryr
REM BERT DR m e—
Ao
f JAZ . o z FRENCH DR
Glen L� y Q n z SU - GUNfy
�� / u < _ l G, p
�o Forest ❑ (,��1� z , a R��� STANNARD TRL
Q-
70 �_� \ D
0 �� KIMBER�
-
crbt-ee Cr
WYSONG CT d Z �NpRT ,.
o Q 1 SMALL CT Z HBROOK DR
Woodbury Village
HILLOCKDRI
Royal Hills
! N
m� � '� / Q !` PO
��O a
� o Pond �
�) t Markwood
VA N ELL AYE ckana -q
0 C010�1
7424 DEER TRACK DRIVE
USGS QUAD MAP
CITY OF RALEIGH, NORTH CAROLINA
DATE: SEPTEMBER 19, 2016
USGS QUADRANGLE WARD CONSULTING ENGINEERS, PC
RALEIGH WEST 2013
SCALE: 1 =2000 4805 Green Road, Suite 100919 870-0526
�_ Raleigh, NC 27616 FAX (919) 870-5359
`t,' F V L/, _ CgC Ve;, ;' --- ,�� I
m .. ep.. Cgg Apc
AgC2 Cg62
4C2 PD CgC .\yB \ CgC / APC \ CeB CeB2 \
C4
CgC2 Cg6CeC2
\ "
ApC2
CeC2 i ..
;gB2,\\ ep
AgB2
_ \\ CeDqgg /
c? Me ApC2 ApC2 CeC v��� Cel
CgB2
CeC2
\ CgC2 A9B2 ApD CeD ApC2 Cel
--- CgC2 CgB2 AgB CeD ApD \ ,�N I CeB2 CeC2
CeC2 V v
Effie G en Me
Eff M a J QQ�
CgC2 C 82 eh ase2 W
/PROJE ' CeD A ApC2
—�-
WY
CeB2 CeC2 CeD HeD �
ApC2
f— ..
CeC2
Ap6 --- CIB3
CeB2 9�
CeC2 .-.
` Q CeD CBC CeB2 )/ cc
ApC2 �.
—S. \ CeC2 30
U AoC Y WwE
;e82 a ria( ,I CeD I ...
Ce 1 CeC2I� \ — Ce �.. WwE WwE
CeB2 A \ r
CeC2 /
1 eC2 T inity \ CeC2
CeC2
/ , ...
_ .. ch CeC2 � . \, \ � APB2
ApC2
�� —
APB2 a 5 CeD �\ QAC Ww CeB2
h �
APC2 CgB2 CeB2 ApB2
ApC2
` CeC2 \ . WwE \
CeC2 � � ApB
Wml
CeB2 CeC
aC2 CeB2 \CeC2 CeD I
Ap
CeC2 CeD.:
CeB2 ApD
/ _ CeC2
CeD....- —� Ce62 P I / APC
CeC2` \ CeB2 IP/ ApD /
i
•. �. CeC2 '/
f` CeD / ApC2
MeApB
L.. —_...
\ CeD APB2
Ce62 y, APC
CeD CeC2
CeB2 = '✓
4� eGL. ma � ApC2 Wy .
--_ _ CeC2 APD CeD \
o LoD / __-- Ma CeB2 CeD O o CeC2
CgC2 PQ
_� — CeC2
C%62
CBC2 �Q. CeB2 Ma WwC WwE
7424 DEER TRACK DRIVE
SOILS MAP
CITY OF RALEIGH, NORTH CAROLINA
DATE: SEPTEMBER 19, 2016
SOURCE:
USDA SCS (NOW NRCS) SOIL SURVEY WARD CONSULTING ENGINEERS, PC
WAKE COUNTY, NORTH CAROLINA
ISSUED NOVEMBER, 1970
SCALE: NTS C 4805 Green Road, Suite 100(919) 870-0526
��� Raleigh, NC 27616 FAX (919) 870-5359
Existing Morphological Data
Project: 7424 Deer Track Drive
Date: 9/15/2016
Prepared By: C. Rogers
Existing
Maximum
Bankfull
Bankfull
Bankfull
Bankfull
Width to
Bankfull
Bottom
Cross Section
Feature
Station
Elevation
Width Wbkf
Area Abkf
Depth dbkf
Depth Ratio
Depth
Width (ft)
(ft)
(ft)
(SF)
(ft)
W/D
dmbkf (ft)
1
Glide
1+69.7
86.1
9.8
21.4
2.2
4.51
2.6
9.4
2
Riffle
1+82.2
86
9.3
20.3
2.2
4.28
2.8
6.4
3
Pool
2+43.4
85.7
14.5
32.2
2.2
6.5
3.9
4.0
4
Riffle
2+64
85.6
10.6
26.6
2.5
4.23
3.3
5.6
5
Pool
2+84.1
85.3
7.7
15.6
2.0
3.78
3.6
6.5
6
Riffle
3+07
84.8
10.2
23.6
2.3
4.4
3
6.2
7
Riffle
3+38.6
84.7
19.1
25.7
1.3
14.21
3.2
3.9
a i;i
w a tlevamm lieeip
Tr.i yr
g --
B4. da
■
�
M
W
Tc✓
�"-
�
■
83.95
Tw E
TW c9
$Z.&5�
T
H�
;�
83.57
Tw
NR ly Y
.16
c
433.95
j �'
■i
7-W
433. p`
i
O
f�
D 6f
Tw
o
93.77
gz.
Tw
5•i Ir
� ■
-4.1�'
.63.48
iw Rp
14-7',
�f
f
E33.
je,dv
Xc y ��
c
1'7
:2
�
`-_---�•'-�E'diKis
'W ER
/ r dCr
9
a 'S+
� 2.93
■
�
�
T�✓
1
N
+
1.95
I
1¢W
T
o
7
Hi? p
iu.-i 1
ga.44
o
Sz -gF7
n°
■
cn
iv
a_rc'
Cn
z
d �. o
Co
o
■
7W
a °
-n
..,�
Y In
O z -
$
LA Z
.+
01 co
Q
��
j
c
10�
x eo
•
x
yr
_
Tw /-7
S 1
0
0
■
i�
TiJ
,n
S 5
E,LI .4
T
81,7
+
cn
J
rw FIR
gz.f9
--
■
t)
w cP
*
D
Lf
o
X
■
N fr.
■
~l
Ito PC! 7,3.4ti
01,5s
0
0
rn
A +7
I
Scanned by CamScanner
Project: Deer Track Location: Existing Cross Section A
Station: 1+94 Benchmark description: Riffle
Date: 9/14/2016 USGS Grid Coordinates Plan Sheet
Photo Reference Location: North East Ref. No.
Permanent Benchmark Elevation: Permanent Benchmark Location:
Blue cells are instructions and notes. Please read them. Cross Section taken from left to right looking downstream.
Gray cells are outputs and should be left alone.
Yellow cells are for data input and manipulation If you need additional sheets for more cross sections, just create a copy of the sheet by right clicking on the tab at the bottom of this sheet.
Height
117==
Back -Si ht Instrumentbe
"TW", "Bankfull right" and "bankfull left" MUST
entered verbatim in this column for the sheet
to work. "TOBL", "TOBR", "TOE L" and TOE R"
are recommended.
6
Bankfull
Bankfull Cross
Section
Left I Right Left I Right
Station
2 X Bankfull
Station I Elevation I Station
Station BS HI FS Elevation
Left End
Station
Ri ht End
Station
Station
Elevation
Elevation from
bankfull
Incremental Av
Height (H) g
Incremental
Distance (ft)
Incremental
Area (ftp)
Station
Distance
Between
Points
Feet Feet Feet Feet Feet
Purple rows are for additional data. Start station O+Og at the first
yellow row.
Additional data needed if elevation is less than
bankfull or 2 x bankfull.
Delete values in these columns where the ground elevation falls lower than bankfull outside the bounds of the stated/calculated bankfull station.
Elevation
Station
Elevation
0
0
0
0
0
0
0
0
These are parameters that
cells.
are used for morphology calculations, after any adjustments below. There is no need to change these
0
0
0
0
0
0
0
0
100 82.2
96.91 861 102.91 01 0
0
0
0
0
0
0
0
0
82 87.0
0
0
0
0
0
0
0
0
0
94.5 87.0
0-
0
0
0
0
0
0
0
0
96.7 86.7
0
0
0
0
0
0
0
0
96.9 86.0 bankfull left
0
96.9
86
0
0
0
0
0
0
97.1 85.0
96.9
97.1
85
1
0.5
0.2
0.1
0
1.019804
97.3 84.0
97.3
84
2
1.5
0.2
0.3
0
1.019804
97.5 83.0 TOE L
97.5
83
3
2.5
0.2
0.5
0
1.019804
100 82.2 TW
100
82.2
3.8
3.4
2.5
8.5
0
2.624881
101.8 83.0 TOE R
101.8
83
3
3.4
1.8
6.12
0
1.969772
102 84.0
102
84
2
2.5
0.2
0.5
0
1.019804
102.4 85.0
-
102.4
85
1
1.5
0.4
0.6
0
1.077033
102.9 86 bankfull right
1 102.9
102.91
86
0
0.51
0.5
0.25
0
1.118034
103 86.2
0
0
0
0
0
0
0
0
105A 87
0
0
0
0
0
0
0
0
135.9 88
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
01
0
0
01
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
01
0
0
0
0
0
0
0
01
0
0
0
0
0
0
0
01
01
01
0
0
0
0
0
00
20
0
01
0
0
0
00
0
0
0
0
0
Pull down orange if more rows needed.
0
01
01
0
0
0
0
0
95.00
90.00
85.00
80.00
75.00
70.00
75.00 80.00 85.00 90.00 95.00 100.00 105.00 110.00 115.00 120.00
125.00
t Bankfull
2 x Bankfull
These numbers are taken from the raw data table. There is no need to change these cells
Bankfull Width ft
6
Bankfull
TOB
TW
Left I Right Left I Right
Station
I Elevation
Station I Elevation I Station
Elevation Station
I Elevation I Station I Elevation
1001
82.2
96.91 861 102.91
01
01 01 0
You can change the yellow cells below. This is where you can adjust the stations or elevations of the parameters below. The units
are +/- feet of offset. The cells can be left blank if you do not wish to make changes.
TW
Bankfull
TOB
0
Left
I Ri ht Left Riht
Station
Elevation
Station
Elevation
Station Elevation Station
Elevation Station Elevation
01
01
01
01
01 01 01
01 0 0
These are parameters that
cells.
are used for morphology calculations, after any adjustments below. There is no need to change these
TW
Bankfull
TOB
Left I Ri ht Left Riht
Station Elevation
Station Elevation Station Elevation Station
Elevation Station Elevation
100 82.2
96.91 861 102.91 01 0
0 0 0
Bankfull Stream Morphology
Station Elevation
96.9 86 W bkf = 6
102.91 86 Abkf = 16.87
2xBankfull dbkf = 2.811667
Station Elevation W/D = 2.13
#NUM! 89.8 Error, data needed if red dmbkf = 3.8
89.8 Wfpa= 205.00
Average Bankfull Elevation ft86
Bankfull Width ft
6
Bankfull Area ft
16.87
Bankfull Wetted Perimeter ft
10.86894
Bankfull Hydraulic Radius ft
1.55213
Low Bank Height ft
-82.2
Avera a PIN Elevation ft
0
LPIN and RPIN
Sta Elev
0 0
0 0
PIN Area
0
Cross Sectional Area Between
Endpoints Calculations
Sta
Elev
Area
0-
0
0-
0
0-
0
82
-
0
0-
0
0-
0
0-
0
o-
1
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
o-
0
0
Ao
-
o
red, cross section does not reach
mkfull elevation, add data.
Project: Deer Track Location: Existing Cross Section B
Station: 2+46 Benchmark description: Riffle
Date: 9/14/2016 USGS Grid Coordinates Plan Sheet
Photo Reference Location: North East Ref. No.
Permanent Benchmark Elevation: Permanent Benchmark Location:
Blue cells are instructions and notes. Please read them. Cross Section taken from left to right looking downstream.
Gray cells are outputs and should be left alone.
Yellow cells are for data input and manipulation
If you need additional sheets for more cross sections, just create a copy of the sheet by right clicking on the tab at the bottom of this sheet.
==17-1i-911
ack-Si ht Instuhment Fore -Si ht Hei ht
be antes d verbatankfull 9m in th sht" and 1columfnlforfthedUST sheet
to work. "TOBL", "TOBR", "TOE L" and TOE R"
are recommended.
-
TW
-
Bankfull Cross
Section
Station Elevation I Station
I Elevation Station
2 X Bankfull
1001
Station BS HI FS Elevation
Left End
Station
Ri ht End
Station
Station
Elevation
Elevation from
bankfull
Incremental Av
Height (H) g
Incremental
Distance (ft)
Incremental
Area (ftp)
Station
Distance
Between
Points
Feet Feet Feet Feet Feet
Purple rows are for additional data. Start station 0+00 at the first
yellow row.
Additional data needed if elevation is less than
bankfull or 2 x bankfull.
Delete values in these columns where the ground elevation falls lower than bankfull outside the bounds of the stated/calculated bankfull station.
Elevation Station Elevation
75.00
01
01
0
0
0
0
0
0
0
0
Left Ri ht Left Ri ht
Station Elevation
Station Elevation Station Elevation Station Elevation Station Elevation
0
0
0
0
0
0
0
0
0-
0
0
0
0
0
0
0
0
0
71 86.0
0-
0
0
0
0
0
0
0
0
90 86.0 TOBL, bankfull left
o
0-
90
86
0
0
0
0
0
0
92 85.0
90
o
92
85
1
0.5
2
1
0
2.236068
94 84.0
o-
94
84
2
1.5
2
3
0
2.236068
95.5 83.0 TOE L
o
95.5
83
3
2.5
1.5
3.75
0
1.802776
100 82.7 TW
100
82.7
3.3
3.15
4.5
14.175
0
4.509989
101.7 83.0 TOE R
101.7
83
3
3.15
1.7
5.355
0
1.726268
102 84.0
102
84
2
2.5
0.3
0.75
0
1.044031
102.3 85.0
-
102.3
85
1
1.5
0.3
0.45
0
1.044031
102.4 86.0 TOBR, Bankfull right
102.4
102.4
86
0
0.5
0.1
0.05
0
1.004988
111.4 87.0 TOE R
-
0
0
0
0
0
0
0
0
140.3 88.0
01
0
0
01
0
01
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
01
0
0
01
0
01
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
01
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Pull down orange if more rows needed.
1 01
0
0
0
0
0
0
011
95.00
90.00
85.00
-
TW
-
Station
I Elevation
Station Elevation I Station
I Elevation Station
-cross se�lon
-1- Bankfull
2 x Bankfull
1001
82.7
-
90
86 102.4 86
You can change the yellow cells below. This is where you can adjust the stations or elevations of the parameters below. The units
are +/- feet of offset. The cells can be left blank if you do not wish to make changes.
80.00
Bankfull TOB
0
-
I Ri ht Left Riht
Station
Elevation
Station
Elevation
1
Elevation Station Elevation
75.00
01
01
-
-
01 01 0
These are parameters that
cells.
are used for morphology calculations, after any adjustments below. There is no need to change these
TW
Bankfull TOB
70.00
75.00 80.00 85.00 90.00 95.00 100.00 105.00 110.00 115.00 120.00 125.00
These numbers are taken from the raw data table. There is no need to change these cells
Bankfull Width ft
Bankfull TOB
TW
Left I Right Left I Right
Station
I Elevation
Station Elevation I Station
I Elevation Station
Elevation I Station I Elevation
1001
82.7
901 861 102.4
90
86 102.4 86
You can change the yellow cells below. This is where you can adjust the stations or elevations of the parameters below. The units
are +/- feet of offset. The cells can be left blank if you do not wish to make changes.
TW
Bankfull TOB
0
Left
I Ri ht Left Riht
Station
Elevation
Station
Elevation
Station Elevation Station
Elevation Station Elevation
01
01
01
01
01 01 01
01 01 0
These are parameters that
cells.
are used for morphology calculations, after any adjustments below. There is no need to change these
TW
Bankfull TOB
0-
Left Ri ht Left Ri ht
Station Elevation
Station Elevation Station Elevation Station Elevation Station Elevation
100 82.7
90 86 102.4 0 90 86 102.4 86
Bankfull Stream Morphology
Station Elevation
90 86 WW = 12.4
102.4 86 Abkf = 28.53
2xBankfull dbkf = 2.300806
Station Elevation W/D = 5.39
#NUM! 89.3 Error, data needed if red dn- W = 3.3
89.3 Wfpa= 140.00
Average Bankfull Elevation ft86
Bankfull Width ft
12.4
Bankfull Area ft
28.53
Bankfull Wetted Perimeter ft
15.60422
Bankfull Hydraulic Radius ft
1.828352
Low Bank Height ft
3.3
Avera a PIN Elevation ft
0
LPIN and RPIN PIN Area
Sta Elev 0
0 0
0 0
Cross Sectional Area Between
Endpoints Calculations
Sta
Elev
Area
0-
0
0-
0
0-
0
71
-
0
0-
0
0-
0
0-
0
o-
1
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
1
0
0-
0
0-
o
0-
0
0-
o
0-
0
0-
o
0-
0
0-
0
0-
0
0-
o
0-
0
0-
o
0-
o
o-
o
0-
o
o-
o
o-
o
red, cross section does not reach
mkfull elevation, add data.
Project: Deer Track Location: Existing Cross Section C
Station: 2+46 Benchmark description: Pool
Date: 9/14/2016 USGS Grid Coordinates Plan Sheet
Photo Reference Location: North East Ref. No.
Permanent Benchmark Elevation: Permanent Benchmark Location:
Blue cells are instructions and notes. Please read them. Cross Section taken from left to right looking downstream.
Gray cells are outputs and should be left alone.
Yellow cells are for data input and manipulation
If you need additional sheets for more cross sections, just create a copy of the sheet by right clicking on the tab at the bottom of this sheet.
==17-1i-911
ack-Si ht Instuhment Fore -Si ht Hei ht
be antes d verbatankfull 9m in th sht" and 1columfnlforfthedUST sheet
to work. "TOBL", "TOBR",'TOE L" and TOE R"
are recommended.
-
TW
Bankfull Cross
Section
I Elevation
Station Elevation Station
2 X Bankfull
I Elevation I Station Elevation
Station BS HI FS Elevation
Left End
Station
Ri ht End
Station
Station
Elevation
Elevation from
bankfull
Incremental Av
Height (H) g
Incremental
Distance (ft)
Incremental
Area (ftp)
Station
Distance
Between
Points
Feet Feet Feet Feet Feet
Purple rows are for additional data. Start station 0+00 at the first
yellow row.
Additional data needed if elevation is less than
bankfull or 2 x bankfull.
Delete values in these columns where the ground elevation falls lower than bankfull outside the bounds of the stated/calculated bankfull station.
Station Elevation Station
-
01
0
0
0
0
0
0
0
0
Bankfull TOB
-
0
0
0
0
0
0
0
0
0-
0
0
0
0
0
0
0
0
28 87.0
0
0
0
0
0
0
0
0
0
78 86.0
0-
0
0
0
0
0
0
0
0
82 85.9
0
0
0
0
0
0
0
0
91 86.3
0
0
0
0
0
0
0
0
0
93.7 86.1
0-
0
0
0
0
0
0
0
0
97.9 85.0 TOBL, bankfull left
95.227273
95.227273
85.7
0
0
0
0
0
0
98.4 84.3
98.4
84.3
1.4
0.7
3.172727
2.220909
0
3.467881
98.6 82.3 TOE L
98.6
82.3
3.4
2.4
0.2
0.48
0
2.009975
99.2 82.1
99.2
82.1
3.6
3.5
0.6
2.1
0
0.632456
100 81.8 TW
100
81.8
3.9
3.75
0.8
3
0
0.8544
102.4 82.2
102.4
82.2
3.5
3.7
2.4
8.88
0
2.433105
105.5 82.7 TOE R
105.51
82.7
3
3.25
3.1
10.075
0
3.140064
105.9 83.5
105.9
83.5
2.2
2.6
0.4
1.04
0
0.894427
110.3 86.0 TOBR, Bankfull right
109.772
109.772
85.7
0
1.1
3.872
4.2592
0
4.453356
121.1 87.0
0
0
0
0
0
0
0
0
151.1 88.0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
01
0
0
01
0
01
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
01
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Pull down orange if more rows needed.
0
0
0
0
0
0
0
0
95.00
90.00
-
TW
-
T
I Elevation
Station Elevation Station
Elevation Station
I Elevation I Station Elevation
1001
81.81
97.91 851 110.31
85.00
85 110.3 86
You can change the yellow cells below. This is where you can adjust the stations or elevations of the parameters below. The units
are +/- feet of offset. The cells can be left blank if you do not wish to make changes.
-
Bankfull TOB
0
Left
Ri ht Left Ri ht
-cross sedron
-1- Bankfull
2 x Bankfull
Elevation
80.00
Elevation
Station Elevation Station
-
01
01
01
0.71
-
01 01 0
These are parameters that
cells.
75.00
TW
Bankfull TOB
-
-
Station Elevation
Station Elevation Station Elevation Station Elevation Station Elevation
100 81.8
97.9 85.7 110.31 01 97.91 85 110.3 86
0-
70.00
75.00 80.00 85.00 90.00 95.00 100.00 105.00 110.00 115.00 120.00 125.00
These numbers are taken from the raw data table. There is no need to change these cells
Bankfull Width ft
Bankfull TOB
TW
Left Right Left Right
Station
I Elevation
Station Elevation Station
Elevation Station
I Elevation I Station Elevation
1001
81.81
97.91 851 110.31
1 97.91
85 110.3 86
You can change the yellow cells below. This is where you can adjust the stations or elevations of the parameters below. The units
are +/- feet of offset. The cells can be left blank if you do not wish to make changes.
TW
Bankfull TOB
0
Left
Ri ht Left Ri ht
Station
Elevation
Station
Elevation
Station Elevation Station
Elevation Station Elevation
01
01
01
0.71
01 01 01
01 01 0
These are parameters that
cells.
are used for morphology calculations, after any adjustments below. There is no need to change these
TW
Bankfull TOB
0-
Left Ri ht Left Ri ht
Station Elevation
Station Elevation Station Elevation Station Elevation Station Elevation
100 81.8
97.9 85.7 110.31 01 97.91 85 110.3 86
Bankfull Stream Morphology
Station Elevation
95.22727 85.7 W bkf = 14.54473
109.7721 85.7 Abkf = 32.05511
2xBankfull dbkf = 2.203899
Station Elevation W/D = 6.60
#NUMI 69.6 Error, data needed if red dmbkf = 3.9
89.6 Wfpa= 225.00
Average Bankfull Elevation ft85.7
Bankfull Width ft
14.54473
Bankfull Area ft
32.05511
Bankfull Wetted Perimeter ft
17.88566
Bankfull Hydraulic Radius ft
1.792224
Low Bank Height ft
3.2
Avera a PIN Elevation ft
0
LPIN and RPIN PIN Area
Sta Elev 0
0 0
0 0
Cross Sectional Area Between
Endpoints Calculations
Sta
Elev
Area
0-
0
0-
0
0-
0
28
-
0
0-
0
0-
0
0-
0
o-
1
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
o
0-
0
0-
o
0-
0
0-
o
0-
0
0-
0
o-
0
o-
o
o-
0
0-
0
o-
o
0-
o
red, cross section does not reach
mkfull elevation, add data.
Project: Deer Track Location: Existing Cross Section D
Station: 2+67 Benchmark description: Riffle
Date: 9/14/2016 USGS Grid Coordinates Plan Sheet
Photo Reference Location: North East Ref. No.
Permanent Benchmark Elevation: Permanent Benchmark Location:
Blue cells are instructions and notes. Please read them. Cross Section taken from left to right looking downstream.
Gray cells are outputs and should be left alone.
Yellow cells are for data input and manipulation
If you need additional sheets for more cross sections, just create a copy of the sheet by right clicking on the tab at the bottom of this sheet.
Back -Si ht Instuhment Fore -Si ht Hei ht
be antes d verbatankfull 9m in th sht" and 1columfnlforfthedUST sheet
to work. "TOBL", "TOBR", "TOE L" and TOE R"
are recommended.
Bankfull TOB
TW
Bankfull Cross
Section
I Elevation
Station Elevation I Station
2 X Bankfull
-
Station BS HI FS Elevation
Left End
Station
Ri ht End
Station
Station
Elevation
Elevation from
bankfull
Incremental Av
Height (H) g
Incremental
Distance (ft)
Incremental
Area (ftp)
Station
Distance
Between
Points
Feet Feet Feet Feet Feet
Purple rows are for additional data. Start station 0+00 at the first
yellow row.
Additional data needed if elevation is less than
bankfulto or 2 x bankfull.
Delete values in these columns where the ground elevation falls lower than bankfull outside the bounds of the stated/calculated bankfull station.
-
-.-cross salon
-�- Bankfull
2 %Bankfull
75.00
0
0
0
0
0
0
0
0
70.00
0-
0
0
0
0
0
0
0
0
0-
75.00 80.00 85.00 90.00 95.00 100.00 105.00 110.00 115.00 120.00 125.00
0
0
0
0
0
0
0
0
45 85.7
0
0
0
0
0
0
0
0
0
54.7 86.0
0-
0
0
0
0
0
0
0
0
71.3 86.0
0
0
0
0
0
0
0
0
79 85.9
0
0
0
0
0
0
0
0
0
84.4 86.0
0-
0
0
0
0
0
0
0
0
87A 86.1
0
0
0
0
0
0
0
0
91.4 86.0
0
0
0
0
0
0
0
0
94.9 85.9
-
0
0
0
0
0
0
0
0
95.4 85.0 TOBL, bankfull left
95.066667
95.066667
85.6
0
0
0
0
0
0
96 84.0
-
96
84
1.6
0.8
0.933333
0.746667
0
1.852326
96.4 83.3
96.4
83.3
2.3
1.95
0.4
0.78
0
0.806226
98.1 83.0
98.1
83
2.6
2.45
1.7
4.165
0
1.726268
99.2 82.6 Toe L
99.2
82.6
3
2.8
1.1
3.08
0
1.17047
100 82.5 TW
100
82.5
3.1
3.05
0.8
2.44
0
0.806226
100.6 82.5
100.6
82.5
3.1
3.1
0.6
1.86
0
0.6
102.1 82.6
102.1
82.6
3
3.05
1.5
4.575
0
1.50333
103.3 82.4
103.3
82.4
3.2
3.1
1.2
3.72
0
1.216553
104.8 82.3 TOE R
104.8
82.3
3.3
3.25
1.5
4.875
0
1.50333
104.8 84.7
1 104.8
84.71
0.9
2.1
0
0
01
2.4
105.7 85.6 TOBR, Bankfull right
105.7
105.7
85.6
0
0.45
0.91
0.405
0
1.272792
109.90 86.20
0
0
0
0
0
0
0
0
113.90 86.60
0
0
0
0
0
0
0
0
124.00 87.00
0
0
0
0
0
0
0
0
151.00 88.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
01
0
0
0
20
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Pull down range if more rows needed.
1 0
0
0
0
0
0
0
0
95.00
90.00
Bankfull Width ft
Bankfull TOB
TW
- -
-
I Elevation
Station Elevation I Station
I Elevation Station
-
1001
82.5
95.41 851 105.71
95.4
85 105.7 85.6
-------------
TW
Bankfull TOB
0
Left
85.00
80.00
Station
Elevation
-
-
-
-.-cross salon
-�- Bankfull
2 %Bankfull
75.00
01
01
--
-- -
01 0 0
These are parameters that
cells.
-
TW
70.00
0-
Left I Ri ht Left Riht
Station Elevation
Station Elevation Station Elevation Station Elevation Station Elevation
100 82.5
95.4 85.6 105.7 0 95.4 85 105.7 85.6
0-
0
0-
75.00 80.00 85.00 90.00 95.00 100.00 105.00 110.00 115.00 120.00 125.00
These numbers are taken from the raw data table. There is no need to change these cells
Bankfull Width ft
Bankfull TOB
TW
Left I Right Left I Right
Station
I Elevation
Station Elevation I Station
I Elevation Station
Elevation I Station I Elevation
1001
82.5
95.41 851 105.71
95.4
85 105.7 85.6
You can change the yellow cells below. This is where you can adjust the stations or elevations of the parameters below. The units
are +/- feet of offset. The cells can be left blank if you do not wish to make changes.
TW
Bankfull TOB
0
Left
I Ri ht Left Riht
Station
Elevation
Station
Elevation
Station Elevation Station
Elevation Station Elevation
01
01
01
0.61
01 01 01
01 0 0
These are parameters that
cells.
are used for morphology calculations, after any adjustments below. There is no need to change these
TW
Bankfull TOB
0-
Left I Ri ht Left Riht
Station Elevation
Station Elevation Station Elevation Station Elevation Station Elevation
100 82.5
95.4 85.6 105.7 0 95.4 85 105.7 85.6
Bankfull Stream Morphology
Station Elevation
95.06667 85.6 W bkf = 10.63333
105.71 85.6 Abkf = 26.64667
2xBankfull dbkf = 2.505956
Station Elevation W/D = 4.24
#NUMI 89.1 Error, data needed if red dmbkf = 3.3
89.1 Wfpa= 225.00
Average Bankfull Elevation ft85.6
Bankfull Width ft
10.63333
Bankfull Area ft
26.64667
Bankfull Wetted Perimeter ft
14.85752
Bankfull Hydraulic Radius ft
1.79348
Low Bank Height ft
2.5
Avera a PIN Elevation ft
0
LPIN and RPIN PIN Area
Sta Elev 0
0 RE
0 0
Cross Sectional Area Between
Endpoints Calculations
Sta
Elev
Area
0-
0
0-
0
0-
0
45
-
0
0-
0
0-
0
0-
0
OF
0
o-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
o
red, cross section does not reach
mkfull elevation, add data.
Project: Deer Track Location: Existing Cross Section E
Station: 2+88 Benchmark description: Pool
Date: 9/14/2016 USGS Grid Coordinates Plan Sheet
Photo Reference Location: North East Ref. No.
Permanent Benchmark Elevation: Permanent Benchmark Location:
Blue cells are instructions and notes. Please read them. Cross Section taken from left to right looking downstream.
Gray cells are outputs and should be left alone.
Yellow cells are for data input and manipulation
If you need additional sheets for more cross sections, just create a copy of the sheet by right clicking on the tab at the bottom of this sheet.
==17-1i-911
ack-Si ht Instuhment Fore -Si ht Hei ht
be antes d verbatankfull 9m in th sht" and 1columfnlforfthedUST sheet
to work. "TOBL", "TOBR",'TOE L" and TOE R"
are recommended.
-
TW
Bankfull Cross
Section
I Elevation I
Station Elevation Station
2 X Bankfull
I Elevation I Station Elevation
Station BS HI FS Elevation
Left End
StationStation
Ri ht End
Station
Elevation
Elevation from
bankfull
Incremental Av
Height (H) g
Incremental
Distance (ft)
Incremental
Area (ftp)
Station
Distance
Between
Points
Feet Feet Feet Feet Feet
Purple rows are for additional data. Start station 0+00 at the first
yellow row.
Additional data needed if elevation is less than
bankfull or 2 x bankfull.
Delete values in these columns where the ground elevation falls lower than bankfull outside the bounds of the stated/calculated bankfull station.
Station Elevation Station
Elevation Station Elevation
-cross salon
-1- Bankfull
2 %Bankfull
0
0
0
0
0
0
0
0
Bankfull TOB
0-
0
0
0
0
0
0
0
0
0-
0
0
0
0
0
0
0
0
40.1 85.7
0
0
0
0
0
0
0
0
0
43.4 86.0
0-
0
0
0
0
0
0
0
0
61.1 86.0
0
0
0
0
0
0
0
0
65.1 85.4
0
0
0
0
0
0
0
0
0
77.7 85.8
0-
0
0
0
0
0
0
0
0
91.7 85.7 TOBL, Bankfull left
0
0
0
0
0
0
0
0
93.1 83.2 TOE L
91.924
91.924
85.3
0
0
0
0
0
0
94.1 83.0
-
94.1
83
2.3
1.15
2.176
2.5024
0
3.166224
95 82.9
95
82.9
2.4
2.35
0.9
2.115
0
0.905539
97.9 82.3
97.9
82.3
3
2.7
2.9
7.83
0
2.961419
99 82.0
99
82
3.3
3.15
1.1
3.465
0
1.140175
100 81.7 TW
100
81.7
3.6
3.45
1
3.45
0
1.044031
100.3 81.7 TOE R
100.3
81.7
3.6
3.6
0.3
1.08
0
0.3
100A 82
100.4
82
3.3
3.45
0.1
0.345
0
0.316228
100.6 83
100.6
83
2.3
2.8
0.2
0.56
0
1.019804
100.9 84
100.9
84
1.3
1.8
0.3
0.54
0
1.044031
101.2 85
101.2
85
0.3
0.8
0.3
0.24
0
1.044031
101.50 86.00 TOBR, Bankfull right
101.29
101.29
85.3
0
0.15
0.09
0.0135
0
0.313209
120.90 87.00
01
0
0
01
0
0
0
0
156.10 88.00
0
0
0
0
0
01
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
01
01
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
n Oran a if more
Pull dowrows needed.
0
0
0
0
01
01
0
0
95.00
90.00
-
TW
-
Station
I Elevation I
Station Elevation Station
-
I Elevation I Station Elevation
1001
81.71
91.71 85.71 101.51
1 91.71
85.71 101.5 86
You can change the yellow cells below. This is where you can adjust the stations or elevations of the parameters below. The units
are +/- feet of offset. The cells can be left blank if you do not wish to make changes.
85.00
Bankfull TOB
0
-
Ri ht Left Ri ht
Station
Elevation
Station
Elevation
Station Elevation Station
Elevation Station Elevation
-cross salon
-1- Bankfull
2 %Bankfull
0
80.00
-0.41
01 0 01
-
These are parameters that
cells.
are used for morphology calculations, after any adjustments below. There is no need to change these
TW
Bankfull TOB
0-
Left Ri ht Left Ri ht
Station Elevation
Station Elevation Station Elevation Station Elevation Station Elevation
75.00
91.71 85.31 101.51 01 91.71 85.71 101.5 86
0-
-
-
0-
0
0-
70.00
75.00 80.00 85.00 90.00 95.00 100.00 105.00 110.00 115.00 120.00 125.00
These numbers are taken from the raw data table. There is no need to change these cells
Bankfull Width ft
Bankfull I TOB
TW
Left Right Left Right
Station
I Elevation I
Station Elevation Station
Elevation Station
I Elevation I Station Elevation
1001
81.71
91.71 85.71 101.51
1 91.71
85.71 101.5 86
You can change the yellow cells below. This is where you can adjust the stations or elevations of the parameters below. The units
are +/- feet of offset. The cells can be left blank if you do not wish to make changes.
TW
Bankfull TOB
0
Left
Ri ht Left Ri ht
Station
Elevation
Station
Elevation
Station Elevation Station
Elevation Station Elevation
01
0
0
-0.41
01 0 01
01 01 0
These are parameters that
cells.
are used for morphology calculations, after any adjustments below. There is no need to change these
TW
Bankfull TOB
0-
Left Ri ht Left Ri ht
Station Elevation
Station Elevation Station Elevation Station Elevation Station Elevation
100 81.7
91.71 85.31 101.51 01 91.71 85.71 101.5 86
Bankfull Stream Morphology
Station Elevation
91.924 85.3 W bkf = 9.366
101.29 85.3 Abkf = 22.1409
2xBankfull dbkf = 2.363965
I
n Elevation W/D = 3.96
M! 88.9 Error, data needed if red dmbkf = 3.6
88.9 Wfpa= 140.00
Average Bankfull Elevation ft85.3
Bankfull Width ft
9.366
Bankfull Area ft
22.1409
Bankfull Wetted Perimeter ft
13.25469
Bankfull Hydraulic Radius ft
1.67042
Low Bank Height ft
4
Avera a PIN Elevation ft
0
LPIN and RPIN PIN Area
Sta Elev 0
0 0
0 0
Cross Sectional Area Between
Endpoints Calculations
Sta
Elev
Area
0-
0
o-
0
0-
0
40.1
-
0
0-
0
0-
0
0-
0
o-
1
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
o
0-
0
0-
o
0-
0
0-
o
0-
0
0-
o
0-0
0-
o
0-
0
0-
o
o-
0
o-
o
o-
0
o-
o
0-
0
o-
o
o-
oil
red, cross section does not reach
mkfull elevation, add data.
Project: Deer Track Location: Existing Cross Section F
Station: 3+11 Benchmark description: Riffle
Date: 9/14/2016 USGS Grid Coordinates Plan Sheet
Photo Reference Location: North East Ref. No.
Permanent Benchmark Elevation: Permanent Benchmark Location:
Blue cells are instructions and notes. Please read them. Cross Section taken from left to right looking downstream.
Gray cells are outputs and should be left alone.
Yellow cells are for data input and manipulation If you need additional sheets for more cross sections, just create a copy of the sheet by right clicking on the tab at the bottom of this sheet.
Back -Si ht
Instrument Fore -Si ht Hei ht
TW",
entered verbatim in this "bankfull
banfulft" MUST sheet
mfor
to work. "TOBL", "TOBR", "TOE L" and TOE R"
recommended.
Bankfull I TOB
TW
Bankfull Cross
Section
I Elevation
Station I Elevation I Station
2 X Bankfull
I Elevation I Station I Elevation
Station BS HI FS Elevation
Left End
Station
Ri ht End
Station
Station
Elevation
Elevation from
bankfull
Incremental Av
Height (H) g
Incremental
Distance (ft)
Incremental
Area (ftp)
Station
Distance
Between
Points
====�are
Feet Feet Feet Feet Feet
Purple rows are for additional data. Start station 0+00 at the first
yellow row.
Additional data needed if elevation is less than
bankfull or 2 x bankfull.
Delete values in these columns where the ground elevation falls lower than bankfull outside the bounds of the stated/calculated bankfull station.
Station Elevation Station
Elevation Station Elevation
01
0
0
0
0
0
0
0
0
Bankfull TOB
0-
0
0
0
0
0
0
0
0
0-
0
0
0
0
0
0
0
0
43.4 85.7
0
0
0
0
0
0
0
0
0
46.7 86.0
0-
0
0
0
0
0
0
0
0
60.2 86.0
0
0
0
0
0
0
0
0
82.3 84.9
0
0
0
0
0
0
0
0
0
83.8 85.0 TOBL, bankfull left
0-
0
0
0
01
0
0
0
0
94.1 85.0
0
0
0
0
0
0
0
0
94.8 84.9
0
0
0
0
0
0
0
0
95.3 84.0
94.829412
94.829412
84.8
0
0
0
0
0
0
95.8 83.0
-
95.8
83
1.8
0.9
0.970588
0.873529
0
2.045004
96 82.2 TOE L
96
82.2
2.6
2.2
0.2
0.44
0
0.824621
97.6 82.0
97.6
82
2.8
2.7
1.6
4.32
0
1.612452
100 81.8 TW
100
81.81
3
2.9
2.4
6.96
0
2.408319
101.5 82.0
101.5
82
2.8
2.9
1.5
4.35
0
1.513275
102.2 82.1 TOE R
102.2
82.1
2.7
2.75
0.7
1.925
0
0.707107
103.3 82.8
103.3
82.8
2
2.35
1.1
2.585
0
1.30384
103.4 83
103.4
83
1.8
1.9
0.1
0.19
0
0.223607
103.6 83.3
103.6
83.3
1.5
1.65
0.2
0.33
0
0.360555
104.40 83.80
104.4
83.8
1
1.25
0.8
1
0
0.943398
104.60 84.00
104.6
84
0.8
0.9
0.2
0.18
0
0.282843
104.80 84.80 TOBR, Bankfull ri ht
104.8
104.8
84.8
0
0.4
0.2
0.08
0
0.824621
106.40 85.00
0
0
0
0
0
0
0
0
108.00 85.40
0
0
0
0
0
0
0
0
124.40 86.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
01
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
20
0
0
0
0
0
0
0
0
0
0
Pull down orange if more rows needed.
0
0
0
0
01
01
0
0
95.00
90.00
85.00
80.00
75.00
70.00
75.00 80.00 85.00 90.00 95.00 100.00 105.00 110.00 115.00 120.00
125.00
cross Semon
Bankfull
2 X Bankfull
These numbers are taken from the raw data table. There is no need to change these cells
Bankfull Width ft
Bankfull I TOB
TW
Left I Right I Left I Right
Station
I Elevation
Station I Elevation I Station
I Elevation I Station
I Elevation I Station I Elevation
1001
81.8
83.81 851 104.81
83.8
85 104.8 84.8
You can change the yellow cells below. This is where you can adjust the stations or elevations of the parameters below. The units
are- feet of offset. The cells can be left blank if you do not wish to make changes.
TW
Bankfull TOB
0
Left
I Ri ht Left Riht
Station
Elevation
Station
Elevation
Station Elevation Station
Elevation Station Elevation
01
01
0
-0.21
01 01 01
01 0 0
These are parameters that
cells.
are used for morphology calculations, after any adjustments below. There is no need to change these
TW
Bankfull TOB
0-
Left Ri ht Left Ri ht
Station Elevation
Station Elevation Station Elevation Station Elevation Station Elevation
100 81.81
83.81 84.81 104.8 01 83 .81 84.8
Bankfull Stream Morphology
Station I Elevation
94.82941 84.8 W bkf = 9.970588
104.8 84.8 Abkf = 23.23353
2xBankfull dbkf = 2.330206
Station Elevation W/D = 4.28
#NUM! 87.8 Error, data needed if red dmbkf = 3
87.8 Wfpa= 140.00
Average Bankfull Elevation ft84.8
Bankfull Width ft
9.970588
Bankfull Area ft
23.23353
Bankfull Wetted Perimeter ft
13.04964
Bankfull Hydraulic Radius ft
1.780396
Low Bank Height ft
3
Avera a PIN Elevation ft
0
LPIN and RPIN PIN Area
Sta Elev 0
0 0
0 0
Cross Sectional Area Between
Endpoints Calculations
Sta
Elev
Area
0-
0
0-
0
0-
0
43.4
-
0
0-
0
0-
0
0-
0
o-
1
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
0-
0
o-
0
0-
0
o-
0
0-
0
o-
0
o-
o
red, cross section does not reach
mkfull elevation, add data.
_\ ` GENERAL NOTES:
DEER TACK DRIVE
i
1. TREES, SHRUBS, AND HEDGES: THE CONTRACTOR SHALL PROTECT ALL TREES AND SHRUBS OUTSIDE
CONSTRUCTION ENTRANC'� -3'^ _ _
COR SW -20.09 � � -`-� �1, �`"�"? �„_ �- _ _ � _ OF THE LIMITS OF DISTURBANCE. THE CONTRACTOR IS ALSO REQUESTED TO SAVE ALL OTHER
- �-� EXISTING TREES AND SHRUBS WHERE POSSIBLE. TREE ROOTS EXPOSED AND/OR DAMAGED DURING
-- "' CONSTRUCTION SHALL BE PRUNED USING EQUIPMENT SPECIFICALLY DESIGNED FOR PRUNING. ALL
7420�_-- _ PRUNING SHALL BE ACCOMPLISHED BY AN ISA CERTIFIED ARBORIST.
DEER TRACK i ► 1 1 2. GRASSED SURFACE RESTORATION: ALL EXISTING GRASSED AREAS DISTURBED DURING CONSTRUCTION
DRIVE ; % II i 1 7428 I ARE TO BE SEEDED AND MULCHED PER THE SPECIFICATIONS UNLESS OTHERWISE INDICATED ON THE
DEER TRACK DRAWINGS OR AS DIRECTED BY THE ENGINEER.
�� --- EXISTING I I DRIVE 3. ALL CONSTRUCTION SHALL BE IN STRICT ACCORDANCE WITH CITY OF RALEIGH AND/OR NCDOT
CONCRETE I i i I STANDARD DETAILS AND SPECIFICATIONS.
EXISTING ; �' 4" DRIVEWAY 1 ` I 4. ANY DISTURBANCE WITHIN THE RIGHT-OF-WAY WILL BE REQUIRED TO BE REPLACED TO THE CITY OF
GRASS-9� I I
i - i RALEIGH AND/OR NCDOT STANDARDS AND INSPECTED.
,a2 I STORM SEMEN 5. CONTRACTOR SHALL INSTALL EROSION CONTROL MEASURES IN ACCORDANCE WITH THE LATEST CITY OF
AREA % i% i/ - 7424 I �� DRAINAGE EA T I RALEIGH STANDARD DETAILS AS FOUND ON THE CITY WEBSITE:
DEER TRACK m I EXISTING SSMH I HTTP://WWW.RALEIGHNC.GOV/BUSINESS/CONTENT/PLANDEV/ARTICLES/DEVSERV/DRAWINGSSTANDARDDETAILSINDEX.HTML
DRIVE I �►N I TOP=93.0 FT.
$ IN.(N)=85.2 FT. CONSTRUCTION SEQUENCE:
TREE PROTECTION i i 10"P I �z I N.(W)=85.7 FT.
I 1 o EXISTING INV OUT.=85.0 FT. I 1. CONTRACTOR TO INSTALL EROSION CONTROL MEASURES AS CALLED FOR ON THE PLANS IN
FENCE (TYP.) i s I HEDGE AREA
EXISTING
HOUSE II 0� 1 NI COORDINATION AND APPROVAL OF THE CITY/PROJECT MANAGER; INSPECT AND MAINTAIN ALL
i 10"MA §FFE-94.14' I � I � Z II EROSION CONTROL MEASURES AND DEVICE AFTER EACH RAIN EVENT AND FOR THE
EXISTING �� �-o I _ , - y DURATION OF CONSTRUCTION.
HEDGE AREA $ qC� I I N _ _ - - I _ 2. INSTALL TEMPORARY STREAM CROSSING.
0, w _ - �A SEWEIR ss 3. PERFORM TREE REMOVAL, CLEARING, GRUBBING, AND DEBRIS REMOVAL AS SHOWN ON THE
EXISTING SSMH DECK STOR .'� i ► I , - „ RRA CO ss_ --PLANS.
TOP=87.94 FT. _ �� I ��� 8 ss ss 1 4. INSTALL STREAM PUMP AROUND OR OTHER STREAM DIVERSION MEASURE TO PROTECT WORK
8 IN.(N)=80.86 FT. _ J i i ss= ��s _ _ I AREA ALONG BANK.
INV OUT.=80.61 FT. '8s _ _ -
x � -- ��- � I i i ss � ss � 5. GRADE STREAM BANK AND INSTALL ROCK TOE AS SHOWN ON PLAN. STABILIZE BANK AS
Lm`mp _ - - w w WORK PROGRESSES DAILY.
EXPOSED ROOTS TO o z _\ ---"� ��_ ss �I� �`� - o 6. REMOVE TEMPORARY STREAM CROSSING.
REMAIN FILL BEHIND z - o ss ss �'� - 1i r ��� m N 7. SEED ALL DISTURBED NON -PAVED AREAS AND COMPLETE PLANTING AS CALLED FOR ON
APPROXIMATELY 25 FT � � - � � � ss � � �� - _
- - - - - - - v ss� __$�_ _ i I EXISTING �� THE PLANTING PLAN.
ss(-) - - _ S 21"rP I GRASS ----- EXISTING FES I 8. REMOVE EROSION CONTROL MEASURES WHEN APPROVED BY CITY INSPECTOR.
.'
ss__-- --- zo____ o _ _ _��--- „ I AREA 18" RCP OUT=85.8 9. COMPLETE AS -BUILT SURVEY.
,1 ss - ss - ss - ss - ss 's I- -� _ - _' , ,
- \ \ 3"C M �(n U _ -�-� r,) 14"MA 71 121 "TP lLL_Z O
k W
L_
oz 1 Lam' � c I EXPOSED ROOTS m o M
- - - - -% �M v / s"PR TP \ REMOVE WITH TREE
i 16"MA X W 221 7" �. s f I w N APPROXIMATELY 15 FT
�Q `�� j �Q _ _
-� O� 8'S , l 37 I �G 21 "TP
12"MA p w/ 1 I G I
�\ - 6"C Q \ -
EXISTING ��O . - - _ -�`� --as, 8'rP�
TOP OF s ,�%'- /' _ ;- i Z W
BANK �� ---� ,�.`_ -
0- a4
EXISTING _ = _ s3 <*O �-�
2 ,, \_
STREAM -� 9��' s2 PT
XS
CENTERLINE af_
�1 0 W L.Ljr( 1
'O M 36 12" ` I i�------ I
ti m N 0"Iv�A
/ p 'e y - a&- \\ �Y \ \ I op
a
i
m �p �d -- 8"TP ��� `30"TP
-1 -1
12
"MA
12" MA EXISTING DEBRIS
Z G� TCE �
JCS � Q0
I Vii' �QOI + ao 40� 'moi
' �. ° i QOl �a0Ln 1 a
W W TEMPORARY STREAMT,-- ,�
- m N N CROSSING 1 WOODED AREA
EXISTING '.'"x
4' SPIT -RAIL
FENCE x-- _�--�_ '•
20 10 0 20 40
PLAN VIEW - SCALE 1"=20'
Y
Z
8"-10" Q
SIDE BOARD m
CLASS A STONE FOR
RAMP ONTO MAT
NOTES:
1. DEPLOY EROSION CONTROLS AS NEEDED.
2. PERFORM ROUTINE INSPECTION TO
INCLUDE REMOVAL OF LOOSE SOIL
TRACKED ONTO BRIDGE BY EQUIPMENT
AND INSPECTION OF STREAMBANKS FOR
STABILITY.
3. MATS SHALL BE POSITIONED TO RETAIN
THE NATURAL STREAM
CHARACTERISTICS.
4. MATS LAID PERPENDICULAR TO THE
STREAM CAN BE SUBSTITUTED WITH
PRE -FABRICATED BRIDGE STRUCTURES
AS SPAN LENGTHS DICTATE OR AT THE
APPROVAL OF THE DESIGNER.
891-1 0"
SIDE BI
TIMBER MAT (LENGTH AS
REQUIRED)
(NO GAPS BETWEEN BOARD
Y
Z
m TIMBER MAT TO SUPPORT
STREAM BANKS (AS
NEEDED)
STO N E
(50 MIN.)
STONE
(50 MIN.)
TIMBER MAT
8"-10" (LENGTH AS REQUIRED)
SIDE BOARD
BANK
r-% 1 A A I
CLASS A STONE
FOR RAMP ONTO MATS
A \GEOTEXTILE FABRIC
PLACED UNDER GRAVEL RAMP
4' WIDE MAT BRIDGE AND TIMBER MAT
SUPPORT (AS NEEDED)
SECTION
BRIDGE MAT STREAM CROSSING
1 SCALE: NOT TO SCALE
PUMP
ZONE
ACTIVE WORK ZONE
no 250' MAX
DISCHARGE WITH ROCK SILL
STABLE OUTLET (NOTE 3)
OR ON BEDROCK
INLET
\ I
I 1 INTAKE HOSE
DISCHARGE
HOSE DEWATERING
SEDIMENT PUMP FLOC
AS_N_EEDED -
SPECIAL STILLING BASIN DIVERSION PUMP
WITH ROCK PAD RAW PUMP
BASE FLOW
NOTE: 1. WORK AREA TO BE STABILIZED AT THE END OF EACH WORK DAY.
2. ROCK SILT SCREENS REQUIRED FOR PUMP
AROUND OPERATIONS ARE CONSIDERED INCIDENTAL TO PUMPING.
3. STABLE OUTLET TO CONSIST OF ROCK PLACED IN CHANNEL
FOR ENERGY DISSIPATION AND 45'
ELBOW INSTALLATION AT THE END OF THE PIPING SO THAT
THE WATER DISCHARGES VERTICALLY UP IN THE AIR. THE OUTLET WILL
BE APPROVED BY THE DESIGNER PRIOR TO PUMPING.
TYPICAL PUMP AROUND OPERATION
SCALE: NOT TO SCALE
MORPHOLOGICAL DATA COLLECTED BY:
WARD CONSULTING ENGINEERS, P.C.
4805 GREEN ROAD, SUITE 100
RALEIGH, NC 27616
LIMITS OF DISTURBANCE = 10,619 SF.
NOTES:
1. UNDERGROUND UTILITY LOCATIONS APPROXIMATE. CONTRACTOR
TO VERIFY ALL LOCATIONS PRIOR TO CONSTRUCTION.
l• CO m
v Lo �
^ O lCJ
rlI 1 0
WN
0 0 0
UD oo O 04
Wcn04
OZ
�m Yy(n
-
O _
3:0 C�
V O Ld
U Z Q
�O� O mW0:�
co Ld
C\2 co CD Ljj
VU C0\2 =Z�
I CD Q
� z ° i
5 Of Ld W
~
W
�F--�z �c� `LQ�
1--�U �z O�Q
C) Lo (n LW
� w co
N
R �1
v
Z
a
J
(n IL
0 Q
0z
Z�
UV
0z
z�
�O
wW
D
z
a
LEGEND:
EXISTING SURVEYED LIDAR
CONSTRUCTION SET
-------
BUFFER LIMITS
SS -ss -
EXISTING SANITARY SEWER
DATE: 1-13-2017
� WE-
EXISTING UNDERGROUND ELECTRIC
REVISIONS:
-------
CENTERLINE OF STREAM
- - - -
EXISTING TOP OF BANK
-x -x -x -
EXISTING 6" CHAIN LINK FENCE
Loa
LIMITS OF DISTURBANCE
TCE
TEMPORARY CONSTRUCTION EASEMENT
PROJECT NO:
TEMPORARY STREAM CROSSING
PROJECT NAME:
DEER TRACK DRIVE
TREE REMOVAL
DWG NAME: EXISTING CONDITIONS
EROSION CONTROL PLAN
TP
TREE PROTECTION FENCE
SCALE:
1 "=20'
CONSTRUCTION ENTRANCE
SHEET NO.
1
95
85
75 80
CROSS SECTI❑N 1+94
AS VIEWED L❑❑KING DOWNSTREAM
95
85
75 75
85 90 95
95
90
100 105 110 115 120 1255
CROSS SECTI❑N 2+13
AS VIEWED L❑❑KING DOWNSTREAM
1.
2.0'
5.9'
9. 6,
0
DATE: 1-13-2017
\�JI� _ �W// %//i,,,,,,,/,
uo► ,u�MEs 0. poll W-1111111 0 WME ON 118110low-
CUT
CONTOUR
90
un
J
Q
U
--GRADE-
APROPO
TIE INTO
PROP ED 3
ROCK TOE 3
Z_
In
Q N r i Lo Lo
.. .. .. .. .. .. .. ..
U
------— — —
_W J J
1®®
/�■—■_--
I A
■
95
85
75 75
85 90 95
95
90
100 105 110 115 120 1255
CROSS SECTI❑N 2+13
AS VIEWED L❑❑KING DOWNSTREAM
95
85
75
75
80 85 90 95
95
85
100 105 110 115 1205
CROSS SECTI❑N 2+46
AS VIEWED L❑❑KING DOWNSTREAM
1.
2.0'
5.9'
9. 6,
0
DATE: 1-13-2017
TIE I NTO
CUT
CONTOUR
90
un
J
Q
U
--GRADE-
APROPO
TIE INTO
PROP ED 3
ROCK TOE 3
Z_
In
Q N r i Lo Lo
r -
U
------— — —
_W J J
J
95
85
75
75
80 85 90 95
95
85
100 105 110 115 1205
CROSS SECTI❑N 2+46
AS VIEWED L❑❑KING DOWNSTREAM
95
90
144
80 85 90
95
90
85
75
95 100 105 110 115 120
J
W
CROSS SECTI❑N 2+67
AS VIEWED LO❑KING DOWNSTREAM
1.
2.0'
5.9'
9. 6,
0
DATE: 1-13-2017
w
Q
U
U
REVISIONS:
90
un
J
Q
U
EXISTING GRADE
TIE INTO
•rte
.�..; 4'LIAM
TI E INTO
In
PROJECT NO:
85
------— — —
A
- • • • ' •
■Er��'��'�11!■�F'
NO M.
■■m—
/�■—■_--
I A
■
0
P
95
90
144
80 85 90
95
90
85
75
95 100 105 110 115 120
J
W
CROSS SECTI❑N 2+67
AS VIEWED LO❑KING DOWNSTREAM
95
90
85
75 175
75 80 85 90 95 100 105 110 115 120
95
85
75
70
95
\ V/ V..
W Lo
_ DEER TACK DRIVE ��
Use lip, r—
Lo co
uG ' � -� tl6E dff —��irr mom—
mn
co co
CN
7420
DEER TRACK _ �$ I I I W 0) m O Z
DRIVE �' ��--- ► I 7428 I Y U)
►I II DEER TRACK O
O
EXISTING 3:I I� I DRIVE p
EXISTING -__ CONCRETE W 1 i► 1
GRASS �' 4- °w DRIVEWAY ' fX4 U z Q
AREA ' i �9}- -____� I i I O� O W.<
PROPOSED SPOIL 'g2 7424 II I20' STORM DRAEASEMENT I co `� N Nap m .
i I INAbj
AREA SPREAD EXCESS �i DEER TRACK i I I I O W
EXCAVATED MATERIAL �� ( m EXISTING SSMH Q Ld
DRIVE I I I>G I TOP=93.0 FT. U •0 _
AND GRADE EVENLY. i �� I `� » U2 z
MAXIMUM DEPTH � � � � I I�_I I 8 IN.(N)=85.2 FT\':v
I CD Q �
SHOULD NOT EXCEED i 10"P 1 i�� I EXISTING 8" IN.(W)=85.7 FTO cp
I I INV OUT.=85.0 FT
6 INCHES s I --I Z
Cd co Q �
EXISTING I i I HEDGE AREA �W r- Of W LL.I
i J \04
EXISTING
o"MA FFOU94.14' II % o 1 � w WU pQ
HEDGE AREA i a9 -^\I ►1w _ U Z Q
ss
__
EXISTING SSMH i !�FCK TORAG ��'�� i� I - w RRA COT=SES SS�-� U �
TOP=87.94 FT. � I �,� 1 1 i I. — �`` B = ss� ss �� I O V O ,� � Ld
8 IN.(N)=80.86 FT. o _ '� - J ss -s---- ---- I f� G'
INV OUT.=80.61 FT. -as- ���� - - I I ss ss
Lrm
04
EXPOSED ROOTS TO - - __ ' i�s� s% ��s III ``��`.. - - - . - � woo
REMAIN FILL BEHIND _ - li ss ,' - il� __ r - ��� m N
WITH SOIL _ _
APPROXIMATELY 25 FT j I ss � ss -$a -121 l ► I EXISTING ��
OF STREAM BANK - ;� �- --%-; ss �`--- _ �� ..S I GRASS -- EXISTING FES I
i ss -- �� �� d ►1
I AREA 18 RCP OUT=85.8
\ 3 -CM II
"TPI1 121`fP WW.
3 PROPOSED -1 -` I' -LL_ Z o
3 ROCK TO �_ 14"MA �, I I EXPOSED ROOTS � NN r6
16"MA /"PR uD e8 _ REMOVE WITH TREE m
6"C 22 -TP _ '� APPROXIMATELY 15 FT 1
87 �l I 21 "rp I� e v 'Q� '�,'•,
m 5 4 \ �Q�A TA 7 I I ��`----_8�+00 I C� '•�j y�
EXISTING
TOP OF
BANK ,- k0 _87
p •�i` ,
EXISTING ,,.i
STREAM � 0 �/' 12 "TP S `�_ '��,
CENTERLINE Fes/ � o 3"MAG �
t,, + + _
------
_
O Co � ODM N � co 36 � �?"\ \\ � � �-
co
k 0 Jo o �.� �"MA o ►� •,3o"rP PROPOSED 3
I s�0 z v y o c`1'n N 12"MA ROCK TOE 3 I�
TCE F W,.� 8"rP PROPOSED o Q o
�aoi �' to aoi o w ROCK TOE p o ao
a131 cy-
0 o cn ani aoi °- 0_ U
- j p N a Of WOODED AREA I
x N
EXISTING � l
4' SPIT -RAIL --x- -,� _ �_ ''-- ~ Z u
FENCE �' x '�-�'- _
NOTES: Z
^ O
20 10 0 20 40 1. UNDERGROUND UTILITY LOCATIONS
APPROXIMATE. CONTRACTOR TO VERIFY F
PLAN VIEW - SCALE 1"=20' ALL LOCATIONS PRIOR TO CONSTRUCTION. J
CROSS SECTION 2+88
AS VIEWED L❑❑KING DOWNSTREAM LEGEND; W O
95 Q
9.7'
1.
2.0'
5.9'
9. 6,
0
DATE: 1-13-2017
w
Q
U
U
REVISIONS:
90
un
J
Q
U
EXISTING GRADE
TIE INTO
85 CONTOUR
TI E INTO
PROJECT NO:
85
------— — —
A
- • • • ' •
■Er��'��'�11!■�F'
NO M.
■■m—
/�■—■_--
I A
■
0
P
01 1
Z
a OR
a
-MATTING
-STREAM
ill
w
II
w
_ -----
PLAN
SCALE:
AS NOTED
5 2,5 0 5
10
SHEET NO.
---
��_�i�
■�wil�_
�A1■ �A1_
2H,
CUT
PROPOSED
95
90
85
75 175
75 80 85 90 95 100 105 110 115 120
95
85
75
70
95
\ V/ V..
W Lo
_ DEER TACK DRIVE ��
Use lip, r—
Lo co
uG ' � -� tl6E dff —��irr mom—
mn
co co
CN
7420
DEER TRACK _ �$ I I I W 0) m O Z
DRIVE �' ��--- ► I 7428 I Y U)
►I II DEER TRACK O
O
EXISTING 3:I I� I DRIVE p
EXISTING -__ CONCRETE W 1 i► 1
GRASS �' 4- °w DRIVEWAY ' fX4 U z Q
AREA ' i �9}- -____� I i I O� O W.<
PROPOSED SPOIL 'g2 7424 II I20' STORM DRAEASEMENT I co `� N Nap m .
i I INAbj
AREA SPREAD EXCESS �i DEER TRACK i I I I O W
EXCAVATED MATERIAL �� ( m EXISTING SSMH Q Ld
DRIVE I I I>G I TOP=93.0 FT. U •0 _
AND GRADE EVENLY. i �� I `� » U2 z
MAXIMUM DEPTH � � � � I I�_I I 8 IN.(N)=85.2 FT\':v
I CD Q �
SHOULD NOT EXCEED i 10"P 1 i�� I EXISTING 8" IN.(W)=85.7 FTO cp
I I INV OUT.=85.0 FT
6 INCHES s I --I Z
Cd co Q �
EXISTING I i I HEDGE AREA �W r- Of W LL.I
i J \04
EXISTING
o"MA FFOU94.14' II % o 1 � w WU pQ
HEDGE AREA i a9 -^\I ►1w _ U Z Q
ss
__
EXISTING SSMH i !�FCK TORAG ��'�� i� I - w RRA COT=SES SS�-� U �
TOP=87.94 FT. � I �,� 1 1 i I. — �`` B = ss� ss �� I O V O ,� � Ld
8 IN.(N)=80.86 FT. o _ '� - J ss -s---- ---- I f� G'
INV OUT.=80.61 FT. -as- ���� - - I I ss ss
Lrm
04
EXPOSED ROOTS TO - - __ ' i�s� s% ��s III ``��`.. - - - . - � woo
REMAIN FILL BEHIND _ - li ss ,' - il� __ r - ��� m N
WITH SOIL _ _
APPROXIMATELY 25 FT j I ss � ss -$a -121 l ► I EXISTING ��
OF STREAM BANK - ;� �- --%-; ss �`--- _ �� ..S I GRASS -- EXISTING FES I
i ss -- �� �� d ►1
I AREA 18 RCP OUT=85.8
\ 3 -CM II
"TPI1 121`fP WW.
3 PROPOSED -1 -` I' -LL_ Z o
3 ROCK TO �_ 14"MA �, I I EXPOSED ROOTS � NN r6
16"MA /"PR uD e8 _ REMOVE WITH TREE m
6"C 22 -TP _ '� APPROXIMATELY 15 FT 1
87 �l I 21 "rp I� e v 'Q� '�,'•,
m 5 4 \ �Q�A TA 7 I I ��`----_8�+00 I C� '•�j y�
EXISTING
TOP OF
BANK ,- k0 _87
p •�i` ,
EXISTING ,,.i
STREAM � 0 �/' 12 "TP S `�_ '��,
CENTERLINE Fes/ � o 3"MAG �
t,, + + _
------
_
O Co � ODM N � co 36 � �?"\ \\ � � �-
co
k 0 Jo o �.� �"MA o ►� •,3o"rP PROPOSED 3
I s�0 z v y o c`1'n N 12"MA ROCK TOE 3 I�
TCE F W,.� 8"rP PROPOSED o Q o
�aoi �' to aoi o w ROCK TOE p o ao
a131 cy-
0 o cn ani aoi °- 0_ U
- j p N a Of WOODED AREA I
x N
EXISTING � l
4' SPIT -RAIL --x- -,� _ �_ ''-- ~ Z u
FENCE �' x '�-�'- _
NOTES: Z
^ O
20 10 0 20 40 1. UNDERGROUND UTILITY LOCATIONS
APPROXIMATE. CONTRACTOR TO VERIFY F
PLAN VIEW - SCALE 1"=20' ALL LOCATIONS PRIOR TO CONSTRUCTION. J
CROSS SECTION 2+88
AS VIEWED L❑❑KING DOWNSTREAM LEGEND; W O
95 Q
9.7'
1.
2.0'
5.9'
9. 6,
0
DATE: 1-13-2017
w
Q
U
U
REVISIONS:
90
un
J
Q
U
EXISTING GRADE
TIE INTO
85 CONTOUR
TI E INTO
PROJECT NO:
85
------— — —
a
— ---- -----
85.8 CD TOU
�e
1 V 4
L� 04
I N
01 1
Z
a OR
a
-MATTING
-STREAM
ill
w
II
w
_ -----
PLAN
SCALE:
AS NOTED
5 2,5 0 5
10
SHEET NO.
---
-----
----- ------ --
2H,
CUT
PROPOSED
2H
INSTALL
C700
INSTAL PROPOSED
EROSIONGRADE
MATTING ON GRADE
EROSION
ANG
STREAM
C N L
ON
BA
STREAM
BANK
_j
z
Lo
Q
(6
II
Do
II II
U
II
00
J
'>
i J
w w w
J
w
_`
>
J
w
85
75
70
EXISTING SURVEYED CONTOURS
ss —ss — EXISTING SANITARY SEWER
— EXISTING UNDERGROUND ELECTRIC c ^
XS 1+98 EXISTING CROSS SECTION 00 ^
90 h
— - — - — - — CENTERLINE OF STREAM
- - - - - EXISTING TOP OF BANK O rT1
94 PROPOSED CONTOURcr
85 PROPOSED ROCK TOE 0. Q �+
TREE REMOVAL N
� a
CUT
80 O FILL
—x —x —x - EXISTING 6" CHAIN LINK FENCE
Lon LIMITS OF DISTURBANCE
75 TCE TEMPORARY CONSTRUCTION EASEMENT ~�
75 80 85 90 95 100 105 110 115 120 125 130 PROPOSED SPOIL AREA
CROSS SECTION 3+11
AS VIEWED L❑❑KING DOWNSTREAM 95 CONSTRUCTION SET
�
75 80 85 90 95
100 105 110 115 120 125 130
0
DATE: 1-13-2017
w
Q
U
U
REVISIONS:
90
un
J
Q
U
EXISTING GRADE
TIE INTO
85 CONTOUR
PROJECT NO:
85
------— — —
a
— ---- -----
—PROPOSED '
GRADE
rl IT
INSTALL C700
EROSION CONTROL L
�e
1 V 4
L� 04
I N
01 1
Z
a OR
a
-MATTING
-STREAM
ill
w
II
w
75 80 85 90 95
100 105 110 115 120 125 130
0
DATE: 1-13-2017
w
Q
U
U
REVISIONS:
90
un
J
Q
U
H
Li
PROJECT NO:
85
a
PROJECT NAME:
Lo
c01
1-
U
0
DEER TRACK DRIVE
DWG NAME:
80
0 PROPOSED
0
U
PLAN
SCALE:
AS NOTED
5 2,5 0 5
10
SHEET NO.
75
„,
CROSS SECTI❑N - H❑RIZ❑NTAL SCALE: 1
=5
PLANTING DETAILS
SEEDLING / LINER BARER❑❑T PLANTING DETAIL
DIBBLE PLANTING METHOD
USING THE KBC PLANTING BAR
HEALING IN
1. Locate a healing -in site In a shady, well
protected area,
2. Excavate a flat bottom trench
12' deep and provide drainage.
Y7
3, Backfill the trench with 2' well
rotted sawdust, Place a 2' layer of
well rotted sawdust at a sloping angle
at one end of the trench,
4, Place a single layer of plants
Vainst the slopping end so that
e root collar is at ground level,
5, Place a 2' laer of well rotted
sawdust over Ue roots maintaining
a sloping angle.
6. Repeat layers of plants and sawdust
as necessary and water thoroughly,
REFORESTATION DETAIL
SCALE: NOT TO SCALE
LONGITUDINAL ANCHOR
TRENCH
*�
FAKE AT 3'-5(1
PLANTING NOTES:
PLANTING BAG
Durinq Alanting, seedlin s
shall be kept -In a moisqtA canvas ba or similar
container to prevent the
root systems from drying,
TERMINAL SLOPE AND CHANNEL
ANCHOR TRENCH
F o�
CHECK SLOT AT 25'
INTERVALS (MIN)
KBC PLANTING BI
Planting bar sl
blade with a ti
cross section,
be12'lon,4'
1' thick a cel
ROOT PRUNING
All seedlings shall be root
pruned, If necessary, so that
no roots extend more than
10 Inches (10') below the
root collar.
NOTES:
1. CHECK SLOTS TO BE CONSTRUCTED
AT 25' INTERVALS.
2. ALL MATTING TO BE SECURED WITH
WOODEN STAKES ACCORDING TO
THE SPECIFICATIONS AT 5'
INTERVALS.
3. FABRIC OVERLAP WHEN 2 ROWS OF
MATERIAL ARE USED SHALL BE
PLACED WITH THE UPPER ROW OF
MATERIAL PLACED OVER THE LOWER
ROW OF MATERIAL.
4. TRENCH MATTING AT TOP AND
BOTTOM OF MAT AS SHOWN IN
DETAIL
5. OVERLAP FABRIC IN DIRECTION OF
FLOW WITH MATTING UPSTREAM ON
TOP OF DOWNSTREAM MAT.
6. MATTING WILL BE INSTALLED
ACCORDING TO THE SPECIFICATIONS.
WOODEN STAKES
INITIAL CHANNEL ANCHOR TRENCH INTERMITTENT CHECK SLOT
COIR MATS CHANNEL INSTALLATION
SCALE: NOT TO SCALE
BANKFULL ELEV. VARIES
ION CONTROL FABRIC
END TOE PROTECTION AT BANKFULL ELEVATION
2' MAX HEIGHT
IN RIFFLE SECTIONS
CLASS II ROCK TOE MIX
65% CLASS II RIPRAP
25% CLASS B RIPRAP
10% #57 STONE MIX
PRIOR TO PLACEMENT
NOTE:
POOL SECTIONS WILL VARY IN HEIGHT TO BANKFULL
ELEVATION FROM 2' TO 4'.
ROCK TOE PROTECTION
SCALE: NOT TO SCALE
- ss— ss— ss— ssSS
IM
40 10
PROPOSED
�♦♦, ROCK TOE
--99----
/ I
/
/
/ —96-------
/ ------
--94— -- t
a
d
/
/
/
/
li
11i�Salo�
-'Cs
�.
-�s — ss
♦�
♦,am 10 10s
go
'♦*0
ON
w Sm 05 10
1��ww� �•
i
1
1
1
1
1
1
1
1
1
1
1
1
1
1 1
1
1
1
1
1
1
1
1 1
1 ;
1
1 1
1 1
1 1
1 ;
ib
1 li
1
1 1
1 1
1 ;
1
1 1
-y 1
PROPOSED
ROCK TOE
I
so 6000 All
Sir All
I
� X
�k —
♦♦♦♦�All *'All
' -.k _
All A,
So
.101-101, 40 All All Sir
10 10 go 0 go waft mu;ino 4*
10 10 10 ♦♦♦♦ � �A*
Permanent Riparian Seed Mix Zone A & B
SY.)
Scientific Name
Common Name
Percent
Elymus hystrix
Bottlebrush grass
15
Panicum anceps
Beaked panic grass
15
Elymus virginicus
Virginia wild rye
10
Bidens frondosa
Devil's beggartick
10
Coreopsis lanceolata
Lanceleaf tickseed
10
Dichanthehum candestinum Deertongue
10
Andropogon gerardli
Big bluestem
5
Juncus effuses
Common rush
5
Vemonia noveboracensis
Ironweed
5
Schizachyrium scoparium
Little bluestem
5
Sorgastrum nutans
Indian grass
5
Tripsicum dactyloides
Gamma grass
5
Temporary Seed Mix to be Sown Simultaneously With the
Permanent Seed in Zone A, B, C & D
Grass Type Time of Year to Plant 1PIanting Rate (Ibslacre)
Rye Grain August 15 - May 1 15
Brown -top millet May 1 -August 15 15
NOTES:
1. PLANTING ZONE A — STREAM BANKS TO BE PLANTED WITH A COMBINATION
OF THE FOLLOWING SMALL TREES/SHRUBS: (ROOTED PLANT PLUGS/TUBLINGS
— 12"-18" IN HEIGHT. LIVE STAKES MAY BE USED UPON APPROVAL BY THE
CITY) .
200 PLANTS TOTAL (3' ON CENTER SPACING)
LINDERA BENZOIN — SPICEBUSH (50 PLANTS)
ILEX VERTICILLATA — WINTERBERRY HOLLY (50 PLANTS)
CORNUS AMOMUM — SILKY DOGWOOD (50 PLANTS)
ALNUS SERRULATA — TAG ALDER (50 PLANTS)
STREAM BANKS IN ZONE A TO BE MATTED WITH C700 EROSION CONTROL
FABRIC. PLACE RIPARIAN SEED, THIN LAYER OF STRAW, AND THEN MATTING
PRIOR TO PLANT INSTALLATION.
2. PLANTING ZONE B — PLANT WITH RIPARIAN SEED AND PLACE STRAW MULCH
3. CONTRACTOR TO REPLANT DISTURBED AREA IN ZONE C TO MATCH EXISTING
GRASS ON SITE. (FESCUE) AND MULCH WITH STRAW. NO TREES OR SHRUBS
REQUIRED FOR ZONE C.
4. PLATING ZONE D — PLANT WITH FESCUE TO MATCH EXISTING GRASS ON SITE
AND INSTALL CURLEX EROSION CONTROL MATTING. NO TREES OR SHRUBS
REQUIRED FOR ZONE D.
5. PLANTING STOCK TO BE GROWN BY NURSERIES WITHIN THE SAME
PHYSIOGRAPHIC REGION (PIEDMONT) AND WITHIN 200 MILES OF THE PROJECT
SITE.
6. FERTILIZER RECOMMENDATIONS:
LIME M TON/AC
PHOSPHATE 20-40 LBS/AC
POTASH 50-70 LBS/AC
WATERING REQUIREMENTS ONCE/WEEK IF NO RAIN
7. CONTRACTOR MAY USE RIPARIAN SEED MIX AS SHOWN IN THE TABLE ABOVE
OR ERNST CONSERVATION SEEDS PIEDMONT RIPARIAN SEED MIX. APPLICATION
RATE 25 LBS/AC.
8. TEMPORARY SEED TO BE PLACED IN ALL ZONES. SEE TABLE.
PLANTING ZONES
0 ZONE A (232
SY.)
ZONE B (472
SY.)
0 ZONE C (314
SY.)
® ZONE D (55
SY.)
® PROPOSED ROCK TOE
10 5 0 10 20
PLAN VIEW — SCALE 1"=10'
l• CO M
v W LO
LO C0
91� o�
I 1 0
WN
UD 0 0 0
oo 100 04
04
WCn O Z
�M yU)
O - _
3:0 C�
V O LLJ
U Z Q
�O� O mW0:�
�co Ld
C\2 N00 SOW
\�U U C\2 =Z�
I CDLLJ Q
I—, z ° i
�54 �� �Ld~
W W
�CD
zs~� �Q�
�U �z 0 <
Za U0O�
O� �O� (nW
U w co
N
v
CONSTRUCTION SET
DATE: 1-13-2017
REVISIONS:
PROJECT NO:
PROJECT NAME:
DEER TRACK DRIVE
DWG NAME: STEAM STABILIZATION
AND PLANTING PLAN
SCALE:
1 "=10'
SHEET NO.
3
111 ,''rrrrri
Cr
o;ai m
� }=
—j
r'!'IrrrLIN
Vi lllll\�����
CONSTRUCTION SET
DATE: 1-13-2017
REVISIONS:
PROJECT NO:
PROJECT NAME:
DEER TRACK DRIVE
DWG NAME: STEAM STABILIZATION
AND PLANTING PLAN
SCALE:
1 "=10'
SHEET NO.
3