Loading...
HomeMy WebLinkAboutNCG210402 DMR SW (6) Phone:(252)771-2497 1443 Northside Road Fax:(252)771-8252 Elizabeth City, NC 27909 • J. W. JONES LUMBER COMPANY, Inc. KILN DRIED PINE -BAND SAWN HARDWOODS January 24, 2017 N.C. Division of Energy Mineral and Land Resources—Central Office ATTN: Bradley Bennett 1612 Mail Service Center Raleigh, NC 27699-1612 Dear Sir or Madam: Enclosed is the Semi-Annual Stormwater Discharge Monitoring Report for the first half of 2016 for our Chip Mill facility in Elizabeth City, NC. The facility exceeded the benchmark concentration for Chemical Oxygen Demand and will begin to implement a Tier Three response. All other pollutants were below benchmark concentrations. Additionally,the facility did not use greater than 55 gallons of new oil per month. Therefore, no Vehicle Maintenance Area Monitoring is required. If you have any questions on the reports, please notify me at telephone number 252-771-2497,fax number 252-771-8252,or email markd@iwioneslumber.com.You may also contact our consulting engineers, Conversion Technology Inc.through Josh Haar at telephone number 770-263-6330 ext. 113 • and email address ihaar@conversiontechnology.com. Thank you. Sincerely, Mark Delosreyes Vice President of Administration F:,,[1,77,--r-r\ E J Enclosures: Semi-Annual Storm Water Discharge Monitoring Reports-2 Copies JAN A1 2017 0.)A1 1TY lig r,,w�ar_Fz rEIGil 111•10 Semi-annual Stormwater Discharge Monitoring Report for North Carolina DEMLR General Permit No. NCG210000 Date submitted 1/18/2017 CERTIFICATE OF COVERAGE NO. NCG210402 SAMPLE COLLECTION YEAR 2016 FACILITY NAME J.W.Jones Lumber Company,Inc. -Chip Mill SAMPLE PERIOD Jan-June ® July-Dec COUNTY Pasquotank or ❑ Monthly) (month) PERSON COLLECTING SAMPLES Woody BaileyDISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA �� ❑Zero-flow ['Water Supply OSA LABORATORY Analytical Services,Inc. Lab Cert.# 381 j �-h._ ,r ®Other C;SW Comments on sample collection or analysis: k 2 u11 PLEASE REMEMBER TO SIGN ON THE REVERSE - T C',F t, Part A:Stormwater Benchmarks and MonitoringResults(Monitoringisret`uredConl ,•ifthe facilitystores exposed accumulations of sawdust,wood chips, q t4/ t;inl;; p bark, mulch,or other similar material on site for longer than seven (7) days.) ❑ No discharge this period?2 fallryNo°'' - amountA;;• C"..41 -,4`;!-: - >-`'�� mical�'O"� en.Dem'arid.':`,`; °z•'`�Total�Sus ende 1 12/01/16 0.25 202 mg/L 7 mg/L h ', _ ry J,141cull 3 1 Monthly sampling(instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit text,Table 3,identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Note: Results must be reported in numerical format. For example,do not report Below Detection Limit, BDL,<PQL, Non-detect, ND,or other similar non- numerical format. When results are below the applicable limits,they must be reported in the format,"<XX me/L",where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark,you must implement Tier 1, Tier 2,or Tier 3 responses. See General Permit text. Permit Date:8/1/2013-7/31/2018 SWU-245,last revised 7/31/2013 Page 1 of 2 Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging> 55 gal of new oil per month. N No discharge this period?2 ., 24-hour:rainfall,` ;',�DateSample ,;r� Outfall.;No: � s -> Collectedi' amount Non-pol�arO&G b" EI?A ; � ��'; ,. p. y, pended=So i s� �(SGT=HEM) 'Benchmarks'===> `y _ 15 mg/L ;,`100 mg%l.�or 50;mg/L4 Footnotes from Part A also apply to this Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES /1 NO 0 IF YES,HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES ® NO❑ REGIONAL OFFICE CONTACT NAME: James Bullock Mail an original and one copy of this DMR,including all"No Discharge"reports, within 30 days of receipt of the lab results(or at end of monitoring period in the case of"No Discharge"reports)to: Division of Water Quality Attn:DWQ Central Files 1617 Mail Service Center Raleigh,North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware that there are significant penalties for submitting false information,including the possibility of fines and imprisonment for knowing violations." cone- I/24//7 (Signature of Permittee) (Date) Permit Date:8/1/2013-7/31/2018 SWU-245,last revised 7/31/2013 Page 2 of 2