Loading...
HomeMy WebLinkAbout20080580 Ver 4_More Info Received - Email_20170131From: 8obZaraecN <bzaraecN@sandec.com> Sent: Tuesday, January 3l'ZUl7lZ:Z4PK4 To: 8urdette, Jennifer a; Smith' [herh L Importance: High Cherri and I discussed both of these issues during our pre -application site visit on October 17, 2016. I'm hoping that she's able to chime in today before she leaves. 6,he confirmed the impact area (which was previously identified as a linear wetland) was now an "intermittent stream". The only reason why the impacts were "avoided" in the previous permit, was that the stream/linear wetland was previously determined to be further down the drainage and has since moved up the drainage into the development area. To avoid the impacts now would require the previously permitted and City approved plans to be completely reworked and the road would need to be shifted to the north not only at this impact location but along a significant length of it to allow for proper alignment and curvature. This would result in the loss of multiple lots (4 to 6) currently designed along the northern side of the road as they would have insufficient depth, and not allow sufficient room for the stormwater bmp north of the road. ' 'm ,V"('iL \ ' FA Please let me know if this response is not acceptable, notably as to the stream determination. If not, I'll go back out there and complete a DWR stream determination form. Wetlands Department Manager Soil & Environmental Consultants, PA North Quarter Office Park 8412Falls ofNeuse Road, Suite 1D4 Raleigh, NIC 27615 (818)846-58DDOffice Phone (818) 256-4517 Direct Line (818)846-8467Fax (818)27D-2D68Mobile Visit usotSandUEC.com| This electronic communication, including all attachments, isintended onlyoormenameucmumnmee(n)anumaynontamnonnumma|inmmauon. This electronic communication may not have passed through our standard review/quality control process. Design data and recommendations included herein are provided as a matter ofconvenience and should not ueused for final design. Rely only on final, hardcopy materials bearing the consultant's original signature and seal. Ifyou are not the named addressee (s), any use, dissemination, distribution or copying of this communication is prohibited. If you have received this electronic communication in error, please notify the sender by return e=rTiail and delete the original communication frorn your system. Thank you. From: Burdette,]ennhera[maiKo:]ennherBurdette@ncdenr.00v] Sent: Tuesday, ]anuary]1,201711:19AM To: BnUZarzecW Subject: RE: Bryson Village - Phase 8_PCN_12-30-2016 (OVVRO8-O58OVer. 4) ptil I have a couple of items of additional information needed for the subject project application received by the Division on January 6, 2017. 1. Provide DWR determination indicating the stream associated with Impact Area #1 is intermittent or a completed stream form. 2. Explain why Impact Area #1 could not be avoided as it was previously permitted or revise the plan to avoid this impact. Thanks, Jennifer Jennifer Burdette 401/Buffer Coordinator Division of Water Resources - 401 & Buffer Permitting Branch Department of Environmental Quality 919 807 6364 office iennifer.burdetteQncdenr.gov Email correspondence to and ii`'rt rn thlo; a('{"'{I`ess o; tiutyect to t1he P,lodhl Carolina Public Records 'Law end 1`Y7ay be disclosed to thloi d I'.'s'ai{`ies, From: Higgins, Karen Sent: Wednesday, January 25, 2017 11:15 AM To: Burdette, Jennifer a <Jennifer.Burdette@ncdenr.gov> Subject: FW: Bryson Village - Phase 8_PCN_12-30-2016 (DWR 08-0580 Ver. 4) I think this is one of yours, so just passing along Bob's offer. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Bob Zarzecki [mailto:bzarzecki@sandec.com Sent: Wednesday, January 25, 2017 10:47 AM To: Higgins, Karen <karen.higgins@ncdenr.gov> Cc: Smith, Cherri L <cherri.smith@ncdenr.gov> Subject: FW: Bryson Village - Phase 8_PCN_12-30-2016 (DWR 08-0580 Ver. 4) history that I think I've included it in the application and addressed everything. But, I'm happy to swing by and walk you all through it if you like. Cherri is famar with it and revisited the stream crossing locations with me a couple months back. Bob Zarzecki Wetlands Department Manager Soil & Environmental Consultants, PA From: Bob Zarzecki Sent: Friday, December 30, 2016 4:27 PM To: Tasha.L.Alexander(a)usace.army.mil; Smith, Cherri L (cherri.smith(d)ncdenr.Qov) Cc: Montalvo, Sheri A Subject: Bryson Village - Phase 8PCN12-30-2016 Tasha & Cherri: Attached is the Bryson Village - Phase 8 PCN. Paper copies will go out on Tuesday, given the late hour. But, I wanted to get it out as it's done and I figured that Cherri may want to hold on to this one as she visited the site with me. But, we're certainly fine if it gets passed along too. Let me know if you have any questions. Otherwise, I wish you both a Happy New Year! Wetlands Department Manager Soil & Environmental Consultants, PA North Quarter Office Park 8412 Falls of Neuse Road, Suite 104 Raleigh, NC 27615 (919) 846-5900 Office Phone (919) 256-4517 Direct Line (919) 846-9467 Fax (919) 270-2068 Mobile bzarzeckia-sandec.com Visit us at SandEC.com! This electronic communication, including all attachments, is intended only for the named addressee (s) and may contain confidential information. This electronic communication may not have passed through our standard review/quality control process. Design data and recommendations included herein are provided as a matter of convenience and should not be used for final design. Rely only on final, hardcopy materials bearing the consultant's original signature and seal. If you are not the named addressee (s), any use, dissemination, distribution or copying of this communication is prohibited. If you have received this electronic communication in error, please notify the sender by return e=rTiail and delete the original communication from your system. Thank you.