Loading...
HomeMy WebLinkAboutNC0005088_State Dam ID: Ruthe-070_20150318 A74:74i6, • NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Donald van der Vaart Governor Secretary Certificate of Approval March 18, 2015 Mr. John Elnitsky Vice President Duke Energy P.O Box 1321, DEC 22C Charlotte, NC 28201-1007 RE: Approval to Repair—Scope 4 RECEIVED/DENR/DWR Cliffside Inactive Ash Basin#5 Main Dam MAR 2 ?lib County State Dam ID: RUTHE-070 Water Quality Permittino Sectirn Dear Mr. Elnitsky: This is in response to your submission dated February 23, 2015,received on February 23, 2015 of plans, specifications and design data dated February 20, 2015 for repair of the subject dam in compliance with the Dam Safety Law of 1967. This dam is of high hazard classification. The plans, specifications and design data submitted were prepared under the supervision of Mr. Joshua M. Bell, PE of AMEC Environment& Infrastructure, Inc. Scope 4 General Work Description: Downstream slope drainage improvements. — This letterconstitutesapproval of the proposal to repair the subject-dam according to the plans and specifications received by this Division on February 23, 2015 with the following stipulations: 1. Project construction shall be supervised by Mr. Joshua M. Bell, PE. Mr. Joshua M. Bell, PE shall be responsible for field observation of construction as necessary to ensure compliance with approved plans. 2. During construction, the Division of Energy, Mineral, and Land Resources may require such progress reports as are deemed necessary. 3. In accordance with GS 143-215.29 and NCAC 15A-2K .0203, .0212, .0215, and .0216, within 30 days of completion of the project, Mr. Joshua M.Bell, PE shall inspect the Division of Energy, Mineral, and Land Resources Energy Section•Geological Survey Section•Land Quality Section 1612 Mail Service Center,Raleigh,North Carolina 27699-1612.919-707-92001 FAX:919-715-8801 512 North Salisbury Street,Raleigh,North Carolina 27604•Internet:http:llportal.ncdenr.org/web/Ir/ An Equal Opportunity 1 Affirmative Action Employer—50%Recycled 10%Post Consumer Paper • Mr. John Elnitsky Cliffside Inactive Ash Basin#5 Main Dam Approval to Repair—Scope 4 RUTHE-070 March 18,2015 Page 3 of 3 TED/smm/bsc cc: Mr. Joshua M. Bell, PE Mr. Zahid Khan, Land Quality Regional Engineer Mr. Jeff Poupart, Division of Water Resources Ms. Kim Hutchinson, Duke Energy Mr. John Toepfer, Duke Energy Mr. Sean DeNeale, Duke Energy File name: RUTHE-070 20150318_COAR-Scope 4_Cliffside Inactive Ash Basin#5 Main Dam