Loading...
HomeMy WebLinkAboutNC0005088_Inactive Ash Basin#5_20150505 AVA, NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Donald van der Vaart Governor Secretary May 5, 2015 Mr. John Elnitsky Vice President RECEIVED/DENS pwR Duke Energy P.O Box 1321, DEC 22C MAY 8 2015 Charlotte,NC 28201-1007Water ,� q Pe� 4Secd ty rttr � on RE: Cliffside Inactive Ash Basin#5 Main Dam Preliminary Report Response Rutherford County RUTHE-070 Dear Mr. Elnitsky: A review has been made on the Preliminary Report entitled"Notice of Deficiency(NOD) —Responses for Recommendations 1, 2, and 3", dated July 25, 2014 and received by this office on July 30, 2014 for the referenced dam. We concur with the conclusions outlined in this report. This preliminary report contains a slope stability analyses report, a spillway capacity analysis report, and a geophysical investigation report. The slope stability analyses indicate factors of safety greater than the minimum criteria. The spillway capacity analysis indicated that the spillway was undersized and therefore has since then been redesigned and was approved as Scopes 1 and 3. The geophysical investigation concluded that there was no evidence that would support the presence of pipes being buried in the embankment and were assumed to have been removed during construction. Before beginning repair work on the referenced dam, two (2) sets of plans and specifications for repair work must be filed with the Division of Energy, Mineral, and Land Resources for approval pursuant to Title 15A, Subchapter 2K of the North Carolina Administrative Code. Please contact Mr. Zahid Khan, Regional Supervisor, Land Quality Section, 610 East Division of Energy, Mineral, and Land Resources Energy Section•Geological Survey Section•Land Quality Section 1612 Mail Service Center, Raleigh,North Carolina 27699-1612.919-707-9200/FAX:919-715-8801 512 North Salisbury Street, Raleigh,North Carolina 27604•Internet:http:/Iportal.ncdenr.org/webllr/ An Equal Opportunity 1 Affirmative Action Employer—50%Recycled 110%Post Consumer Paper Mr. John Elnitsky Cliffside Inactive Ash Basin#5 Main Dam Preliminary Report Response RUTHE-070 May 5, 2015 Page 2 of 2 Center Ave., Suite 301, Mooresville,North Carolina 28115, (704) 663-1699 or me at telephone number(919)707-9220 should you have any questions concerning this matter. We look forward to receiving final design documents from you. Sincerely, Brian Shane Cook, PE Assitaut'-State Dam Safety Engineer Land Quality Section BSC cc: Mr. Richard L. Hiner,PE Mr. Zahid Khan, Land Quality Regional Engineer Mr. Jeff Poupart, Division of Water Resources Mr. Randy Hart, Duke Energy File Name: RUTHE-070 20150505 PRR Cliffside Inactive Ash Basin#5 Main Dam