Loading...
HomeMy WebLinkAboutNCG080370 DMR SW (3) Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG080000 Date submitted 7/25/2016 CERTIFICATE OF COVERAGE N o ryGQ$b37M SAMPLE COLLECTION YEAR 2016 FACILITY NAME United Parcel Service-Hope Mills SAMPLE PERIOD I]Jan-June E]July-Dec COUNTY Cumberland $ or]Monthly'. (month) th;, PERSON COLLECTING SAMPLES James W.Willard II(INENCO,INC.) REcig1EitaGING TO CLASS E1ORW IHQW ]Trout nPNA SEP1 -' 20 10 r Cert# LABORATORY Pace Analytical Services,Inc. Lab 12,40,37706,&37712 ]Zero-flow ❑Water Supply SA LABORATORY INENCO,Inc. Lab Cert.It 5540 CENTRAL FiL� Comments on sample collection or analysis: DVVR SECTION X Other Class C PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 - Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes no Part A:Vehicle Maintenance Areas Monitoring Requirements(If applicable) r]No discharge this period?2 Outfall. • '; 'Date 00530; 00400, , 00556 No Sample,Collected, ' :Total Suspended` ;;pH ? Non-Polar Oil and Grease/pH EPA , New Motor Oil Usage,' • . ,5olds' ,Stanlard Method`1664(SGT-HEM);'mg/L.�,.�':�,•; 'Annual average gal/ma • -Benchmark . '50'or"100see'pernit` . Within'6.0-9:0 `15,` . '' SDO-001 02/03/16 8.5 6.90 <5.0 70 Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals(if applicable) Outfall. Date 00556% :'00530'` 00400 Nor Sample Collected,' Non=Polar,Oil`and,Grease/TPH EPA Method:;,` :Total Suspended Solids pH' ;nto dd r'' "' 1664 SGT HEM,m L"`' . ` 1' ( ), gl ., ;mg/I�,',� � ,• , , ,. „ ., ',Staridar•d'units;'':? . , Permit j.imit'; ', ,. , , ' , , , 15.`` ,. 50 0 .100 see permit=,`,=`" ,, Within 6:0;=9:0` :;,`; For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised April 11,2013 Page 1of2 United Parcel Service-Hope Mills STORM EVENT CHARACTERISTICS: Date 02/03/2016 to 02/04/2016 (first event sampled) Total Event Precipitation(inches): 2.23 - Date (list each additional event sampled this reporting period,and rainfall amount) Total Event Precipitation(inches): Note: If you report a sample value in excess of the benchmark,you must implement Tier 1,Tier Z or Tier 3 responses. See General Permit text. FOR PARTAAND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES n NO n IF YES,HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES n NO REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR,including all"No Discharge"reports,within 30 days of receipt of the lab results(or at end of monitoring period in the case of"No Discharge"reports)to: Division of Water Quality Attn:DWQ Central Files 1617 Mail Service Center Raleigh,North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware that there are significant penalties for submitting false information,including the possibility of fines and imprisonment for knowing violations." in4 ,— 9/114 (Signature of ermittee) (Date) Additional copies of this form may be downloaded at: http://portal.ncdenr.ore/web/wg/ws/su/npdessw#tab-4 SWU-250 last revised April 11,2013 Page 2 of 2