Loading...
HomeMy WebLinkAboutNC0003573_316(b) Determination 2015_20150309 PO T 1 DuPont Chemicals&Flueroproducts Fayetteville Works Plant 22828 NC Hwy 87 West Fayetteville,NC 283067332 CERTIFIED MAIL ARTICLE NUMBER 7007 0710 0005 1455 9799 RETURN RECEIPT REQUESTED RECEIIgoi N iQ R arc , N,IAR 0 9 2015 Ms. Teresa Rodriguez NCDENR Division of Water Resources Water Quality NPDES Complex Permitting Unit Permitting Section 1617 Mail Service Center Raleigh,North Carolina 27699-1617 SUBJECT: 316(b)Preliminary Determination NPDES Permit No.NC0003573 Dear Ms. Rodriguez: This letter is in response to the February 25, 2015 request from the North Carolina Division of Water Resources for the below information so as to make a final determination of the applicabilithy of the new Cooling Water Intake Structure Rule of Section 316(b) of the Clean Water Act. 1. Design intake flow for the facility: 21.600 MGD from the Cape Fear River 2. Average actual intake (2012-2014): 10.149 MGD from the Cape Fear River 3. Percent of water used exclusively for cooling purposes: Approximately 83% Should you have any questions,please feel free to call me at (910) 678-1155. S"./0000f-ir Michael E. Johnson, PE Environmental Manager E.I.du Pont de Nemours and Company