Loading...
HomeMy WebLinkAboutNC0003425_Request for Essential Maintenance_20160314 jr•. DUKEvia -CCP 410 South Wilmington Street ENERGYMail Code NC15 Raleigh, NC 27601 March 14, 2016 RECEIVED/NCDEQ/DWR Mr. Jeffrey Poupart, Section Chief NC Division of Water Resources MAR 1 6 21.' 1617 Mail Service Center Water Quality Raleigh, NC 27699-1617 Permitting Section Subject: Request for concurrence of essential maintenance Roxboro Steam Electric Plant Permit Number: NC0003425 Person County Dear Mr. Poupart, In accordance with guidance received from you in a meeting on November 18th, 2015, Duke Energy requests concurrence that temporarily lowering the west ash basin at the subject facility to install an alternative spillway in the intermediate filter dike is considered "essential maintenance" under the terms of the subject permit. The engineering plans for the alternate spillway were submitted to the NC DEQ Dam Safety staff for approval on August 14, 2015. While there is no immediate threat, the alternate spillway is necessary because an engineering evaluation suggests the RCP riser structures for the intermediate filter dike do not meet the criteria for structural stability under seismic conditions. When the alternate spillway is installed, the existing RCP structure will be properly closed. In order to install the alternate spillway, the ash basin water level must be temporarily lowered by approximately two (2) feet. Duke proposes to lower the water level through the use of pumps with floating intakes. The pumped water will be released through the existing flow path upstream of internal outfall 002 and final outfall 003. Flows will be sampled and measured at internal outfall 002 in accordance with the terms of the subject NPDES permit and results will be reported on the monthly Discharge Monitoring Report. Verbal notification will be provided to the DEQ DWR regional office at least 48 hours prior to commencement of lowering the water level for installation of the alternate spillway. Duke Energy requests written concurrence that this activity constitutes essential maintenance and that Duke may proceeded upon DEQ Dam Safety's approval of the plans. If you have any questions regarding this activity, please contact me at (919) 546-2439 or shannon.langley@duke-energy.com. Sincerely, E. Shannon Langley Lead Environmental Specialist Cc. DEQ Regional Office Supervisor Sergei Chernikov - DWR Rob Miller—via email Robert Howard —via email Jake Muessen — via email Mike Lazar— via email Danny Satterwhite — ORC- via email Shannon Langley— NCRH 15th floor