HomeMy WebLinkAboutNC0001643_Permit (Modification)_20050110 �OF W A T�nQ Michael F.Farley,Governor
`Q 77 (i William G.Rose Jr.,Secretan'
North Carolina Department of Envinminmt and Natural Resources
Alan W.Klimek,P.E.Director
Division of Water Quality
January 10,2005
Paula Powell
Eden Real Estate Associates,LLC
P.O. Box 1823
High Point,North Carolina 27261
Subject: NPDES Permit Modification
Permit NC0001643
MGM Transport Corp.
formerly Pillowtex/Hollingsworth GP
Rockingham County
Dear Ms. Powell:
Division personnel have reviewed and approved your request to transfer ownership of the subject permit,
received on January 7,2005. This permit modification documents the change in ownership.
Please find enclosed the revised permit. All other terms and conditions contained in the original permit remain
unchanged and in full effect This permit modification is issued under the requirements of North Carolina General
Statutes 143-215.1 and the Memorandum of Agreement between North Carolina and the U.S. Environmental
Protection Agency.
The effluent limitations and inocutoring requirements contained in this permit were based upon the waste stream
characteristics associated with the activities performed by the former owner. If,your operation of the facility will be
significantly different from that of the former owner,it is suggested that you contact this office to discuss the matter.
Changing circumstances may allow for modification of the permit However,at this time,you are responsible for
complying with all terms and conditions of the current(enclosed)permit.
If you have any questions concerning this per mit modification,please contact the Point Source Branch at(919)
733-5083,extension 520_
Sinctre! ',
Alan W. Klimek,P.E.
cc: Central Fiks
US EPA Region IV
Kirstin Olsen-Hdiiugsworth GP
Winston-Salem Regional Office,Water Quality Section
NPDFS Unit l=ike
o
NCarolina
X11 eUMly
North Cardura Division of Water Qualit} 1617 Nail Service Cerder Raleigh,NC 27699-1617 Phone(919)733-7015 Cu�Service
Internet. h2o ens state nc us 512 N.Salistwry SL Raleigh,NC 77604 FAX (919)733-2496 1-8776236748
i
Pennit NC0001643
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
TO DISCHARGE WASTEWATER UNDER THE
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1,other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Cornimsion,and the
Federal Water Pollution Control Act,as anwxided,
Eden Real Estate Associates, LLC
is hereby authorized to discharge wastewater from a facility located at the
MGM Transport Corp.
New Street
Eden
Rockingham County
to receiving waters designated as the Dan River in the Roanoke River basin in accordance with effluent lirnitations,
monitoring requirements,and other conditions set forth in Parts I,II,III and IV hereof.
This permit shall become effective January 10,2005.
This permit and authorization to discharge shall expire at midnight on April 30, 2007.
Signed this day January 10, 2005.
Alan W. Klimek,P.E.,Director
Division of Water Quality
By Authority of the Environmental Management C.omrnission
Permit NCO001643
SUPPLEMENT TO PERMIT COVER SHEET
Eden Real Estate Associates, LLC is hereby authorized to:
1. Continue to operate the existing 0.500 MGD wastewater treatment system consisting
of dual influent lift pumps, lint screen, aeration basin, dual clarifiers, chlorine contact
chamber, post aeration chamber, and sludge lagoon located in Eden at the New
Street Mill in Rockingham County.
2. Discharge from said treatment works at the location specified on the attached map
into the Dan River, classified C waters in the Roanoke River Basin.
�s o
ter an D
Outfall 001
trial W e Ponds
ade
i
epi '''
S�
6K
n o.
U
I •. `
N a :.
X.x
tee:M MW'NNC0001643 Facility
lAmetude.79"42°13"W Location
Qua& Southeast Den B20NW MGM Transport Corp.
Sty Class:c
Receiving Stream:Dan River
Sub-Basin:03-02-03 1V0rth SCALE 1.24000
Permit NC0001643
A. (I.) EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS
During die period beginning on the effective date of the permit and lasting until expiration,the Pemuttee i5
authorized to discharge non-contact cooling water,boiler blowdown and domestic wastewater from outfall 001.
Such discharges shall be limited and monitored by the Permittee as specified below:
Effluent Characteristics Limits Monitoring Requirements
Monthly Daily Measurement Sample Sample Location
AverageMaximum Frequency Type
Flow 0.5 MGD Continuous Recording Influent or Effluent
BOD, 20°C 30.0 45.0 ffqL W ite Effluent
Total Suspended SoIkW 30.0 mg1L 45.0 Weekly Convosite Effluent
Total Nitrogen Quarterly Composite Effluent
NO2+NO3+TKN
Total Rmphorus Quartaty Effluent
Dissolved Oxygen Weekly Grab Effluent,
L)pstrearn&Downstream
Fecal Coliform Weekly Grab Effluent
pH2 Weekly Grab Effluent
Total Residual Chlodne3 W Grab Effluent
Conductivity Weekly Grab Upstream&Downstream
Temperature(°C} Weekly Grab Effluent,
Upstream&Downstream
Total Copper Weekly Composite Effluent
Footnotes:
I. Upstream = at least 50 feet upstream from the outfall. Downstream = at Highway 700. Upstream and
Downstream samples shall be grab samples.
2. The pH of the effluent shall not be less than►6.0 nor greater than 9.0 (on the standard units scale).
3. Monitoring is required only if chlorine is added to die treatment system.
4. The temperature of the effluent shall not cause an increase in the temperature of the receiving stream of more
than 2.8°C and in no case cause the ambient water temperature to exceed 32°C.
There shall be no discharge of floating solids or visible foam in other than trace amounts.
A. (2.) BIOCIDE CONDITION
There shall be no chromium:zinc or coMcr added to the treatment system except as M-approved
additives to biocidal compounds.
The permittee shall obtain approval from the Division's Aquatic Toxicology Unit prior to the use of any biocide
(not previously approved by the Division)in the effluent discharged under this permt. Approval for use of any
biocide not previously approved should be requested at least 90 days in advance of any planned usage-
Contact the Aquatic Toxicology Unit for detailed instructions on requesting approval of biocides:
NC DF.NR/DWQ/ Aquatic Toxicology Unit
1621 Marl Service Center
Raleigh,North Carolina 27699-1621
I
NPDES Permit Requirements
Page 1 of 16
PART II
STANDARD CONDITIONS FOR NPDES PERMITS
Section A. Definitions
2/Month
Samples are collected twice per month with at least ten calendar days between sampling events.
3/Week
Samples are collected three times per week on three separate calendar days.
Act or"the Act"
The Federal Water Pollution Control Act,also known as the Clean Water Act,as amended, 33 USC 1251,et. seq.
Annual Average
The arithmetic mean of all "daily discharges" of a pollutant measured during the calendar year. In.the case of fecal
coliform, the geometric mean of such discharges.
Arithmetic Mean
The summation of the individual values divided by the number of individual values.
Bypass
The known diversion of waste streams from any portion of a treatment facility including the collection system,which
is not a designed or established or operating mode for the facility.
CalenDav
The period from midnight of one day until midnight of the next day. However, for purposes of this permit, any
consecutive 24-hour period that reasonably represents the calendar day may be used for sampling.
Calendar Quarter
One of the following distinct periods: January through March, April through June, July through September, and
October through December.
Composite Sample
A sample collected over a 24-hour period by continuous sampling or combining grab samples of at least 100 ml in
such a manner as to result in a total sample representative of the wastewater discharge during the sample period. The
Director may designate the most appropriate method (specific number and size of aliquots necessary, the time
interval between grab samples, etc.) on a case-by-case basis. Samples may be collected manually or automatically.
Composite samples may be obtained by the following methods:
(1) Continuous: a single,continuous sample collected over a 24-hour period proportional to the rate of flow.
(2) Constant time/variable volume: a series of grab samples collected at equal time intervals over a 24 hour
period of discharge and combined proportional to the rate of flow measured at the time of individual sample
collection,or
(3) Variable time/constant volume: a series of grab samples of equal volume collected over a 24 hour period
with the time intervals between samples determined by a preset number of gallons passing the sampling
point. Flow measurement between sample intervals shall be determined by use of a flow recorder and
totalizer, and the preset gallon interval between sample collection fixed at no greater than 1/24 of the
expected total daily flow at the treatment system,or
(4) Constant time/constant volume: a series of grab samples of equal volume collected over a 24-hour period at
a constant time interval. This method may only be used in situations where effluent flow rates vary
less than 15 percent. The grab samples shall be taken at intervals of no greater than 20 minutes apart
during any 24-hour period and must be of equal size and of no less than 100 milliliters. Use of this method
requires prior approval by the Director.
Version 6/20/2003
NPDES Perrot Requirements
Page 3 of 16
Monthly Average (concentration limitl
The arithmetic mean of all "daily discharges" of a pollutant measured during the calendar month. In the case of fecal
coliform, the geometric mean of such discharges.
Permit IssuingAuthority
The Director of the Division of Water Quality.
Quarterly Average concentration limio
The average of all samples taken over a calendar quarter.
Severe property damage
Substantial physical damage to property, damage to the treatment facilities which causes them to become inoperable,
or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a
bypass. Severe property damage excludes economic loss caused by delays in production.
Toxic Pollutant:
Any pollutant listed as toxic under Section 307(a)(1) of the Clean Water Act.
Upset
An incident beyond the reasonable control of the Permittee causing unintentional and temporary noncompliance with
permit effluent limitations and/or monitoring requirements. An upset does not include noncompliance caused by
operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive
maintenance,or careless or improper operation.
Weekly Average (concentration limitl
The arithmetic mean of all "daily discharges" of a pollutant measured during the calendar week. In the case of fecal
coliform, the geometric mean of such discharges.
Section B. General Conditions
1. Duty to Comply
The Permittee must comply with all conditions of this permit. Any permit noncompliance constitutes a violation
of the Clean Water Act and is grounds for enforcement action; for permit termination,revocation and reissuance,
or modification;or denial of a permit renewal application [40 CFR 122.41].
a. The Permittee shall comply with effluent standards or prohibitions established under section 307(a) of the
Clean Water Act for toxic pollutants and with standards for sewage sludge use or disposal established under
section 405(d) of the Clean Water Act within the time provided in the regulations that establish these
standards or prohibitions or standards for sewage sludge use or disposal, even if the permit has not yet been
modified to incorporate the requirement.
b. The Clean Water Act provides that any person who violates section 301,302, 306,307,308,318 or 405 of the
Act, or any permit condition or limitation implementing any such sections in a permit issued under section
402, or any requirement imposed in a pretreatment program approved under sections 402(a)(3) or 402(6)(8)
of the Act,is subject to a civil penalty not to exceed $25,000 per day for each violation. [40 CFR 122.41 (a)
(2)]
c. The Clean Water Act provides that any person who negligently violates sections 301,302, 306, 307, 308, 318, or
405 of the Act, or any condition or limitation implementing any of such sections in a permit issued under
section 402 of the Act, or any requirement imposed in a pretreatment program approved under section
402(a)(3) or 402(b)(8) of the Act, is subject to criminal penalties of$2,500 to $25,000 per day of violation, or
imprisonment of not more than 1 year, or both. In the case of a second or subsequent conviction for a
negligent violation, a person shall be subject to criminal penalties of not more than $50,000 per day of
violation, or by imprisonment of not more than 2 years,or both. [40 CFR 122.41 (a) (2)]
Version 6/20/2003
I
NPDES Permit Requirements
Page 5 of 16
7. Severability
The provisions of this permit are severable. If any provision of this permit, or the application of any provision of this
permit to any circumstances, is held invalid, the application of such provision to other circumstances, and the remainder
of this permit, shall not be affected thereby [NCGS 15013-23].
8. Duty to Provide Information
The Permittee shall furnish to the Permit Issuing Authority,within a reasonable time, any information which the
Permit Issuing Authority may request to determine whether cause exists for modifying,revoking and reissuing,or
terminating this permit or to determine compliance with this permit. The Permittee shall also furnish to the
Permit Issuing Authority upon request, copies of records required by this permit [40 CFR 122.41 (h)].
9. Duty to Reapply
If the Permittee wishes to continue an activity regulated by this permit after the expiration date of this permit, the
Permittee must apply for and obtain a new permit [40 CFR 122.41 (b)].
10. Expiration of Permit
The Permittee is not authorized to discharge after the expiration date. In order to receive automatic
authorization to discharge beyond the expiration date, the Permittee shall submit such information, forms, and
fees as are required by the agency authorized to issue permits no later than 180 days prior to the expiration date.
Any Permittee that has not requested renewal at least 180 days prior to expiration, or any Permittee that does not
have a permit after the expiration and has not requested renewal at least 180 days prior to expiration, will subject
the Permittee to enforcement procedures as provided in NCGS 143-215.6 and 33 USC 1251 et. seq.
11. Signatory Requirements
All applications, reports, or information submitted to the Permit Issuing Authority shall be signed and certified
[40 CFR 122.41 (k)].
a. All permit applications shall be signed as follows:
(I) For a corporation: by a responsible corporate officer. For the purpose of this Section, a responsible
corporate officer means: (a) a president, secretary, treasurer or vice president of the corporation in
charge of a principal business function, or any other person who performs similar policy or decision
making functions for the corporation, or (b) the manager of one or more manufacturing,production, or
operating facilities,provided, the manager is authorized to make management decisions which govern the
operation of the regulated facility including having the explicit or implicit duty of making major capital
investment recommendations, and initiating and directing other comprehensive measures to assure long
term environmental compliance with environmental laws and regulations; the manager can ensure that
the necessary systems are established or actions taken to gather complete and accurate information for
permit application requirements; and where authority to sign documents has been assigned or delegated
to the manager in accordance with corporate procedures .
(2) For a partnership or sole proprietorship: by a general partner or the proprietor,respectively;or
(3) For a municipality, State, Federal, or other public agency: by either a principal executive officer or
ranking elected official [40 CFR 122.22].
b. All reports required by the permit and other information requested by the Permit Issuing Authority shall be
signed by a person described in paragraph a. above or by a duly authorized representative of that person. A
person is a duly authorized representative only if-
1-
f:1. The authorization is made in writing by a person described above;
2. The authorization specified either an individual or a position having responsibility for the overall
operation of the regulated facility or activity, such as the position of plant manager, operator of a well or
well field, superintendent, a position of equivalent responsibility, or an individual or position having
overall responsibility for environmental matters for the company. (A duly authorized representative may
thus be either a named individual or any individual occupying a named position.);and
3. The written authorization is submitted to the Permit Issuing Authority [40 CFR 122.221
Version 6/20/2003
NPDES Permit Requirements
Page 7 of 16
b. Within 120 calendar days of:
➢ Receiving notification of a change in the classification of the system requiring the designation of a
new ORC and back-up ORC
➢ A vacancy in the position of ORC or back-up ORC.
2. Proper Operation and Maintenance
The Permittee shall at all times provide the operation and maintenance resources necessary to operate the existing
facilities at optimum efficiency. The Permittee shall at all times properly operate and maintain all facilities and
systems of treatment and control (and related appurtenances) which are installed or used by the Permittee to
achieve compliance with the conditions of this permit. Proper operation and maintenance also includes adequate
laboratory controls and appropriate quality assurance procedures. This provision requires the Permittee to install
and operate backup or auxiliary facilities only when necessary to achieve compliance with the conditions of the
permit [40 CFR 122.41 (e)].
3. Need to Halt or Reduce not a Defense
It shall not be a defense for a Permittee in an enforcement action that it would have been necessary to halt or
reduce the permitted activity in order to maintain compliance with the condition of this permit [40 CFR 122.41
(01-
4. Bypassing of Treatment Facilities
a. Bypass not exceeding limitations [40 CFR 122.41 (m) (2)]
The Permittee may allow any bypass to occur which does not cause effluent limitations to be exceeded, but
only if it also is for essential maintenance to assure efficient operation. These bypasses are not subject to the
provisions of Paragraphs b. and c. of this section.
b. Notice [40 CFR 122.41 (m) (3)]
(1) Anticipated bypass. If the Permittee knows in advance of the need for a bypass, it shall submit prior
notice, if possible at least ten days before the date of the bypass; including an evaluation of the
anticipated quality and effect of the bypass.
(2) Unanticipated bypass. The Permittee shall submit notice of an unanticipated bypass as required in Part
II. E. 6. (24-hour notice).
c. Prohibition of Bypass
(1) Bypass from the treatment facility is prohibited and the Permit Issuing Authority may take enforcement
action against a Pernvttee for bypass,unless:
(A) Bypass was unavoidable to prevent loss of life,personal injury or severe property damage;
(B) There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities,
retention of untreated wastes or maintenance during normal periods of equipment downtime. This
condition is not satisfied if adequate backup equipment should have been installed in the exercise of
reasonable engineering judgment to prevent a bypass which occurred during normal periods of
equipment downtime or preventive maintenance;and
(C) The Permittee submitted notices as required under Paragraph b. of this section.
(2) Bypass from the collection system is prohibited and the Permit Issuing Authority may take enforcement
action against a Permittee for a bypass as provided in any current or future system-wide collection system
permit associated with the treatment facility.
(3) The Permit Issuing Authority may approve an anticipated bypass, after considering its adverse effects, if
the Permit Issuing Authority determines that it will meet the three conditions listed above in Paragraph c.
(1) of this section.
5. Upsets
a. Effect of an upset [40 CFR 122.41 (n) (2)]: An upset constitutes an affirmative defense to an action
brought for noncompliance with such technology based permit effluent limitations if the requirements of
paragraph b. of this condition are met. No determination made during administrative review of claims that
Version 6/20/2003
I
NPDES Permit Requirements
Page 9 of 16
3. Flow Measurements
Appropriate flow measurement devices and methods consistent with accepted scientific practices shall be selected
and used to ensure the accuracy and reliability of measurements of the volume of monitored discharges. The
devices shall be installed, calibrated and maintained to ensure that the accuracy of the measurements is consistent
with the accepted capability of that type of device. Devices selected shall be capable of measuring flows with a
maximum deviation of less than 10% from the true discharge rates throughout the range of expected discharge
volumes. Flow measurement devices shall be accurately calibrated at a minimum of once per year and maintained
to ensure that the accuracy of the measurements is consistent with the accepted capability of that type of device.
The Director shall approve the flow measurement device and monitoring location prior to installation.
Once-through condenser cooling water flow monitored by pump logs,or pump hour meters as specified in Part I
of this permit and based on the manufacturer's pump curves shall not be subject to this requirement.
4. Test Procedures
Test procedures for the analysis of pollutants shall conform to the EMC regulations (published pursuant to
NCGS 143-215.63 et. seq.), the Water and Air Quality Reporting Acts, and to regulations published pursuant to
Section 3040, 33 USC 1314, of the Federal Water Pollution Control Act (as Amended), and 40 CFR 136; or in
the case of sludge use or disposal,approved under 40 CFR 136,unless otherwise specified in 40 CFR 503,unless
other test procedures have been specified in this permit [40 CFR 122.41].
To meet the intent of the monitoring required by this permit, all test procedures must produce minimum
detection and reporting levels that are below the permit discharge requirements and all data generated must be
reported down to the minimum detection or lower reporting level of the procedure. If no approved methods are
determined capable of achieving minimum detection and reporting levels below permit discharge requirements,
then the most sensitive (method with the lowest possible detection and reporting level) approved method must
be used.
5. Penalties for Tampering
The Clean Water Act provides that any person who falsifies, tampers with, or knowingly renders inaccurate, any
monitoring device or method required to be maintained under this permit shall, upon conviction, be punished by
a fine of not more than $10,000 per violation, or by imprisonment for not more than two years per violation, or
by both. If a conviction of a person is for a violation committed after a first conviction of such person under this
paragraph, punishment is a fine of not more than $20,000 per day of violation, or by imprisonment of not more
than 4 years,or both [40 CFR 122.41].
6. Records Retention
Except for records of monitoring information required by this permit related to the Permittee's sewage sludge
use and disposal activities, which shall be retained for a period of at least five years (or longer as required by 40
CFR 503), the Permittee shall retain records of all monitoring information,including.
➢ all calibration and maintenance records
➢ all original strip chart recordings for continuous monitoring instrumentation
➢ copies of all reports required by this permit
➢ copies of all data used to complete the application for this permit
These records or copies shall be maintained for a period of at least 3 years from the date of the sample,
measurement,report or application. This period may be extended by request of the Director at any time [40 CFR
122.41].
7. Recording Results
For each measurement or sample taken pursuant to the requirements of this permit, the Permittee shall record
the following information [40 CFR 122.411:
a. The date, exact place,and time of sampling or measurements;
b. The individual(s) who performed the sampling or measurements;
c. The date(s) analyses were performed;
d. The individual(s)who performed the analyses;
Version 6/20/2003
• NPDES Permit Requirements
Page 11 of 16
6. Twenty-four flour Reporting
a. The Permittee shall report to the Director or the appropriate Regional Office any noncompliance that
potentially threatens public health or the environment. Any information shall be provided orally within 24
hours from the time the Permittee became aware of the circumstances. A written submission shall also be
provided within 5 days of the time the Permittee becomes aware of the circumstances. The written
submission shall contain a description of the noncompliance, and its cause; the period of noncompliance,
including exact dates and times, and if the noncompliance has not been corrected, the anticipated time it is
expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the
noncompliance [40 CFR 122.410) (6)].
b. The Director may waive the written report on a case-by-case basis for reports under this section if the oral
report has been received within 24 hours.
c. Occurrences outside normal business hours may also be reported to the Division's Emergency Response
personnel at (800) 662-7956, (800) 858-0368 or(919) 733-3300.
7. Other Noncompliance
The Permittee shall report all instances of noncompliance not reported under Part Il. E. 5 and 6. of this permit at
the time monitoring reports are submitted. The reports shall contain the information listed in Part II. E. 6. of
this permit [40 CFR 122.410) (7)].
8. Other Information
Where the Permittee becomes aware that it failed to submit any relevant facts in a permit application, or
submitted incorrect information in a permit application or in any report to the Director,it shall promptly submit
such facts or information [40 CFR 122.410) (8)].
9. Noncompliance Notification
The Permittee shall report by telephone to either the central office or the appropriate regional office of the
Division as soon as possible, but in no case more than 24 hours or on the next working day following the
occurrence or first knowledge of the occurrence of any of the following.
a. Any occurrence at the water pollution control facility which results in the discharge of significant amounts of
wastes which are abnormal in quantity or characteristic, such as the dumping of the contents of a sludge
digester; the known passage of a slug of hazardous substance through the facility; or any other unusual
circumstances.
b. Any process unit failure, due to known or unknown reasons, that render the facility incapable of adequate
wastewater treatment such as mechanical or electrical failures of pumps,aerators,compressors,etc.
c. Any failure of a pumping station, sewer line, or treatment facility resulting in a by-pass directly to receiving
waters without treatment of all or any portion of the influent to such station or facility.
Persons reporting such occurrences by telephone shall also file a written report within 5 days following first
knowledge of the occurrence.
10. Availability of Reports
Except for data determined to be confidential under NCGS 143-215.3 (a)(2) or Section 308 of the Federal Act, 33
USC 1318, all reports prepared in accordance with the terms shall be available for public inspection at the offices
of the Division of Water Quality. As required by the Act, effluent data shall not be considered confidential.
Knowingly making any false statement on any such report may result in the imposition of criminal penalties as
provided for in NCGS 143-215.1(b)(2) or in Section 309 of the Federal Act.
11. Penalties for Falsification of Reports
The Clean Water Act provides that any person who knowingly makes any false statement, representation, or
certification in any record or other document submitted or required to be maintained under this permit,including
monitoring reports or reports of compliance or noncompliance shall, upon conviction, be punished by a fine of
Version 6/20/2003
NPDES Permit Requirements
Page 13 of 16
adverse impacts to waters of the State. This permit cannot be rescinded while any activities requiring this permit
continue at the permitted facility.
PART IV
SPECIAL CONDITIONS FOR MUNCIPAL FACILITIES
Section A. Publicly Owned Treatment Works (,P
All POWs must provide adequate notice to the Director of the following.
1. Any new introduction of pollutants into the POTW from an indirect discharger which would be subject to
section 301 or 306 of CWA if it were directly discharging those pollutants; and
2. Any substantial change in the volume or character of pollutants being introduced by an indirect discharger
as influent to that POTW at the time of issuance of the permit.
3. For purposes of this paragraph,adequate notice shall include information on (1) the quality and quantity of
effluent introduced into the POTW, and (2) any anticipated impact of the change on the quantity or quality
of effluent to be discharged from the POTW.
Section B. Municipal Control of Pollutants from Industrial Users.
1. Effluent limitations are listed in Part I of this permit. Other pollutants attributable to inputs from
industries using the municipal system may be present in the Permittee's discharge. At such time as
sufficient information becomes available to establish limitations for such pollutants, this permit may be
revised to specify effluent limitations for any or all of such other pollutants in accordance with best
practicable technology or water quality standards.
2. Under no circumstances shall the Permittee allow introduction of the following wastes in the waste
treatment system:
a. Pollutants which create a fire or explosion hazard in the POTW, including, but not limited to,
wastestrearns with a closed cup flashpoint of less than 140 degrees Fahrenheit or 60 degrees
Centigrade using the test methods specified in 40 CFR 261.21;
b. Pollutants which will cause corrosive structural damage to the POTW, but in no case Discharges
with pH lower than 5.0,unless the works is specifically designed to accommodate such Discharges;
C. Solid or viscous pollutants in amounts which will cause obstruction to the flow in the POTW
resulting in Interference;
d. Any pollutant, including oxygen demanding pollutants (BOD, etc.) released in a Discharge at a flow
rate and/or pollutant concentration which will cause Interference with the POTW;
e. Heat in amounts which will inhibit biological activity in the POTW resulting in Interference, but in
no case heat in such quantities that the temperature at the POTW Treatment Plant exceeds 40°C
(104°F) unless the Division,upon request of the POTNV,approves alternate temperature limits;
f. Petroleum oil, nonbiodegradable cutting oil, or products of mineral oil origin in amounts that will
cause interference or pass through;
g. Pollutants which result in the presence of toxic gases, vapors, or fumes within the POTW in a
quantity that may cause acute worker health and safety problems;
h. Any trucked or hauled pollutants,except at discharge points designated by the POTW.
3. With regard to the effluent requirements listed in Part I of this permit, it may be necessary for the
Permittee to supplement the requirements of the Federal Pretreatment Standards (40 CFR, Part 403) to
ensure compliance by the Permittee with all applicable effluent limitations. Such actions by the Permittee
may be necessary regarding some or all of the industries discharging to the municipal system.
4. The Permittee shall require any industrial discharges sending influent to the permitted system to meet
Federal Pretreatment Standards promulgated in response to Section 307(b) of the Act. Prior to accepting
wastewater from any significant industrial user, the Permittee shall either develop and submit to the
Version 6/20/2003
NPDES Permit Requirements
Page 15 of 16
6. Authorization to Construct (A to C)
The Permittee shall ensure that an Authorization to Construct permit (AtC) is issued to all applicable
industrial users for the construction or modification of any pretreatment facility. Prior to the issuance of
an AtC, the proposed pretreatment facility and treatment process must be evaluated for its capacity to
comply with all Industrial User Pretreatment Permit (IUP) limitations.
7. POTW Inspection& Monitoring of their SIUs
The Permittee shall conduct inspection, surveillance, and monitoring activities as described in its Division
approved pretreatment program in order to determine, independent of information supplied by industrial
users,compliance with applicable pretreatment standards. The Permittee must:
a. Inspect all Significant Industrial Users (SIUs) at least once per calendar year;and
b. Sample all Significant Industrial Users (SIUs) at least twice per calendar year for all permit-
limited pollutants, once during the period from January 1 through June 30 and once during the
period from July 1 through December 31, except for organic compounds which shall be sampled
once per calendar year;
8. SIU Self Monitoring and Reporting
The Permittee shall require all industrial users to comply with the applicable monitoring and reporting
requirements outlined in the Division approved pretreatment program, the industry's pretreatment permit,
or in 15A NCAC 2H .0908.
9. Enforcement Response Plan (ERP)
The Permittee shall enforce and obtain appropriate remedies for violations of all pretreatment standards
promulgated pursuant to section 307(b) and (c) of the Clean Water Act (40 CFR 405 et. seq.), prohibitive
discharge standards as set forth in 40 CFR 403.5 and 15A NCAC 2H .0909, and specific local limitations.
All enforcement actions shall be consistent with the Enforcement Response Plan (ERP) approved by the
Division.
10. Pretreatment Annual Reports (PAR)
The Pernuttee shall report to the Division in accordance with I SA NCAC 2H .0908. In lieu of submitting
annual reports, Modified Pretreatment Programs developed under 15A NCAC 2H .0904 (b) may be
required to meet with Division personnel periodically to discuss enforcement of pretreatment requirements
and other pretreatment implementation issues.
For all other active pretreatment programs, the Permittee shall submit two copies of a Pretreatment Annual
Report (PAR) describing its pretreatment activities over the previous twelve months to the Division at the
following address:
NC DENR / DWQ / Pretreatment Unit
1617 Mail Service Center
Raleigh,NC 27699-1617
These reports shall be submitted according to a schedule established by the Director and shall contain the
following:
a.) Narrative
A brief discussion of reasons for, status of, and actions taken for all Significant Industrial
Users (SIUs) in Significant Non-Compliance (SNC);
b.) Pretreatment Program Summary (PPS)
A pretreatment program summary (PPS) on specific forms approved by the Division;
c.) Significant Non-Compliance Report (SNCR)
The nature of the violations and.the actions taken or proposed to correct the violations on
specific forms approved by the Division;
d.) Industrial Data Summary Forms (IDSQ
Version 6/20/2003