Loading...
HomeMy WebLinkAboutNC0001643_Permit (Modification)_20050110 �OF W A T�nQ Michael F.Farley,Governor `Q 77 (i William G.Rose Jr.,Secretan' North Carolina Department of Envinminmt and Natural Resources Alan W.Klimek,P.E.Director Division of Water Quality January 10,2005 Paula Powell Eden Real Estate Associates,LLC P.O. Box 1823 High Point,North Carolina 27261 Subject: NPDES Permit Modification Permit NC0001643 MGM Transport Corp. formerly Pillowtex/Hollingsworth GP Rockingham County Dear Ms. Powell: Division personnel have reviewed and approved your request to transfer ownership of the subject permit, received on January 7,2005. This permit modification documents the change in ownership. Please find enclosed the revised permit. All other terms and conditions contained in the original permit remain unchanged and in full effect This permit modification is issued under the requirements of North Carolina General Statutes 143-215.1 and the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection Agency. The effluent limitations and inocutoring requirements contained in this permit were based upon the waste stream characteristics associated with the activities performed by the former owner. If,your operation of the facility will be significantly different from that of the former owner,it is suggested that you contact this office to discuss the matter. Changing circumstances may allow for modification of the permit However,at this time,you are responsible for complying with all terms and conditions of the current(enclosed)permit. If you have any questions concerning this per mit modification,please contact the Point Source Branch at(919) 733-5083,extension 520_ Sinctre! ', Alan W. Klimek,P.E. cc: Central Fiks US EPA Region IV Kirstin Olsen-Hdiiugsworth GP Winston-Salem Regional Office,Water Quality Section NPDFS Unit l=ike o NCarolina X11 eUMly North Cardura Division of Water Qualit} 1617 Nail Service Cerder Raleigh,NC 27699-1617 Phone(919)733-7015 Cu�Service Internet. h2o ens state nc us 512 N.Salistwry SL Raleigh,NC 77604 FAX (919)733-2496 1-8776236748 i Pennit NC0001643 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY TO DISCHARGE WASTEWATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1,other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Cornimsion,and the Federal Water Pollution Control Act,as anwxided, Eden Real Estate Associates, LLC is hereby authorized to discharge wastewater from a facility located at the MGM Transport Corp. New Street Eden Rockingham County to receiving waters designated as the Dan River in the Roanoke River basin in accordance with effluent lirnitations, monitoring requirements,and other conditions set forth in Parts I,II,III and IV hereof. This permit shall become effective January 10,2005. This permit and authorization to discharge shall expire at midnight on April 30, 2007. Signed this day January 10, 2005. Alan W. Klimek,P.E.,Director Division of Water Quality By Authority of the Environmental Management C.omrnission Permit NCO001643 SUPPLEMENT TO PERMIT COVER SHEET Eden Real Estate Associates, LLC is hereby authorized to: 1. Continue to operate the existing 0.500 MGD wastewater treatment system consisting of dual influent lift pumps, lint screen, aeration basin, dual clarifiers, chlorine contact chamber, post aeration chamber, and sludge lagoon located in Eden at the New Street Mill in Rockingham County. 2. Discharge from said treatment works at the location specified on the attached map into the Dan River, classified C waters in the Roanoke River Basin. �s o ter an D Outfall 001 trial W e Ponds ade i epi ''' S� 6K n o. U I •. ` N a :. X.x tee:M MW'NNC0001643 Facility lAmetude.79"42°13"W Location Qua& Southeast Den B20NW MGM Transport Corp. Sty Class:c Receiving Stream:Dan River Sub-Basin:03-02-03 1V0rth SCALE 1.24000 Permit NC0001643 A. (I.) EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS During die period beginning on the effective date of the permit and lasting until expiration,the Pemuttee i5 authorized to discharge non-contact cooling water,boiler blowdown and domestic wastewater from outfall 001. Such discharges shall be limited and monitored by the Permittee as specified below: Effluent Characteristics Limits Monitoring Requirements Monthly Daily Measurement Sample Sample Location AverageMaximum Frequency Type Flow 0.5 MGD Continuous Recording Influent or Effluent BOD, 20°C 30.0 45.0 ffqL W ite Effluent Total Suspended SoIkW 30.0 mg1L 45.0 Weekly Convosite Effluent Total Nitrogen Quarterly Composite Effluent NO2+NO3+TKN Total Rmphorus Quartaty Effluent Dissolved Oxygen Weekly Grab Effluent, L)pstrearn&Downstream Fecal Coliform Weekly Grab Effluent pH2 Weekly Grab Effluent Total Residual Chlodne3 W Grab Effluent Conductivity Weekly Grab Upstream&Downstream Temperature(°C} Weekly Grab Effluent, Upstream&Downstream Total Copper Weekly Composite Effluent Footnotes: I. Upstream = at least 50 feet upstream from the outfall. Downstream = at Highway 700. Upstream and Downstream samples shall be grab samples. 2. The pH of the effluent shall not be less than►6.0 nor greater than 9.0 (on the standard units scale). 3. Monitoring is required only if chlorine is added to die treatment system. 4. The temperature of the effluent shall not cause an increase in the temperature of the receiving stream of more than 2.8°C and in no case cause the ambient water temperature to exceed 32°C. There shall be no discharge of floating solids or visible foam in other than trace amounts. A. (2.) BIOCIDE CONDITION There shall be no chromium:zinc or coMcr added to the treatment system except as M-approved additives to biocidal compounds. The permittee shall obtain approval from the Division's Aquatic Toxicology Unit prior to the use of any biocide (not previously approved by the Division)in the effluent discharged under this permt. Approval for use of any biocide not previously approved should be requested at least 90 days in advance of any planned usage- Contact the Aquatic Toxicology Unit for detailed instructions on requesting approval of biocides: NC DF.NR/DWQ/ Aquatic Toxicology Unit 1621 Marl Service Center Raleigh,North Carolina 27699-1621 I NPDES Permit Requirements Page 1 of 16 PART II STANDARD CONDITIONS FOR NPDES PERMITS Section A. Definitions 2/Month Samples are collected twice per month with at least ten calendar days between sampling events. 3/Week Samples are collected three times per week on three separate calendar days. Act or"the Act" The Federal Water Pollution Control Act,also known as the Clean Water Act,as amended, 33 USC 1251,et. seq. Annual Average The arithmetic mean of all "daily discharges" of a pollutant measured during the calendar year. In.the case of fecal coliform, the geometric mean of such discharges. Arithmetic Mean The summation of the individual values divided by the number of individual values. Bypass The known diversion of waste streams from any portion of a treatment facility including the collection system,which is not a designed or established or operating mode for the facility. CalenDav The period from midnight of one day until midnight of the next day. However, for purposes of this permit, any consecutive 24-hour period that reasonably represents the calendar day may be used for sampling. Calendar Quarter One of the following distinct periods: January through March, April through June, July through September, and October through December. Composite Sample A sample collected over a 24-hour period by continuous sampling or combining grab samples of at least 100 ml in such a manner as to result in a total sample representative of the wastewater discharge during the sample period. The Director may designate the most appropriate method (specific number and size of aliquots necessary, the time interval between grab samples, etc.) on a case-by-case basis. Samples may be collected manually or automatically. Composite samples may be obtained by the following methods: (1) Continuous: a single,continuous sample collected over a 24-hour period proportional to the rate of flow. (2) Constant time/variable volume: a series of grab samples collected at equal time intervals over a 24 hour period of discharge and combined proportional to the rate of flow measured at the time of individual sample collection,or (3) Variable time/constant volume: a series of grab samples of equal volume collected over a 24 hour period with the time intervals between samples determined by a preset number of gallons passing the sampling point. Flow measurement between sample intervals shall be determined by use of a flow recorder and totalizer, and the preset gallon interval between sample collection fixed at no greater than 1/24 of the expected total daily flow at the treatment system,or (4) Constant time/constant volume: a series of grab samples of equal volume collected over a 24-hour period at a constant time interval. This method may only be used in situations where effluent flow rates vary less than 15 percent. The grab samples shall be taken at intervals of no greater than 20 minutes apart during any 24-hour period and must be of equal size and of no less than 100 milliliters. Use of this method requires prior approval by the Director. Version 6/20/2003 NPDES Perrot Requirements Page 3 of 16 Monthly Average (concentration limitl The arithmetic mean of all "daily discharges" of a pollutant measured during the calendar month. In the case of fecal coliform, the geometric mean of such discharges. Permit IssuingAuthority The Director of the Division of Water Quality. Quarterly Average concentration limio The average of all samples taken over a calendar quarter. Severe property damage Substantial physical damage to property, damage to the treatment facilities which causes them to become inoperable, or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass. Severe property damage excludes economic loss caused by delays in production. Toxic Pollutant: Any pollutant listed as toxic under Section 307(a)(1) of the Clean Water Act. Upset An incident beyond the reasonable control of the Permittee causing unintentional and temporary noncompliance with permit effluent limitations and/or monitoring requirements. An upset does not include noncompliance caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance,or careless or improper operation. Weekly Average (concentration limitl The arithmetic mean of all "daily discharges" of a pollutant measured during the calendar week. In the case of fecal coliform, the geometric mean of such discharges. Section B. General Conditions 1. Duty to Comply The Permittee must comply with all conditions of this permit. Any permit noncompliance constitutes a violation of the Clean Water Act and is grounds for enforcement action; for permit termination,revocation and reissuance, or modification;or denial of a permit renewal application [40 CFR 122.41]. a. The Permittee shall comply with effluent standards or prohibitions established under section 307(a) of the Clean Water Act for toxic pollutants and with standards for sewage sludge use or disposal established under section 405(d) of the Clean Water Act within the time provided in the regulations that establish these standards or prohibitions or standards for sewage sludge use or disposal, even if the permit has not yet been modified to incorporate the requirement. b. The Clean Water Act provides that any person who violates section 301,302, 306,307,308,318 or 405 of the Act, or any permit condition or limitation implementing any such sections in a permit issued under section 402, or any requirement imposed in a pretreatment program approved under sections 402(a)(3) or 402(6)(8) of the Act,is subject to a civil penalty not to exceed $25,000 per day for each violation. [40 CFR 122.41 (a) (2)] c. The Clean Water Act provides that any person who negligently violates sections 301,302, 306, 307, 308, 318, or 405 of the Act, or any condition or limitation implementing any of such sections in a permit issued under section 402 of the Act, or any requirement imposed in a pretreatment program approved under section 402(a)(3) or 402(b)(8) of the Act, is subject to criminal penalties of$2,500 to $25,000 per day of violation, or imprisonment of not more than 1 year, or both. In the case of a second or subsequent conviction for a negligent violation, a person shall be subject to criminal penalties of not more than $50,000 per day of violation, or by imprisonment of not more than 2 years,or both. [40 CFR 122.41 (a) (2)] Version 6/20/2003 I NPDES Permit Requirements Page 5 of 16 7. Severability The provisions of this permit are severable. If any provision of this permit, or the application of any provision of this permit to any circumstances, is held invalid, the application of such provision to other circumstances, and the remainder of this permit, shall not be affected thereby [NCGS 15013-23]. 8. Duty to Provide Information The Permittee shall furnish to the Permit Issuing Authority,within a reasonable time, any information which the Permit Issuing Authority may request to determine whether cause exists for modifying,revoking and reissuing,or terminating this permit or to determine compliance with this permit. The Permittee shall also furnish to the Permit Issuing Authority upon request, copies of records required by this permit [40 CFR 122.41 (h)]. 9. Duty to Reapply If the Permittee wishes to continue an activity regulated by this permit after the expiration date of this permit, the Permittee must apply for and obtain a new permit [40 CFR 122.41 (b)]. 10. Expiration of Permit The Permittee is not authorized to discharge after the expiration date. In order to receive automatic authorization to discharge beyond the expiration date, the Permittee shall submit such information, forms, and fees as are required by the agency authorized to issue permits no later than 180 days prior to the expiration date. Any Permittee that has not requested renewal at least 180 days prior to expiration, or any Permittee that does not have a permit after the expiration and has not requested renewal at least 180 days prior to expiration, will subject the Permittee to enforcement procedures as provided in NCGS 143-215.6 and 33 USC 1251 et. seq. 11. Signatory Requirements All applications, reports, or information submitted to the Permit Issuing Authority shall be signed and certified [40 CFR 122.41 (k)]. a. All permit applications shall be signed as follows: (I) For a corporation: by a responsible corporate officer. For the purpose of this Section, a responsible corporate officer means: (a) a president, secretary, treasurer or vice president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision making functions for the corporation, or (b) the manager of one or more manufacturing,production, or operating facilities,provided, the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long term environmental compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures . (2) For a partnership or sole proprietorship: by a general partner or the proprietor,respectively;or (3) For a municipality, State, Federal, or other public agency: by either a principal executive officer or ranking elected official [40 CFR 122.22]. b. All reports required by the permit and other information requested by the Permit Issuing Authority shall be signed by a person described in paragraph a. above or by a duly authorized representative of that person. A person is a duly authorized representative only if- 1- f:1. The authorization is made in writing by a person described above; 2. The authorization specified either an individual or a position having responsibility for the overall operation of the regulated facility or activity, such as the position of plant manager, operator of a well or well field, superintendent, a position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative may thus be either a named individual or any individual occupying a named position.);and 3. The written authorization is submitted to the Permit Issuing Authority [40 CFR 122.221 Version 6/20/2003 NPDES Permit Requirements Page 7 of 16 b. Within 120 calendar days of: ➢ Receiving notification of a change in the classification of the system requiring the designation of a new ORC and back-up ORC ➢ A vacancy in the position of ORC or back-up ORC. 2. Proper Operation and Maintenance The Permittee shall at all times provide the operation and maintenance resources necessary to operate the existing facilities at optimum efficiency. The Permittee shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) which are installed or used by the Permittee to achieve compliance with the conditions of this permit. Proper operation and maintenance also includes adequate laboratory controls and appropriate quality assurance procedures. This provision requires the Permittee to install and operate backup or auxiliary facilities only when necessary to achieve compliance with the conditions of the permit [40 CFR 122.41 (e)]. 3. Need to Halt or Reduce not a Defense It shall not be a defense for a Permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the condition of this permit [40 CFR 122.41 (01- 4. Bypassing of Treatment Facilities a. Bypass not exceeding limitations [40 CFR 122.41 (m) (2)] The Permittee may allow any bypass to occur which does not cause effluent limitations to be exceeded, but only if it also is for essential maintenance to assure efficient operation. These bypasses are not subject to the provisions of Paragraphs b. and c. of this section. b. Notice [40 CFR 122.41 (m) (3)] (1) Anticipated bypass. If the Permittee knows in advance of the need for a bypass, it shall submit prior notice, if possible at least ten days before the date of the bypass; including an evaluation of the anticipated quality and effect of the bypass. (2) Unanticipated bypass. The Permittee shall submit notice of an unanticipated bypass as required in Part II. E. 6. (24-hour notice). c. Prohibition of Bypass (1) Bypass from the treatment facility is prohibited and the Permit Issuing Authority may take enforcement action against a Pernvttee for bypass,unless: (A) Bypass was unavoidable to prevent loss of life,personal injury or severe property damage; (B) There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate backup equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventive maintenance;and (C) The Permittee submitted notices as required under Paragraph b. of this section. (2) Bypass from the collection system is prohibited and the Permit Issuing Authority may take enforcement action against a Permittee for a bypass as provided in any current or future system-wide collection system permit associated with the treatment facility. (3) The Permit Issuing Authority may approve an anticipated bypass, after considering its adverse effects, if the Permit Issuing Authority determines that it will meet the three conditions listed above in Paragraph c. (1) of this section. 5. Upsets a. Effect of an upset [40 CFR 122.41 (n) (2)]: An upset constitutes an affirmative defense to an action brought for noncompliance with such technology based permit effluent limitations if the requirements of paragraph b. of this condition are met. No determination made during administrative review of claims that Version 6/20/2003 I NPDES Permit Requirements Page 9 of 16 3. Flow Measurements Appropriate flow measurement devices and methods consistent with accepted scientific practices shall be selected and used to ensure the accuracy and reliability of measurements of the volume of monitored discharges. The devices shall be installed, calibrated and maintained to ensure that the accuracy of the measurements is consistent with the accepted capability of that type of device. Devices selected shall be capable of measuring flows with a maximum deviation of less than 10% from the true discharge rates throughout the range of expected discharge volumes. Flow measurement devices shall be accurately calibrated at a minimum of once per year and maintained to ensure that the accuracy of the measurements is consistent with the accepted capability of that type of device. The Director shall approve the flow measurement device and monitoring location prior to installation. Once-through condenser cooling water flow monitored by pump logs,or pump hour meters as specified in Part I of this permit and based on the manufacturer's pump curves shall not be subject to this requirement. 4. Test Procedures Test procedures for the analysis of pollutants shall conform to the EMC regulations (published pursuant to NCGS 143-215.63 et. seq.), the Water and Air Quality Reporting Acts, and to regulations published pursuant to Section 3040, 33 USC 1314, of the Federal Water Pollution Control Act (as Amended), and 40 CFR 136; or in the case of sludge use or disposal,approved under 40 CFR 136,unless otherwise specified in 40 CFR 503,unless other test procedures have been specified in this permit [40 CFR 122.41]. To meet the intent of the monitoring required by this permit, all test procedures must produce minimum detection and reporting levels that are below the permit discharge requirements and all data generated must be reported down to the minimum detection or lower reporting level of the procedure. If no approved methods are determined capable of achieving minimum detection and reporting levels below permit discharge requirements, then the most sensitive (method with the lowest possible detection and reporting level) approved method must be used. 5. Penalties for Tampering The Clean Water Act provides that any person who falsifies, tampers with, or knowingly renders inaccurate, any monitoring device or method required to be maintained under this permit shall, upon conviction, be punished by a fine of not more than $10,000 per violation, or by imprisonment for not more than two years per violation, or by both. If a conviction of a person is for a violation committed after a first conviction of such person under this paragraph, punishment is a fine of not more than $20,000 per day of violation, or by imprisonment of not more than 4 years,or both [40 CFR 122.41]. 6. Records Retention Except for records of monitoring information required by this permit related to the Permittee's sewage sludge use and disposal activities, which shall be retained for a period of at least five years (or longer as required by 40 CFR 503), the Permittee shall retain records of all monitoring information,including. ➢ all calibration and maintenance records ➢ all original strip chart recordings for continuous monitoring instrumentation ➢ copies of all reports required by this permit ➢ copies of all data used to complete the application for this permit These records or copies shall be maintained for a period of at least 3 years from the date of the sample, measurement,report or application. This period may be extended by request of the Director at any time [40 CFR 122.41]. 7. Recording Results For each measurement or sample taken pursuant to the requirements of this permit, the Permittee shall record the following information [40 CFR 122.411: a. The date, exact place,and time of sampling or measurements; b. The individual(s) who performed the sampling or measurements; c. The date(s) analyses were performed; d. The individual(s)who performed the analyses; Version 6/20/2003 • NPDES Permit Requirements Page 11 of 16 6. Twenty-four flour Reporting a. The Permittee shall report to the Director or the appropriate Regional Office any noncompliance that potentially threatens public health or the environment. Any information shall be provided orally within 24 hours from the time the Permittee became aware of the circumstances. A written submission shall also be provided within 5 days of the time the Permittee becomes aware of the circumstances. The written submission shall contain a description of the noncompliance, and its cause; the period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time it is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance [40 CFR 122.410) (6)]. b. The Director may waive the written report on a case-by-case basis for reports under this section if the oral report has been received within 24 hours. c. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 858-0368 or(919) 733-3300. 7. Other Noncompliance The Permittee shall report all instances of noncompliance not reported under Part Il. E. 5 and 6. of this permit at the time monitoring reports are submitted. The reports shall contain the information listed in Part II. E. 6. of this permit [40 CFR 122.410) (7)]. 8. Other Information Where the Permittee becomes aware that it failed to submit any relevant facts in a permit application, or submitted incorrect information in a permit application or in any report to the Director,it shall promptly submit such facts or information [40 CFR 122.410) (8)]. 9. Noncompliance Notification The Permittee shall report by telephone to either the central office or the appropriate regional office of the Division as soon as possible, but in no case more than 24 hours or on the next working day following the occurrence or first knowledge of the occurrence of any of the following. a. Any occurrence at the water pollution control facility which results in the discharge of significant amounts of wastes which are abnormal in quantity or characteristic, such as the dumping of the contents of a sludge digester; the known passage of a slug of hazardous substance through the facility; or any other unusual circumstances. b. Any process unit failure, due to known or unknown reasons, that render the facility incapable of adequate wastewater treatment such as mechanical or electrical failures of pumps,aerators,compressors,etc. c. Any failure of a pumping station, sewer line, or treatment facility resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. Persons reporting such occurrences by telephone shall also file a written report within 5 days following first knowledge of the occurrence. 10. Availability of Reports Except for data determined to be confidential under NCGS 143-215.3 (a)(2) or Section 308 of the Federal Act, 33 USC 1318, all reports prepared in accordance with the terms shall be available for public inspection at the offices of the Division of Water Quality. As required by the Act, effluent data shall not be considered confidential. Knowingly making any false statement on any such report may result in the imposition of criminal penalties as provided for in NCGS 143-215.1(b)(2) or in Section 309 of the Federal Act. 11. Penalties for Falsification of Reports The Clean Water Act provides that any person who knowingly makes any false statement, representation, or certification in any record or other document submitted or required to be maintained under this permit,including monitoring reports or reports of compliance or noncompliance shall, upon conviction, be punished by a fine of Version 6/20/2003 NPDES Permit Requirements Page 13 of 16 adverse impacts to waters of the State. This permit cannot be rescinded while any activities requiring this permit continue at the permitted facility. PART IV SPECIAL CONDITIONS FOR MUNCIPAL FACILITIES Section A. Publicly Owned Treatment Works (,P All POWs must provide adequate notice to the Director of the following. 1. Any new introduction of pollutants into the POTW from an indirect discharger which would be subject to section 301 or 306 of CWA if it were directly discharging those pollutants; and 2. Any substantial change in the volume or character of pollutants being introduced by an indirect discharger as influent to that POTW at the time of issuance of the permit. 3. For purposes of this paragraph,adequate notice shall include information on (1) the quality and quantity of effluent introduced into the POTW, and (2) any anticipated impact of the change on the quantity or quality of effluent to be discharged from the POTW. Section B. Municipal Control of Pollutants from Industrial Users. 1. Effluent limitations are listed in Part I of this permit. Other pollutants attributable to inputs from industries using the municipal system may be present in the Permittee's discharge. At such time as sufficient information becomes available to establish limitations for such pollutants, this permit may be revised to specify effluent limitations for any or all of such other pollutants in accordance with best practicable technology or water quality standards. 2. Under no circumstances shall the Permittee allow introduction of the following wastes in the waste treatment system: a. Pollutants which create a fire or explosion hazard in the POTW, including, but not limited to, wastestrearns with a closed cup flashpoint of less than 140 degrees Fahrenheit or 60 degrees Centigrade using the test methods specified in 40 CFR 261.21; b. Pollutants which will cause corrosive structural damage to the POTW, but in no case Discharges with pH lower than 5.0,unless the works is specifically designed to accommodate such Discharges; C. Solid or viscous pollutants in amounts which will cause obstruction to the flow in the POTW resulting in Interference; d. Any pollutant, including oxygen demanding pollutants (BOD, etc.) released in a Discharge at a flow rate and/or pollutant concentration which will cause Interference with the POTW; e. Heat in amounts which will inhibit biological activity in the POTW resulting in Interference, but in no case heat in such quantities that the temperature at the POTW Treatment Plant exceeds 40°C (104°F) unless the Division,upon request of the POTNV,approves alternate temperature limits; f. Petroleum oil, nonbiodegradable cutting oil, or products of mineral oil origin in amounts that will cause interference or pass through; g. Pollutants which result in the presence of toxic gases, vapors, or fumes within the POTW in a quantity that may cause acute worker health and safety problems; h. Any trucked or hauled pollutants,except at discharge points designated by the POTW. 3. With regard to the effluent requirements listed in Part I of this permit, it may be necessary for the Permittee to supplement the requirements of the Federal Pretreatment Standards (40 CFR, Part 403) to ensure compliance by the Permittee with all applicable effluent limitations. Such actions by the Permittee may be necessary regarding some or all of the industries discharging to the municipal system. 4. The Permittee shall require any industrial discharges sending influent to the permitted system to meet Federal Pretreatment Standards promulgated in response to Section 307(b) of the Act. Prior to accepting wastewater from any significant industrial user, the Permittee shall either develop and submit to the Version 6/20/2003 NPDES Permit Requirements Page 15 of 16 6. Authorization to Construct (A to C) The Permittee shall ensure that an Authorization to Construct permit (AtC) is issued to all applicable industrial users for the construction or modification of any pretreatment facility. Prior to the issuance of an AtC, the proposed pretreatment facility and treatment process must be evaluated for its capacity to comply with all Industrial User Pretreatment Permit (IUP) limitations. 7. POTW Inspection& Monitoring of their SIUs The Permittee shall conduct inspection, surveillance, and monitoring activities as described in its Division approved pretreatment program in order to determine, independent of information supplied by industrial users,compliance with applicable pretreatment standards. The Permittee must: a. Inspect all Significant Industrial Users (SIUs) at least once per calendar year;and b. Sample all Significant Industrial Users (SIUs) at least twice per calendar year for all permit- limited pollutants, once during the period from January 1 through June 30 and once during the period from July 1 through December 31, except for organic compounds which shall be sampled once per calendar year; 8. SIU Self Monitoring and Reporting The Permittee shall require all industrial users to comply with the applicable monitoring and reporting requirements outlined in the Division approved pretreatment program, the industry's pretreatment permit, or in 15A NCAC 2H .0908. 9. Enforcement Response Plan (ERP) The Permittee shall enforce and obtain appropriate remedies for violations of all pretreatment standards promulgated pursuant to section 307(b) and (c) of the Clean Water Act (40 CFR 405 et. seq.), prohibitive discharge standards as set forth in 40 CFR 403.5 and 15A NCAC 2H .0909, and specific local limitations. All enforcement actions shall be consistent with the Enforcement Response Plan (ERP) approved by the Division. 10. Pretreatment Annual Reports (PAR) The Pernuttee shall report to the Division in accordance with I SA NCAC 2H .0908. In lieu of submitting annual reports, Modified Pretreatment Programs developed under 15A NCAC 2H .0904 (b) may be required to meet with Division personnel periodically to discuss enforcement of pretreatment requirements and other pretreatment implementation issues. For all other active pretreatment programs, the Permittee shall submit two copies of a Pretreatment Annual Report (PAR) describing its pretreatment activities over the previous twelve months to the Division at the following address: NC DENR / DWQ / Pretreatment Unit 1617 Mail Service Center Raleigh,NC 27699-1617 These reports shall be submitted according to a schedule established by the Director and shall contain the following: a.) Narrative A brief discussion of reasons for, status of, and actions taken for all Significant Industrial Users (SIUs) in Significant Non-Compliance (SNC); b.) Pretreatment Program Summary (PPS) A pretreatment program summary (PPS) on specific forms approved by the Division; c.) Significant Non-Compliance Report (SNCR) The nature of the violations and.the actions taken or proposed to correct the violations on specific forms approved by the Division; d.) Industrial Data Summary Forms (IDSQ Version 6/20/2003