HomeMy WebLinkAboutNC0001422_Effluent Channel Fish Screen Proposal_20160506 ste:a DUKE L.V.Sutton Energy Complex 801 Sutton Steam Plant Rd ENERGY® Wilmington, NC 28401 PROGRESS o.910.341.4750 t.910.341.4790 June 3, 2016 Certified Mail#7012 1640 0000 4619 8245(2 copies) Mr. Eric Fleek NCDE OSciences Section, Biological Assessment Branch REc NEDir aItoDEQ'DVdR Water 1621 Mail Service Center 0 & 215 Raleigh, NC 27699-1621 }UN water Subject: Duke Energy Progress, LLC ,9 Section L. V. Sutton Energy Complex NPDES Permit NC0001422 Effluent Channel Fish Screen Proposal Dear Mr. Fleek: Perm In accordance with the requirements of the NPDES permit for the L.V. Sutton Energy Complex (Sutton), Duke Energy Progress, LLC (Duke Energy) hereby submits the attached proposed design for a fish screen in our effluent channel. This submittal is required by section A(9), Note 5, of our NPDES permit which became effective on December 7, 2015. Note 5 of Section A(9) requires that "The facility shall install a screen or barrier at the end of the Effluent Channel to minimize fish migration into the Channel. The design of the screen/barrier shall be submitted to the Division for approval no later than 6 months from the effective date of the permit. The screen/barrier shall be installed no later than 6 months after Division approval." As you are aware, Duke Energy is required by the Coal Ash Management Act to close the two Sutton ash ponds by August 2019. Closure of these ponds will be accomplished by excavating and removing the ash to offsite locations and/or a proposed onsite landfill. The effluent channel, which conveys wastewater from the Sutton Plant to the cooling pond (Sutton Lake) is flanked on either side by legacy ash disposal areas. Full excavation of the ash will require that the portions of the berms on either side of the effluent channel be removed and rebuilt. Significant work will be performed within the effluent channel itself, including barge and equipment access. Current proposals include the construction of sheet piling walls within the channel to facilitate full ash removal. Due to the extent and complexity of these activities, and the urgency and priority with which Duke Energy must perform the excavation activities, Duke Energy requests that the Division allow the installation of a fish barrier after pond closure is complete and the effluent channel has been re-established. Once you have had an opportunity to review this submittal, we would request the opportunity to meet with you to discuss the proposal, the ash excavation activities, and any other questions you may have. Duke Energy remains committed to safely closing ash basins at all of our North Carolina sites. We look forward to continuing to work with staff from your agency in a collaborative manner to facilitate this work. L.V.Sutton Electric Plant NPDES Permit NC0001422 Effluent Channel Fish Screen Proposal Page 2 of 2 If there are any questions on this submittal, please contact either: • Ms. Toya Ogallo, Environmental Specialist at our North Carolina Regional Headquarters, phone (919) 546-6647 or email Letoya.Ogallo@duke-energy.com, or • Mr. Kent Tyndall, Environmental Professional for the L. V. Sutton Energy Complex Plant; phone (910) 341-4775 or e-mail Kent.Tyndall@duke-eneray.com. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Sincerely, nit 6' It Jesse E. Huntley, II Station Manager Enclosures cc: Sergei Chernikov, NCDEQ, NPDES Complex Permitting Unit Jim Gregson, Supervisor, Surface Water Protection Section, Wilmington Regional Office \ '' / \\ \ '‘.\\,'',„ / /. i i • • FUTURE BOAT / °\‘' P, BARRIER / NOTES: (OPTIONAL) , / # .\ 1.EXISTING GRADE AND BATHYMETRY DATA IS APPROXIMATE / AND COMPILED FROM MULTIPLE SOURCES.UPDATED SURVEY GN CHANNEL MARKER / �\ ' 2.ELEVATIONS IS REQUIRED 3HOOWN ARE NAVDR TO FINAL 188 BASED BODY (TYP.)-1 \\ 3.EFFLUENT CHANNEL DISCHARGE IS 288 MGD(446 CFS) �� 4# .\ '-'1'"::::-.\__‘,, \ 4.WATER LEVELS:MAX.EL. 10.5 FT MSL.,MIN.EL.8.5 FT MSL 0 \ \ • , \\�� 5.APPROACH DESIGN VELOCITIES:0.3 FT/SEC TO 0.4 FT/SEC SUTTON / \ . {lb' APPROX. FUTURE TEMPORARY �` 6.ESTIMATED FISH EXCLUSION:3!4 INCH BAR MESH WILL •44 (..._COOLING / SHEET PILE, BY OTHERS FOR ASH EXCLUDE FISH 4 INCH IN LENGTH AND LARGER ASSUMING FISH POND ,�---^-, / • POND PROJECT � `\� GIRTH OF 2.5 INCHES AND LARGER ~ice\ \� '\ DEPTH INDICATOR ,'``.[: -P I 111 A 4 BODY (TYP.) % _: v `'� '�0 !`. �--. \� l co BARRIER �.\ '- FFFC ``�\ NET ��' ....„.E.,..3:-..., O094 7. �� E APPROX. ����� \ I EDGE OF ','z...>::-..„ �_� a WATER (TYP.) � � C\ APPROX. EXISTING L_ 0 , / PIPE CROSSING Is 3 1 Al GENERAL ARRANGEMENT PLAN [q r 0 30 60 Z i 11 C 184'± W 1 / APPROX. FUTURE TEMPORARY R WINCH NET DROP LINES SUPPORT CABLE CHANNEL MARKER BOUY SHEET PILE, BY OTHERS FOR Q 24 ! g _ ASH POND PROJECT L 20 16 ---- "°" °ii�i■i ■....--- pisiE- - ..■..iiii: • �z 12 ---- - ' . U UUUUIUUUUUU.UI.iU.U. iiiiiiii�i�I UIIu ..._...�-_....,,....�,....I� �- _-e •::.... _a_. _:::_:_i -- - .�srr�sa�ss_Tsssassssss_s.,sas ss.�ss.=s.-=s•. =r- - - -- - i1i._.. A�t ....._�_-- • g w s-•e-•-•- s-•-c•-.-•v.•--•-a v••••v•••14V•AW, •-••8.'3 i i?'c•s••d. — • •"• ' _..---- - %1---- — 2 O 8 ..--- --__II MI�iw�i�i�i�•w�i�Di�`�w!i�w•iiwHi�w� ►w>i�i�iiiii�i�i�i�i�i�i!�i�w•i�i�wF►•i�w�4•i�6lw�Ow�w�w��w�w�i�ii��w•i�i�i�i l� �'A_�i iRi►w!i�'.�- �`� _ ' ——.. p� •i9Lllli•�L'i'�ilw/wTi!i!i:•li!•!ii!i!i!w!ii'OiTw!wTi!�il.Ti4!i!i!i!.!►T.•I�ii!i!i!i!�i !i•.!i�!w!!i!.•i OC 0t1 J 11: 04.4_•I•i!w•i•wi�•W W W WIi•w•i A,OWA1• •'••• • •• 4• ••i..••AAO.0, w• O pp[[J EXtTMI G . '`••.�.H.w.�.•.�.w.r.....A4A,.�.�J;!>t ll� NYl!!1....- U a'w -4 -"t..,.f.$A•.b+►❖.•.o•..•.b❖.i.:.!I�::I_ •? -- -- -- _ - -—- -8 ---- --- -- GRACE - - ----- ---- - Zd=z +3► 100 90 8' 71 60 50 40 30 20 11 ' 10 20 30 40 i 60 70 80 90 100 110 120 130 140 150 W li 4 z SOUTH EFFLUENT NET ANCHOR BLOCK HORIZONTAL WEIGHT POST CONSTRUCTION NORTH EFFLUENT (��w CHANNEL BANK (TYP.) 4: LINE (TYP.) NET EXTENSION- 3/4" CHANNEL BANK -+W BAR MESH MAIN EFFLUENT CHANNEL BARRIER NET- 3/4" BAR MESH OA BARRIER NET ELEVATION `` 3163515170N DO NOT USE FOR CONSTRUCTION [qI 0 10 20 Efra.ft o. FOR REGULATORY REVIEW ONLY C-I ` swr 2 of 3 7 SUPPORT CABLE DETAIL CABLE TO NET 16 DROP LINE 16 H 9.0 DEPTH INDICATOR DEPTH INDICATOR H 12 BUOY 12 BUOY ' V �� x---- MHW EL. 10.5 FT T - _ 1 _ • MHW EL. 10.5 FT g_ 1 BARRIER 8 • NET i ) 4 FLOW + 4 FLOW —� k —► ; WEIGHT CHAIN ,, WEIGHT CHAIN (TYP.) I u 0 �� (TYP.) 0 NET SUPPORT WINCH °� xI J BARRIER 10,000 Lb = 4 1 BOTTOM SKIRT/SEAL 4 _ NET 7.5 HP t 3 ` 1 Fpox. EFFLUENT APPROX. EFFLUENT CONCRETE 230V, 3 PH '" a1 8 CHANNEL BOTTOM 8 CHANNEL BOTTOM BLOCK SANCHOR BLOCK SOUTH G BARRIER NET SECTION-RAISED POSITION © BARRIER NET SECTION-LOWERED POSITION ; s 3 0 - g _ a o J L Z m � W 9'O H :ARRIER NET SUPPORT CABLE a R i (pir1 a NET SPECIFICATIONS: , Li ET DROP LINE 1.MESH 3/4"BAR,320 LB BREAKING STRENGTH -o Q 2. MATERIAL ULTRA-HIGH MOLECULAR WEIGHT > i POLYETHYLENE FIBER(DYNEEMA SK 75) x w \'') Z Z ill o p DZ 7\___ �ETARRIER o uQ EMBEDDED o m U CY Cw ANCHBOLT OR CONCRETE w z BLOCK ® O o DETAIL w o F t! ANCHOR BLOCK NORTH n w 0 CI) >i J W 4 31635UTTOto DO NOT USE FOR CONSTRUCTION FOR REGULATORY REVIEW ONLY Orm ing No C-2 ` sheet 3 13 R u a Duke EnergyCorporation ... . ...,„ ,...., • ,__., • .. • .....„.., L. V. SUTTON ENERGY COMPLEX „, .. .ii a a EFFLUENT CHANNEL BARRIER NET z, .... c... 1 A .� .� NPDESPERMITNC000] 422 1 1 OUTFALL 0081 VICINITY MAP } V P • '"is ♦ a ,cio\ , `-:-.4 O 3 D O \ •:• J . . . \•- Z 'il •T; , * • r Iii 1 i L. L. " �.h APPROXIMATE PROPOSE ❑ a 1ph--- .. .i ”' BARRIER NET LOCATION EFFLUENT CHANNEL + '�' i` i, J OUTFALL 008 "` 4 ►� �. ra � • FFA • az w ' 7C }m ti ' � �r .acp * a • x r B �F< z z • n �D AERIAL SIIL AERIAL DETALL r gabNumber' 1 DO NOT USE FOR CONSTRUCTION 3 I 63SU1TON FOR REGULATORY REVIEW ONLY rDraw ng No: T-I ` IL Sheet 1 13