Loading...
HomeMy WebLinkAbout20080748 Ver 1_More Info Received_20080707Environmental Consultants, PA Road • Raleigh, North Carolina 27614 • Phone: (919) 846-5900 • Fax: (919) 846-9467 Division of Water Quality Attn: Cyndi Karoly/Ian McMillan 2321 Crabtree Boulevard Suite 250 Raleigh, NC 27604 July 7, 2008 U ?( -il-21115 1 EC Project # 11025.W1 15 DWQ No. # 08-0748 JUL 7 2008 DENR - WATER OUAUTY WETLANDS AND STORMWATER BRANCH Re: Reply to the Division of Water Quality's 05/01/08 request for additional information Creekside Village Wake County, North Carolina Dear Ms. Karoly and Mr. McMillan: This letter is in response to your letter dated May 1, 2008 which requested additional information for the proposed Creekside Village. The following restates your questions/comments and is then followed by our response. Additional Information Requested 1. Diffuse Flow and Buffer Authorization: a. Please submit bypass channel design information. Channel capacity and riprap lining material shall be designed for the 10 year storm. Please use the precipitation intensity corresponding to the time of concentration (5minutes) but not the 24-hour storm to estimate the peak flow rate. b. Please use discharge rate from the dry pond to size the level spreaders, and split the flows to the level spreaders if dB-80 servers that purpose. This will help avoid very long level spreaders that are difficult to install. Mr. Patrick Perez (Project Engineer with John A. Edwards & Co.) explained the following in recent correspondence: La. Bypass channel design calculations attached. The channel was designed for the 10 yr storm flow leaving pond through Riser #2 through FES #82. By routing the 16yr storm (Intensity = 7.22 in/hr) flow through pond, flow through fes-82 yields 45.0 cfs. Charlotte Office: Greensboro Office: 236 LePhillip Court, Suite C 3817-E Lawndale Drive Concord, NC 28025 Greensboro, NC 27455 Phone: (704) 720-9405 Phone: (336) 540-8234 Fax: (704) 720-9406 Fax: (336) 540-8235 b. The Level spreaders was sized based on the the first flush (1') flow to the dry pond (18cfs to 9cfs/level spreader). Then Pond riser #1 was sized to convey 18cfs to FES83184. See attached calcs for level spreader sizing. Attached please find the appropriate calculations and diagrams. Please feel free to call me if you require any further explanation. Sincerely, r...,_.._ Nicole J. Thomson Regulatory Specialist Attachments: 5 copies of Response letter 5 copies of level spreader and dry pond calculations and diagrams cc: Ms. Lauren Witherspoon, DWQ Raleigh Regional Office .. iVTL?1V5 iT r' = Ike 0. LO c.?s //7 m ok- l -"-,4v rM 7&-14e /2r?-?s?, uCa zo -? ,ova r-Rw-sr.C. ?iS?-? ' s 5 r?.c3D TO eaIvey ,c?2sr ,??vsff 7* ?cdv? 5rxpenmoe sprt T7z-;g &ox ?J13 - BD, . 7ffuS MAX l--r aw r° ?rg`eo = 18e.A 04L g Gcduc? 5¢?-?4 . a4sw- **--Z is -517-Lm -r-o coN V-K IN - S(---E ATr-s'C.KmtZWfS po? 3`?PASS ?- av N t? %>tm4r4. Emm!E E rR?i o?, BRIDGE TECHNOLOGIES, LLC. 1.800-344-2102 NORTH AMERICAN GREEN EROSION CONTROL MATERIALS DESIGN SOFTWARE VERSION 4.3 NORTH AMERICAN GREEN CHANNEL PROTECTION - ENGLISH/S.I. USER SPECIFIED CHANNEL LINING BACK-UP COMPUTATIONS PROJECT NAME: Creekside Village PROJECT NO.: COMPUTED BY: Patrick Perez DATE: 6/27/2008 FROM STATION/REACH: TO STATION/REACH: DRAINAGE AREA: DESIGN FREQUENCY: INPUT PARAMETERS Channel Discharge : 45.0 cfs (1.27 MA 3/s) Peak Flow Period : 0.083 hours Channel Slope : 0.01 ft/ft (0.01 m/m) Channel Bottom Width : 10.0 ft (3.05 m) Left Side Slope :21 Right Side Slope :2:1 Channel Lining : Rock Riprap 13in Permi. Shear(Tp) :4.33 psf (207.5 Pa) Phase = 0 CALCULATIONS Initial Depth Estimate = 0.16 * (45.0 /(0.01010.5))10.375 = 1.58 ft (.48 m) Final Channel Depth (after 8 iterations) = 1.81 ft (0.55 m) Flow Area = (10.0 * 1.8)+(0.5 *1.81^2 * (2.0+2.0)) = 24.6 sq.ft (2.3 m^2) Wet Per. =10.0 +(1.8*(((2.OA2)+1)^.5 +((2.0"2)+1)^.5)) = 18.1 ft (5.5 m) Hydraulic Radius = (24.6 / 18.1) = 1.4 ft (0.4 m) Channel Velocity =(1.48610.100)*(1.4^0.667)*(0.010^.5) = 1.8 fps (0.6 m/s) Channel Effective Manning's Roughness = 0.100 Calculated Shear (Td) = 62.4 * 1.81 * 0.010 = 1.13 psf (53.9 Pa) Safety Factor = (Tp/Td) _ (4.33 /1.13) = 3.85 odhAmericanGrmn- ECMDS Vasion4.3 7/2008 Q06AMCOMPUTED BY: Patrick Perez PROJECT NAME: DeekoldeViace OJECT NO.: ROMSTATIONIREACH: ITOSTATION/REACH ! DRAINAGE AREA: ESIGNFREQUENCY: HYDRAULIC RESULTS Discharge Peak Flow Vebciy(fps ArmIsaN) Hydraulic Namal R°d`Rpap(n-0'1001 Period s Red3 k D N 455. .0 0.1 1.83 24.58 1.36 1.81 S-0.0100 1 'width =1QgON1 Not to Scale Reach Mat" Type labily Anays' Vegetatrm Cheacterishos PemissLb Calculated Safely Factor Remarks Staple Pattem Phase Gass Type DensRy Shear Stress (1131) Sheaf Stress (psf) Straight RockRpap Umegetated 4.33 1.13 3.85 STABLE 13in Back 1.I P S Sc,-